CN102862010B - Double-end automatic conveyor for connecting rod welding workpiece - Google Patents

Double-end automatic conveyor for connecting rod welding workpiece Download PDF

Info

Publication number
CN102862010B
CN102862010B CN201210372960.1A CN201210372960A CN102862010B CN 102862010 B CN102862010 B CN 102862010B CN 201210372960 A CN201210372960 A CN 201210372960A CN 102862010 B CN102862010 B CN 102862010B
Authority
CN
China
Prior art keywords
workpiece
welding
cylinder
connecting rod
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210372960.1A
Other languages
Chinese (zh)
Other versions
CN102862010A (en
Inventor
刘成军
刘云志
宋力强
肖静杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Wall Motor Co Ltd
Original Assignee
Great Wall Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Motor Co Ltd filed Critical Great Wall Motor Co Ltd
Priority to CN201210372960.1A priority Critical patent/CN102862010B/en
Publication of CN102862010A publication Critical patent/CN102862010A/en
Application granted granted Critical
Publication of CN102862010B publication Critical patent/CN102862010B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

一种双头连杆焊接工件自动输送装置,它由工件拿取翻转机构、两头焊接工序间工件输送机构、工件顶起转位机构、焊接与后处理工序间工件输送机构和PLC控制系统组成,所述工件拿取翻转机构布置在连杆工件焊装设备的储料箱与第一焊机之间,所述两头焊接工序间工件输送机构与工件顶起转位机构匹配,它们布置在连杆工件焊装设备的第一焊机与第二焊机之间,所述焊接与后处理工序间工件输送机构布置在连杆工件焊装设备的第二焊机与后处理装置之间。本发明具有自动化程度高、运行可靠的特点,能有效降低操作人员劳动强度、减少安全生产隐患,提高产品质量和焊接生产效率。

An automatic conveying device for welding workpieces with double-headed connecting rods, which is composed of a workpiece taking and turning mechanism, a workpiece conveying mechanism between welding processes at both ends, a workpiece lifting and transposition mechanism, a workpiece conveying mechanism between welding and post-processing procedures, and a PLC control system. The workpiece picking and turning mechanism is arranged between the storage box of the connecting rod workpiece welding equipment and the first welding machine. Between the first welding machine and the second welding machine of the workpiece welding equipment, the workpiece conveying mechanism between welding and post-processing procedures is arranged between the second welding machine and the post-processing device of the connecting rod workpiece welding equipment. The invention has the characteristics of high degree of automation and reliable operation, can effectively reduce the labor intensity of operators, reduce hidden dangers in production safety, and improve product quality and welding production efficiency.

Description

一种双头连杆焊接工件自动输送装置An automatic conveying device for welding workpieces with double-headed connecting rods

技术领域 technical field

本发明涉及一种工件输送装置,尤其是一种汽车连杆零件在焊装过程中的自动输送装置,属于汽车技术领域。 The invention relates to a workpiece conveying device, in particular to an automatic conveying device for automobile connecting rod parts during the welding process, belonging to the technical field of automobiles.

背景技术 Background technique

汽车是由成千上万个零部件组成的,各零部件生产企业为了降低成本、提升产品品质、提高工作效率、降低工人的劳动强度,生产设备都在朝着自动化、人性化的方向发展。例如汽车转向系统稳定杆连杆的焊接有电阻焊接、普通焊接等多种形式,其中电阻焊接形式由电阻焊机完成,它具有简单可靠、工作效率高的特点,能够依靠大电流瞬间融化两电极间的材料,快速完成产品的焊接,能满足不同形式连杆产品的焊接要求,在本行业中应用最为普遍。但目前电阻焊机一般由人工操作,需操作工人用手拿取工件后再用气缸顶紧。操作时,气缸将连杆杆顶紧在电阻焊的下电极上,如果没有顶紧会出现电流不能接通或接触电阻大,从而影响焊接质量。在此过程中,极易发生气缸压住手指现象,给操作人员带来人身伤害。并且,人手拿取工件存在着放置点不统一的问题,导致产品一致性差。这是因为当人手放置到定位点时,有可能放置的产品不垂直、或没有将产品放置好就顶紧了气缸、或者每次放置的力量大小不同而导致产品没在恰当的位置焊接,造成产品一致性差。另外,在整个焊接过程中,需要对连杆两头分别焊接。由于连杆由三个零件组合而成,它包括一根杆、两个圆头形的座,焊接是将圆头形的座分别焊接在杆的两端,并且圆头座的形状为一端孔小,一端孔大,将一端焊接完成后,焊接另一端时需要将焊接完成的转变角度形成180度的角度,也就是焊接完成的产品为圆头座小孔的朝向正好相反,需将焊接完成了一端的产品翻转两个180度,第一个一百八十度为转过来焊接另一端,第二个为圆头座的朝向,并且是在高温的情况下完成,既要防止烫伤、又要将半产品焊接另一端时放好位置,不能偏差,且气缸顶紧不能晃动,以保证产品焊接后的品质,这就造成操作人员劳动强度大、以及存在烫伤的潜在风险。 Automobiles are composed of thousands of parts. In order to reduce costs, improve product quality, improve work efficiency, and reduce labor intensity, all parts manufacturers are developing their production equipment in the direction of automation and humanization. For example, the welding of the stabilizer bar connecting rod of the automobile steering system has various forms such as resistance welding and ordinary welding. Among them, the resistance welding form is completed by the resistance welding machine. It has the characteristics of simplicity, reliability and high work efficiency, and can instantly melt the two electrodes by relying on high current. It can quickly complete the welding of products, and can meet the welding requirements of different types of connecting rod products. It is the most common application in this industry. But resistance welding machine is generally operated by manual operation at present, needs operator to take workpiece with hand and then tops up with cylinder again. During operation, the cylinder pushes the connecting rod on the lower electrode of the resistance welding. If there is no pressing, the current cannot be connected or the contact resistance is large, which will affect the welding quality. During this process, it is very easy for the cylinder to press the finger, which will cause personal injury to the operator. Moreover, there is a problem of inconsistent placement points when taking workpieces by hand, resulting in poor product consistency. This is because when the human hand is placed on the positioning point, the placed product may not be vertical, or the cylinder is tightened without placing the product properly, or the force of each placement is different, resulting in the product not being welded in the proper position, resulting in Product consistency is poor. In addition, during the whole welding process, the two ends of the connecting rod need to be welded separately. Since the connecting rod is composed of three parts, it includes a rod and two round-head-shaped seats. Welding is to weld the round-head-shaped seats to both ends of the rod respectively, and the shape of the round-head seat is an end hole. Small, one end hole is big, after one end is welded, when welding the other end, it is necessary to form a 180-degree angle of the welded transformation angle, that is, the welded product is a round head seat with the small hole facing the opposite direction, and the welding needs to be completed The product at one end is turned over two 180 degrees, the first 180 degrees is to turn over to weld the other end, and the second is the orientation of the round head seat, and it is done under high temperature conditions, both to prevent burns and to When the semi-product is welded to the other end, it should be placed in a good position without deviation, and the cylinder should be tightened so that it cannot shake to ensure the quality of the product after welding. This will cause high labor intensity for the operator and the potential risk of burns.

发明内容 Contents of the invention

本发明的目的在于针对现有技术之弊端,提供一种自动化程度高、运行可靠、能降低操作人员劳动强度、减少安全生产隐患、提高焊接生产效率的双头连杆焊接工件自动输送装置。 The object of the present invention is to aim at the disadvantages of the prior art, to provide a double-headed link welding workpiece automatic conveying device with high degree of automation, reliable operation, which can reduce the labor intensity of operators, reduce safety hazards in production, and improve welding production efficiency.

本发明所述问题是以下述技术方案实现的: Problem described in the present invention is realized with following technical scheme:

一种双头连杆焊接工件自动输送装置,它由工件拿取翻转机构、两头焊接工序间工件输送机构、工件顶起转位机构、焊接与后处理工序间工件输送机构和PLC控制系统组成。 An automatic delivery device for welding workpieces with double-end connecting rods, which is composed of a workpiece taking and turning mechanism, a workpiece conveying mechanism between welding processes at both ends, a workpiece jacking and indexing mechanism, a workpiece conveying mechanism between welding and post-processing procedures, and a PLC control system.

上述双头连杆焊接工件自动输送装置,所述工件拿取翻转机构布置在连杆工件焊装设备的储料箱与第一焊机之间,所述两头焊接工序间工件输送机构与工件顶起转位机构布置在连杆工件焊装设备的第一焊机与第二焊机之间,所述焊接与后处理工序间工件输送机构布置在连杆工件焊装设备的第二焊机与后处理装置之间。 In the above-mentioned automatic conveying device for welding workpieces with connecting rods, the workpiece taking and turning mechanism is arranged between the storage box of the connecting rod workpiece welding equipment and the first welding machine, and the workpiece conveying mechanism between the welding processes at both ends is connected to the workpiece top. The lifting and indexing mechanism is arranged between the first welding machine and the second welding machine of the connecting rod workpiece welding equipment, and the workpiece conveying mechanism between the welding and post-processing procedures is arranged between the second welding machine and the second welding machine of the connecting rod workpiece welding equipment. between aftertreatment devices.

上述双头连杆焊接工件自动输送装置,所述工件拿取翻转机构设有第一工作台,在第一工作台上安装第一直线运动单元,所述第一直线运动单元上设置第一左右移动无杆缸,在第一左右移动无杆缸上面固定安装第一上下移动气缸,所述第一上下移动气缸的伸缩杆末端连接第一前后移动气缸,在第一前后移动气缸伸缩杆末端连接第一升降气缸,所述第一升降气缸伸缩杆末端连接第一步进电机,在第一步进电机的输出轴上装配第一工件夹紧单元。 In the above-mentioned automatic conveying device for welding workpieces with double-headed connecting rods, the workpiece taking and turning mechanism is provided with a first workbench, and a first linear motion unit is installed on the first workbench, and a second linear motion unit is installed on the first linear motion unit. A left and right moving rodless cylinder, the first up and down moving cylinder is fixedly installed on the first left and right moving rodless cylinder, the telescopic rod end of the first up and down moving cylinder is connected with the first front and rear moving cylinder, The end is connected with the first lifting cylinder, the telescoping rod end of the first lifting cylinder is connected with the first stepping motor, and the first workpiece clamping unit is assembled on the output shaft of the first stepping motor.

上述双头连杆焊接工件自动输送装置,所述两头焊接工序间工件输送机构设有第二工作台,在第二工作台上安装第二直线运动单元,所述第二直线运动单元上设置第二左右移动无杆缸,在第二左右移动无杆缸上面固定安装第二上下移动气缸,所述第二上下移动气缸的伸缩杆末端连接第二前后移动气缸,在第二前后移动气缸伸缩杆末端连接第二升降气缸,所述第二升降气缸伸缩杆末端连接第二步进电机,在第二步进电机的输出轴上装配第二工件夹紧单元。 In the above-mentioned automatic workpiece conveying device for double-end connecting rod welding, the workpiece conveying mechanism between the welding processes at both ends is provided with a second workbench, and a second linear motion unit is installed on the second workbench, and a second linear motion unit is arranged on the second Two left and right moving rodless cylinders, a second up and down moving cylinder is fixedly installed on the second left and right moving rodless cylinder, the end of the telescopic rod of the second up and down moving cylinder is connected to the second front and rear moving cylinder, and the telescopic rod of the second front and rear moving cylinder is The end is connected with the second lifting cylinder, the end of the telescopic rod of the second lifting cylinder is connected with the second stepping motor, and the second workpiece clamping unit is assembled on the output shaft of the second stepping motor.

上述双头连杆焊接工件自动输送装置,所述焊接与后处理工序间工件输送机构设有第三工作台,在第三工作台上安装第三直线运动单元,所述第三直线运动单元上设置第三左右移动无杆缸,在第三左右移动无杆缸上面固定安装第三前后移动气缸,在第三前后移动气缸伸缩杆末端连接第三升降气缸,所述第三升降气缸伸缩杆末端连接第三步进电机,在第三步进电机的输出轴上装配与第三工件夹紧单元。 In the above-mentioned automatic workpiece conveying device for double-headed connecting rod welding, the workpiece conveying mechanism between the welding and post-processing procedures is provided with a third workbench, and a third linear motion unit is installed on the third workbench, and the third linear motion unit is A third left and right moving rodless cylinder is installed, and a third front and rear moving cylinder is fixedly installed on the third left and right moving rodless cylinder. Connect the third stepper motor, and assemble the third workpiece clamping unit on the output shaft of the third stepper motor.

上述双头连杆焊接工件自动输送装置,所述工件顶起转位机构与两头焊接工序间工件输送机构匹配,它包括上下移动无杆缸、第四步进电机、旋转块和第四工作台,所述上下移动无杆缸固定在第四工作台上,所述第四步进电机安装在上下移动无杆缸侧壁上,在第四步进电机输出轴末端装配旋转块,所述旋转块上设有与连杆工件的销孔座匹配的凹槽。 The above-mentioned automatic conveying device for welding workpieces with double-headed connecting rods, the workpiece lifting and indexing mechanism is matched with the workpiece conveying mechanism between the welding processes at both ends, and it includes a rodless cylinder moving up and down, a fourth stepping motor, a rotating block and a fourth workbench , the up and down moving rodless cylinder is fixed on the fourth workbench, the fourth stepping motor is installed on the side wall of the up and down moving rodless cylinder, and a rotating block is assembled at the end of the output shaft of the fourth stepping motor, and the rotating The block is provided with a groove matching the pin-hole seat of the connecting rod workpiece.

上述双头连杆焊接工件自动输送装置,所述PLC控制系统与连杆工件焊装设备控制系统匹配,所有与PLC控制系统执行元件配合的气缸均为磁力环气缸。 In the above-mentioned automatic conveying device for welding workpieces with double-headed connecting rods, the PLC control system is matched with the control system of welding equipment for connecting rod workpieces, and all the cylinders that cooperate with the actuators of the PLC control system are magnetic ring cylinders.

本发明由不同的直线运动单元、气缸、步进电机和工件夹紧单元组成机械手结构,替代人工完成连杆工件焊接过程中工件的取料翻转、两焊接工序、焊接与后处理工序间的运送,减少了连杆工件焊接耗用时间,可将整个循环过程控制在12秒内完成;本发明通过PLC系统控制实现工件的移动、转位、旋转等动作,并且所有气缸均采用磁力环气缸,每步动作均有防错装置,保证了产品生产的一致性。总之,本发明具有自动化程度高、运行可靠的特点,能有效降低操作人员劳动强度、减少安全生产隐患,提高产品质量和焊接生产效率。 The invention consists of different linear motion units, cylinders, stepping motors and workpiece clamping units to form a manipulator structure, which replaces the manual completion of the workpiece picking and turning, two welding processes, and transportation between welding and post-processing processes during the welding process of connecting rod workpieces. , reduces the welding time of the connecting rod workpiece, and can complete the entire cycle process within 12 seconds; the invention realizes the movement, indexing, rotation and other actions of the workpiece through PLC system control, and all cylinders use magnetic ring cylinders, Each step has an anti-error device to ensure the consistency of product production. In a word, the present invention has the characteristics of high degree of automation and reliable operation, can effectively reduce the labor intensity of operators, reduce hidden dangers in production safety, and improve product quality and welding production efficiency.

附图说明 Description of drawings

下面结合附图对本发明作进一步说明。 The present invention will be further described below in conjunction with accompanying drawing.

图1是本发明的总体布置示意图; Fig. 1 is a general layout schematic diagram of the present invention;

图2是工件拿取翻转机构的组成结构示意图; Fig. 2 is a schematic diagram of the composition and structure of the workpiece taking and turning mechanism;

图3是两头焊接工序间工件输送机构的组成结构示意图; Figure 3 is a schematic diagram of the composition and structure of the workpiece conveying mechanism between the welding processes at both ends;

图4是工件顶起转位机构的组成结构示意图; Fig. 4 is a schematic diagram of the composition and structure of the workpiece jacking and indexing mechanism;

图5是焊接与后处理工序间工件输送机构的组成结构示意图; Fig. 5 is a schematic diagram of the composition and structure of the workpiece conveying mechanism between welding and post-processing procedures;

图6是连杆工件在焊接过程中空间姿态变化示意图。 Fig. 6 is a schematic diagram of the spatial attitude change of the connecting rod workpiece during the welding process.

图中各标号为:1、工件拿取翻转机构,1-1、第一工作台,1-2、第一直线运动单元,1-3、第一左右移动无杆缸,1-4、第一上下移动气缸,1-5、第一前后移动气缸,1-6、第一步进电机,1-7、第一升降气缸,1-8、第一夹紧单元,2、两头焊接工序间工件输送机构,2-1、第二工作台,2-2、第二直线运动单元,2-3、第二左右移动无杆缸,2-4、第二上下移动气缸,2-5、第二前后移动气缸,2-6、第二步进电机,2-7、第二升降气缸,2-8、第二夹紧单元,3、焊接与后处理工序间工件输送机构,3-1、第三工作台,3-2、第三直线运动单元,3-3、第三左右移动无杆缸,3-4、第三前后移动气缸,3-5、第三步进电机,3-6、第三夹紧单元,3-7、第三升降气缸, 4、工件顶起转位机构,4-1、上下移动无杆气缸,4-2、第四步进电机,4-3、旋转块,4-4、第四工作台,4-5、凹槽,5、连杆工件,5-1、连杆工件杆身,5-2、连杆第一销孔座,5-3、连杆第二销孔座,6、储料箱,7、第一焊机,8、第二焊机,9、连杆销孔座输送装置,10、后处理装置(冲标识装置)。 The labels in the figure are: 1, the workpiece taking and turning mechanism, 1-1, the first workbench, 1-2, the first linear motion unit, 1-3, the first left and right moving rodless cylinder, 1-4, The first up and down moving cylinder, 1-5, the first forward and backward moving cylinder, 1-6, the first stepping motor, 1-7, the first lifting cylinder, 1-8, the first clamping unit, 2, welding process at both ends Between the workpiece conveying mechanism, 2-1, the second workbench, 2-2, the second linear motion unit, 2-3, the second left and right moving rodless cylinder, 2-4, the second up and down moving cylinder, 2-5, The second forward and backward moving cylinder, 2-6, the second stepping motor, 2-7, the second lifting cylinder, 2-8, the second clamping unit, 3, the workpiece conveying mechanism between welding and post-processing procedures, 3-1 , the third workbench, 3-2, the third linear motion unit, 3-3, the third left and right moving rodless cylinder, 3-4, the third front and rear moving cylinder, 3-5, the third stepping motor, 3- 6. The third clamping unit, 3-7, the third lifting cylinder, 4. The workpiece jacking and indexing mechanism, 4-1, the rodless cylinder moving up and down, 4-2, the fourth stepping motor, 4-3, Rotary block, 4-4, the fourth worktable, 4-5, groove, 5, connecting rod workpiece, 5-1, connecting rod workpiece shaft, 5-2, the first pin hole seat of connecting rod, 5-3 , the second pin-hole seat of the connecting rod, 6, the material storage box, 7, the first welding machine, 8, the second welding machine, 9, the conveying device for the pin-hole seat of the connecting rod, 10, the post-processing device (marking device).

具体实施方式 Detailed ways

参看图 1,本发明为连杆工件焊装设备的配套工装,它由工件拿取翻转机构1、两头焊接工序间工件输送机构2、工件顶起转位机构4、焊接与后处理工序间工件输送机构3和PLC控制系统组成,其中工件拿取翻转机构1布置在连杆工件焊装设备的储料箱6与第一焊机7之间,用于完成工件原材料(连杆杆身)的抓取和空间姿态的调整,将连杆由原来的水平放置,转变成杆的两端为竖直放置。两头焊接工序间工件输送机构2与工件顶起转位机构4匹配,它们布置在连杆工件焊装设备的第一焊机7与第二焊机8之间,用于完成连杆工件在连杆第一销孔座焊装工序和连杆第二销孔座焊装工序之间的运送,并在运送过程中完成工件空间姿态的调整(此时的状态为竖直状态,已经焊接完的一端在上方,需要将状态调整为将焊接完的一端翻转180度,即焊接完的一端朝下,并且圆头座的小孔朝向也要旋转180度,使小孔朝向另一端);焊接与后处理工序间工件输送机构3布置在连杆工件焊装设备的第二焊机8与后处理装置10之间,用于完成连杆工件在连杆第二销孔座焊装工序和后处理工序之间的运送,并在运送过程中完成工件空间姿态的调整(将竖直放置的产品转为平行放置,为了让开电阻焊机本身,竖直放置移动的话,会与电阻焊机本身相干涉,翻转后才能进行下一序的作业)。 Referring to Fig. 1, the present invention is a matching tooling for the connecting rod workpiece welding equipment, which consists of a workpiece taking and turning mechanism 1, a workpiece conveying mechanism 2 between welding processes at both ends, a workpiece jacking and indexing mechanism 4, and workpieces between welding and post-processing processes Conveying mechanism 3 and PLC control system, wherein the workpiece taking and turning mechanism 1 is arranged between the storage box 6 and the first welding machine 7 of the connecting rod workpiece welding equipment, and is used to complete the workpiece raw material (connecting rod shaft) The adjustment of grasping and spatial posture changes the connecting rod from the original horizontal placement to the vertical placement of both ends of the rod. The workpiece conveying mechanism 2 between the two ends of the welding process is matched with the workpiece jacking and indexing mechanism 4. They are arranged between the first welding machine 7 and the second welding machine 8 of the connecting rod workpiece welding equipment, and are used to complete the connecting rod workpiece. The transportation between the welding process of the first pin-hole seat of the rod and the welding process of the second pin-hole seat of the connecting rod, and the adjustment of the spatial posture of the workpiece is completed during the transportation process (the state at this time is a vertical state, and the welded One end is on the top, you need to adjust the state to turn the welded end 180 degrees, that is, the welded end faces down, and the small hole of the round head seat should also be rotated 180 degrees so that the small hole faces the other end); welding and The post-processing workpiece conveying mechanism 3 is arranged between the second welding machine 8 of the connecting rod workpiece welding equipment and the post-processing device 10, and is used to complete the welding process and post-processing of the connecting rod workpiece on the second pin hole seat of the connecting rod. The transportation between processes, and the adjustment of the workpiece space posture during the transportation process (turning the vertically placed products into parallel ones, in order to get away from the resistance welding machine itself, if it is placed vertically and moves, it will be in contact with the resistance welding machine itself Interference, the next sequence of operations can only be carried out after flipping).

参看图1~图6,本发明可替代人工完成连杆工件焊接过程中工件的取料翻转、两焊接工序、焊接与后处理工序间的运送,减少了连杆工件焊接耗用时间,可将整个循环过程控制在12秒内完成;本发明通过PLC控制实现工件的移动、转位、旋转等动作,并且所有气缸均采用磁力环气缸(如SC50X250-S型磁力环的气缸),每步动作均有防错装置,保证了产品生产的一致性。这是因为有了磁力环的防错作用,当没到位时,就不会进行下一步动作从而保证了产品的一致性。 Referring to Figures 1 to 6, the present invention can replace the manual completion of the reclaiming and flipping of the workpiece during the welding process of the connecting rod workpiece, the transportation between the two welding processes, the welding and the post-processing process, and reduces the time spent on welding the connecting rod workpiece. The entire cycle process control is completed within 12 seconds; the present invention realizes the movement, indexing, rotation and other actions of the workpiece through PLC control, and all cylinders use magnetic force ring cylinders (such as SC50X250-S type magnetic force ring cylinders), each step of the action All have anti-error devices to ensure the consistency of product production. This is because of the anti-error function of the magnetic ring, when it is not in place, it will not proceed to the next step to ensure the consistency of the product.

本发明的具体操作步骤为:一、工件上料,按下开关按钮,工件拿取翻转机构1的第一夹紧单元将储料箱6出口处的连杆杆身抓取后翻转90°,工件5由水平状态变为竖直状态,再由工件拿取翻转机构1输送至第一焊机7的焊装作业区,在此完成第一连杆销孔座5-1的焊装,工件拿取翻转机构1退回到初始位置;二、两头焊接工序间工件输送,两头焊接工序间工件输送机构2的第二夹紧单元将工件抓取后,由第二步进电机2-6驱动完成工件在竖直面内180°旋转,此时工件的第一连杆销孔座5-1位于工件5下端,经工件顶起转位机构调整,工件5完成水平面内180°旋转,再由两头焊接工序间工件输送机构2输送至第二焊机8的焊装作业区,在此完成第二连杆销孔座5-2的焊装,两头焊接工序间工件输送机构2退回到初始位置;三、焊接与后处理工序间工件输送,焊接与后处理工序间工件输送机构3的第二夹紧单元将工件抓取后,由第三步进电机3-5驱动完成工件竖直面内90°旋转,此时工件为水平状态,再由焊接与后处理工序间工件输送机构3输送至后处理装置10工作区,后处理装置10(冲标识装置)对工件5进行冲标识作业。焊接与后处理工序完成后,工件输送机构3退回到初始位置,至此完成一个工件输送循环。 The specific operation steps of the present invention are: 1. Loading the workpiece, pressing the switch button, the first clamping unit of the workpiece taking and turning mechanism 1 grabs the connecting rod shaft at the outlet of the storage box 6 and turns it over 90°, The workpiece 5 changes from a horizontal state to a vertical state, and then is transported to the welding operation area of the first welding machine 7 by the workpiece taking and turning mechanism 1, where the welding of the first connecting rod pin hole seat 5-1 is completed, and the workpiece Take the turning mechanism 1 and return to the initial position; 2. The workpiece is transported between the two welding processes. After the second clamping unit of the workpiece transport mechanism 2 between the two welding processes grabs the workpiece, it is driven by the second stepping motor 2-6 to complete The workpiece rotates 180° in the vertical plane. At this time, the first connecting rod pin hole seat 5-1 of the workpiece is located at the lower end of the workpiece 5. After the adjustment of the workpiece jacking and indexing mechanism, the workpiece 5 completes the 180° rotation in the horizontal plane. The workpiece conveying mechanism 2 between the welding processes is transported to the welding operation area of the second welding machine 8, where the welding of the second connecting rod pin hole seat 5-2 is completed, and the workpiece conveying mechanism 2 between the welding processes at both ends returns to the initial position; 3. Workpiece transportation between welding and post-processing procedures. After the second clamping unit of the workpiece conveying mechanism 3 between welding and post-processing procedures grabs the workpiece, it is driven by the third stepping motor 3-5 to complete the workpiece vertical plane 90 ° rotation, the workpiece is in a horizontal state at this time, and then transported to the work area of the post-processing device 10 by the workpiece conveying mechanism 3 between the welding and post-processing procedures, and the post-processing device 10 (marking device) carries out stamping and marking operations on the workpiece 5. After the welding and post-processing procedures are completed, the workpiece conveying mechanism 3 returns to the initial position, thus completing a workpiece conveying cycle.

本发明的三个夹紧单元可采用HDZ-16-15T-2;其结构特点为靠气推动活塞前后运动,活塞通过主轴带动平行运动的夹片来回移动,完成张开夹紧的动作,平行夹片上可以组装各种样式的辅助工具,以夹持各种形状的产品。 The three clamping units of the present invention can adopt HDZ-16-15T-2; its structural feature is that the piston moves back and forth by air, and the piston drives the parallel moving clips to move back and forth through the main shaft to complete the opening and clamping action, parallel Auxiliary tools of various styles can be assembled on the clip to hold products of various shapes.

Claims (2)

1. a bipitch connecting rod welding work pieces automatic conveying device, it is characterized in that, it by workpiece take workpiece conveying mechanism (2) between switching mechanism (1), two welding sequence, workpiece jack-up indexing mechanism (4), between welding and postprocessing working procedures, workpiece conveying mechanism (3) and PLC control system form;
Described workpiece switching mechanism (1) of taking is provided with the first workbench (1-1), at upper installation first linear motion unit (1-2) of the first workbench (1-1);
Between the welding sequence of described two, workpiece conveying mechanism (2) is provided with the second workbench (2-1), at upper installation second linear motion unit (2-2) of the second workbench (2-1);
Between described welding and postprocessing working procedures, workpiece conveying mechanism (3) is provided with the 3rd workbench (3-1), in the upper installation the 3rd linear motion unit (3-2) of the 3rd workbench (3-1);
Described workpiece switching mechanism (1) of taking is arranged between the material storing box (6) of connecting rod workpiece pattern welding equipment and the first welding machine (7), between the welding sequence of described two, workpiece conveying mechanism (2) and workpiece jack-up indexing mechanism (4) are arranged between first welding machine (7) of connecting rod workpiece pattern welding equipment and the second welding machine (8), and between described welding and postprocessing working procedures, workpiece conveying mechanism (3) is arranged between second welding machine (8) of connecting rod workpiece pattern welding equipment and after-treatment device (10);
Described first linear motion unit (1-2) being arranged first moves left and right without bar cylinder (1-3), move left and right first and move up and down cylinder (1-4) without fixedly mounting first above bar cylinder (1-3), the described first expansion link end moving up and down cylinder (1-4) connects the first movable cylinder (1-5), the first lift cylinder (1-7) is connected at the first movable cylinder (1-5) expansion link end, described first lift cylinder (1-7) expansion link end connects the first stepper motor (1-6), first stepper motor (1-6) output shaft assembles the first Workpiece clamping unit (1-8),
Described second linear motion unit (2-2) being arranged second moves left and right without bar cylinder (2-3), move left and right second and move up and down cylinder (2-4) without fixedly mounting second above bar cylinder (2-3), the described second expansion link end moving up and down cylinder (2-4) connects the second movable cylinder (2-5), the second lift cylinder (2-7) is connected at the second movable cylinder (2-5) expansion link end, described second lift cylinder (2-7) expansion link end connects the second stepper motor (2-6), the output shaft of the second stepper motor (2-6) assembles second workpiece clamping unit (2-8),
Described 3rd linear motion unit (3-2) arranges the 3rd to be moved left and right without bar cylinder (3-3), move left and right without fixedly mounting the 3rd movable cylinder (3-4) above bar cylinder (3-3) the 3rd, the 3rd lift cylinder (3-7) is connected at the 3rd movable cylinder (3-4) expansion link end, described 3rd lift cylinder (3-7) expansion link end connects the 3rd stepper motor (3-5), and the output shaft of the 3rd stepper motor (3-5) assembles the 3rd Workpiece clamping unit (3-6);
Described workpiece jack-up indexing mechanism (4) is mated with workpiece conveying mechanism (2) between the welding sequence of two, it comprises and moves up and down without bar cylinder (4-1), 4th stepper motor (4-2), spill spin block (4-3) and the 4th workbench (4-4), described moving up and down is fixed on the 4th workbench (4-4) without bar cylinder (4-1), described 4th stepper motor (4-2) is arranged on the sidewall that moves up and down without bar cylinder (4-1), at the 4th stepper motor (4-2) output shaft end assembling spill spin block (4-3), described spill spin block (4-3) is provided with the groove (4-5) mated with connecting rod workpiece pin-and-hole seat.
2. a kind of bipitch connecting rod welding work pieces automatic conveying device according to claim 1, it is characterized in that, described PLC control system is mated with connecting rod workpiece pattern welding equipment control system, and all cylinders coordinated with PLC control system executive component are magnetic ring cylinder.
CN201210372960.1A 2012-09-29 2012-09-29 Double-end automatic conveyor for connecting rod welding workpiece Expired - Fee Related CN102862010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210372960.1A CN102862010B (en) 2012-09-29 2012-09-29 Double-end automatic conveyor for connecting rod welding workpiece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210372960.1A CN102862010B (en) 2012-09-29 2012-09-29 Double-end automatic conveyor for connecting rod welding workpiece

Publications (2)

Publication Number Publication Date
CN102862010A CN102862010A (en) 2013-01-09
CN102862010B true CN102862010B (en) 2015-05-27

Family

ID=47441280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210372960.1A Expired - Fee Related CN102862010B (en) 2012-09-29 2012-09-29 Double-end automatic conveyor for connecting rod welding workpiece

Country Status (1)

Country Link
CN (1) CN102862010B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103692117B (en) * 2013-12-06 2016-03-23 中联重科股份有限公司 Automatic feeding equipment for rack pads
CN113510404B (en) * 2021-08-25 2025-01-14 安徽中科自动化股份有限公司 A tobacco heat exchanger welding production line
CN114193139B (en) * 2021-12-30 2023-02-07 东莞华贝电子科技有限公司 Auxiliary material side pastes equipment and production line body

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201002178Y (en) * 2007-01-31 2008-01-09 雅致集成房屋股份有限公司 Automatic welding device
CN201394707Y (en) * 2009-03-09 2010-02-03 北京联东模板有限公司 Automatic template welding system
CN101879651A (en) * 2010-06-18 2010-11-10 宁波宇环机械设备有限公司 Full-automatic nut wielding machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110101493A (en) * 2010-03-08 2011-09-16 삼성중공업 주식회사 Guide device for welding carriage and automatic welding device having same
WO2012075660A1 (en) * 2010-12-07 2012-06-14 苏州和林精密科技有限公司 Automatic stacking and welding process method and apparatus for micro iron cores

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201002178Y (en) * 2007-01-31 2008-01-09 雅致集成房屋股份有限公司 Automatic welding device
CN201394707Y (en) * 2009-03-09 2010-02-03 北京联东模板有限公司 Automatic template welding system
CN101879651A (en) * 2010-06-18 2010-11-10 宁波宇环机械设备有限公司 Full-automatic nut wielding machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中轻型焊接H型钢自动生产线的设计和制造;罗文辉等;《焊接设备与材料》;20011031;第30卷(第5期);第30-33页 *

Also Published As

Publication number Publication date
CN102862010A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
US10933487B2 (en) Spot welding apparatus
CN104801869A (en) Automatic welding production line of car wheel casing and production method thereof
CN202701656U (en) Tool platform suitable for multiple vehicle types
CN202910526U (en) Automated welding device for lifting type manual pallet truck
CN203003385U (en) Inner reinforcing plate assembly fixture of rear side member
CN104785938A (en) Assembling and welding working station for cylinders and end plates of steam-injection machine
CN102862010B (en) Double-end automatic conveyor for connecting rod welding workpiece
CN103447721A (en) Full-automatic spot-welding equipment
CN208409325U (en) Workpiece quickly overturns transfer mechanism
CN107838539A (en) A kind of automatic butt-welding device
CN205166209U (en) Flexible automation of multi -vehicle type side wall tetrahedron is welding assembly line in batches
CN205906625U (en) A conveying mechanism for multi -vehicle type switches
CN203820127U (en) Automatic winding equipment applicable to plastic pipe production
CN114589677A (en) A forging or stamping manipulator
CN103433669A (en) Novel rocker arm type lower car body locating tool
CN204524573U (en) A kind of wheel cover of automobile automatic welding production line
CN204747903U (en) A rotary lifting device for welding
CN209125198U (en) Positioning device for combined welding of automobiles
CN212239715U (en) Welding workstation at bottom of elevator sedan-chair
CN203356907U (en) Tail end beam positioning and clamping device
CN204504861U (en) A kind of servo five connecting rod full-automatic material-feeding machinery hand
CN218285531U (en) Forging or stamping manipulator
CN206405808U (en) A kind of automatic processing apparatus for energy-saving and emission-reduction auto parts and components
CN205888364U (en) Car B post interior trim automatic cutout and welding set
CN103433670A (en) Dual-base type multi-point contact lower car body locating device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20210929