- CN102857970A CN102857970A CN2011101775418A CN201110177541A CN102857970A CN 102857970 A CN102857970 A CN 102857970A CN 2011101775418 A CN2011101775418 A CN 2011101775418A CN 201110177541 A CN201110177541 A CN 201110177541A CN 102857970 A CN102857970 A CN 102857970A
- Authority
- CN
- China
- Prior art keywords
- load
- load information
- current
- information
- average value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/16—Performing reselection for specific purposes
- H04W36/22—Performing reselection for specific purposes for handling the traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
- H04W28/086—Load balancing or load distribution among access entities
- H04W28/0861—Load balancing or load distribution among access entities between base stations
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
- H04W28/09—Management thereof
- H04W28/0958—Management thereof based on metrics or performance parameters
- H04W28/0967—Quality of Service [QoS] parameters
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses an inter-cell load balance realizing method which comprises the following steps that: if load balance is needed, a base station determines the average of the current load information of all adjacent cells; and the base station determines to execute LB (load balancing) operation or MLB (mobility load balancing) operation according to the average of the load information and the current load information thereof. The invention also discloses an inter-cell load balance realizing device. The method and device disclosed by the invention can effectively realize load balance according to the actual conditions of the current load of the base station so as to ensure the success rate of switching and quickly realize load balance in the case of overload.
Description
Technical field
The present invention relates to Long Term Evolution (LTE, Long Term Evolution) technology, particularly implementation method and the device of load balance between a kind of LTE system small area.
Background technology
The LTE system is resource limited system, the resource of each residential quarter is limited, increase along with number of users and professional number, the load of residential quarter can increase gradually, and the increase of cell load can affect the index performance of customer service, if can not reduce timely and effectively the load of residential quarter, when the load of system is increased to the warning line of system, the rapid variation of performance that can cause system, even can cause system crash, main manifestations is: the access success rate is low, handover success rate is low, descending power load is too high and neighboring interval disturbs large etc.Therefore, for so that the load of each residential quarter in certain zone all in a horizontal line, thereby so that system is more stable and efficiently, need to carry out balance to the minizone load.
At present, in the LTE system, realize that the method for minizone load balance mainly comprises: load balancing (LB, Load Balancing) technology and mobility load balance (MLB, Mobility Load balancing) technology.Wherein, the task of LB technology is process many inter-cell traffic unbalanced, particularly, by adopting the mode of switching or re-selecting cell, the business that realizes is flowing to the underload residential quarter from the high load capacity residential quarter, thereby make Radio Resource keep higher utilance, keep to a certain extent higher service quality, and effectively reduce the probability of cutting off rate; The MLB technology is as self-organizing network (SON, Self-Organized Network) self-optimization function in, mainly be by the Automatic Optimal mobility parameters, that is: cell reselection parameters or handoff parameter, the partial service of the higher residential quarter of load is transferred to the lower adjacent area of load, thereby realize the uniform distribution of minizone load, and then improve power system capacity, and reduce artificial interference to network management.
No matter be LB technology or MLB technology, all will adjudicate as initial conditions with the current information on load in adjacent area that the current information on load in the adjacent area of LTE system is carried in the X2 mouth message and transmits; Wherein, described current information on load comprises: current wireless resource utility efficiency, current hardware information on load, current transmission load indication information, integration capability information that up-downgoing can be used and the up-downgoing ability rating indication information of residential quarter.Wherein, described current wireless resource utility efficiency comprises: Physical Resource Block (the GBR PRB of up-downgoing guaranteed rate business, Guaranteed Bit Rate Physical Resource Block) total Physical Resource Block (PRB, the Physical Resource Block) utilance of Physical Resource Block (non-GBR PRB) utilance of utilance, the non-guaranteed rate business of up-downgoing and up-downgoing; Described current hardware information on load comprises: up-downgoing hardware information on load; Described current transmission load indication information comprises: up-downgoing transmission information on load.The LB technology is output as the subscriber equipment (UE that needs switching, UserEquipment) and candidate handover cell, the MLB technology is output as amended handoff parameter or reselecting parameters, that is to say, in the LB technology, evolved base station (eNB, evolved Node B) issues the order that switches to corresponding candidate handover cell to UE, in the MLB technology, eNB issues amended handoff parameter or reselecting parameters to UE.
For the LB technology, because after UE receives orders, directly switch, so the LB technology can realize load balance rapidly, but, when switching, because UE can not be known the signal quality of corresponding candidate handover cell, therefore, the LB technology realizes switches to blind switching, and the success rate of switching can not be guaranteed; For the MLB technology, because what eNB issued to UE is amended handoff parameter or reselecting parameters, at this moment, UE switches based on measurement, in this case, UE can be known the signal quality of candidate handover cell, so the success rate of switching can be guaranteed, but, because UE need to switch based on measurement, therefore, the MLB technology realizes that the effect of load balance is slow.
In sum, in the technical scheme of existing realization minizone load balance, what have exists the lower defective of handover success rate, and the existence that has realizes the slower defective of effect of load balance.
Summary of the invention
In view of this, main purpose of the present invention is to provide implementation method and the device of a kind of minizone load balance, can according to the actual conditions of base station present load, effectively realize load balance.
For achieving the above object, technical scheme of the present invention is achieved in that
The invention provides the implementation method of a kind of minizone load balance, the method comprises:
After definite needs carried out load balance, the mean value of the information on load that all neighbor cells are current was determined in the base station;
According to mean value and self current information on load of described information on load, determine to carry out LB operation or MLB operation.
In the such scheme, when determining the mean value of the information on load that all neighbor cells are current, the method further comprises:
Obtain the current information on load of all neighbor cells.
In the such scheme, the described current information on load of all neighbor cells that obtains, for:
Resource status by the X2 mouth upgrades (RESOURCE STATUS UPDATE) message, obtains the current information on load of all neighbor cells.
In the such scheme, described information on load is wireless resource utility efficiency or for the hardware information on load or be transmission load indication information.
In the such scheme, described wireless resource utility efficiency comprises: up-downgoing GBR PRB utilance, and up-downgoing non-GBR PRB utilance.
In the such scheme, according to mean value and self current information on load of described information on load, determine to carry out LB operation or MLB operation, for:
Judge the information on load that the mean value of described information on load and self are current difference square whether less than default threshold value, and according to judged result, carry out LB operation or MLB operation.
In the such scheme, described according to judged result, carry out LB operation or MLB operation, for:
If the difference of the information on load that the mean value of described information on load and self are current square less than default threshold value, then carry out the MLB operation, if the difference of the information on load that the mean value of described information on load and self are current square more than or equal to default threshold value, then carry out the LB operation.
The present invention also provides the implement device of a kind of minizone load balance, and this device comprises: determining unit and performance element; Wherein,
Determining unit after determining to carry out load balance, is determined the mean value of the information on load that all neighbor cells are current, and the mean value of determining is sent to performance element;
Performance element, after being used for receiving the mean value of determining of determining unit transmission, according to mean value and self current information on load of described information on load, definite LB of execution operates or the MLB operation.
In the such scheme, this device further comprises:
Acquiring unit be used for obtaining the current information on load of all neighbor cells, and the current information on load of all neighbor cells that will obtain sends to determining unit;
Determining unit also is used for receiving the current information on load of all neighbor cells that acquiring unit sends.
In the such scheme, described performance element specifically is used for:
Judge the information on load that the mean value of described information on load and self are current difference square whether less than default threshold value, and according to judged result, carry out LB operation or MLB operation.
Implementation method and the device of minizone provided by the invention load balance, need to carry out the base station of load balance according to mean value and self current information on load of described information on load, determine to carry out LB operation or MLB operation, that is: when the base station according to mean value and self current information on load of described information on load, when determining that self present load is high capacity, carry out the MLB operation, mean value and self current information on load when the base station according to described information on load, when determining self present load for overload, carry out the LB operation, so, can effectively realize load balance according to the actual conditions of base station present load, thereby can guarantee the success rate switched, can also when overload, realize rapidly load balance.
Description of drawings
Fig. 1 is the implementation method schematic flow sheet of minizone of the present invention load balance;
Fig. 2 is the implementation method schematic flow sheet of embodiment one minizone load balance;
Fig. 3 is the implementation method schematic flow sheet of embodiment two minizone load balances;
Fig. 4 is the implementation method schematic flow sheet of embodiment three minizone load balances;
Fig. 5 is the implement device structural representation of minizone of the present invention load balance.
Embodiment
Basic thought of the present invention is: after determining to carry out load balance, the mean value of the information on load that all neighbor cells are current is determined in the base station; According to mean value and self current information on load of described information on load, determine to carry out LB operation or MLB operation.
The present invention is further described in more detail below in conjunction with drawings and the specific embodiments.
The implementation method of minizone of the present invention load balance as shown in Figure 1, may further comprise the steps:
Step 101: after determining to carry out load balance, the base station obtains the current information on load of all neighbor cells;
Here, described base station specifically can be eNB;
Described base station obtains the current information on load of all neighbor cells and refers to: the base station obtains the current information on load of self all neighbor cell;
The described current information on load of all neighbor cells that obtains is specially:
By the RESOURCE STATUS UPDATE message of X2 mouth, obtain the current information on load of all neighbor cells;
Wherein, at all neighbor cells of base station configuration, can know all neighbor cells accordingly in advance, and then can by the RESOURCE STATUS UPDATE message of X2 mouth, obtain the current information on load of all neighbor cells;
Described information on load is specifically as follows: wireless resource utility efficiency, hardware information on load or transmission load indication information.
Step 102: the mean value of determining the information on load that all neighbor cells are current.
Step 103: LB operation or MLB operation are determined to carry out according to mean value and self current information on load of described information on load in the base station;
Particularly, the base station judge the information on load that the mean value of described information on load and self are current difference square whether less than default threshold value, and according to judged result, carry out LB operation or MLB operation;
Wherein, according to the size that described threshold value need to be set;
Described according to judged result, carry out LB operation or MLB operation, be specially:
If the difference of the information on load that the mean value of described information on load and self are current square less than default threshold value, then carry out the MLB operation, if the difference of the information on load that the mean value of described information on load and self are current square more than or equal to default threshold value, then carry out the LB operation;
Here, the concrete processing procedure of carrying out MLB operation and execution LB operation is prior art, repeats no more here.
Below in conjunction with embodiment the present invention is described in further detail again.
Embodiment one:
The application scenarios of present embodiment is: eNB gets access to the current wireless resource utility efficiency in all adjacent areas by the RESOURCE STATUS UPDATE message of X2, that is: described information on load is wireless resource utility efficiency.The implementation method of present embodiment minizone load balance as shown in Figure 2, may further comprise the steps:
Step 201: after determining to carry out load balance, eNB obtains the current wireless resource utility efficiency of all neighbor cells by the RESOURCESTATUS UPDATE message of X2 mouth;
Here, described wireless resource utility efficiency comprises: up-downgoing GBR PRB utilance and up-downgoing non-GBR PRB utilance; Described wireless resource utility efficiency can further include: the PRB utilance that up-downgoing is total.
Step 202:eNB determines the mean value of the wireless resource utility efficiency that all neighbor cells are current;
Particularly, adopt formula (1) to determine the wireless resource utility efficiency that each neighbor cell is current:
RbLoad
i=r1 * (up GBR PRB utilance)
i+ r2 * (descending GBR PRB utilance)
i+ r3 * (up non-GBR PRB utilance)
i+ r4 * (descending non-GBR PRB utilance)
i(1)
Adopt afterwards formula (2) to determine the mean value of the wireless resource utility efficiency that all neighbor cells are current:
RbLoad
Aver=(RbLoad
1+RbLoad
2+..+RbLoad
n)/n (2)
Wherein, i represents i neighbor cell in all neighbor cells, RbLoad
iRepresent i the wireless resource utility efficiency that neighbor cell is current, n represents always to have n neighbor cell, RbLoad
AverThe mean value that represents the wireless resource utility efficiency that all neighbor cells are current, that is: the mean value of the current wireless resource utility efficiency of n neighbor cell, r1+r2+r3+r4=1, r1, r2, r3 and r4 represent without the specific electric load weight coefficient; When practical application, can determine according to simulation result the value of r1, r2, r3 and r4; The concrete processing procedure of determining the value of r1, r2, r3 and r4 according to simulation result is those skilled in the art's conventional techniques means;
When described Radio Resource rate further comprises the total PRB utilance of up-downgoing with rate, can adopt equally said method to determine the mean value of the wireless resource utility efficiency that all neighbor cells are current, that is: only utilize up-downgoing GBR PRB utilance and up-downgoing non-GBR PRB utilance, determine the mean value of the wireless resource utility efficiency that all neighbor cells are current.
Step 203: judge whether to satisfy formula: (RbLoad
Aver-RbLaod)
2<RbTh, if so, then execution in step 204, otherwise, execution in step 205;
Here, described formula is expressed as with language: the difference of the wireless resource utility efficiency that the mean value of the wireless resource utility efficiency that described all neighbor cells are current and eNB self are current square less than default threshold value, wherein, RbLaod represents the wireless resource utility efficiency that eNB self is current, and RbTh represents the threshold value preset; Adopt formula (1) to determine the value of RbLaod, that is: determine that the method that the current wireless resource utility efficiency of method that the current wireless resource utility efficiency of eNB self adopts and definite each neighbor cell adopts is identical;
If satisfy (RbLoad
Aver-RbLaod)
2<RbTh illustrate that then the current load of eNB need to carry out load balance, but load does not also reach the overload threshold value of setting, that is: do not need UE to switch immediately, can switch by the MLB operation; If do not satisfy (RbLoad
Aver-RbLaod)
2<RbTh illustrates that then the current load of eNB need to carry out load balance, and load reached the overload threshold value of setting, that is: need UE to switch immediately, can switch by the LB operation.
Step 204: carry out the MLB operation.
Step 205: carry out the LB operation.
Embodiment two:
The application scenarios of present embodiment is: eNB gets access to the current hardware information on load in all adjacent areas by the RESOURCE STATUS UPDATE message of X2, that is: described information on load is the hardware information on load.The implementation method of present embodiment minizone load balance as shown in Figure 3, may further comprise the steps:
Step 301: after determining to carry out load balance, eNB obtains the current hardware information on load of all neighbor cells by the RESOURCESTATUS UPDATE message of X2 mouth;
Here, described hardware information on load comprises: upstream hardware information on load and descending hardware information on load.
Step 302:eNB determines the mean value of the hardware information on load that all neighbor cells are current;
Particularly, adopt formula (3) to determine the hardware information on load that each neighbor cell is current:
HwLoad
i=h1 * (upstream hardware information on load)
i+ h2 * (descending hardware information on load)
i(3)
Adopt afterwards formula (4) to determine the mean value of the hardware information on load that all neighbor cells are current:
HwLoad
Aver=(HwLoad
1+HwLoad
2+..+HwLoad
n)/n (4)
Wherein, i represents i neighbor cell in all neighbor cells, HwLoad
iRepresent i the hardware information on load that neighbor cell is current; N represents always to have n neighbor cell; HwLoad
AverThe mean value that represents the hardware information on load that all neighbor cells are current, that is: the mean value of the current hardware information on load of n neighbor cell, h1+h2=1, h1 and h2 represent hardware load weight coefficient; When practical application, can determine according to simulation result the value of h1 and h2; The concrete processing procedure of determining the value of h1 and h2 according to simulation result is those skilled in the art's conventional techniques means.
Step 303: judge whether to satisfy formula: (HwLoad
Aver-HwLaod)
2<HwTh, if so, then execution in step 304, otherwise, execution in step 305;
Here, described formula is expressed as with language: the difference of the hardware information on load that the mean value of the hardware information on load that described all neighbor cells are current and eNB self are current square less than default threshold value, wherein, HwLaod represents the hardware information on load that eNB self is current, and HwTh represents the threshold value preset; Wherein, adopt formula (3) to determine the value of HwLaod, that is: determine that the method that the current hardware information on load of method that the current hardware information on load of eNB self adopts and definite each neighbor cell adopts is identical;
If satisfy (HwLoad
Aver-HwLaod)
2<HwTh illustrate that then the current load of eNB need to carry out load balance, but load does not also reach the overload threshold value of setting, that is: do not need UE to switch immediately, can switch by the MLB operation; If do not satisfy (HwLoad
Aver-HwLaod)
2<HwTh illustrates that then the current load of eNB need to carry out load balance, and load reached the overload threshold value of setting, that is: need UE to switch immediately, can switch by the LB operation.
Step 304: carry out the MLB operation;
Step 305: carry out the LB operation.
Embodiment three:
The application scenarios of present embodiment is: eNB gets access to the current transmission load indication information in all adjacent areas by the RESOURCE STATUS UPDATE message of X2, that is: described information on load is transmission load indication information.The implementation method of present embodiment minizone load balance as shown in Figure 4, may further comprise the steps:
Step 401: after determining to carry out load balance, eNB obtains the current transmission load indication information of all neighbor cells by the RESOURCESTATUS UPDATE message of X2 mouth;
Here, described transmission load indication information comprises: uplink load indication information and downlink transfer load indication information.
Step 402:eNB determines the mean value of the transmission load indication information that all neighbor cells are current;
Particularly, adopt formula (5) to determine the transmission load indication information that each neighbor cell is current:
Tn1Load
i=t1 * (uplink load indication information)
i+ t2 * (downlink transfer load indication information)
i(5)
Adopt afterwards formula (6) to determine the mean value of the transmission load indication information that all neighbor cells are current:
Tn1Load
Aver=(Tn1Load
1+Tn1Load
2+..+Tn1Load
n)/n (6)
Wherein, i represents i neighbor cell in all neighbor cells, Tn1Load
iRepresent i the transmission load indication information that neighbor cell is current, n represents always to have n neighbor cell, Tn1Load
AverThe mean value that represents the current transmission of all neighbor cells load indication information, that is: the mean value of the current transmission load indication information of n neighbor cell, t1+t2=1, t1 and t2 represent the transmission weight coefficient of loading; When practical application, can determine according to simulation result the value of t1 and t2; The concrete processing procedure of determining the value of t1 and t2 according to simulation result is those skilled in the art's conventional techniques means.
Step 403: judge whether to satisfy formula: (Tn1Load
Aver-Tn1Laod)
2<Tn1Th, if so, then execution in step 404, otherwise, execution in step 405;
Here, described formula is expressed as with language: the difference of the transmission load indication information that the mean value of the current transmission of described all neighbor cells load indication information and eNB self are current square less than the threshold value of presetting, wherein, Tn1Laod represents the current transmission of eNB self load indication information, and Tn1Th represents the threshold value preset; Adopt formula (5) to determine the value of Tn1Laod, that is: the method for determining to load the method transmission current with determining each neighbor cell that the current transmission load indication information of eNB self adopts indication information adopting is identical;
If satisfy (Tn1Load
Aver-Tn1Laod)
2<Tn1Th illustrate that then the current load of eNB need to carry out load balance, but load does not also reach the overload threshold value of setting, that is: do not need UE to switch immediately, can switch by the MLB operation; If do not satisfy (Tn1Load
Aver-Tn1Laod)
2<Tn1Th illustrates that then the current load of eNB need to carry out load balance, and load reached the overload threshold value of setting, that is: need UE to switch immediately, can switch by the LB operation.
Step 404: carry out the MLB operation;
Step 405: carry out the LB operation.
For realizing said method, the present invention also provides the implement device of a kind of minizone load balance, and as shown in Figure 5, this device comprises: determining unit 51 and performance element 52; Wherein,
Determining unit 51 after determining to carry out load balance, is determined the mean value of the information on load that all neighbor cells are current, and the mean value of determining is sent to performance element 52;
Performance element 52, after being used for receiving the mean value of determining of determining unit transmission, according to mean value and self current information on load of described information on load, definite LB of execution operates or the MLB operation.
Wherein, this device can further include: acquiring unit be used for obtaining the current information on load of all neighbor cells, and the current information on load of all neighbor cells that will obtain sends to determining unit 51;
Determining unit 51 also is used for receiving the current information on load of all neighbor cells that acquiring unit sends.
Described acquiring unit specifically is used for:
By the RESOURCE STATUS UPDATE message of X2 mouth, obtain the current information on load of all neighbor cells.
Described performance element 52 specifically is used for:
Judge the information on load that the mean value of described information on load and self are current difference square whether less than default threshold value, and according to judged result, carry out LB operation or MLB operation.
The above is preferred embodiment of the present invention only, is not for limiting protection scope of the present invention.
Claims (12)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110177541.8A CN102857970B (en) | 2011-06-28 | 2011-06-28 | The implementation method and device of a kind of inter-cell load balance |
PCT/CN2011/081454 WO2013000225A1 (en) | 2011-06-28 | 2011-10-27 | Method and apparatus for realizing load balancing among cells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110177541.8A CN102857970B (en) | 2011-06-28 | 2011-06-28 | The implementation method and device of a kind of inter-cell load balance |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102857970A true CN102857970A (en) | 2013-01-02 |
CN102857970B CN102857970B (en) | 2017-05-31 |
Family
ID=47404081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110177541.8A Active CN102857970B (en) | 2011-06-28 | 2011-06-28 | The implementation method and device of a kind of inter-cell load balance |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN102857970B (en) |
WO (1) | WO2013000225A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103987085A (en) * | 2013-02-07 | 2014-08-13 | 华为技术有限公司 | Inter-cell mobility load balance method and mobility load balance device |
CN104105135A (en) * | 2013-04-02 | 2014-10-15 | 电信科学技术研究院 | Mobile load balancing, air interface resource utilization rate counting method and device |
CN104918287A (en) * | 2015-06-15 | 2015-09-16 | 厦门大学 | Load balancing method and device |
CN104994532A (en) * | 2015-07-28 | 2015-10-21 | 中国联合网络通信集团有限公司 | Method and device for obtaining use ratio of base station |
CN105247922A (en) * | 2013-06-13 | 2016-01-13 | 瑞典爱立信有限公司 | Load sharing in cellular networks |
CN105848215A (en) * | 2014-12-01 | 2016-08-10 | 财团法人资讯工业策进会 | Central control server and load balancing method thereof |
CN107124739A (en) * | 2017-04-14 | 2017-09-01 | 京信通信技术(广州)有限公司 | A kind of load-balancing method and device |
CN107872825A (en) * | 2016-09-23 | 2018-04-03 | 中兴通讯股份有限公司 | A kind of load-balancing method and device, base station |
CN115442865A (en) * | 2021-06-02 | 2022-12-06 | 中国移动通信集团广东有限公司 | Network load balancing method and device, electronic equipment and storage medium |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103220688B (en) * | 2013-04-02 | 2015-07-01 | 西安交通大学 | Moving-load balancing method based on efficacy function in LTE (long term evolution) self-organized network |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101513097A (en) * | 2006-08-30 | 2009-08-19 | 诺基亚西门子通信有限公司 | Method to balance traffic load between nearby LTE/WiMAX cells grouped into inner and border constellations |
CN102098728A (en) * | 2011-01-05 | 2011-06-15 | 北京邮电大学 | Mobile load balancing method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1146169C (en) * | 2000-11-28 | 2004-04-14 | 华为技术有限公司 | Method and control system for load balancing between same-frequency cells in code division multiple access communication system |
CN101686497B (en) * | 2008-09-24 | 2013-04-17 | 华为技术有限公司 | Cell load equalization method, and cell load evaluation method and device |
CN101765153A (en) * | 2008-12-25 | 2010-06-30 | 中兴通讯股份有限公司 | Method and system for realizing load balance |
CN101965012B (en) * | 2009-07-22 | 2014-08-13 | 中兴通讯股份有限公司 | Load balancing method and device |
-
2011
- 2011-06-28 CN CN201110177541.8A patent/CN102857970B/en active Active
- 2011-10-27 WO PCT/CN2011/081454 patent/WO2013000225A1/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101513097A (en) * | 2006-08-30 | 2009-08-19 | 诺基亚西门子通信有限公司 | Method to balance traffic load between nearby LTE/WiMAX cells grouped into inner and border constellations |
CN102098728A (en) * | 2011-01-05 | 2011-06-15 | 北京邮电大学 | Mobile load balancing method |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103987085B (en) * | 2013-02-07 | 2017-06-27 | 华为技术有限公司 | Minizone moving load method and moving load balancer in a balanced way |
CN103987085A (en) * | 2013-02-07 | 2014-08-13 | 华为技术有限公司 | Inter-cell mobility load balance method and mobility load balance device |
CN104105135A (en) * | 2013-04-02 | 2014-10-15 | 电信科学技术研究院 | Mobile load balancing, air interface resource utilization rate counting method and device |
CN105247922A (en) * | 2013-06-13 | 2016-01-13 | 瑞典爱立信有限公司 | Load sharing in cellular networks |
CN105247922B (en) * | 2013-06-13 | 2019-07-12 | 瑞典爱立信有限公司 | Load in cellular network is shared |
CN105848215A (en) * | 2014-12-01 | 2016-08-10 | 财团法人资讯工业策进会 | Central control server and load balancing method thereof |
CN104918287B (en) * | 2015-06-15 | 2018-09-25 | 厦门大学 | A kind of method and device of load balancing |
CN104918287A (en) * | 2015-06-15 | 2015-09-16 | 厦门大学 | Load balancing method and device |
CN104994532A (en) * | 2015-07-28 | 2015-10-21 | 中国联合网络通信集团有限公司 | Method and device for obtaining use ratio of base station |
CN104994532B (en) * | 2015-07-28 | 2018-07-20 | 中国联合网络通信集团有限公司 | The acquisition methods and device of base station utilization rate |
CN107872825A (en) * | 2016-09-23 | 2018-04-03 | 中兴通讯股份有限公司 | A kind of load-balancing method and device, base station |
CN107872825B (en) * | 2016-09-23 | 2022-09-13 | 中兴通讯股份有限公司 | Load balancing method and device, and base station |
CN107124739A (en) * | 2017-04-14 | 2017-09-01 | 京信通信技术(广州)有限公司 | A kind of load-balancing method and device |
CN107124739B (en) * | 2017-04-14 | 2020-06-23 | 京信通信系统(中国)有限公司 | Load balancing method and device |
CN115442865A (en) * | 2021-06-02 | 2022-12-06 | 中国移动通信集团广东有限公司 | Network load balancing method and device, electronic equipment and storage medium |
CN115442865B (en) * | 2021-06-02 | 2024-10-01 | 中国移动通信集团广东有限公司 | Network load balancing method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN102857970B (en) | 2017-05-31 |
WO2013000225A1 (en) | 2013-01-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102857970A (en) | Inter-cell load balance realizing method and device | |
KR101508705B1 (en) | Radio communication system, method, and radio communication apparatus | |
KR101503042B1 (en) | Method, femto base station and femto management system for load balancing | |
EP3070981B1 (en) | Energy saving method and device for heterogeneous network | |
JP5498860B2 (en) | Radio base station, radio communication system, and control method | |
CN102938910B (en) | Enhancement type load balancing method based on adjacent region load information | |
CN102572983B (en) | The method, system and device that a kind of network by mobile terminal switches | |
CN102611989B (en) | Minimum road test method and apparatus | |
US10104595B2 (en) | Method of automatically adjusting mobility parameter | |
CN102202350B (en) | Optimization method for load balancing actively initiated by light load cell | |
CN102065475A (en) | Method for realizing load balancing | |
EP3488633B1 (en) | Decentralized base station load balancing | |
WO2012062143A1 (en) | Method and device for balancing resident load between cells | |
CN104918287B (en) | A kind of method and device of load balancing | |
CN104010315B (en) | A kind of cell selecting method based on user experience quality | |
CN103369572A (en) | A Load-Based Automatic Neighbor Relation Optimization Method in Long Term Evolution System | |
CN104904268B (en) | Method and network node for the improved utilization of resources in the radio communications system of load balance | |
CN102014428B (en) | Method and device for selecting cells to be switched at switching preparatory stage | |
CN102131238B (en) | Load balancing method from time division-synchronization code division multiple access (TD-SCDMA) system to global system for mobile communication (GSM) system | |
Zhang et al. | A two-layer mobility load balancing in LTE self-organization networks | |
CN102202351B (en) | Method for optimizing load balance among cells | |
JP6002844B2 (en) | Terminal selection method, system based on self-organizing network, and network entity | |
CN105916178A (en) | Load balancing method and apparatus thereof | |
CN106488473B (en) | Communication control method and device | |
Prasad et al. | Energy saving enhancement for LTE-advanced heterogeneous networks with dual connectivity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201109 Address after: No.3, Tonghai Road, chuegang Town, Rudong County, Nantong City, Jiangsu Province, 226000 Patentee after: Rudong County Shengtai new rural development and Construction Co., Ltd Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice Patentee before: ZTE Corp. |
|
TR01 | Transfer of patent right |