CN102900095B - Transmission tower plate-type single rope foundation structure - Google Patents

Transmission tower plate-type single rope foundation structure Download PDF

Info

Publication number
CN102900095B
CN102900095B CN201210383694.2A CN201210383694A CN102900095B CN 102900095 B CN102900095 B CN 102900095B CN 201210383694 A CN201210383694 A CN 201210383694A CN 102900095 B CN102900095 B CN 102900095B
Authority
CN
China
Prior art keywords
plate
foundation
lower plate
anchor head
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210383694.2A
Other languages
Chinese (zh)
Other versions
CN102900095A (en
Inventor
雒亿平
范雪峰
付兵彬
杜鸿
朱文化
邓永婕
夏懿
徐昊亮
杨晶
张中丹
宋汶秦
贾春蓉
张军
杨昌海
余泳
田云飞
孙志宏
魏勇
李玉科
万小花
李麟鹤
韩建锋
梁魁
薛国斌
朱海涛
卢宏达
张琦
丁政中
马国伟
张艳霞
陈兆燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Gansu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Gansu Electric Power Co Ltd
Priority to CN201210383694.2A priority Critical patent/CN102900095B/en
Publication of CN102900095A publication Critical patent/CN102900095A/en
Application granted granted Critical
Publication of CN102900095B publication Critical patent/CN102900095B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明公开一种输电杆塔板式单索基础结构,包括一个铺设在地表的上板和一个埋设在地下的下板,所述上板和下板之间通过钢绞绳连接,在上板和下板之间的所述钢绞绳外部设有胶套管,在所述胶套管内部充装有防腐填料;所述钢绞绳的两端分别设有一个锚头,上部的锚头与上板之间设有上承载垫板,下部的锚头与下板之间设有下承载垫板;所述上承载垫板上浇注有四个对称布置的地脚螺栓。本发明提供的输电杆塔板式单索基础结构,具有传力边界条件完善明晰,充分发挥各种材料的物理力学性能,节约投资,安全可靠度高及施工简便等优点,适用于上拔力较小,地基土物理力学性质较好的黄土地区,如110kV以下电压等级线路基础机构。

The invention discloses a single-cable foundation structure of a transmission pole tower plate, which comprises an upper plate laid on the ground surface and a lower plate buried in the ground, the upper plate and the lower plate are connected by steel strands, and the upper plate and the lower plate are connected by steel strands. The outside of the steel strand between the plates is provided with a rubber sleeve, and the inside of the rubber sleeve is filled with anti-corrosion filler; the two ends of the steel strand are respectively provided with an anchor head, and the upper anchor head is connected with the upper An upper bearing backing plate is provided between the plates, and a lower bearing backing plate is provided between the lower anchor head and the lower plate; four symmetrically arranged anchor bolts are poured on the upper bearing backing plate. The transmission pole tower-type single-cable foundation structure provided by the invention has the advantages of perfect and clear force transmission boundary conditions, fully exerting the physical and mechanical properties of various materials, saving investment, high safety and reliability, and simple construction, etc., and is suitable for small pull-out force , the loess area with good physical and mechanical properties of the foundation soil, such as the foundation mechanism of the line with a voltage level below 110kV.

Description

输电杆塔板式单索基础结构Transmission pole tower type single cable foundation structure

技术领域 technical field

本发明是一种输电杆塔设备,具体的说是输电杆塔的基础固定结构。 The invention relates to a power transmission pole and tower equipment, specifically a foundation fixing structure for a power transmission pole and tower.

背景技术 Background technique

在大厚度黄土地区,杆塔基础主要采用“大开挖”基础类、掏挖扩底基础类、爆扩桩基础类基础。“大开挖”基础类系指埋置于预先挖好的基坑内并将回填土夯实的基础,它是以扰动的回填土构成抗拔土体保持基础的上拔稳定。掏挖扩底基础类系指以混凝土和钢筋骨架灌注于以机械或人工掏挖成的土胎内的基础,它是以天然构成的抗拔土体保持基础的上拔稳定。爆扩桩基础类系指以混凝土和钢筋骨架灌注于以爆扩成型的土胎内的扩大端的短桩基础,其抗拔土体基本接近于未扰动的天然土。 In large-thickness loess areas, the foundations of pole towers mainly adopt "big excavation" foundations, digging and bottom expansion foundations, and explosive expansion pile foundations. "Large excavation" foundation category refers to the foundation buried in the pre-excavated foundation pit and the backfill soil is compacted. It uses the disturbed backfill soil to form an uplift-resistant soil body to maintain the uplift stability of the foundation. Excavated and expanded bottom foundation refers to the foundation that is filled with concrete and steel skeleton in the soil tire excavated by machinery or manually. It maintains the uplift and stability of the foundation with the naturally formed uplift-resistant soil. Explosive expansion pile foundation refers to the short pile foundation with concrete and steel skeleton poured into the enlarged end of the soil tire formed by explosion expansion. The uplift soil is basically close to the undisturbed natural soil.

“大开挖”基础类的主要尺寸均由其抗拔稳定性能所决定,为了满足上拔稳定性的要求,必须加大基础尺寸,提高了基础造价,同时由于弃土较多,对环境的破坏也较大。掏挖扩底基础类适合于无水渗入基坑的粘性土中,同时桩基础规范规定,如基础采用桩基,基础持力层需穿过湿陷性黄土,因此该基础不适用于大厚度湿陷性黄土地区。爆扩桩基础类施工难度较大且工艺和尺寸检查都有一定困难。 The main size of the "big excavation" foundation is determined by its uplift stability. In order to meet the requirements of uplift stability, the size of the foundation must be increased, which increases the cost of the foundation. The damage is also greater. Excavation and bottom expansion foundations are suitable for cohesive soil without water infiltration into the foundation pit. At the same time, the pile foundation specification stipulates that if the foundation adopts pile foundation, the bearing layer of the foundation must pass through collapsible loess, so this foundation is not suitable for large thickness Collapsible loess area. Explosive expansion pile foundation construction is more difficult, and there are certain difficulties in process and dimension inspection.

发明内容 Contents of the invention

为了解决上述问题,本发明提供一种适用于大厚黄土地区的输电杆塔板式单索基础结构。 In order to solve the above problems, the present invention provides a single-cable foundation structure for transmission poles and towers suitable for the thick loess area.

本发明的目的通过以下技术方案来具体实现: The purpose of the present invention is specifically achieved through the following technical solutions:

输电杆塔板式单索基础结构,包括一个铺设在地表的上板和一个埋设在地下的下板,所述上板和下板之间通过钢绞绳连接,在上板和下板之间的所述钢绞绳外部设有胶套管,所述胶套管的两端分别与上板和下板接触,在所述胶套管内部充装有防腐填料;所述钢绞绳的两端分别设有一个锚头,上部的锚头与上板之间设有上承载垫板,下部的锚头与下板之间设有下承载垫板;所述上承载垫板上浇注有四个对称布置的地脚螺栓。所述上板、下板均为钢筋混凝土材料浇注成型。 The tower-type single-cable foundation structure of transmission poles includes an upper slab laid on the ground and a lower slab buried underground. The upper slab and the lower slab are connected by steel strands. The outside of the steel strand rope is provided with a rubber sleeve, and the two ends of the rubber sleeve are respectively in contact with the upper plate and the lower plate, and the inside of the rubber sleeve is filled with anti-corrosion filler; the two ends of the steel strand rope are respectively There is an anchor head, an upper load-bearing backing plate is set between the upper anchor head and the upper plate, and a lower load-bearing backing plate is set between the lower anchor head and the lower plate; four symmetrical Arranged anchor bolts. Both the upper plate and the lower plate are poured and formed with reinforced concrete materials.

所述上板采用长方形的结构,并且上板的面积远大于下板的面积。 The upper plate adopts a rectangular structure, and the area of the upper plate is much larger than that of the lower plate.

本发明提供的输电杆塔板式单索基础结构,上板作为基础保护帽使用,具有传力边界条件完善明晰,充分发挥各种材料的物理力学性能,节约投资,安全可靠度高及施工简便等优点,适用于上拔力较小,地基土物理力学性质较好的黄土地区,如110kV以下电压等级线路基础机构。 The tower plate type single cable foundation structure of the transmission pole provided by the present invention, the upper plate is used as the basic protective cap, has the advantages of perfect and clear force transmission boundary conditions, fully exerting the physical and mechanical properties of various materials, saving investment, high safety and reliability, and simple construction. , suitable for loess areas with small pull-up force and good physical and mechanical properties of the foundation soil, such as the foundation mechanism of the voltage level below 110kV.

该基础结构为柔性基础,采用该基础结构可提高杆塔抵抗动荷载的能力;同时可以减少弃土量,保护生态环境;而且拆卸方便,如该基础不再使用,可将钢绞线直接剪断,挖除上板即可,降低了基础拆除工程量;并且可以将荷载传递机构兼做地线使用。该基础结构荷载传递明确,结构计算和施工较简便。 The foundation structure is a flexible foundation, which can improve the ability of the tower to resist dynamic loads; at the same time, it can reduce the amount of spoil and protect the ecological environment; and it is easy to disassemble. If the foundation is no longer used, the steel strands can be cut directly. It only needs to dig out the upper plate, which reduces the amount of foundation demolition work; and the load transmission mechanism can also be used as the ground wire. The load transfer of the foundation structure is clear, and the structure calculation and construction are relatively simple.

附图说明 Description of drawings

下面根据附图和实施例对本发明作进一步详细说明。 The present invention will be described in further detail below according to the drawings and embodiments.

图1是本发明实施例所述输电杆塔板式单索基础结构的结构图。 Fig. 1 is a structural diagram of a transmission pole-tray type single-cable foundation structure according to an embodiment of the present invention.

图2是本发明实施例所述输电杆塔板式单索基础结构的地表俯视图。 Fig. 2 is a top view of the ground surface of the transmission pole tower-type single-cable foundation structure according to the embodiment of the present invention.

具体实施方式 Detailed ways

如图1-2所示,本发明实施例所述输电杆塔板式单索基础结构,包括一个铺设在地表的上板1和一个埋设在地下的下板2,所述上板1和下板2之间通过钢绞绳3连接,在上板1和下板2之间的所述钢绞绳3外部设有胶套管4,所述胶套管4的两端分别与上板1和下板2接触,在所述胶套管4内部充装有防腐填料5;所述钢绞绳3的两端分别设有一个锚头61、62,上部的锚头61与上板1之间设有上承载垫板71,下部的锚头62与下板2之间设有下承载垫板72;所述上承载垫板71上浇注有四个对称布置的地脚螺栓8。所述上板1、下板2均为钢筋混凝土材料浇注成型。所述上板1采用长方形的结构,并且上板1的面积远大于下板2的面积。 As shown in Figure 1-2, the transmission pole tower type single-cable foundation structure according to the embodiment of the present invention includes an upper plate 1 laid on the ground surface and a lower plate 2 buried underground, the upper plate 1 and the lower plate 2 The steel strands 3 are connected between them, and the outside of the steel strand 3 between the upper plate 1 and the lower plate 2 is provided with a rubber sleeve 4, and the two ends of the rubber sleeve 4 are connected with the upper plate 1 and the lower plate respectively. Plate 2 is in contact, and the inside of the rubber sleeve 4 is filled with anti-corrosion filler 5; the two ends of the steel strand 3 are respectively provided with an anchor head 61, 62, and the upper anchor head 61 and the upper plate 1 are provided with There is an upper bearing base plate 71, and a lower bearing base plate 72 is provided between the lower anchor head 62 and the lower plate 2; the upper bearing base plate 71 is poured with four symmetrically arranged anchor bolts 8. Both the upper plate 1 and the lower plate 2 are poured and formed with reinforced concrete materials. The upper board 1 adopts a rectangular structure, and the area of the upper board 1 is much larger than that of the lower board 2 .

本发明提供的输电杆塔板式单索基础结构,上板1作为基础保护帽使用,具有传力边界条件完善明晰,充分发挥各种材料的物理力学性能,节约投资,安全可靠度高及施工简便等优点,适用于上拔力较小,地基土物理力学性质较好的黄土地区,如110kV以下电压等级线路基础机构。 In the transmission pole tower-type single-cable foundation structure provided by the present invention, the upper plate 1 is used as a basic protective cap, which has perfect and clear force transmission boundary conditions, fully exerts the physical and mechanical properties of various materials, saves investment, has high safety and reliability, and is easy to construct, etc. Advantages, it is suitable for loess areas with small pull-out force and good physical and mechanical properties of the foundation soil, such as the foundation mechanism of the voltage level below 110kV.

该基础结构为柔性基础,采用该基础结构可提高杆塔抵抗动荷载的能力;同时可以减少弃土量,保护生态环境;而且拆卸方便,如该基础不再使用,可将钢绞线直接剪断,挖除上板即可,降低了基础拆除工程量;并且可以将荷载传递机构兼做地线使用。该基础结构荷载传递明确,结构计算和施工较简便。 The foundation structure is a flexible foundation, which can improve the ability of the tower to resist dynamic loads; at the same time, it can reduce the amount of spoil and protect the ecological environment; and it is easy to disassemble. If the foundation is no longer used, the steel strands can be cut directly. It only needs to dig out the upper plate, which reduces the amount of foundation demolition work; and the load transmission mechanism can also be used as the ground wire. The load transfer of the foundation structure is clear, and the structure calculation and construction are relatively simple.

Claims (2)

1. transmission tower plate-type single rope foundation structure, comprise the lower plate that a upper plate being laid on earth's surface and are embedded in underground, it is characterized in that, connected by steel strand rope between described upper plate and lower plate, described upper plate, lower plate is Reinforced Concrete Materials moulding by casting, described steel strand rope outside is between the upper and lower plates provided with gum cover pipe, the two ends of described gum cover pipe contact with lower plate with upper plate respectively, anticorrosive packing is filled with at described glue inside pipe casing, the two ends of described steel strand rope are respectively equipped with an anchor head, carrying backing plate is provided with between the anchor head on top and upper plate, lower carrying backing plate is provided with between the anchor head of bottom and lower plate.
2. transmission tower plate-type single rope foundation structure as claimed in claim 1, it is characterized in that, described upper carrying backing plate upper has four stone bolt be arranged symmetrically with.
CN201210383694.2A 2012-10-11 2012-10-11 Transmission tower plate-type single rope foundation structure Expired - Fee Related CN102900095B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210383694.2A CN102900095B (en) 2012-10-11 2012-10-11 Transmission tower plate-type single rope foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210383694.2A CN102900095B (en) 2012-10-11 2012-10-11 Transmission tower plate-type single rope foundation structure

Publications (2)

Publication Number Publication Date
CN102900095A CN102900095A (en) 2013-01-30
CN102900095B true CN102900095B (en) 2015-03-04

Family

ID=47572561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210383694.2A Expired - Fee Related CN102900095B (en) 2012-10-11 2012-10-11 Transmission tower plate-type single rope foundation structure

Country Status (1)

Country Link
CN (1) CN102900095B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297763A (en) * 2015-10-29 2016-02-03 绍兴文理学院元培学院 Assembled type flexible half-excavation foundation for electric transmission lines in mountainous areas
CN107165186B (en) * 2017-06-22 2019-12-03 国网浙江省电力公司台州供电公司 A kind of power transmission tower single anchor cable mat foundation and construction method
CN107816054A (en) * 2017-12-01 2018-03-20 绍兴大明电力设计院有限公司 Flexible roof bolt basis
CN110528559A (en) * 2019-08-27 2019-12-03 西安理工大学 Transmission line of electricity combines the design method of the anchor pole of plate stem list anchor slab foundation structure
CN110528560A (en) * 2019-08-27 2019-12-03 西安理工大学 A kind of single anchor slab basis fixed structure of transmission line of electricity joint plate stem
CN110528565A (en) * 2019-08-27 2019-12-03 西安理工大学 Transmission line of electricity combines the design method of the lower plate of the double anchor slab foundation structures of plate stem

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063509A (en) * 2006-04-30 2007-10-31 通用电气公司 Tower adapter, method of producing a tower foundation and tower foundation
KR100946573B1 (en) * 2009-12-08 2010-03-11 파슨스 브링커호프 아시아 리미티드 Steel base with adjusting leveling and construction method using the same
CN201443071U (en) * 2009-06-12 2010-04-28 孟庆波 Galvanized anchor rod
CN201874004U (en) * 2009-09-25 2011-06-22 山东电力集团公司日照供电公司 Foundation employing rock bottom-enlarging anchor pile for overhead power transmission line
CN102277877A (en) * 2010-04-30 2011-12-14 通用电气公司 Apparatus and method for producing a concrete foundation
CN202194153U (en) * 2011-07-21 2012-04-18 从卫民 High-voltage line iron tower base
CN202850045U (en) * 2012-10-11 2013-04-03 甘肃省电力公司电力经济技术研究院 Transmission tower plate-type single cable basic structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063509A (en) * 2006-04-30 2007-10-31 通用电气公司 Tower adapter, method of producing a tower foundation and tower foundation
CN201443071U (en) * 2009-06-12 2010-04-28 孟庆波 Galvanized anchor rod
CN201874004U (en) * 2009-09-25 2011-06-22 山东电力集团公司日照供电公司 Foundation employing rock bottom-enlarging anchor pile for overhead power transmission line
KR100946573B1 (en) * 2009-12-08 2010-03-11 파슨스 브링커호프 아시아 리미티드 Steel base with adjusting leveling and construction method using the same
CN102277877A (en) * 2010-04-30 2011-12-14 通用电气公司 Apparatus and method for producing a concrete foundation
CN202194153U (en) * 2011-07-21 2012-04-18 从卫民 High-voltage line iron tower base
CN202850045U (en) * 2012-10-11 2013-04-03 甘肃省电力公司电力经济技术研究院 Transmission tower plate-type single cable basic structure

Also Published As

Publication number Publication date
CN102900095A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900095B (en) Transmission tower plate-type single rope foundation structure
CN102900094B (en) Transmission tower plate-type three-rope foundation structure
CN201254730Y (en) Reinforcement tower foundation
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
CN102900093B (en) Plate-type double-cable foundation structure of transmission tower
CN102704505A (en) Onshore wind generating set foundation
CN204662246U (en) steep slope bridge pier structure
CN201390973Y (en) A pile-slab foundation for a self-supporting iron tower
CN219158994U (en) A foundation pit support structure for ultra-deep and large-diameter circular pipe-jacking wells in deep soft soil areas
CN101691760A (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN202124863U (en) Screw anchor excavated composite foundation
CN102733407A (en) Two-ring grouted single pile foundation
CN202881967U (en) Transmission tower plate type three-cable base structure
CN206418517U (en) A kind of prefabricated anchor foundation for frozen soil foundation
CN201502065U (en) A type of composite foundation for bolt combined excavation
CN202850045U (en) Transmission tower plate-type single cable basic structure
CN204676581U (en) A kind of rock foundation overhead power transmission line line pole tower and bracing wire novel foundation
CN202787308U (en) Plate type dual-rope foundation structure of power transmission pole tower
CN201883453U (en) Combined pipe jacking working well
CN201635073U (en) A prestressed anchorage system with three layers of protection and double anchorage sections
CN207314353U (en) A kind of supporting construction applied to foundation pit
CN204676580U (en) A kind of rock foundation overhead power line steel tower prestressed anchor basis
CN204125965U (en) There is the blower foundation that pressure dispersing type arranges high-strength prestressed anchor bar/anchor cable
CN204510861U (en) Whole building mobile route ground anti-settling structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

Termination date: 20201011