CN102912807B - 一种沉井顶升纠偏方法 - Google Patents

一种沉井顶升纠偏方法 Download PDF

Info

Publication number
CN102912807B
CN102912807B CN201210429350.0A CN201210429350A CN102912807B CN 102912807 B CN102912807 B CN 102912807B CN 201210429350 A CN201210429350 A CN 201210429350A CN 102912807 B CN102912807 B CN 102912807B
Authority
CN
China
Prior art keywords
open caisson
pile
jacking
quicklime
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210429350.0A
Other languages
English (en)
Other versions
CN102912807A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN102912807A publication Critical patent/CN102912807A/zh
Application granted granted Critical
Publication of CN102912807B publication Critical patent/CN102912807B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种沉井顶升纠偏方法,其特征是生石灰桩布置在沉井需要顶升的部位,生石灰桩斜向打入地基土中,沉井顶升过程中要进行实时监测,生石灰桩施工完毕后要进行注浆施工,施工时先进行外围注浆,再进行沉井内部注浆,外围孔注浆量根据注浆量来控制;中间孔注浆量根据注浆量和压力进行双重控制,压力不超过2.5MPa。本发明具有造价低、施工方便等特点。

Description

一种沉井顶升纠偏方法
技术领域
本发明涉及一种沉井顶升纠偏方法,适用于市政领域。
背景技术
沉井施工时由于各种因素出现倾斜现象,传统的方法采用掏土下沉进行纠偏。但对于一些有功能性要求的沉井,如果沉井标高下降会影响其使用功能,只能通过顶升纠偏的方法进行纠偏以满足使用要求。在地基中灌入生石灰块,由于生石灰块吸收桩周土中的水分发生消化反应生成熟石灰,同时桩身体积膨胀,使桩间土产生强大的挤压力,另外石灰在地基土中会产生离子交换、胶凝作用,使土中粘粒的颗粒含量大大减小,土的力学性质有所改善。可以利用以上原理对沉井进行顶升纠偏。
发明内容
本发明解决的技术问题是提供一种沉井顶升纠偏方法,解决沉井的顶升纠偏的问题。
本发明中生石灰桩布置在沉井需要顶升的部位,生石灰桩斜向打入地基土中,生石灰桩倾斜率为75°~90°。沉井顶升过程中要进行实时监测,待沉井顶升量达到8~10cm要暂时停止施工,3d后待土体基本稳定后再行施工生石灰桩。生石灰桩施工完毕后要进行注浆施工。
生石灰桩桩长根据顶升量进行调整,顶升量为5cm以内,桩长为5~6m,间距为1.2~1.4cm;顶升量为5~10cm,桩长为6~7m,桩间距为1.2~1.1cm;顶升量为10~14cm,桩长为7~8m,桩间距为0.9~1cm;顶升量为14~17cm,桩长为8~9m,桩间距为0.8~0.9cm;顶升量为17~20cm,桩长为9~10m,桩间距为0.7~0.8cm。
对于淤泥质土,生石灰桩直径为400~450cm;对于粘土,生石灰桩直径为450~500cm;对于砂土,生石灰桩直径为500~600cm。
生石灰桩配料以生石灰为主,并掺入掺和料粉煤灰和附加剂石膏。对于不同含水量采取不同的粉煤灰掺入量和石膏掺入量,当含水量为30%以下时,粉煤灰掺入量为15%,石膏掺入量为5%;当含水量为30%~50%时,粉煤灰掺入量为13%,石膏掺入量为4%;当含水量为50%~70%时,粉煤灰掺入量为11%,石膏掺入量为3%;当含水量为70%~90%时,粉煤灰掺入量为9%,石膏掺入量为2%;当含水量为90%以上时,粉煤灰掺入量为7%,石膏掺入量为1%。
注浆竖向区域为2m深度范围内,平面区域为沉井外围30~50cm,注浆管布置间距为1.2~1.5m,施工时先进行外围注浆,再进行沉井内部注浆。外围孔注浆量根据注浆量来控制;中间孔注浆量根据注浆量和压力进行双重控制,压力不超过2.5MPa。
注浆浆液采用水泥浆掺加3%的水玻璃,水玻璃模数为2.4~3.4,水玻璃浓度为40oBe。
本发明顶升量为20cm以内。本发明利用生石灰的吸水、膨胀、发热以及与桩周围土体发生离子交换等作用,从而使得桩周土的含水量降低,密实度提高,同时达到顶升纠偏的目的。本发明具有施工成本低、速度快等特点。
附图说明
图1沉井纠偏示意图
附图标志:1、生石灰桩,2、沉井,3、地基土
具体实施方式
以下结合附图对本实施例进行详细描述。
图1为沉井纠偏示意图。本实施例沉井2需要顶升12cm,沉井2下面地基土3为淤泥质土,含水量为60%。生石灰桩1布置在沉井2需要顶升的部位,生石灰桩1斜向打入地基土4中,生石灰桩1倾斜率为80°。沉井2顶升过程中要进行实时监测,待沉井3顶升量达到8cm要暂时停止施工,3d后待土体基本稳定后再行施工生石灰桩1,使沉井2继续顶升4cm。
生石灰桩1桩长为8m,桩间距为0.9cm,桩直径为400cm。生石灰桩1配料以生石灰为主,并掺入掺和料粉煤灰和附加剂石膏。粉煤灰掺入量为11%,石膏掺入量为3%。
注浆竖向区域为2m深度范围内,平面区域为沉井外围30~50cm,注浆管布置间距为1.2~1.5m,施工时先进行外围注浆,再进行沉井内部注浆。外围孔注浆量根据注浆量来控制,根据浆液扩散半径和砂层的孔隙率按《注浆技术规程》计算获得;中间孔注浆量根据注浆量和压力进行双重控制,压力不超过2.5MPa,避免由于注浆压力过大将临近的孔壁压垮。
注浆浆液采用水泥浆掺加3%的水玻璃,以增加其抗渗性和早期强度,水玻璃模数为3,水玻璃浓度为40oBe。浆液配置开始到注浆完成的时间不大于1h。

Claims (2)

1.一种沉井顶升纠偏方法,其特征是生石灰桩布置在沉井需要顶升的部位,生石灰桩斜向打入地基土中,生石灰桩倾斜率为75°~90°,沉井顶升过程中要进行实时监测,待沉井顶升量达到8~10cm要暂时停止施工,3d后待土体基本稳定后再行施工生石灰桩;生石灰桩施工完毕后要进行注浆施工;生石灰桩桩长根据顶升量进行调整,顶升量为5cm以内,桩长为5~6m,间距为1.2~1.4cm;顶升量为5~10cm,桩长为6~7m,桩间距为1.2~1.1cm;顶升量为10~14cm,桩长为7~8m,桩间距为0.9~1cm;顶升量为14~17cm,桩长为8~9m,桩间距为0.8~0.9cm;顶升量为17~20cm,桩长为9~10m,桩间距为0.7~0.8cm,注浆竖向区域为2m深度范围内,平面区域为沉井外围30~50cm,注浆管布置间距为1.2~1.5m。
2.根据权利要求1所述的沉井顶升纠偏方法,其特征是对于淤泥质土,生石灰桩直径为400~450cm;对于粘土,生石灰桩直径为450~500cm;对于砂土,生石灰桩直径为500~600cm。
CN201210429350.0A 2010-06-05 2010-06-05 一种沉井顶升纠偏方法 Expired - Fee Related CN102912807B (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010201389 CN101845830B (zh) 2010-06-05 2010-06-05 一种沉井纠偏施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN 201010201389 Division CN101845830B (zh) 2010-06-05 2010-06-05 一种沉井纠偏施工方法

Publications (2)

Publication Number Publication Date
CN102912807A CN102912807A (zh) 2013-02-06
CN102912807B true CN102912807B (zh) 2015-11-25

Family

ID=42770630

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 201010201389 Expired - Fee Related CN101845830B (zh) 2010-06-05 2010-06-05 一种沉井纠偏施工方法
CN201210429350.0A Expired - Fee Related CN102912807B (zh) 2010-06-05 2010-06-05 一种沉井顶升纠偏方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN 201010201389 Expired - Fee Related CN101845830B (zh) 2010-06-05 2010-06-05 一种沉井纠偏施工方法

Country Status (1)

Country Link
CN (2) CN101845830B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845830B (zh) * 2010-06-05 2013-08-28 朱虹 一种沉井纠偏施工方法
CN104032777B (zh) * 2014-05-14 2016-01-20 中冶集团武汉勘察研究院有限公司 土工布袋组合微型桩顶升纠倾建/构筑物的方法
CN104047307B (zh) * 2014-07-03 2017-01-11 上海申元岩土工程有限公司 采用联合注浆对建筑物基础进行加固和纠偏的方法
CN106088126A (zh) * 2016-06-30 2016-11-09 中国五冶集团有限公司 一种沉井纠偏施工方法
CN108396760B (zh) * 2016-11-17 2020-02-04 叶香雄 倾斜沉井组合纠偏施工技术
CN107326919A (zh) * 2017-05-31 2017-11-07 上海市政建设有限公司 一种沉井终沉阶段纠偏系统及其使用方法
CN108824468A (zh) * 2018-08-23 2018-11-16 中铁六局集团广州工程有限公司 沉井及其施工方法
CN110004963B (zh) * 2019-04-18 2024-02-06 郑州市市政工程总公司 沉井下沉全过程纠偏预防报警系统及沉井下沉纠偏方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5761117A (en) * 1980-09-30 1982-04-13 Kimitaka Kondo Roller sheet pile type caisson foundation work
CN102926394A (zh) * 2010-06-05 2013-02-13 朱虹 一种利用石灰桩纠偏沉井的方法
CN101845830B (zh) * 2010-06-05 2013-08-28 朱虹 一种沉井纠偏施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070513A (ja) * 2004-08-31 2006-03-16 Sekkeishitsu Soil:Kk 構造物の高さ調節方法
CN1654749A (zh) * 2005-02-28 2005-08-17 广州大学 建筑物充水式纠倾及基础加固方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5761117A (en) * 1980-09-30 1982-04-13 Kimitaka Kondo Roller sheet pile type caisson foundation work
CN102926394A (zh) * 2010-06-05 2013-02-13 朱虹 一种利用石灰桩纠偏沉井的方法
CN101845830B (zh) * 2010-06-05 2013-08-28 朱虹 一种沉井纠偏施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
湿陷性黄土地区倾斜建筑物的膨胀法纠偏加固理论分析与实践;朱彦鹏等;《岩石力学与工程学报》;20050803;第24卷(第15期);全文 *

Also Published As

Publication number Publication date
CN101845830A (zh) 2010-09-29
CN101845830B (zh) 2013-08-28
CN102912807A (zh) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102912807B (zh) 一种沉井顶升纠偏方法
CN202099816U (zh) 一种地下室外墙后浇带预制防水挡土板
CN204662499U (zh) 地下室混凝土外墙、防水、肥槽一体化施工构造
CN205857242U (zh) 一种地下室底板梁无砖胎膜构造结构
CN102226335A (zh) 一种控制软土工后沉降变形的地基处理方法
CN103031835B (zh) 一种提高地基承载力的方法
CN203546678U (zh) 一种沥青混凝土心墙堆石坝结构
CN103967224B (zh) 大面积现浇泡沫混凝土平屋面保温找坡分层施工方法
CN101560775A (zh) 复合土钉墙结构
CN106812219A (zh) 填充墙顶部塞缝施工方法
CN103396065A (zh) 一种盾构施工控制用同步注浆浆液及其注浆方法
CN204551547U (zh) 地下室外墙竖向后浇带封堵装置
CN102926394B (zh) 一种利用石灰桩纠偏沉井的方法
CN204551430U (zh) 一种用于软土地基上的预埋花管注浆加固装置
CN103046534B (zh) 一种提高地基承载力的方法
CN103343534A (zh) 基坑施工封闭降水方法
CN105507336A (zh) 一种利用降水井形成复合地基的方法
CN201891124U (zh) 一种钻孔时封堵泉眼的装置
CN204000919U (zh) 一种新型自排水式塔吊基础结构
CN204343286U (zh) 一种钢管桩支架
CN204510291U (zh) 一种超深地下空间结构底板下减压排水系统
CN106120655B (zh) 土石坝沥青混凝土心墙深处漏水的快速修复方法
CN202187253U (zh) 平原地区非饱和土地基高速铁路路基结构
CN205188933U (zh) 一种利用降水井形成的复合地基
CN201722684U (zh) 一种组合桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20160605