CN102979540A - 锚网钩接链网方法 - Google Patents

锚网钩接链网方法 Download PDF

Info

Publication number
CN102979540A
CN102979540A CN2012105195844A CN201210519584A CN102979540A CN 102979540 A CN102979540 A CN 102979540A CN 2012105195844 A CN2012105195844 A CN 2012105195844A CN 201210519584 A CN201210519584 A CN 201210519584A CN 102979540 A CN102979540 A CN 102979540A
Authority
CN
China
Prior art keywords
anchor net
anchor
stubble
net
nets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105195844A
Other languages
English (en)
Inventor
王强
付志亮
和卢斌
孙义
李永军
王亮
高鸿
王新丰
Original Assignee
王强
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王强 filed Critical 王强
Priority to CN2012105195844A priority Critical patent/CN102979540A/zh
Publication of CN102979540A publication Critical patent/CN102979540A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及矿山巷道支护领域,用于锚网间的连接。目前矿井锚网索支护巷道锚网链接时,搭接处受巷道围岩压力易变形。本发明直接利用锚网纵筋茬(3)、锚网横筋茬(5)与锚网钩接扳手(1),钩接链网。两锚网的重合长度比原来减少2/3,节约锚网使用数量。使用锚网纵筋茬(3)、锚网横筋茬(5)链接链网,即使在地压较大处,也不易变形鼓起,增大了巷道断面,提高了巷道的支护强度。

Description

锚网钩接链网方法
技术领域
[0001] 本发明涉及矿山巷道支护领域,用于锚网之间的连接。
背景技术
[0002]目前,煤矿井下锚网索支护巷道,锚网链接处受围岩应力影响地压较大时,极易变形鼓起。这样,减小了巷道断面,支护强度也不足。而且,两锚网搭接使用铁丝链接,两锚网重合长度在300mm左右,造成材料浪费。
发明内容
[0003] 为了克服上述现有技术的不足,本发明提供了一种锚网钩接链网方法。
[0004] 本发明所采用的技术方案是:利用锚网茬和锚网钩接扳手,把两锚网链接在一起。
[0005] 与现有技术相比,本发明的有益效果是:(1)利用锚网茬链接链网提高了巷道的支护强度,增大了巷道断面。(2)直接利用锚网茬链接,节约锚网使用数量。(3)使用锚网茬的链接强度,远大于铁丝链接的强度。
附图说明
[0006] 图I为锚网钩接链网方法图。
[0007] 图中,锚网钩接扳手(I)、横筋(2)、锚网纵筋茬(3)、纵筋(4)、锚网横筋茬(5)、手柄(6)、套孔(7)。
具体实施方式
[0008] 下面结合附图对本发明进一步说明。
[0009] 锚网横向布置钩接时,锚网长边与巷道中线垂直,先将锚网I与锚网3短边的两根横筋(2)紧挨在一起,利用锚网纵筋茬(3)将锚网I与锚网3钩接在一起。
[0010] 锚网纵向布置,即两循环之间接茬处的钩接,先将锚网I与锚网2长边的两根纵筋
(4)紧挨在一起,利用锚网横筋茬(5)将锚网I与锚网2钩接在一起。钩接的端头要基本平齐,钩接要严实、有力。
[0011] 两片金属网片安放在确定的位置后,手握锚网钩接扳手(I)的手柄(6),将锚网钩接扳手(I)上的套孔⑵套在锚网纵筋茬(3)、锚网横筋茬(5)的底部;
[0012] 以锚网钩接链网扳手为支点,用力向下按手柄(6),使锚网纵筋茬(3)、锚网横筋茬(5)向下折弯;
[0013] 从锚网纵筋茬(3)、锚网横筋茬(5)取下锚网钩接扳手(I),将锚网钩接扳手(I)翻转180°后,锚网钩接扳手(I)上的套孔(7)再次套在折弯的锚网纵筋茬(3)、锚网横筋茬(5)底部;
[0014]以锚网钩接链网扳手(I)为支点,用力向下按手柄(6),使锚网纵筋茬(3)、锚网横筋茬(5)弯成180°与锚网重叠在一起。此时,完成一处的钩接工序。

Claims (9)

1.锚网钩接链网方法,其特征在于:使用锚网钩接扳手(I)与锚网纵筋茬(3)将锚网I、锚网3连接的方法。
2.锚网钩接链网方法,其特征在于:使用锚网钩接扳手(I)与锚网横筋茬(5)将锚网I、锚网2连接的方法。
3.根据权利要求I所述的方法,其特征在于:矿井锚网索支护巷道锚网链接,搭接链网处围岩受压变形鼓起时,使用锚网钩接链网方法。
4.根据权利要求I所述的方法,其特征在于:锚网横向布置钩接时,锚网长边与巷道中线垂直,先将锚网I与锚网3短边的两根横筋(2)靠住,使用锚网纵筋茬(3)把锚网I与锚网3钩接在一起。
5.根据权利要求I所述的方法,其特征在于:锚网纵向布置钩接时,先将锚网I与锚网2长边的两根纵筋(4)靠住,利用锚网横筋茬(5)将锚网I与锚网2钩接在一起。
6.根据权利要求3或4所述,其特征在于:将两片金属网片安放到位后,手握锚网钩接扳手(I)的手柄(6),把锚网钩接扳手上的套孔(7)套在锚网纵筋茬(3)、锚网横筋茬(5)的底部。
7.根据权利要求5所述的方法,其特征在于:以锚网钩接扳手(I)为支点,用力向下按手柄(6),使锚网纵筋茬(3)、锚网横筋茬(5)向下折弯。
8.根据权利要求6所述的方法,其特征在于:取下锚网钩接扳手(1),将锚网钩接扳手(I)翻转180°,再次套在折弯的锚网纵筋茬(3)、锚网横筋茬(5)上。
9.根据权利要求7所述的方法,其特征在于:以锚网钩接扳手(I)为支点,向下用力按锚网钩接扳手(1),使锚网纵筋茬(3)、锚网横筋茬(5)弯成180°与锚网重叠在一起,完成一处的钩接工序。
CN2012105195844A 2012-12-06 2012-12-06 锚网钩接链网方法 Pending CN102979540A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105195844A CN102979540A (zh) 2012-12-06 2012-12-06 锚网钩接链网方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105195844A CN102979540A (zh) 2012-12-06 2012-12-06 锚网钩接链网方法

Publications (1)

Publication Number Publication Date
CN102979540A true CN102979540A (zh) 2013-03-20

Family

ID=47853857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105195844A Pending CN102979540A (zh) 2012-12-06 2012-12-06 锚网钩接链网方法

Country Status (1)

Country Link
CN (1) CN102979540A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397893A (zh) * 2013-08-12 2013-11-20 四川广旺能源发展(集团)有限责任公司唐家河煤矿 巷道支护用防护网以及支护系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2707965Y (zh) * 2004-12-10 2005-07-06 郭国政 井巷支护工钢圆对棚
CN2866020Y (zh) * 2005-12-23 2007-02-07 枣庄矿业(集团)有限责任公司田陈煤矿 煤矿锚网握钩器
CN101260719A (zh) * 2008-04-11 2008-09-10 山东龙新建材股份有限公司 一种网架预制复合板、夹芯楼板及其连接施工方法
CN202228094U (zh) * 2011-09-14 2012-05-23 鞍钢集团矿业公司 用于井下巷道的锚网支撑器
CN102562093A (zh) * 2012-02-21 2012-07-11 山东盛大矿业股份有限公司 全长锚固密集型树脂锚杆喷锚网支护方法
CN102677826A (zh) * 2012-05-25 2012-09-19 江西中联建设集团有限公司 一种马凳筋及应用方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2707965Y (zh) * 2004-12-10 2005-07-06 郭国政 井巷支护工钢圆对棚
CN2866020Y (zh) * 2005-12-23 2007-02-07 枣庄矿业(集团)有限责任公司田陈煤矿 煤矿锚网握钩器
CN101260719A (zh) * 2008-04-11 2008-09-10 山东龙新建材股份有限公司 一种网架预制复合板、夹芯楼板及其连接施工方法
CN202228094U (zh) * 2011-09-14 2012-05-23 鞍钢集团矿业公司 用于井下巷道的锚网支撑器
CN102562093A (zh) * 2012-02-21 2012-07-11 山东盛大矿业股份有限公司 全长锚固密集型树脂锚杆喷锚网支护方法
CN102677826A (zh) * 2012-05-25 2012-09-19 江西中联建设集团有限公司 一种马凳筋及应用方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397893A (zh) * 2013-08-12 2013-11-20 四川广旺能源发展(集团)有限责任公司唐家河煤矿 巷道支护用防护网以及支护系统

Similar Documents

Publication Publication Date Title
CN201368828Y (zh) 相似模拟实验架加载装置
CN102733836A (zh) 软弱特厚煤层综放回采巷道支护方法
CN102979540A (zh) 锚网钩接链网方法
CN204436419U (zh) 简易临时液压超前支护装置
CN203925532U (zh) 一种巷道用工字钢架
CN201560781U (zh) 半煤岩沿空留巷巷道支护装置
CN202250210U (zh) 矿用多功能刮板机辅助机具
CN201943721U (zh) 掘进工作面锚杆支护前探梁
CN203891905U (zh) 无腿棚支架
CN202970747U (zh) 一种中空锚注矿用锚索
CN204524118U (zh) 一种煤矿用纵横金属平焊网加工器
CN203321553U (zh) 锚网钩接扳手
CN206015677U (zh) 一种锚杆对中支架
CN204877513U (zh) 新型矿用双u型钢带托板顶板支护装置
CN203022774U (zh) 煤矿井下巷道顶板新型t形棚
CN103883342B (zh) 带反底拱连锁装置的u型钢刚性连接支架及其施工方法
CN204527942U (zh) 皮带支架上设置的物料架
CN203248174U (zh) 底拱连锁梁
CN202900296U (zh) 一种让压免张拉预应力锚索
CN202325551U (zh) 矿用支护钢带
CN205576190U (zh) 高炉铁口组合砖固定装置
CN103758539A (zh) 一种用于锚注支护的钢带
CN207393847U (zh) 一种用于大倾角长距离输送带快速溜放的夹具
CN207245003U (zh) 一种梁下脱缝钢板悬挂结构
CN203730017U (zh) 一种矿用圆角梯形支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130320