CN102912980B - 一种钢筋保护层垫块固定方法 - Google Patents
一种钢筋保护层垫块固定方法 Download PDFInfo
- Publication number
- CN102912980B CN102912980B CN201210397515.0A CN201210397515A CN102912980B CN 102912980 B CN102912980 B CN 102912980B CN 201210397515 A CN201210397515 A CN 201210397515A CN 102912980 B CN102912980 B CN 102912980B
- Authority
- CN
- China
- Prior art keywords
- cushion block
- wall surface
- side wall
- reinforcement
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210397515.0A CN102912980B (zh) | 2012-10-18 | 2012-10-18 | 一种钢筋保护层垫块固定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210397515.0A CN102912980B (zh) | 2012-10-18 | 2012-10-18 | 一种钢筋保护层垫块固定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102912980A CN102912980A (zh) | 2013-02-06 |
CN102912980B true CN102912980B (zh) | 2014-12-24 |
Family
ID=47611528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210397515.0A Expired - Fee Related CN102912980B (zh) | 2012-10-18 | 2012-10-18 | 一种钢筋保护层垫块固定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102912980B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012849B (zh) * | 2016-06-08 | 2018-08-14 | 江苏燕宁工程科技集团有限公司 | 一种悬浇梁直线段钢筋整体绑扎吊装施工方法以及桥梁 |
CN114214914A (zh) * | 2021-12-09 | 2022-03-22 | 山东高速股份有限公司 | 一种预制箱梁用钢筋保护层垫块组合构件 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2721369A1 (de) * | 1977-05-12 | 1978-11-23 | Horst Mueller | Abstandshalter fuer das bewehrungsmaterial im stahlbetonbau |
DE19525160B4 (de) * | 1995-07-11 | 2004-01-08 | Gebr. Seifert Gmbh + Co | Scheibenförmiger Abstandhalter für Bewehrungsstangen im Betonbau |
CN2507941Y (zh) * | 2001-09-14 | 2002-08-28 | 南宁泰格金属制品有限公司 | 钢筋混凝土中的钢筋保护层垫块 |
JP5130578B2 (ja) * | 2004-05-12 | 2013-01-30 | 株式会社丸備 | 鉄筋コンクリート用スペーサ |
CN200971587Y (zh) * | 2006-05-26 | 2007-11-07 | 中交第二航务工程局有限公司 | 梅花形钢筋保护层垫块及其生产模具 |
CN201212214Y (zh) * | 2008-06-06 | 2009-03-25 | 湖北全洲扬子江建设工程有限公司 | 钢筋混凝土保护层垫块 |
-
2012
- 2012-10-18 CN CN201210397515.0A patent/CN102912980B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102912980A (zh) | 2013-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105345926B (zh) | 预应力混凝土箱梁的预制施工方法 | |
CN101781879B (zh) | 独塔无背索斜拉桥施工方法 | |
CN107190981B (zh) | 一种异形圆弧曲面混凝土现浇屋面的施工方法 | |
CN103410269B (zh) | 无粘结预应力现浇钢筋混凝土空心板施工结构及施工方法 | |
CN103088947B (zh) | 冷弯薄壁格构型钢-混凝土叠合保温楼板及其生产工艺 | |
CN103806656A (zh) | 现浇混凝土无梁板内置薄壁空心盒体的施工方法 | |
CN104088461A (zh) | Y型现浇混凝土柱模板系统及其施工方法 | |
CN106065681A (zh) | 一种基于bim技术的整体装配式建筑中叠合板现浇板带施工方法 | |
CN103306463B (zh) | 一种金属衬里混凝土风道施工方法 | |
CN105464010A (zh) | 一种基于自动运输的混凝土箱涵施工工法及系统 | |
CN104631674A (zh) | 一种叠合楼板及其施工方法 | |
CN102936958B (zh) | 工具式支架定位混凝土楼板上部钢筋的施工方法 | |
CN103046764B (zh) | 钢筋网细石混凝土加固预应力混凝土空心板的方法 | |
CN102912980B (zh) | 一种钢筋保护层垫块固定方法 | |
CN116910854A (zh) | 一种基于数字建造的大跨度拱形混凝土结构施工方法 | |
CN103615063A (zh) | 一种浇筑坡屋面混凝土的施工方法及其使用的钢筋结构 | |
CN204401844U (zh) | 易于安装的叠合楼板 | |
CN103821121B (zh) | 大型钢筋混凝土海洋平台及其制造方法 | |
CN102465605A (zh) | 建筑底板钢筋支架方法 | |
CN204435616U (zh) | 桁架钢筋双层纤维石膏板、免拆模板墙体结构 | |
CN208309947U (zh) | 一种空心楼盖 | |
CN113174862B (zh) | 高墩中横隔板施工方法及高墩中横隔板结构体系 | |
CN110374012A (zh) | 一种t梁原位支架法预制工法 | |
CN205840082U (zh) | 一种brt轻质芯模密肋复合楼板结构 | |
CN210508478U (zh) | 一种用于清水砖墙的l型外包墙体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: QINGHAI LITONG ENGINEERING CONSULTING CO., LTD. CC Free format text: FORMER OWNER: QINGHAI LITONG ENGINEERING CONSULTING CO., LTD. SHANDONG EXPRESSWAY QINGDAO HIGHWAY CO., LTD. QINGDAO TRAFFIC ENGINEERING SUPERVISION CONSULTING CO., LTD. Effective date: 20140508 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Guo Baolin Inventor after: Yan Zongwei Inventor after: Sun Rishuang Inventor after: Cui Jipeng Inventor after: Liu Lingling Inventor after: Wang Pengwei Inventor after: Wei Xiaoxia Inventor after: Niu Lijun Inventor after: Shao Xinpeng Inventor after: Zhu Jupeng Inventor after: Zhao Jiangang Inventor after: Yang Xiaobo Inventor after: Ji Hui Inventor after: Cai Tangtao Inventor after: Cai Minshan Inventor after: Li Zilong Inventor before: Guo Baolin Inventor before: Cui Jipeng Inventor before: Liu Lingling Inventor before: Wang Pengwei Inventor before: Wei Xiaoxia Inventor before: Niu Lijun Inventor before: Shao Xinpeng Inventor before: Zhu Jupeng Inventor before: Yang Xiaobo Inventor before: Ji Hui Inventor before: Cai Minshan Inventor before: Li Zilong Inventor before: Yan Zongwei Inventor before: Sun Rishuang |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GUO BAOLIN SHAO XINPENG ZHU JUPENG YANG XIAOBO JI HUI CAI MINSHAN LI ZILONG YAN ZONGWEI SUN RISHUANG CUI JIPENG LIU LINGLING WANG PENGWEI WEI XIAOXIA NIU LIJUN TO: GUO BAOLIN SHAO XINPENG ZHU JUPENG ZHAO JIANGANG YANG XIAOBO JI HUI CAI TANGTAO CAI MINSHAN LI ZILONG YAN ZONGWEI SUN RISHUANG CUI JIPENG LIU LINGLING WANG PENGWEI WEI XIAOXIA NIU LIJUN |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140508 Address after: Miao road Laoshan District 266061 of Shandong Province, Qingdao City, No. 29 Applicant after: CRBC International Co., Ltd. Applicant after: Qinghai Litong Engineering Consulting Co.,Ltd. Applicant after: CCCC Fourth Highway Engineering Co., Ltd. Applicant after: Shandong Provincial Communications Planning and Design Institute Applicant after: Qingdao Traffic Engineering Supervision Consulting Co., Ltd. Address before: Miao road Laoshan District 266061 of Shandong Province, Qingdao City, No. 29 Applicant before: CRBC International Co., Ltd. Applicant before: Qinghai Litong Engineering Consulting Co.,Ltd. Applicant before: Shandong Provincial Communications Planning and Design Institute Applicant before: Qingdao Traffic Engineering Supervision Consulting Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141224 Termination date: 20171018 |