CN102953410A - System for integrally recycling clean wastewater inside and outside building - Google Patents
System for integrally recycling clean wastewater inside and outside building Download PDFInfo
- Publication number
- CN102953410A CN102953410A CN2012100728950A CN201210072895A CN102953410A CN 102953410 A CN102953410 A CN 102953410A CN 2012100728950 A CN2012100728950 A CN 2012100728950A CN 201210072895 A CN201210072895 A CN 201210072895A CN 102953410 A CN102953410 A CN 102953410A
- Authority
- CN
- China
- Prior art keywords
- valve
- storage tank
- water
- building
- waste water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
- Domestic Plumbing Installations (AREA)
Abstract
The invention provides a system for integrally recycling clean wastewater inside and outside a building. The system for integrally recycling clean wastewater inside and outside the building consists of an underground water storage tank, a ground water storage tank, upper and lower water dividing sliding valves, an inclined water collection hopper, a motor immersible pump, a sleeve pipeline, a filtering deslagging abutting disinfectant tank, an overflow valve and a switching circuit, as well as upper and lower water dividing sliding valves, another filtering deslagging abutting disinfectant tank, a water storage tank, a motor water pump, a circulating pipeline and a remote control switching circuit. The improvements are shown in that the upper and lower water dividing sliding valves are additionally arranged so as to separate the clean wastewater from sewage from the source; the filtering deslagging abutting disinfectant tanks are additionally arranged to ensure the quality of the clean wastewater; the inclined water collection hopper is additionally arranged, so that the clean wastewater is collected to the circulating pipeline; and the cleaning wastewater is firstly stored for use indoors through the ground water storage tank, the underground water storage tank and the water storage tank outside the building. Excessive water flows out of the building through the overflow valve for adjustment, so that the integrated circulation system is realized. The existing huge reclaimed water circulating system is omitted. The integrated circulating system is low in manufacture cost, and convenient and reliable to transform and mount. The system is applied to daily life so as to achieve the purposes of saving water and reducing emission for a long time. A single water tank and the circulating system of the whole building are suitable for establishing and improving of new and old buildings, and usable for factories, hospitals, hotels, public toilets and individual families.
Description
Technical field
The present invention relates to economize on water, the waste water overall circulation system of wastewater treatment, in a kind of building in the particularly suitable life under the various architectural environments, clean the recycling of waste water total system outside the building, this device relate to family, hotel, restaurant, factory, hospital, etc. the waste water integral body cycling and reutilization of enterprise and institution.
Background technology
In the waste water that life utilization consumes, there is quite a few water to be still the waste water of cleaning, can also recycle.In today of science and technology prosperity, the condition that each fresh water has concerned human survival is saved in the increase that urban water use is a large amount of.Consumption to water purification is human waste to water resource, increases again expense.Be the consumption of alternative this part water purification, and reduce the discharging of sewage, the mixed flow that solves cleaning waste water and sewage is crucial, generally adopt at present huge middle water recycle equipment, produce cleaning waste water in the water of mixed flow, increase thus the cost that utilizes of cleaning waste water, inconvenience is applied.For solving the mixed flow of cleaning waste water and sewage, in existing patented technology 87206469 following improvement is arranged, adopt two circulation lines, adopt the floor drain of the dull and stereotyped valve plate of the left and right upset of diplopore to separate the waste water of sewage and cleaning, or No. 200620047037, patent, the conversion electromagnetic valve guiding valve is installed below floor drain pipe is made cleaning waste water and sewage reach shunting.The improvement of this technology because not too adapting to existing living water use facility, does not obtain social recognition and extensively promotes.Or in existing 200820141224.4 patents, adopt the shunting of " fourth " circular hole shunt valve, though obtained approval.But also can further improve in the shunting of shunt valve and water and the mouth of pipe of water, this technology is the improvement for this partial monopoly.
Summary of the invention
This invention forms in a kind of building, cleans the waste water overall circulation system outside the building, and this technology further remedies the deficiency of the system's adjusting of cleaning waste water circulation and recycling, and concrete technological invention thes contents are as follows:
In the building of the present invention, clean the waste water overall circulation system outside the building, by storage tank between ground (1), ground storage tank (+1) and bushing pipeline (42), circulation line (2), two position four-way valves (3) with switching valve, motor submersible pump (5), oblique drip pan (14), filter deslagging docking disinfect box (7), screen pack (16), upper minute neatly valve (8), under divide neatly valve (9), sensor (11), microswitch (12), remote control switching circuit (10), water flushing tap (17), overflow valve (21), motor and water pump (18), electromagnetic valve (4), conversion electromagnetic valve (6), storage tank (19), roof storage tank (20) formation that communicates, this invention is that the whole five kinds of circulation forms of this cleaning waste water all adopt a minute neatly valve (8), under a minute neatly valve (9) be installed in bathtub, wash basin or washroom, on on the washing bay and the ground, inner tube links to each other with inner tube (1) and the existing soil pipe of bushing pipeline (42) on its valve, outer tube is connected with the outer tube (2) of bushing pipeline (42) and at outer tube oblique drip pan (14) is housed, tiltedly drip pan (14) is connected with circulation line (2) again, docks disinfect box (7) with the filtration deslagging again, storage tank between ground (1) or ground storage tank (+1) connect.Motor submersible pump (5) in storage tank, two position four-way valves (3) with switching valve, three-way valve (49) connection washroom water flushing tap (17) and toilet form the circulation of two kinds of independent water tank cleaning waste water again; Or the overflow valve on storage tank (21) again, is connected with the motor and water pump (18) in circulation line (2) and conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7), storage tank (19) and the roof storage tank (20) in parallel, connects to form and the circulation form of two kinds of full building overflow complementations through the circulating system of electromagnetic valve (4) and front two kinds of water tanks again; Or through upper minute neatly valve (8), divide the inner tube (1) of neatly valve (9), bushing pipeline (42) still to link to each other with existing soil pipe down.Outer tube is connected with outer tube, use again oblique drip pan (14) to be connected with filtration deslagging docking disinfect box (7) with bushing pipeline (42), or directly dock disinfect box (7) with the filtration deslagging of conversion electromagnetic valve (6) and parallel connection, storage tank (19), roof storage tank (20) connects, and directly connect three-way valve (49) and be communicated with washroom water flushing tap (17) and toilet, form Simple cleaning waste water circulation, in these five kinds of buildings, clean waste water circulation outside the building, all adopt sensor (11), microswitch (12), remote control switching circuit (10) control consists of in a kind of building, clean the waste water overall circulation system outside the building.
In this building, clean the primary invention of waste water overall circulation system outside the building, be that a minute neatly valve (8) is by guiding valve (27) on the band valve plate, be contained in the outer seat (28), guiding valve (27) is made double side on its band valve plate, the inwall of inner side edge outer wall and outer seat (28) inner tube slides, outer side edges outer wall and outer seat (28) outer tube wall slides, have the notch that leaks (25) on it and screen pack (16) is installed, double side adopts the sealing of " O " RunddichtringO, the valve plate that upset valve plate or machinery lift is housed on the guiding valve (27) on the band valve plate, after being connected with the inner tube (1) of bushing pipeline (42), inner tube directly is connected with the raw sewage pipe, sewage flows into foul sewer system, guiding valve (27) slides up and down on the band valve plate, cleaning waste water is between the notch that leaks (25) on the outer side edges flows to inner tube and outer tube: the outer tube of outer seat (28) is connected with the outer tube of bushing pipeline (42), is with on the valve plate on the guiding valve (27), the shunting of cleaning waste water and sewage has been finished in lower motion and valve plate upset.
Invent again in addition in a kind of building, clean lower minute neatly valve (9) of waste water overall circulation system outside the building, to be contained in the slide valve seat (22) by upper guiding valve (23), guiding valve on it (23) is made double side, inner side edge inwall and slide valve seat (22) outer wall of inner tube slides, the outer side edges outer wall slides with band valve plate slide valve seat (22) outer tube wall, have the notch that leaks (25) on it and fill screen pack (16), double side all adopts the sealing of " O " RunddichtringO, the valve plate that upset valve plate or machinery lift is housed on the slide valve seat (23), its inner tube is connected and connects soil pipe with the inner tube (1) of bushing pipeline (42), outer tube is connected with the outer tube (2) of bushing pipeline (42), upper guiding valve (23) upper, lower slider can flow between outer tube and inner tube through the notch that leaks (25) on the outer side edges cleaning waste water: on the valve plate on this slide valve seat (22), under lift with valve plate upset and make sewage get back to soil pipe, finished the shunting of cleaning waste water and sewage.
More than upper and lower minute neatly valve (8), (9) of two kinds of inventions finished cleaning waste water in the waste water and the shunting of sewage.
Secondly according in a kind of building, clean the instructions for use of waste water overall circulation system water outside the building, invented again the filtration deslagging docking disinfect box (7) that is contained on the circulation line.Left side welding 2 water inlets (32) and the backhand welding of its case (26) connect a delivery port (31), and respectively with bushing pipeline (42), circulation line (2) connects and communicates, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9), bushing pipeline (42), tiltedly drip pan (14) flows in the front case (26-1) that filters deslagging docking disinfect box (7), again through case inner filtration sterilization slag discharge plate (29) sterilization, flow in the rear cabinet (30), finished again purification and the sterilization of circulation cleaning waste water.In order to guarantee its normal operation, the lower floor that will filter on the deslagging docking disinfect box (7) is made 10 degree that turn forward, the centre will be divided into front case (26-1) with rear cabinet (30) and communicate with filtering sterilization slag discharge plate (29) on the case (26), the below is the passage of scum pipe (36), residue is discharged through scum pipe (36) and slag-drip opening (35), slag-drip opening is sealing at ordinary times, the residue of front case (26-1) is changed and is removed residue when filtering sterilization slag discharge plate (29) by the seal cover on the case (37).
Invent again at bushing pipeline (42) inner tube (1) pipe outer lower end cover the oblique drip pan of dustpan box-like (14) and sealing are arranged, be connected sealing with bushing pipeline (42) outer tube above it, tiltedly drip pan (14) is front makes circular delivery port, delivery port links to each other with circulation line (2), bushing pipeline (42) inner tube (1) word is housed outward or A-frame is fixed in the outer tube (2), and with upper minute neatly valve (8), under divide neatly valve (9) inner tube to connect, directly connect again soil pipe, divide neatly valve outer tube to be connected with the outer tube (2) of bushing pipeline (42), guarantee cleaning waste water and sewage separation.
In another building, clean the waste water overall circulation system outside the building and adopt storage tank (1) and ground storage tank (+1) between ground, mounted motor submersible pump (5), overflow valve (21) in it, communicate with two position four-way valves (3) of switching valve and with motor submersible pump (5), rotate this valve and finish and inwardly draw water and outside water supply, rely on control circuit finish cleaning waste water overall circulation system storage tank inwardly with outwards water storage and water supply.Storage tank is installed in washroom or the kitchen or under the ground surface and between the waterproofing course on the structure precast plate.
According to the invention of the difference of structure original paper: in bathtub, wash basin or washroom, washing bay and minute neatly valve (8) is installed on ground, divide neatly valve (9), inner tube still to pass through bushing pipeline (42) inner tube (1) down links to each other with existing soil pipe.Bushing pipeline (42) inner tube (1) pipe outer lower end cover has the oblique drip pan of dustpan box-like (14) and sealing, is connected sealing with bushing pipeline (42) outer tube above it.Tiltedly drip pan (14) is front makes circular delivery port, and delivery port links to each other with circulation line (2).Bushing pipeline (42) links to each other with filtration deslagging docking disinfect box (7) with circulation line (2) respectively with oblique drip pan (14), be mounted on again storage tank (1) and ground storage tank (+1) between the ground in washroom and kitchen, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, sewage flows directly into plumbing drain, the oblique drip pan (14) of cleaning waste water on bushing pipeline (42), circulation line (2) is connected with filtration deslagging docking disinfect box (7), store in storage tank (1) or the ground storage tank (+1) between the inflow place more again, the motor submersible pump (5) in it is installed again, two position four-way valves (3) with switching valve, the three-way valve (49) that connects connects the toilet of water flushing tap (17) and washroom again, if rotating two position four-way valves (3) with switching valve in it finishes in storage tank and draws water and outside water supply, these two kinds of circulations are two water tank circulation forms that make separately the separate cleaning waste water overall circulation system of storage tank between land used (1) or ground storage tank (+1) composition, this circulation is subjected to sensor (11), microswitch (12), remote control switching circuit (10) control can claim in a kind of building, clean the circulation of two kinds of self-contained water tanks of waste water overall circulation system outside the building.
And according to the invention of the difference of structure original paper: install a minute neatly valve (8), lower minute neatly valve (9) on bathtub, wash basin or washroom, washing bay and ground, its inner tube is passed through bushing pipeline (42) inner tube (1) and is still linked to each other with existing soil pipe, bushing pipeline (42) inner tube (1) pipe outer lower end cover has the oblique drip pan of dustpan box-like (14) and sealing, is connected sealing with bushing pipeline (42) outer tube above it.Tiltedly drip pan (14) is front makes circular delivery port, and delivery port links to each other with circulation line (2).Bushing pipeline (42) and oblique drip pan (14) be respectively with circulation line (2) with filter deslagging docking disinfect box (7) and link to each other, and is mounted on storage tank (1) and ground storage tank (+1) between the ground in washroom and kitchen again.Cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, sewage flows directly into plumbing drain, cleaning waste water is through bushing pipeline (42), tiltedly drip pan (14) and filtration deslagging docking disinfect box (7) and circulation line (2) store in storage tank (1) or the ground storage tank (+1) between the inflow place again, the motor submersible pump (5) in it is installed again, two position four-way valves (3) with switching valve, three-way valve (49) connects the toilet of water flushing tap (17) and washroom, if rotating two position four-way valves (3) with switching valve in it finishes in storage tank and draws water and outside water supply, this is self-contained water tank cleaning waste water circulation, owing to superfluous water in relief valve (21) storage tank has been installed again through overflow valve (21) in the storage tank, conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7) in parallel arrive in the storage tank (19), controlled by control circuit, make motor and water pump (18) work that is installed in roof, cleaning waste water is flow in the roof storage tank (20) to be stored, use again storage tank (1) or ground storage tank (+1) between the ground in circulation line (2) the connection building, return storage tank between ground (1) or ground storage tank (+1) storage through electromagnetic valve (4) and water pressure, for water flushing tap (17) and toilet, in the building of composition, clean the again circulation of two kinds of full building overflow complementations of the whole circulation of waste water outside the building.
In the difference invention that has according to the structure original paper, install a minute neatly valve (8), lower minute neatly valve (9) on bathtub, wash basin or washroom, washing bay and ground, its inner tube still links to each other with existing soil pipe by bushing pipeline (42) inner tube (1).Bushing pipeline (42) inner tube (1) pipe outer lower end cover has the oblique drip pan of dustpan box-like (14) and sealing, is connected sealing with bushing pipeline (42) outer tube (2) above it.Tiltedly drip pan (14) is front makes circular delivery port, and delivery port links to each other with circulation line (2).Bushing pipeline (42) links to each other with filtration deslagging docking disinfect box (7) with circulation line (2) respectively with oblique drip pan (14), or directly link to each other with the filtration deslagging docking disinfect box (7) of conversion electromagnetic valve (6) parallel connection, the storage tank (19) that then connects, be connected with roof storage tank (20) with circulation line (2), directly be connected with three-way valve (49) in the building again, be connected with toilet with washroom water flushing tap (17) again, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, through bushing pipeline (42), oblique drip pan (14), flow directly in the circulation line (2), flow in the storage tank (19) through conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7) in parallel again, controlled by control circuit, make motor and water pump (18) work that is installed in roof, cleaning waste water flows in the roof storage tank (20) and stores, be connected with toilet with washroom water flushing tap (17) again with circulation line (2) connecting tee valve (49), cleaning waste water relies on self pressure directly to supply washroom water flushing tap (17) and toilet, and this forms in the economy building, clean the most easy circulation of waste water overall circulation system outside the building.
Five kinds of circulation forms have consisted of in a kind of building of the present invention, have cleaned the waste water overall circulation system outside the building, (Fig. 1).
Following advantage is arranged behind employing the present invention:
Easy upper minute neatly valve (8) is installed, is divided neatly valve (9) shunting down, will clean the artificial shunting of wastewater sources out.Make water obtain fully rationally utilizing, next makes oblique drip pan (14), filters deslagging docking disinfect box (7) water of shunting is guaranteed.This system adopts engineering to expect, also relatively is convenient to install, and has saved manufacturing cost.When this valve is widely used in family, the sewage outlet place of factory is installed in again shunting oil and water place.After hospital, enterprise and institution use, make the cleaning waste water of purification again obtain utilizing, also obtained corresponding water saving simultaneously, reduce discharging waste water.The water recycling will become a kind of sign of social civilization.In addition, this system adopts filters the cleaning quality that deslagging docking disinfect box (7) has guaranteed cleaning waste water, flows back to the pollution that the circulating system has prevented transmission of disease and environment after sterilization.Have again overflow valve (21), between the reasonable combination of storage tank (1), ground storage tank (+1), electromagnetic valve (4), circulation line (2), Quan Lou, the whole circulating water saving system of full factory's cleaning waste water are become a reality.Removed wetting system in the huge recycling from, adopted family, factory, hospital, the business unit of this system to obtain immediately good economic effect, and be that society brings huge economic and social profit.
Description of drawings
In a kind of building of Fig. 1, clean the waste water overall circulation system outside the building
Minute neatly valve (8) on Fig. 2
Minute neatly valve (8) schematic diagram on Fig. 2-1
Lower minute neatly valve (9) of Fig. 3
Fig. 3-1 time minute neatly valve (9) schematic diagram
Fig. 4 filters deslagging docking disinfect box (7)
Fig. 4-1 filters deslagging docking disinfect box (7) schematic diagram
The oblique drip pan of Fig. 5 (14)
Fig. 5-1 is drip pan (14) schematic diagram tiltedly
Fig. 6 bushing pipeline (42)
Fig. 6-1 bushing pipeline (42) elevation
Fig. 6-2 bushing pipeline (42) elevation
The circulation of storage tank between the ground among Fig. 7 (1)
The circulation of Fig. 8 ground storage tank (+1)
The circulation of the full building of the cleaning waste water overflow complementation that storage tank between Fig. 9 ground (1) and overflow valve (21) form
The circulation of the full building of the cleaning waste water overflow complementation that Figure 10 ground storage tank (+1) and overflow valve (21) form
In the simplest and easy a kind of building of Figure 11, clean the circulation of waste water overall circulation system outside the building
The specific embodiment
In a kind of building of implementing according to the part among Fig. 1, Fig. 2, Fig. 2-1, Fig. 3, Fig. 3-1, Fig. 4, Fig. 4-1, Fig. 5, Fig. 5-1, Fig. 6, Fig. 6-1, Fig. 6-2, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, clean the circulation of waste water overall circulation system outside the building.According to three different concrete structures, form into the enforcement that is combined in five buildings, cleans the whole endless form of waste water outside the building, concrete embodiment is as follows.
Implementation of the present invention is made a minute neatly valve (8), lower minute neatly valve (9) by (Fig. 2, Fig. 2-1 schematic diagram, Fig. 3, Fig. 3-1 schematic diagram), is installed on bathtub, wash basin or washroom, the washing bay to reach on the ground.Upward the upper guiding valve (27) of minute neatly valve (8) is made double side, be contained in the slide valve seat (28), the inner side edge outer wall cooperates slip with slide valve seat (28) inner tube wall, the outer side edges outer wall cooperates slip with slide valve seat (28) outer tube wall, all adopts the sealing of " O " shape sealing ring.Have leak-off chute (25) on upper guiding valve (27) outer side edges, and dress screen pack (16); Or make down a minute neatly valve (9) by (Fig. 3, Fig. 3-1 schematic diagram) invention, be installed on bathtub, wash basin or washroom, the washing bay and reach on the ground.Upper guiding valve (23) is made double side, is contained in the slide valve seat (22), and the inner side edge inwall cooperates slip with slide valve seat (22) outer wall of inner tube.The outer side edges outer wall cooperates slip with slide valve seat (22) outer tube wall.Have leak-off chute (25) on upper guiding valve (23) outer side edges, and dress screen pack (16).Cleaning waste water flows between the interlayer of inner tube and outer tube through leak-off chute (25) when mentioning.The upper end inner tube (1) of bushing pipeline (42) is connected with slide valve seat (28), (22) inner tube, and the outer tube of slide valve seat (28), (22) is connected with the outer tube (2) of bushing pipeline (42).
Then carry out, implement by (Fig. 4, Fig. 4-1 schematic diagram), make and filter deslagging docking disinfect box (7).Make two water inlets (32) on this case (26), connect with upper minute neatly valve (8) or the lower minute circulation line (2) that be connected of neatly valve (9) and be connected with washing machine.In the upper end of filtering sterilization slag discharge plate (29) oblique cutting cartonning (26), be divided into front case (26-1) and rear cabinet (30), sealing cover (37) is housed on it, be convenient to change filtration sterilization slag discharge plate (29) and get rid of with slag.Delivery port (31) has been installed in the back of rear cabinet (30) and circulation line (2) is connected on storage tank between ground (1) or the ground storage tank (+1), or connection is docked on the front pipeline of storage tank (19) of disinfect box (7) with the filtration deslagging of conversion electromagnetic valve (6) parallel connection.Filtering deslagging connects lower floor on the disinfect box (7) 10 degree that turn forward and is convenient to deslagging, have precipitation scum pipe (36) at filtration sterilization slag discharge plate (29), the vibration of water makes sediment deposit to forward slag-drip opening (35) and locates, manually open the slag-drip opening (35) of sealing, make residue and precipitation flow into soil pipe.When cleaning waste water through shunting, again after bushing pipeline (42), oblique drip pan (14) flow into and filter deslagging docking disinfect box (7), sterilize the after filtration again purification of slag discharge plate (29) in the phase (30), has been finished further purification after being flowed into by front case (26-1).Flowing forward in the slope of sediment at the bottom of case, collects by scum pipe (36) passage, flows into plumbing drain after opening slag-drip opening (35).Water is purified sterilization, has finished systematic collection and the purification of cleaning waste water.Then, cleaning waste water flows in the storage tank via circulation line (2), or flow in the storage tank (19) through conversion electromagnetic valve (6) filtration deslagging docking disinfect box (7) in parallel, via motor and water pump (18) work of control circuit control, flow in the roof storage tank (20) again.This circulation is subjected to sensor (11), microswitch (12), remote control switching circuit (10) control.
Secondly by the enforcement of (Fig. 5, Fig. 5-1 schematic diagram), make pipe outer lower end and sealing that the oblique drip pan of dustpan box-like (14) is enclosed within bushing pipeline (42) inner tube (1).Be connected sealing above it with outer tube.Tiltedly drip pan (14) is front makes circular delivery port, delivery port links to each other with circulation line (2), the below is connected with filtration deslagging docking disinfect box (7), cleaning waste water through shunting flows in the circulation line (2) that is connected and docks in the disinfect box (7) with the filtration deslagging, between the inflow place in storage tank (1) or the ground storage tank (+1), finished the shunting of sewage with cleaning waste water again.
In addition, in implementing in the above, need to press (Fig. 6), (Fig. 6-1), (Fig. 6-2) schematic diagram are made pipe (2) and are enclosed within pipe (1) outside, and middle employing one word or triangle travel(l)ing rest support inner tube (1) or be made as fixedly integral support support.Upper end inner tube (1) is connected with upper and lower minute neatly valve (8), the slide valve seat (28) of (9), (22) inner tube, outer tube (2) is connected with slide valve seat (28), (22) outer tube, lower end inner tube (1) is connected sealing with soil pipe, the outer tube sealing that is connected with oblique drip pan (14), cleaning waste water flows between the interlayer of inner tube and outer tube, makes sewage separate to flow with cleaning waste water and is guaranteed.
Independent case the first implementation method of the circulation of storage tank (1) between the concrete family's land used that adopts among Fig. 1:
At first by minute neatly valve (8) in the partial graph (Fig. 2, Fig. 2-1 schematic diagram) of (Fig. 1), (Fig. 3, Fig. 3-1 schematic diagram) manufacturings, a minute neatly valve (9) is installed on bathtub, wash basin or washroom, the washing bay and reaches on the ground down.Upper and lower minute neatly valve (8), (9), lifting or depress with the upset of valve plate sewage and cleaning effluent segregation of it: or by (Fig. 3, Fig. 3-1) makes lower guiding valve (9), it lift or depress with the upset of valve plate equally with sewage and cleaning effluent segregation.The upper end inner tube (1) of bushing pipeline (42) is connected with slide valve seat (22), slide valve seat (28) inner tube, the outer tube of slide valve seat (22,28) is connected with the outer tube (2) of bushing pipeline (42), and the lower end links to each other with oblique drip pan (14).Sewage through shunting directly flows into plumbing drain through the inner tube (1) of inner tube and bushing pipeline (42).The cleaning waste water of shunting flows in the middle of the inner tube and outer tube interlayer of bushing pipeline (42).This bushing pipeline (42) is made by (Fig. 6, Fig. 6-1), outer tube (2) is enclosed within the outside of inner tube (1), a middle word or the triangle travel(l)ing rest of adopting supports inner tube (1), or is fixedly integral support support, and sewage and cleaning effluent segregation are guaranteed.
Secondly again by (Fig. 5, Fig. 5-1) makes the oblique drip pan (14) of dustpan box-like, be enclosed within bushing pipeline (42) inner tube (1) outer lower end and sealing, outer tube is connected with circuits (42) outer tube (2) and seals, and inner tube (1) is connected with soil pipe.Tiltedly drip pan (14) is front has made round delivery port, and delivery port links to each other with circulation line (2).The below is connected with filtration deslagging docking disinfect box (7), and this filtration deslagging docking disinfect box (7) is to make by (Fig. 4, Fig. 4-1).This case (26) left side is made two water inlets (32) and is connected with the washing machine drainage mouth with circulation line (2).And with filtering in sterilization slag discharge plate (29) the oblique cutting cartonning (26), be divided into front case (26-1) and rear cabinet (30), and sealing cover (37) is housed on it, be convenient to change filtration sterilization slag discharge plate (29) and scarfing cinder.Rear cabinet (30) has been installed delivery port (31) and has been connected with circulation line (2), is connected on the storage tank between ground (1).At this moment, the cleaning waste water of shunting flows into circulation line (2) through the oblique delivery port of drip pan (14) again and docks with the filtration deslagging and be purified in the disinfect box (7) and sterilize, in the storage tank (1), the motor submersible pump (5) of installation exports with the port on circulation line (2) the connecting tee valves (49) between last inflow place.The another port still links to each other with pure water pipe.Connect again toilet and flushing valve (17).When toilet or flushing valve (17) water, work with sensor (11) and microswitch (12) remote control switching circuit (10) on the interior float-controlled valve support of toilet via being installed in water flushing tap (17), connect the power supply of the motor submersible pump (5) on the storage tank.The pump of storage tank between ground (1) is to water supply such as toilet and flushing valves.Storage tank between ground (1) is installed under rest room or the kitchen ground surface and between the waterproofing course on the structure precast plate or under the car wash site.The cleaning waste water of upper and lower minute neatly valve (8), (9) shunting replenishes in the storage tank (1) between the inflow place endlessly.This is the first implementation method that (Fig. 1) partial graph adopts separately storage tank between a land used (1):
Adopt independent the second implementation method of (Fig. 8) domestic storage tank (+1) circulation:
Equally at first by minute neatly valve (8) in (Fig. 2, Fig. 2-1 schematic diagram) of (Fig. 8), (Fig. 3, Fig. 3-1) manufacturings, a minute neatly valve (9) is installed on bathtub, wash basin or washroom, the washing bay and reaches on the ground down.Make a minute neatly valve (8) by (Fig. 2), it lift or depress upset with valve plate with sewage and clean effluent segregation.Or make down a minute neatly valve (9) by (Fig. 3, Fig. 3-1), it lift or depress with the upset of valve plate equally with sewage with clean effluent segregation.Cleaning waste water flows between the interlayer of inner tube and outer tube through leak-off chute (25) when mentioning.The upper end inner tube (1) of bushing pipeline (42) is with upper minute neatly valve (8), slide valve seat (28, the 22) inner tube of minute neatly valve (9) is connected down, the outer tube of slide valve seat (28,22) is connected with the outer tube of bushing pipeline (42), the lower end links to each other with the oblique drip pan of dustpan box-like (14), is connected on the circulation line (2) through the circle delivery port.Sewage through shunting directly flows into plumbing drain through the inner tube (1) of inner tube and bushing pipeline (42).The cleaning waste water of shunting flows in the middle of the inner tube and outer tube interlayer of bushing pipeline (42).This bushing pipeline (42) is to make by (Fig. 6 Fig. 6, Fig. 6-1,6-2 schematic diagram), and outer tube (2) is enclosed within inner tube (1) outside, and a middle word or the triangle travel(l)ing rest of adopting supports inner tube, or is that fixedly integral support supports.Sewage and cleaning effluent segregation are guaranteed.
Secondly again by (Fig. 5, Fig. 5-1 schematic diagram) the oblique drip pan of dustpan box-like (14) of making, be enclosed within bushing pipeline (42) inner tube (1) outer lower end and sealing, outer tube is connected with bushing pipeline (42) outer tube (2) and seals, and inner tube (1) is connected with soil pipe.Tiltedly drip pan (14) is front has made round delivery port, delivery port links to each other with circulation line (2), the below is connected with filtration deslagging docking disinfect box (7), and this filtration deslagging docking disinfect box (7) is to make by (Fig. 4, Fig. 4-1 schematic diagram).Two water inlets (32) are installed on this case (26) left side to be connected with the washing machine drainage mouth with circulation line (2).And with filtering in sterilization slag discharge plate (29) the oblique cutting cartonning (26), be divided into front case (26-1) and rear cabinet (30), and sealing cover (37) is housed on it, be convenient to change filtration sterilization slag discharge plate (29) and scarfing cinder.A delivery port (31) has then been installed on the right side, back of rear cabinet (30), connects with circulation line (2), is connected on the ground storage tank (+1).At this moment, the delivery port of the oblique drip pan (14) of cleaning waste water warp of shunting flows into circulation line (2) again and docks in the disinfect box (7) with the filtration deslagging, make cleaning waste water further be purified and sterilize, in the last inflow surface storage tank (+1).The port of motor submersible pump (5) outlet of installing in the ground storage tank (+1) on circulation line (2) the connecting tee valves (49), the another port still links to each other with pure water pipe.Be connected with toilet, flushing valve (17) again.When toilet or flushing valve (17) water, work with sensor (11) and microswitch (12), remote control switching circuit (10) on the interior float-controlled valve support of toilet via being installed in water flushing tap (17), connect the power supply of the motor submersible pump (5) on the storage tank.The pump of ground storage tank (+1) outwards supplies water, different is when ground storage tank (+1) water level is higher than the water level of circulation line (2), need be rotatably installed in two position four-way valves (3) of the band conversion on the water tank sidewall to suction condition, control again the power work of motor submersible pump (5), at this moment changed by the flow direction of circulation line (2) water of two position four-way valves (3) reversal connection, motor submersible pump this moment (5) is through the counter earthward additional water inlet of storage tank (+1) of filtration deslagging docking disinfect box (7) that is contained on the circulation line (2).The cleaning waste water that divides neatly valve (9) shunting when upper minute neatly valve (8), down through bushing pipeline (42), tiltedly drip pan (14), circulation line (2), filter deslagging docking disinfect box (7) and replenish in the inflow surface storage tank (+1) endlessly and intake.This is the third implementation method that adopts separately ground storage tank (+1) circulation.
:
Full building adopts between ground storage tank (1) overflow complementary (Fig. 9) the third implementation method that circulates:
At first press in (Fig. 2, Fig. 2-1 schematic diagram), (Fig. 3, Fig. 3-1 schematic diagram) manufacturing of Fig. 9 minute neatly valve (8), (9) be installed on bathtub, wash basin or washroom, the washing bay and ground on.Make a minute neatly valve (8) by (Fig. 2, Fig. 2-1 schematic diagram), it lift or depress upset with valve plate with sewage and clean effluent segregation.Or make down a minute neatly valve (9) by (Fig. 3, Fig. 3-1 schematic diagram), it lift or depress with the upset of valve plate equally with sewage with clean effluent segregation.When mentioning, cleaning waste water flows between the interlayer of inner tube and outer tube through leak-off chute (25).The upper end inner tube (1) of bushing pipeline (42) is connected with upper and lower slide valve seat (28,22) inner tube, the outer tube of slide valve seat (28,22) is connected with the outer tube (2) of bushing pipeline (42), the lower end links to each other with the oblique drip pan of dustpan box-like (14), and the sewage through shunting directly flows into plumbing drain through the inner tube of inner tube and bushing pipeline (42).The cleaning waste water of shunting flows in the middle of the inner tube and outer tube interlayer of bushing pipeline (42).This bushing pipeline (42) is to make by (Fig. 6, Fig. 6-1, Fig. 6-2 schematic diagrames), and outer tube (2) is enclosed within inner tube (1) outside, and a middle word or the triangle travel(l)ing rest of adopting supports inner tube, or is that fixedly integral support supports.Sewage and cleaning effluent segregation are guaranteed.
Secondly the oblique drip pan of dustpan box-like (14) of making by (Fig. 5, Fig. 5-1 schematic diagram) again is enclosed within bushing pipeline (42) inner tube (1) outer lower end and sealing, outer tube and bushing pipeline (42).Pipe (2) connects and sealing, and inner tube (1) is connected with soil pipe.The oblique drip pan of dustpan box-like (14) is front has made round delivery port, delivery port links to each other with circulation line (2), the below is connected with filtration deslagging docking disinfect box (7), and this filtration deslagging docking disinfect box (7) is to make by (Fig. 4, Fig. 4-1 schematic diagram).Two water inlets of system (32) are connected with the washing machine drainage mouth with circulation line (2) on this case (26) left side.And with filtering in sterilization slag discharge plate (29) the oblique cutting cartonning (26), be divided into front case (26-1) and rear cabinet (30), and sealing cover (37) is housed on it, be convenient to change filtration sterilization slag discharge plate (29) and scarfing cinder.The back of rear cabinet (30) has been installed a delivery port (31) and has been connected with circulation line (2), filtration deslagging docking disinfect box (7), is connected on the storage tank between ground (1).At this moment, the cleaning waste water of shunting flows into circulation line (2) through the oblique delivery port of drip pan (14) again and dock in the disinfect box (7) with filtering deslagging, makes to clean waste water and be purified and sterilize, at last between the inflow place in the storage tank in (1).The outlet of the motor submersible pump (5) of installing in the storage tank between ground (1) links to each other with a port of three-way valve (49) with circulation line (2), and the another port still links to each other with pure water pipe, is connected with toilet, flushing valve (17) again.When toilet or flushing valve (17) water, via being installed in water flushing tap
(17) with toilet in sensor (11) and microswitch (12) remote control switching circuit (10) work on the float-controlled valve support, the power supply of the motor submersible pump (5) on the connection storage tank.The pump of storage tank between ground (1) outwards supplies water, and guarantees the waters such as toilet and flushing valve.Storage tank between ground (1) is installed under rest room or the kitchen ground surface and between the waterproofing course on the structure precast plate, or under the car wash site.Through upper minute neatly valve (8), divide the cleaning waste water of neatly valve (9) shunting additional storage tank (1) between the inflow place endlessly down.Different is, when cistern water level is higher than the water level that is installed in storage tank between ground (1) overflow valve (21), cleaning waste water automatically flows into through this valve and installs in the filtration deslagging docking sterilizing tube (7) that connects, or in the filtration deslagging docking disinfect box (7) of inflow by conversion electromagnetic valve (6) parallel connection, then flow into again the storage of beautifying the environment in the interior storage of the storage tank (19) that is connected or the pond, ground.Sensor (11) above storage tank (20), microswitch (12), remote control switching circuit (10) work, make upper motor and water pump (18) work of roof storage tank (20), cleaning waste water enters in the roof storage tank (20) for subsequent use, with circulation line (2) with roof storage tank (20) be installed in the upper electromagnetic valve (4) of storage tank between ground (1) and link to each other, electromagnetic valve (4) control has been finished in the export-oriented building, building and has been cleaned replenishing of waste water to storage tank between ground (1) automatic water-supply.Cleaning waste water by upper minute neatly valve (8), down minute neatly valve (9) shunting can flow in the storage tank between ground (1) endlessly.Overflow valve (21) also can overflow automatically simultaneously, gets back in the storage tank (19).Cleaning waste water is again through roof control circuit and motor and water pump
(18) work, it is for subsequent use to make cleaning waste water deposit roof storage tank (20) in.Through electromagnetic valve (4) work, make storage tank between ground again
(1) obtains the replenishing of cleaning waste water of roof storage tank (20).This is the third implementation method that (Fig. 9) full building adopts the full building overflow complementary cycle of storage tank (1) between ground.
Full building adopts the 4th kind of implementation method of ground storage tank (+1) overflow complementary (Figure 10) circulation:
At first by (Figure 10); (Fig. 2, Fig. 2-1 schematic diagram), (Fig. 3, Fig. 3-1 schematic diagram) make upper and lower minute neatly valve (8), (9) be installed on bathtub, wash basin or washroom, the washing bay and ground on.Make a minute neatly valve (8) by (Fig. 2, Fig. 2-1 schematic diagram), it lift or depress upset with valve plate with sewage and clean effluent segregation.Or make down a minute neatly valve (9) by (Fig. 3, Fig. 3-1 schematic diagram), it lift or depress with the upset of valve plate equally with sewage with clean effluent segregation.。Cleaning waste water flows between the interlayer of inner tube and outer tube through leak-off chute (25) when mentioning.The upper end inner tube (1) of bushing pipeline (42) is connected with slide valve seat (28,22) inner tube, is connected with soil pipe again.The outer tube of slide valve seat (28,22) is connected with the outer tube of bushing pipeline (42), and its lower end links to each other with oblique drip pan (14).Sewage through shunting directly flows into plumbing drain through the inner tube (1) of inner tube and bushing pipeline (42).The cleaning waste water of shunting flows in the middle of the inner tube and outer tube interlayer of bushing pipeline (42).This bushing pipeline (42) is to make by (Fig. 6, Fig. 6-1, Fig. 6-2 schematic diagrames), and outer tube (2) is enclosed within inner tube
(1) outside, a middle word or the triangle travel(l)ing rest of adopting supports inner tube, or is that fixedly integral support supports.Sewage and cleaning effluent segregation are guaranteed.
Secondly again by (Fig. 5, Fig. 5-1 schematic diagram) the oblique drip pan of dustpan box-like (14) of making, be enclosed within the connection of bushing pipeline (42) inner tube (1) outer lower end and sealing, outer tube is connected with bushing pipeline (42) outer tube (2) and seals, and inner tube (1) is connected with soil pipe.Tiltedly drip pan (14) is front has made round delivery port, delivery port links to each other with circulation line (2), the below is connected with filtration deslagging docking disinfect box (7), and this filtration deslagging docking disinfect box (7) is to make by (Fig. 4, Fig. 4-1 schematic diagram).Making two water inlets (32) on this case (26) is connected with the washing machine drainage mouth with circulation line (2).And with filtering in sterilization slag discharge plate (29) the oblique cutting cartonning (26), being divided into front case (26-1) and rear cabinet (30), its case is equipped with sealing cover on (26)
(37), be convenient to change filtration sterilization slag discharge plate (29) and scarfing cinder.The back of rear cabinet (30) has been installed a delivery port (31) and has been connected with circulation line (2), is connected on the ground storage tank (+1), or is mounted on the storage tank outside the building (19).At this moment, the cleaning waste water of shunting flows into circulation line (2) through the oblique delivery port of drip pan (14) again and dock in the disinfect box (7) with filtering deslagging, makes to clean waste water and be purified and sterilize, at last in the inflow surface storage tank (+1).Motor submersible pump (5) outlet of installing in the ground storage tank (+1) links to each other with a port of three-way valve (49) with circulation line (2), and the another port still links to each other with pure water pipe.Connect again toilet or flushing valve (17), during water, work with sensor (11) and microswitch (12) remote control switching circuit (10) on the interior float-controlled valve support of toilet via being installed in water flushing tap (17), connect the power supply of the motor submersible pump (5) on the storage tank.The motor submersible pump (5) of ground storage tank (1) supplies water to water flushing tap (17) and toilet, different is when ground storage tank (+1) water level is higher than the water level of circulation line (2), need be rotatably installed in two position four-way valves (3) of the band conversion on the water tank sidewall to suction condition, control again the power work of motor submersible pump (5), at this moment changed by the flow direction of circulation line (2) water of two position four-way valves (3) reversal connection, motor submersible pump this moment (5) is through the counter earthward additional water inlet of storage tank (+1) of filtration deslagging docking disinfect box (7) that is contained on the circulation line (2).The cleaning waste water that divides neatly valve (9) shunting when upper minute neatly valve (8), down through bushing pipeline (42), tiltedly drip pan (14), circulation line (2), filter deslagging docking disinfect box (7) water and replenish in the inflow surface storage tank (+1) endlessly and intake.
Be not both overflow valve (21) and can automatically overflow yet, get back in the storage tank (19).Through the work of roof control circuit, work again by the upper motor and water pump (18) that connects of roof storage tank (20) for cleaning waste water, and it is for subsequent use that cleaning waste water deposits roof storage tank (20) in.The again work of the upper electromagnetic valve (4) of ground storage tank (+1) in the building adds in the building in the ground storage tank (+1) the cleaning waste water of roof storage tank (20).This be by (Figure 10) with ground storage tank (+1) a kind of building in, clean the 4th kind of implementation method of the full building overflow of waste water overall circulation system complementary cycle outside the building.
Adopt in a kind of building that (Figure 11) implement, clean the circulation of waste water overall circulation system outside the building.At first by minute neatly valve (8) in (Fig. 2, Fig. 2-1 schematic diagram), (Fig. 3, Fig. 3-1 schematic diagram) manufacturings, a minute neatly valve (9) is installed in and reaches ground on bathtub, wash basin or washroom, the washing bay down.Make a minute neatly valve (8) by (Fig. 2, Fig. 2-1 schematic diagram), it lift or depress upset with valve plate with sewage and clean effluent segregation.Or make down a minute neatly valve (9) by (Fig. 3, Fig. 3-1 schematic diagram), it lift or depress with the upset of valve plate equally with sewage with clean effluent segregation.When mentioning, cleaning waste water flows between the interlayer of inner tube and outer tube through leak-off chute (25).The upper end inner tube (1) of bushing pipeline (42) and slide valve seat (28), (22) inner tube connects, and the outer tube of slide valve seat (28,22) is connected with the outer tube (2) of bushing pipeline (42).The lower end links to each other with oblique drip pan (14).Sewage through shunting directly flows into plumbing drain through the inner tube of inner tube and bushing pipeline (42).The cleaning waste water of shunting flows in the middle of the inner tube and outer tube interlayer of bushing pipeline (42).This bushing pipeline (42) is by (Fig. 6.Fig. 6-1) make, outer tube (2) is enclosed within inner tube (1) outside, and a middle word or the triangle travel(l)ing rest of adopting supports inner tube (1), or is made as fixedly integral support support.Sewage and cleaning effluent segregation are guaranteed.
Secondly again by (Fig. 5, Fig. 5-1) the oblique drip pan of dustpan box-like (14) of making, be enclosed within bushing pipeline (42) lower end, outer tube is connected sealing with outer tube, inner tube also is enclosed within bushing pipeline (42) inner tube (1) outside and sealing, tiltedly drip pan (14) is front has made round delivery port, delivery port links to each other with circulation line (2), the below is connected with filtration deslagging docking disinfect box (7), this filtration deslagging docking disinfect box (7) is to make by (Fig. 4, Fig. 4-1 schematic diagram).Making two water inlets (32) on this case (26) left side is connected with the washing machine drainage mouth with circulation line (2).And with filtering in the oblique cutting cartonning of sterilization slag discharge plate (29), be divided into front case (26-1) and rear cabinet (30), and sealing cover (37) is housed on it, be convenient to change filtration sterilization slag discharge plate (29) and scarfing cinder.The back of rear cabinet (30) has been installed a delivery port (31) and has been connected with circulation line (2), directly is mounted on conversion electromagnetic valve (6) the filtration deslagging docking disinfect box (7) and storage tank (19) in parallel again.At this moment, the cleaning waste water of shunting flows into circulation line (2) through the oblique delivery port of drip pan (14) again and docks in the disinfect box (7) with filtering deslagging, makes to clean waste water and be purified and sterilize.Or flow directly in the filtration deslagging docking disinfect box (7) that connects conversion electromagnetic valve (6) parallel connection, then flow into the storage of beautifying the environment in the storage tank (19) that is connected or in the pond, ground.Sensor (11) above roof storage tank (20), microswitch (12), remote control switching circuit (10) work, upper motor and water pump (18) work of installing of storage tank (20), cleaning waste water enters in the roof storage tank (20) for subsequent use, roof storage tank (20) directly uses a port of the three-way valve (49) at each family in circulation line (2) and the building to link to each other, and the another port still links to each other with pure water pipe.Be connected with toilet or flushing valve (17) again.When toilet or flushing valve (17) water, cleaning waste water relies on gravity to supply water from trend toilet or flushing valve (17) in the roof storage tank (20).This is to form in the Simple cleaning waste water building by (Figure 11), clean the most easy the 5th kind of embodiment of the whole circulation of waste water outside the building.
Five kinds of circulation forms have formed in a kind of building, clean the waste water overall circulation system outside the building.
Claims (10)
1. in the building, clean the waste water overall circulation system outside the building, by storage tank between ground (1), ground storage tank (+1) and bushing pipeline (42), circulation line (2), two position four-way valves (3) with switching valve, motor submersible pump (5), oblique drip pan (14), filter deslagging docking disinfect box (7), screen pack (16), upper minute neatly valve (8), under divide neatly valve (9), sensor (11), microswitch (12), remote control switching circuit (10), water flushing tap (17), overflow valve (21), motor and water pump (18), electromagnetic valve (4), conversion electromagnetic valve (6), storage tank (19), roof storage tank (20) composition that communicates, it is characterized in that the whole five kinds of circulation forms of this cleaning waste water all adopt a minute neatly valve (8), under divide neatly valve (9), at first with sewage and cleaning shunting, and be installed in bathtub, wash basin or washroom, on on the washing bay and the ground, inner tube links to each other with inner tube (1) and the existing soil pipe of bushing pipeline (42) on its valve, outer tube is connected with the outer tube (2) of bushing pipeline (42) and at outer tube oblique drip pan (14) is housed, and connect with circulation line (2), dock disinfect box (7) with the filtration deslagging again, storage tank between ground (1) or ground storage tank (+1) connect, the motor submersible pump (5) in storage tank again, two position four-way valves (3) with switching valve, three-way valve (49) connects washroom water flushing tap (17) and toilet, forms the circulation of two kinds of independent water tank cleaning waste water; Or the overflow valve on storage tank (21) again, is connected with the motor and water pump (18) in circulation line (2) and conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7), storage tank (19) and the roof storage tank (20) in parallel, connects to form and the circulation form of two kinds of full building overflow complementations through the circulating system of electromagnetic valve (4) and front two kinds of water tanks again; Or through upper minute neatly valve (8), under divide neatly valve (9), the inner tube (1) of bushing pipeline (42) still links to each other with existing soil pipe, outer tube is connected with outer tube, use again oblique drip pan (14) to be connected with filtration deslagging docking disinfect box (7) with bushing pipeline (42), circulation line (2) directly docks disinfect box (7) with the filtration deslagging of conversion electromagnetic valve (6) and parallel connection, storage tank (19), roof storage tank (20) connects, and directly connect three-way valve (49) and be communicated with washroom water flushing tap (17) and toilet, form Simple cleaning waste water circulation, in these five kinds of buildings, clean waste water circulation outside the building, all adopt sensor (11), microswitch (12), remote control switching circuit (10) control consists of in a kind of building, clean the waste water overall circulation system outside the building.
2. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that a minute neatly valve (8) is by guiding valve (27) on the band valve plate, be contained in the outer seat (28), guiding valve (27) is made double side on its band valve plate, the inwall of inner side edge outer wall and outer seat (28) inner tube slides, outer side edges outer wall and outer seat (28) outer tube wall slides, have the notch that leaks (25) on it and screen pack (16) is installed, double side adopts the sealing of " 0 " RunddichtringO, the valve plate that upset valve plate or machinery lift is housed on the guiding valve (27) on the band valve plate, after being connected with the inner tube (1) of bushing pipeline (42), inner tube directly is connected with the raw sewage pipe, sewage flows into foul sewer system, guiding valve (27) slides up and down on the band valve plate, cleaning waste water is between the notch that leaks (25) on the outer side edges flows to inner tube and outer tube: the outer tube of outer seat (28) is connected with the outer tube of bushing pipeline (42), is with on the valve plate on the guiding valve (27), the shunting of cleaning waste water and sewage has been finished in lower motion and valve plate upset.
3. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that lower minute the neatly valve (9) be to be contained in the slide valve seat (22) by upper guiding valve (23), guiding valve on it (23) is made double side, inner side edge inwall and slide valve seat (22) outer wall of inner tube slides, the outer side edges outer wall slides with band valve plate slide valve seat (22) outer tube wall, have the notch that leaks (25) on it and fill screen pack (16), double side all adopts the sealing of " 0 " RunddichtringO, the valve plate that upset valve plate or machinery lift is housed on the slide valve seat (23), its inner tube is connected and connects soil pipe with the inner tube (1) of bushing pipeline (42), outer tube is connected with the outer tube (2) of bushing pipeline (42), upper guiding valve (23) upper, lower slider can flow between outer tube and inner tube through the notch that leaks (25) on the outer side edges cleaning waste water: on the valve plate on this slide valve seat (22), under lift with valve plate upset and make sewage get back to soil pipe, finished the shunting of cleaning waste water and sewage.
4. according to claim 1 in described a kind of building, clean the waste water overall circulation system outside the building, it is characterized in that being equipped with on it filtration deslagging docking disinfect box (7), left side welding 2 water inlets (32), backhand welding connects a delivery port (31), and respectively with bushing pipeline (42), circulation line (2) connects and communicates, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9), bushing pipeline (42), tiltedly drip pan (14) flows into and filters in the deslagging docking front case of disinfect box (7) (26-1), again through case inner filtration sterilization slag discharge plate (29) sterilization, flow in the rear cabinet (30), reach cleaning wastewater repurification and the sterilization of circulation.
5. according to claim 1 in described a kind of building, clean the waste water overall circulation system outside the building, it is characterized in that filtering lower floor on the deslagging docking disinfect box (7) 10 degree that turn forward, the centre will be divided into front case (26-1) and rear cabinet (30) with filtering sterilization slag discharge plate (29) on the case (26), and be scum pipe (36) passage below communicating, residue is discharged through scum pipe (36) and slag-drip opening (35), slag-drip opening is sealing at ordinary times, the residue of front case (26-1) is changed and is removed residue when filtering sterilization slag discharge plate (29) by the seal cover on the case (37).
6. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that bushing pipeline (42) inner tube (1) pipe outer lower end cover has the oblique drip pan of dustpan box-like (14) and sealing, be connected sealing with bushing pipeline (42) outer tube above it, tiltedly drip pan (14) is front makes circular delivery port, delivery port links to each other with circulation line (2), bushing pipeline (42) inner tube (1) is outer to be equipped with a word or A-frame fixedly in the outer tube (2), and upper minute neatly valve (8), under divide neatly valve (9) inner tube, connect, directly connect again soil pipe, divide neatly valve outer tube to be connected with the outer tube (2) of bushing pipeline (42), guarantee cleaning waste water and sewage separation.
7. according to claim 1 in described a kind of building, clean the waste water overall circulation system outside the building, it is characterized in that storage tank between ground (1), the interior mounted motor submersible pump of ground storage tank (+1) (5), overflow valve (21), communicate with storage tank with two position four-way valves (3) of switching valve and with motor submersible pump (5), rotating this valve finishes and inwardly draws water and outside water supply, rely on control circuit finish in the storage tank of cleaning waste water overall circulation system to inner storing water with outwards supply water, and be installed in washroom or the kitchen or under the ground surface and between the waterproofing course on the structure precast plate.
8. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that being installed in bathtub, wash basin or washroom, reach ground upper minute neatly valve (8) on the washing bay, under divide neatly valve (9), at first with sewage and cleaning shunting, inner tube still links to each other with existing soil pipe by bushing pipeline (42) inner tube (1), outer tube is connected with circulation line (2) with the drip pan of being connected (14) by bushing pipeline (42) again, its lower installation connects filtration deslagging docking disinfect box (7), be mounted on again storage tank (1) and ground storage tank (+1) between the ground in washroom and kitchen, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, sewage flows directly into plumbing drain, the cleaning oblique drip pan (14) of waste water on bushing pipeline (42) with filter deslagging and dock between disinfect box (7) inflow place storage in storage tank (1) or the ground storage tank (+1), the motor submersible pump (5) in it is installed again, two position four-way valves (3) with switching valve, the three-way valve (49) that connects connects the toilet of water flushing tap (17) and washroom again, if rotating two position four-way valves (3) with switching valve in it finishes in storage tank and draws water and outside water supply, these two kinds of circulations are two circulations that make separately the separate cleaning waste water overall circulation system of storage tank between land used (1) or ground storage tank (+1) composition, this circulation is subjected to sensor (11), microswitch (12), remote control switching circuit (10) control can claim in a kind of building, clean the circulation of two kinds of self-contained water tanks of waste water overall circulation system outside the building.
9. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that being installed in bathtub, wash basin or washroom, reach ground upper minute neatly valve (8) on the washing bay, under divide neatly valve (9), at first with sewage and cleaning shunting, its inner tube still links to each other with existing soil pipe by bushing pipeline (42) inner tube (1), outer tube is connected with circulation line (2) with the drip pan of being connected (14) by bushing pipeline (42) again, its lower connection is filtered deslagging docking disinfect box (7), be mounted on again storage tank (1) and ground storage tank (+1) between the ground in washroom and kitchen, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, sewage flows directly into plumbing drain, cleaning waste water is through bushing pipeline (42), oblique drip pan (14) and filtration deslagging docking disinfect box (7) and circulation line (2) be storage tank (1) or ground storage tank (+1) inner storing water between the inflow place again, the motor submersible pump (5) in it is installed again, two position four-way valves (3) with switching valve, three-way valve (49) connects the toilet of water flushing tap (17) and washroom, if rotating two position four-way valves (3) with switching valve in it finishes in storage tank and draws water and outside water supply, form self-contained water tank cleaning waste water circulation, owing to superfluous water in relief valve (21) storage tank has been installed again through overflow valve (21) in the storage tank, conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7) in parallel flow in the storage tank (19), controlled by control circuit, make motor and water pump (18) work that is installed in roof, cleaning waste water flows in the roof storage tank (20) and stores, use again storage tank (1) or ground storage tank (+1) between the ground in circulation line (2) the connection building, return storage tank between ground (1) or ground storage tank (+1) storage through electromagnetic valve (4) and water pressure, for water flushing tap (17) and toilet, in the building of composition, clean the again circulation of two kinds of full building overflow complementations of the whole circulation of waste water outside the building.
10. in a kind of building according to claim 1, clean the waste water overall circulation system outside the building, it is characterized in that being installed in bathtub, wash basin or washroom, reach ground upper minute neatly valve (8) on the washing bay, under divide neatly valve (9), at first with sewage and cleaning shunting, its inner tube still links to each other with existing soil pipe by bushing pipeline (42) inner tube (1), outer tube is connected with circulation line (2) with the drip pan of being connected (14) by bushing pipeline (42) again, directly link to each other with the filtration deslagging docking disinfect box (7) of conversion electromagnetic valve (6) parallel connection again, the storage tank (19) that then connects, be connected with roof storage tank (20) with circulation line (2), directly be connected with three-way valve (49) in the building again, be connected with toilet with washroom water flushing tap (17) again, cleaning waste water is through upper minute neatly valve (8), under divide neatly valve (9) shunting, through bushing pipeline (42), oblique drip pan (14), flow directly into circulation line
(2) in, flow in the storage tank (19) through conversion electromagnetic valve (6) and filtration deslagging docking disinfect box (7) in parallel again, controlled by control circuit, make motor and water pump (18) work that is installed in roof, cleaning waste water flows in the roof storage tank (20) and stores, be connected with toilet with washroom water flushing tap (17) again with circulation line (2) connecting tee valve (49), cleaning waste water relies on self pressure directly to supply washroom water flushing tap (17) and toilet, and this forms in the economy building, clean the most easy circulation of waste water overall circulation system outside the building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100728950A CN102953410A (en) | 2012-03-09 | 2012-03-09 | System for integrally recycling clean wastewater inside and outside building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100728950A CN102953410A (en) | 2012-03-09 | 2012-03-09 | System for integrally recycling clean wastewater inside and outside building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102953410A true CN102953410A (en) | 2013-03-06 |
Family
ID=47762751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100728950A Pending CN102953410A (en) | 2012-03-09 | 2012-03-09 | System for integrally recycling clean wastewater inside and outside building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953410A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397685A (en) * | 2013-08-06 | 2013-11-20 | 尹宏开 | City water-saving water-supplying system engineering |
TWI800709B (en) * | 2020-01-31 | 2023-05-01 | 玉山商業銀行股份有限公司 | Method for withdrawing cash via external system and system for the same |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2559290B2 (en) * | 1990-10-26 | 1996-12-04 | 憲 田中 | Method and apparatus for cleaning and collecting inner surface of pipe |
CN1743575A (en) * | 2005-09-22 | 2006-03-08 | 孟北京 | Water-saving toilet |
CN2918551Y (en) * | 2006-05-26 | 2007-07-04 | 钱永禄 | Water-saving device |
CN202073145U (en) * | 2011-04-15 | 2011-12-14 | 中天建设集团有限公司 | Household water-saving device |
CN202073144U (en) * | 2010-12-14 | 2011-12-14 | 张明 | Overall circulation system for cleaning wastewater inside and outside building |
CN202081468U (en) * | 2011-05-12 | 2011-12-21 | 高尔军 | Floor water-saving device |
-
2012
- 2012-03-09 CN CN2012100728950A patent/CN102953410A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2559290B2 (en) * | 1990-10-26 | 1996-12-04 | 憲 田中 | Method and apparatus for cleaning and collecting inner surface of pipe |
CN1743575A (en) * | 2005-09-22 | 2006-03-08 | 孟北京 | Water-saving toilet |
CN2918551Y (en) * | 2006-05-26 | 2007-07-04 | 钱永禄 | Water-saving device |
CN202073144U (en) * | 2010-12-14 | 2011-12-14 | 张明 | Overall circulation system for cleaning wastewater inside and outside building |
CN202073145U (en) * | 2011-04-15 | 2011-12-14 | 中天建设集团有限公司 | Household water-saving device |
CN202081468U (en) * | 2011-05-12 | 2011-12-21 | 高尔军 | Floor water-saving device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397685A (en) * | 2013-08-06 | 2013-11-20 | 尹宏开 | City water-saving water-supplying system engineering |
CN103397685B (en) * | 2013-08-06 | 2015-10-14 | 尹宏开 | Urban water conservation water system engineering |
TWI800709B (en) * | 2020-01-31 | 2023-05-01 | 玉山商業銀行股份有限公司 | Method for withdrawing cash via external system and system for the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205892901U (en) | Can store non -potable water's among reverse osmosis water purification machine device | |
CN101858100B (en) | Washing water collecting device and method | |
CN205062933U (en) | Little circulation system of domestic water | |
CN208455736U (en) | Water water storage and treatment for reuse system in a kind of side-stand type for toilet | |
CN202248116U (en) | Split domestic water saver | |
CN201538992U (en) | Total circulating system for cleaning waste water in and out floor | |
CN204849933U (en) | Automatic modularization drainage reuse of reclaimed water device | |
CN109868863A (en) | Water rinses toilet device in a kind of utilization | |
CN2918551Y (en) | Water-saving device | |
CN201794120U (en) | Daily water-saving device | |
CN102953410A (en) | System for integrally recycling clean wastewater inside and outside building | |
CN103912042A (en) | Device for recycling and reusing waste water of household water purifier | |
CN1707041A (en) | Serially connected intermediate water utilizing system | |
CN206667410U (en) | A kind of closestool water-saving device | |
CN202073144U (en) | Overall circulation system for cleaning wastewater inside and outside building | |
CN206467711U (en) | Reuse flushing system after a kind of reclaimed water and rainwater-collecting | |
CN101294404B (en) | Rainwater and reclaimed water system apparatus for toilet | |
CN100491657C (en) | Household water-saving pipeline system | |
JP2012158971A (en) | Equipment and method for conveying filth in public lavatory | |
CN206245411U (en) | A kind of Domestic water recovering utility | |
CN101718109B (en) | Wastewater recycling system of large-scale public place | |
CN200999371Y (en) | Secondary water using type flush toilet | |
CN205296312U (en) | Family domestic wastewater recovering and utilizing device | |
CN2769367Y (en) | Multifunction sewage treatment efficient water-saving device | |
CN103912039A (en) | Residential building water supplying system with water purification machine wastewater recycling function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130306 |