CN102878576A - Smoke separation wall structure of horizontal coal burning boiler - Google Patents

Smoke separation wall structure of horizontal coal burning boiler Download PDF

Info

Publication number
CN102878576A
CN102878576A CN2012104184217A CN201210418421A CN102878576A CN 102878576 A CN102878576 A CN 102878576A CN 2012104184217 A CN2012104184217 A CN 2012104184217A CN 201210418421 A CN201210418421 A CN 201210418421A CN 102878576 A CN102878576 A CN 102878576A
Authority
CN
China
Prior art keywords
boiler
smoke separation
brick baffle
separation wall
horizontal coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104184217A
Other languages
Chinese (zh)
Inventor
邵金平
袁巍巍
胡海琴
俞志峰
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI XINENG BOILER CO Ltd
Original Assignee
WUXI XINENG BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI XINENG BOILER CO Ltd filed Critical WUXI XINENG BOILER CO Ltd
Priority to CN2012104184217A priority Critical patent/CN102878576A/en
Publication of CN102878576A publication Critical patent/CN102878576A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a smoke separation wall structure of a horizontal coal burning boiler. The smoke separation wall structure is widely applied to the field of industrial boilers such as a horizontal coal burning organic heat carrier boiler with a convection heating surface. The smoke separation wall structure comprises a support beam and first smoke separation walls, wherein the support beam is fixed on two sides of a convection section of a steel frame of a boiler body; the first smoke separation walls are arranged on the support beam one by one to separate convection tube banks, so that high-temperature smoke forms a series loop along the tube banks; the upper part of each first smoke separation wall and roof tubes of the boiler are sealed together; each first smoke separation wall is formed by casting fire resistant concrete; and two sides of each first smoke separation wall and a boiler steel frame are fixed together by welding through fixed angle steel. The smoke separation walls of the smoke separation wall structure of the horizontal coal burning boiler are formed by casting the fire resistant concrete, so that the problem that the smoke separation walls of the horizontal coal burning organic heat carrier boiler are deformed by heating even fall off in operation is effectively solved; and the smoke separation wall structure is convenient to manufacture and assemble, and the manufacturing cost of the boiler is reduced.

Description

A kind of horizontal coal-fired boiler brick baffle structure
Technical field
The present invention relates to a kind of horizontal coal-fired boiler, relate in particular to a kind of brick baffle structure for horizontal coal-fired boiler of organic heat carrier.
Background technology
At present, extensive use along with boiler of organic heat carrier, according to horizontal coal-fired boiler of organic heat carrier design feature, arrange convection heating surface at the radiation heating-surface rear portion, convection heating surface is divided into several sections usually, for flue gas is flowed along certain direction, need between each section heating surface, increase brick baffle; Guarantee certain flue gas flow rate, make the effect of heat convection reach best; Traditional brick baffle adopts alloy-steel plate as partition material, but finds after after a while operation, and many partition wall steel plates modification of being heated under hot environment is for a long time arranged, and serious coming off blocks flue; Cause the flue gas short circuit effectively not carry out heat exchange, have a strong impact on normally carrying out of production; Adopt simultaneously steel alloy high as its cost of brick baffle, boiler manufacture cost is increased accordingly, energy-saving and cost-reducing in now fierce market competition, the manufacturing cost that reduces product just can make product more competitive.
Summary of the invention
The object of the present invention is to provide a kind of horizontal coal-fired boiler brick baffle structure, its can install easily and in running flexible type and coming off not, reduce simultaneously the manufacturing cost of boiler, make the boiler can long-time even running.Effectively solved the problem that horizontal coal-fired boiler brick baffle exists in the prior art.
The objective of the invention is to be achieved through the following technical solutions:
A kind of horizontal coal-fired boiler brick baffle structure, it comprises brace summer and the first brick baffle, described brace summer is fixed in the both sides of boiler body steelframe convection section, described the first brick baffle is arranged on the brace summer piecewise convection bank is separated, make high-temperature flue gas form series loop along tube bank, and the top of described the first brick baffle and the sealing of the roof tube of boiler, wherein, described the first brick baffle is formed by the refractory concrete casting, and the both sides of described the first brick baffle are by fixedly angle steel and boiler steelframe are welded and fixed.
Especially, the radiant section in the described boiler body adopts both sides' coil pipe, also is provided with the second brick baffle between radiant tube and the first convection bank, to prevent the high-temperature flue gas short circuit.
Especially, the top rear side of described the first brick baffle is welded and fixed by sealing channel-section steel and both sides steelframe, adopts refractory concrete cast sealing with position, roof tube boundary.
Especially, described the second brick baffle is formed by the refractory concrete cast.
Especially, the both sides correspondence of described boiler body steelframe convection section is provided with supporting seat, and described brace summer is fixedly welded on the supporting seat.
Beneficial effect of the present invention is that described horizontal coal-fired boiler brick baffle structure compared with prior art has following advantage:
1) brick baffle adopts the refractory concrete cast to form, temperature distortion even the problem that comes off when effectively solving horizontal coal-fired boiler of organic heat carrier brick baffle operation;
2) simple and convenient during fabrication and installation.
3) compare the refractory concrete cost with alloy-steel plate lower, thereby reduce the manufacturing cost of boiler.
Description of drawings
Fig. 1 is the structural representation of the horizontal coal-fired boiler brick baffle structure that provides of the specific embodiment of the invention 1;
Fig. 2 is the left view of Fig. 1.
The specific embodiment
Further specify technical scheme of the present invention below in conjunction with accompanying drawing and by the specific embodiment.
See also Fig. 1 to shown in Figure 2, in the present embodiment, a kind of horizontal coal-fired boiler brick baffle structure comprises boiler body and the convection tube of convection section in the boiler body is set, the both sides correspondence of described boiler body steelframe convection section is provided with supporting seat 2, be welded with brace summer 1 on the described supporting seat 2, the first brick baffle 3 that is formed by the refractory concrete cast is set on the described brace summer 1 piecewise, the both sides of described the first brick baffle 3 are by fixedly angle steel 6 and boiler steelframe are welded and fixed, to guarantee that boiler first brick baffle 3 in transportation can not be shifted, collapse, described the first brick baffle 3 separates convection bank, make high-temperature flue gas form series loop along tube bank, and the top rear side of described the first brick baffle 3 is welded and fixed with the both sides steelframe by sealing channel-section steel 4, adopts refractory concrete cast sealing with position, roof tube 5 boundary.
In the present embodiment, because the radiant section in the boiler body adopts both sides' coil pipe, between radiant tube and the first convection bank, also be provided with the second brick baffle 7, to prevent the high-temperature flue gas short circuit.
During assembling, described the second brick baffle 7 is poured into a mould in advance, after radiant section and the first convection section are in place, with its hoisted in position, is fixed on the crossbeam of the bottom steelframe that welding is good in advance; After convection bank is in place, brace summer 1 is placed on supporting seat 2 tops is welded and fixed; The first brick baffle 3 is poured into a mould equally in advance, after beam 1 to be supported is welded and fixed, 3 liftings of the first brick baffle is placed on the top of brace summer 1; To roof tube 5 belows, fixedly angle steel 6 is welded and fixed at both sides and the side steelframe of the first brick baffle 3 again, then will seal channel-section steel 4 and be fixedly welded at rear, the first brick baffle 3 top, and with the refractory concrete cast the first brick baffle 3 and roof tube 5 sealings be got final product at an upper portion thereof.
Above-mentioned horizontal coal-fired boiler brick baffle structure is designed to the refractory concrete cast with the convection section partition wall of boiler body by original alloy-steel plate.Make horizontal coal-fired boiler of organic heat carrier reduce the fault rate of boiler in running, reduce simultaneously the manufacturing cost of boiler.
Above embodiment has just set forth basic principle of the present invention and characteristic; the present invention is not limited by above-mentioned example; without departing from the spirit and scope of the present invention, the present invention also has various variations and change, and these variations and change all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (5)

1. horizontal coal-fired boiler brick baffle structure, it comprises brace summer and the first brick baffle, described brace summer is fixed in the both sides of boiler body steelframe convection section, described the first brick baffle is arranged on the brace summer piecewise convection bank is separated, and the top of described the first brick baffle and the sealing of the roof tube of boiler, it is characterized in that: described the first brick baffle is formed by the refractory concrete casting, and the both sides of described the first brick baffle are by fixedly angle steel and boiler steelframe are welded and fixed.
2. horizontal coal-fired boiler brick baffle structure according to claim 1; It is characterized in that: the radiant section in the described boiler body adopts both sides' coil pipe, also is provided with the second brick baffle between radiant tube and the first convection bank.
3. horizontal coal-fired boiler brick baffle structure according to claim 1; It is characterized in that: the top rear side of described the first brick baffle is welded and fixed by sealing channel-section steel and both sides steelframe, adopts refractory concrete cast sealing with position, roof tube boundary.
4. horizontal coal-fired boiler brick baffle structure according to claim 2; It is characterized in that: described the second brick baffle is formed by the refractory concrete cast.
5. horizontal coal-fired boiler brick baffle structure according to claim 1; It is characterized in that: the both sides correspondence of described boiler body steelframe convection section is provided with supporting seat, and described brace summer is fixedly welded on the supporting seat.
CN2012104184217A 2012-10-26 2012-10-26 Smoke separation wall structure of horizontal coal burning boiler Pending CN102878576A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104184217A CN102878576A (en) 2012-10-26 2012-10-26 Smoke separation wall structure of horizontal coal burning boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104184217A CN102878576A (en) 2012-10-26 2012-10-26 Smoke separation wall structure of horizontal coal burning boiler

Publications (1)

Publication Number Publication Date
CN102878576A true CN102878576A (en) 2013-01-16

Family

ID=47480009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104184217A Pending CN102878576A (en) 2012-10-26 2012-10-26 Smoke separation wall structure of horizontal coal burning boiler

Country Status (1)

Country Link
CN (1) CN102878576A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151055A (en) * 2017-11-08 2018-06-12 上海锅炉厂有限公司 A kind of partition wall positioning device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4449482A (en) * 1982-04-28 1984-05-22 Dorr-Oliver Incorporated Fluidized bed boilers
CN2046608U (en) * 1988-01-14 1989-10-25 梁丰新 Anthracite-fired hot water boiler
CN2190235Y (en) * 1993-11-01 1995-02-22 刘雪华 Smoke eliminating, dust collecting and energy saving device in stoves
CN2555480Y (en) * 2001-12-14 2003-06-11 张振勇 High efficiency thermal tube horizontal hot water boiler
CN1450323A (en) * 2002-07-04 2003-10-22 王森 Horizontal wet method desulfurization and dust-removing coal boiler
CN2651607Y (en) * 2003-08-15 2004-10-27 烟台火焰山锅炉有限公司 Water-closing impact desulfurized dust remover for boiler
CN2692573Y (en) * 2004-03-04 2005-04-13 严胡平 Single-cylinder longitudinal smokeless boiler
CN2807008Y (en) * 2005-07-20 2006-08-16 严胡平 Energy-saving smokeless boiler
CN201448866U (en) * 2009-06-05 2010-05-05 祁洪波 Boiler slop smoke partition wall
CN201731617U (en) * 2010-03-18 2011-02-02 刘博� Horizontal pipe array hot water boiler
CN102679556A (en) * 2012-05-30 2012-09-19 无锡锡能锅炉有限公司 Structural component of heating surface on tail part of fired coal-water-slurry boiler
CN202868721U (en) * 2012-10-26 2013-04-10 无锡锡能锅炉有限公司 Horizontal coal-fired boiler smoke separating wall structure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4449482A (en) * 1982-04-28 1984-05-22 Dorr-Oliver Incorporated Fluidized bed boilers
CN2046608U (en) * 1988-01-14 1989-10-25 梁丰新 Anthracite-fired hot water boiler
CN2190235Y (en) * 1993-11-01 1995-02-22 刘雪华 Smoke eliminating, dust collecting and energy saving device in stoves
CN2555480Y (en) * 2001-12-14 2003-06-11 张振勇 High efficiency thermal tube horizontal hot water boiler
CN1450323A (en) * 2002-07-04 2003-10-22 王森 Horizontal wet method desulfurization and dust-removing coal boiler
CN2651607Y (en) * 2003-08-15 2004-10-27 烟台火焰山锅炉有限公司 Water-closing impact desulfurized dust remover for boiler
CN2692573Y (en) * 2004-03-04 2005-04-13 严胡平 Single-cylinder longitudinal smokeless boiler
CN2807008Y (en) * 2005-07-20 2006-08-16 严胡平 Energy-saving smokeless boiler
CN201448866U (en) * 2009-06-05 2010-05-05 祁洪波 Boiler slop smoke partition wall
CN201731617U (en) * 2010-03-18 2011-02-02 刘博� Horizontal pipe array hot water boiler
CN102679556A (en) * 2012-05-30 2012-09-19 无锡锡能锅炉有限公司 Structural component of heating surface on tail part of fired coal-water-slurry boiler
CN202868721U (en) * 2012-10-26 2013-04-10 无锡锡能锅炉有限公司 Horizontal coal-fired boiler smoke separating wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李元章: "层燃锅炉隔烟墙质量及管理问题", 《中国锅炉压力容器安全》 *
李红玉: "关于加固快装锅炉隔烟墙的建议", 《同煤科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151055A (en) * 2017-11-08 2018-06-12 上海锅炉厂有限公司 A kind of partition wall positioning device
CN108151055B (en) * 2017-11-08 2023-11-03 上海锅炉厂有限公司 Partition wall positioner

Similar Documents

Publication Publication Date Title
CN201615598U (en) Horizontal type coal-fired hot blast furnace
CN202868721U (en) Horizontal coal-fired boiler smoke separating wall structure
CN202432493U (en) Modular afterheat boiler
CN102878576A (en) Smoke separation wall structure of horizontal coal burning boiler
CN201697152U (en) Novel combined type plate air preheater
CN204922959U (en) Whole abrasionproof structure of CFB boiler water wall
CN204084298U (en) Waste heat boiler
CN201133777Y (en) Air pre-heating device for high-temperature flue gas
CN201539859U (en) Connection structure of slag falling tube and once wind chamber
CN202074559U (en) Membrane wall structure for water tube boiler
CN202692089U (en) Light type membrane-wall water-cooling air hopper
CN202074560U (en) Film-type wall boiler
CN203443363U (en) Hanging molten steel sleeve used for metallurgical kiln
CN210832078U (en) Boiler water wall abrasionproof decreases structure
CN102734828A (en) Sector plate regulator of rotary air preheater
CN103574569B (en) cement kiln head waste heat boiler
CN201318682Y (en) Water cooling smoke retaining screen of waste heat boiler radiation chamber
CN202172821U (en) Radiator for bulk curing tobacco leaves
CN205373409U (en) Heating furnace with module lining
CN203757760U (en) T-shaped sealing component for water walls
CN204214286U (en) The split type bonnet of rotatable metallurgical furnace and there is its rotatable metallurgical furnace
CN203810374U (en) Tube box structure for low temperature economizer
CN220489201U (en) Mounting structure of two-stage horizontal air preheater on boiler
CN202382616U (en) Tube-replaceable vertical type array tube air pre-heater
CN204573973U (en) The two drum waste heat boiler of a kind of novel horizontal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130116