CN102837204B - Processing tool for cylinders of mills and installation and use method thereof - Google Patents
Processing tool for cylinders of mills and installation and use method thereof Download PDFInfo
- Publication number
- CN102837204B CN102837204B CN201210363735.1A CN201210363735A CN102837204B CN 102837204 B CN102837204 B CN 102837204B CN 201210363735 A CN201210363735 A CN 201210363735A CN 102837204 B CN102837204 B CN 102837204B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- disc
- welded
- brackets
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
- Crushing And Grinding (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种磨机筒体加工工装及其安装使用方法。 The invention relates to a mill cylinder processing tool and an installation and use method thereof.
背景技术 Background technique
目前,MQY4585磨机是申请人生产的溢流型球磨机,也是申请人生产的最大的磨机,磨机筒体加工难度很大,筒体的有效长度8500mm,筒径有效直径为φ4500mm,筒体重量达57472kg,无论是加工、还是吊装对公司的现有设备都是一个极大的挑战,公司原有的加工磨机筒体的工装结构是在磨机筒体中穿入加工筒体的工装主轴,主轴的两端采用支撑盘将筒体撑起,主轴两端有中心孔,机床顶尖将工装的主轴顶起就可以实现筒体的加工,但是MQY4585磨机筒体太长,重量超重,已经超出原有工装主轴的长度及工装所能承受的重量,以往磨机筒体的加工工装对MQY4585磨机筒体不合适,因此需要设计一套新型加工工装,用于此磨机的筒体加工。 At present, the MQY4585 mill is an overflow ball mill produced by the applicant, and it is also the largest mill produced by the applicant. The barrel of the mill is very difficult to process. The effective length of the barrel is 8500mm, and the effective diameter of the barrel is φ4500mm. The weight is up to 57472kg. Whether it is processing or hoisting, it is a great challenge to the company's existing equipment. The company's original tooling structure for processing the mill barrel is a tooling that penetrates the processing barrel in the mill barrel Spindle, both ends of the main shaft are supported by support discs, and there are center holes at both ends of the main shaft. The machining of the cylindrical body can be realized by lifting the main shaft of the tooling by the top of the machine tool. However, the cylindrical body of the MQY4585 mill is too long and the weight is too heavy. It has exceeded the length of the main shaft of the original tooling and the weight that the tooling can bear. The previous processing tooling for the mill barrel is not suitable for the MQY4585 mill barrel. Therefore, it is necessary to design a new processing tooling for the barrel of this mill. processing.
发明内容 Contents of the invention
本发明的目的是为克服上述现有技术的不足,提供一种磨机筒体加工工装及其安装使用方法,特别是针对尺寸较大的MQY4585磨机筒体加工的新型加工工装,MQY4585磨机筒体主要加工部位为两端法兰的内外端面、外圆、内孔及法兰端面上的止口,筒体加工主要是将筒体架起能够让C61630大头车床的顶尖将筒体顶起,这样就可以顺利加工筒体。 The object of the present invention is to overcome the above-mentioned deficiencies in the prior art, and provide a mill cylinder processing tool and its installation and use method, especially a new type of processing tool for processing the larger MQY4585 mill cylinder, MQY4585 mill The main processing parts of the cylinder body are the inner and outer end faces of the flanges at both ends, the outer circle, the inner hole and the seam on the end face of the flange. The main processing of the cylinder body is to erect the cylinder body so that the top of the C61630 big head lathe can lift the cylinder body , so that the cylinder can be processed smoothly.
为实现上述目的,本发明采用下述技术方案: To achieve the above object, the present invention adopts the following technical solutions:
一种磨机筒体加工工装,其包括两组相同的结构体,每一组结构体均有一个圆盘,所述圆盘的一表面上固定有一支撑,圆盘的边缘固定有若干卡爪,所述卡爪上设置有能够调节位置的顶丝;工作状态时,圆盘边缘与所需加工的筒体内壁上焊接的若干小支架固定连接,顶丝顶在所需加工的筒体内壁上焊接的若干大支架的下端面上。 A mill cylinder processing tooling, which includes two sets of identical structures, each set of structures has a disc, a support is fixed on one surface of the disc, and several claws are fixed on the edge of the disc , the claw is provided with a top wire that can adjust the position; in the working state, the edge of the disc is fixedly connected with several small brackets welded on the inner wall of the cylinder to be processed, and the top wire is on the inner wall of the cylinder to be processed The lower end faces of several large supports welded on.
所述支撑设有中心孔,中心孔与C61630大头车床两头顶尖相对应。 The support is provided with a central hole, which corresponds to the top ends of the C61630 big head lathe.
所述每组结构体上的卡爪为8个,卡爪通过螺栓、垫圈、螺母把合在圆盘上,顶丝的顶端套装螺母套。 There are 8 claws on each group of structures, and the claws are combined on the disk through bolts, washers and nuts, and the top of the jacking wire is fitted with a nut sleeve.
所述支撑通过螺栓、垫圈、螺母把合在圆盘上。 The support is fastened on the disk by bolts, washers and nuts.
每个圆盘上均设有四个与筒体内壁上焊接的四个小支架配合安装的长条孔,小支架上焊接有螺母,螺母上拧入螺柱,螺柱上穿上压板,装入垫圈、螺母,穿过长条孔把合在圆盘上;小支架距离筒体的法兰端面为300mm。 Each disc is provided with four elongated holes that are installed in cooperation with four small brackets welded on the inner wall of the cylinder. Nuts are welded on the small brackets, and studs are screwed into the nuts, and pressure plates are put on the studs. Insert the washer and the nut, pass through the long hole and fit on the disc; the distance between the small bracket and the flange end face of the cylinder is 300mm.
所述大支架距离筒体端面法兰为310mm。 The distance between the large bracket and the end face flange of the cylinder is 310mm.
一种磨机筒体加工工装的安装使用方法,步骤如下: A method for installing and using mill barrel processing tooling, the steps are as follows:
1)在距离筒体法兰端面300mm处在筒体内壁上共焊接8个小支架,即在筒体两端法兰内壁各焊接4个小支架; 1) A total of 8 small brackets are welded on the inner wall of the cylinder at a distance of 300mm from the end face of the flange of the cylinder, that is, 4 small brackets are welded on the inner wall of the flange at both ends of the cylinder;
2)圆盘一端面与焊接在筒体上的小支架贴合,将圆盘通过螺栓、螺母与小支架把合在一起; 2) One end surface of the disc fits with the small bracket welded on the cylinder body, and the disc is connected together through bolts, nuts and the small bracket;
3)将圆盘与带中心孔的支撑把合在一起,在圆盘上安装卡爪,卡爪上安装顶丝; 3) Put the disc and the support handle with the center hole together, install the jaws on the disc, and install the top wire on the jaws;
4)再在距离筒体端面法兰310mm处的筒体内壁上焊接16个大支架,即筒体两端法兰内壁各焊接8个大支架,圆盘卡爪上的顶丝顶住焊接在筒体上的大支架下部的平面上; 4) Then weld 16 large brackets on the inner wall of the cylinder at a distance of 310mm from the end flange of the cylinder, that is, weld 8 large brackets on the inner wall of the flange at both ends of the cylinder, and the jacking wire on the disc claw withstands the welding on the On the plane of the lower part of the large bracket on the cylinder;
5)工装安装完毕后,C61630大头车床的顶尖顶住支撑上的中心孔,将筒体顶起,在加工过程中,按筒体外圆找正,通过调节卡爪上的顶丝,来对筒体进行找正,筒体找正后,就能够实现筒体的加工。 5) After the tooling is installed, the top of the C61630 big-head lathe withstands the center hole on the support, and the cylinder is jacked up. During the processing, the cylinder is aligned according to the outer circle of the cylinder, and the cylinder is aligned by adjusting the jacking screw on the claw. The body is aligned, and after the cylinder is aligned, the processing of the cylinder can be realized.
本发明的有益效果是,本发明利用公司原有的设备,设计出一套新的工装,解决了大型磨机筒体加工的难题,扩大了公司机床的加工范围,并且此套工装设计简单,操作方便,满足了图纸精度要求,节约了大量的外协资金。 The beneficial effect of the present invention is that the present invention uses the original equipment of the company to design a new set of tooling, which solves the difficult problem of processing large mill cylinders and expands the processing range of the company's machine tools, and the design of this set of tooling is simple, It is easy to operate, meets the accuracy requirements of drawings, and saves a lot of outsourcing funds.
附图说明 Description of drawings
图1是本发明的装配图; Fig. 1 is an assembly drawing of the present invention;
图2是图1的左视图; Fig. 2 is the left view of Fig. 1;
图3是从筒体法兰端面看本发明的示意图; Fig. 3 is a schematic view of the present invention viewed from the end face of the cylinder flange;
图4是图2中A-A剖视图旋转(小支架装配图); Figure 4 is the rotation of the A-A sectional view in Figure 2 (assembly diagram of the small bracket);
图5是图2中A-A剖视图局部放大; Fig. 5 is a partial enlargement of the A-A sectional view in Fig. 2;
图6是图2中B-B剖视图旋转(大支架装配图); Figure 6 is the rotation of the B-B sectional view in Figure 2 (assembly diagram of the large bracket);
图7是图2中B-B剖视局部放大; Fig. 7 is a partial enlargement of B-B section in Fig. 2;
其中1.顶丝,2.螺母套,3.卡爪,4.第一螺栓,5. 第一垫圈,6. 第一螺母,7.圆盘,8.第二螺栓,9. 第二垫圈,10. 第二螺母,11.支撑,12.支撑上的中心孔,13.小支架,14.第三螺母,15.压板,16.第三垫圈,17.第四螺母,18.螺柱,19.大支架。 1. Top screw, 2. Nut sleeve, 3. Claw, 4. First bolt, 5. First washer, 6. First nut, 7. Disc, 8. Second bolt, 9. Second washer , 10. Second nut, 11. Support, 12. Center hole on support, 13. Small bracket, 14. Third nut, 15. Pressure plate, 16. Third washer, 17. Fourth nut, 18. Stud , 19. Large bracket.
具体实施方式 Detailed ways
下面结合附图和实施例对本发明进行进一步的阐述,应该说明的是,下述说明仅是为了解释本发明,并不对其内容进行限定。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the following description is only for explaining the present invention and not limiting its content.
MQY4585磨机筒体加工工装,其包括两组相同的结构体,每一组结构体均有一个圆盘7,所述圆盘7的一表面上固定有一支撑11,通过第二螺栓8、第二垫圈9、第二螺母10把合在圆盘7上。支撑11设有中心孔12,中心孔12与C61630大头车床两头顶尖相对应。圆盘7的边缘固定有8个卡爪3,通过第一螺栓4、第一垫圈5、第一螺母6把合在圆盘7上,卡爪3上设置有能够调节位置的顶丝1,顶丝1的顶端套装螺母套2;工作状态时,圆盘7边缘与所需加工的筒体内壁上焊接的4个小支架13固定连接,顶丝1顶在所需加工的筒体内壁上焊接的8个大支架19的下端面上,大支架19距离筒体端面法兰为310mm。 MQY4585 mill barrel processing tooling, which includes two sets of identical structures, each set of structures has a disc 7, a support 11 is fixed on one surface of the disc 7, through the second bolt 8, the second Two washers 9 and the second nut 10 are combined on the disc 7 . Support 11 is provided with central hole 12, and central hole 12 is corresponding with two tops of C61630 big head lathe. There are 8 claws 3 fixed on the edge of the disk 7, which are connected to the disk 7 by the first bolt 4, the first washer 5, and the first nut 6. The claw 3 is provided with a top screw 1 capable of adjusting the position. The top of the jacking wire 1 is fitted with a nut sleeve 2; in the working state, the edge of the disc 7 is fixedly connected to the four small brackets 13 welded on the inner wall of the cylinder to be processed, and the jacking wire 1 is placed on the inner wall of the cylinder to be processed On the lower end faces of the 8 welded large brackets 19, the distance between the large brackets 19 and the end face flange of the cylinder is 310mm.
每个圆盘7上均设有四个与筒体内壁上焊接的四个小支架13配合安装的长条孔,小支架13上焊接有第三螺母14,第三螺母14上拧入螺柱18,螺柱18上穿上压板15,装入第三垫圈16、第四螺母17,穿过长条孔把合在圆盘7上;小支架13距离筒体的法兰端面为300mm。 Each disc 7 is provided with four elongated holes cooperating with four small brackets 13 welded on the inner wall of the cylinder, the small brackets 13 are welded with a third nut 14, and the third nut 14 is screwed into a stud 18. Put the pressure plate 15 on the stud 18, pack the third washer 16 and the fourth nut 17, and pass through the long hole to fit on the disc 7; the distance between the small bracket 13 and the flange end face of the cylinder is 300mm.
该磨机筒体加工工装的安装使用方法,步骤如下: The installation and use method of the mill barrel processing tooling is as follows:
1)在距离筒体法兰端面300mm处在筒体内壁上共焊接8个小支架13,即在筒体两端法兰内壁各焊接4个小支架13; 1) A total of 8 small brackets 13 are welded on the inner wall of the cylinder at a distance of 300 mm from the end face of the flange of the cylinder, that is, 4 small brackets 13 are welded on the inner walls of the flanges at both ends of the cylinder;
2)圆盘7一端面与焊接在筒体上的小支架13贴合,将圆盘13通过螺栓、螺母与小支架13把合在一起; 2) One end surface of the disk 7 fits the small bracket 13 welded on the cylinder body, and the disk 13 is combined with the small bracket 13 through bolts and nuts;
3)将圆盘13与带中心孔的支撑11把合在一起,在圆盘7上安装卡爪3,卡爪3上安装顶丝1; 3) Put the disk 13 and the support 11 with the center hole together, install the claw 3 on the disk 7, and install the top wire 1 on the claw 3;
4)再在距离筒体端面法兰310mm处的筒体内壁上焊接16个大支架19,即筒体两端法兰内壁各焊接8个大支架19,圆盘7卡爪3上的顶丝1顶住焊接在筒体上的大支架19下部的平面上; 4) Then weld 16 large brackets 19 on the inner wall of the cylinder at a distance of 310 mm from the end flange of the cylinder, that is, weld 8 large brackets 19 on the inner walls of the flanges at both ends of the cylinder, and the top wire on the disc 7 claw 3 1 withstand the plane of the lower part of the large bracket 19 welded on the cylinder;
5)工装安装完毕后,C61630大头车床的顶尖顶住支撑上的中心孔12,将筒体顶起,在加工过程中,按筒体外圆找正,通过调节卡爪3上的顶丝1,来对筒体进行找正,筒体找正后,就能够实现筒体的加工。 5) After the installation of the tooling is completed, the top of the C61630 big-head lathe withstands the center hole 12 on the support, and the cylinder body is lifted up. During the processing, it is aligned according to the outer circle of the cylinder, and by adjusting the top screw 1 on the claw 3, To align the cylinder, after the cylinder is aligned, the processing of the cylinder can be realized.
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。 Although the specific implementation of the present invention has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the present invention. On the basis of the technical solution of the present invention, those skilled in the art can make various Modifications or variations are still within the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210363735.1A CN102837204B (en) | 2012-09-26 | 2012-09-26 | Processing tool for cylinders of mills and installation and use method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210363735.1A CN102837204B (en) | 2012-09-26 | 2012-09-26 | Processing tool for cylinders of mills and installation and use method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102837204A CN102837204A (en) | 2012-12-26 |
| CN102837204B true CN102837204B (en) | 2015-03-11 |
Family
ID=47365069
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210363735.1A Active CN102837204B (en) | 2012-09-26 | 2012-09-26 | Processing tool for cylinders of mills and installation and use method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102837204B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106141704B (en) * | 2015-03-30 | 2019-04-09 | 中国有色(沈阳)冶金机械有限公司 | A kind of heavy type face lathe variable diameter cylinder processing assembled tool |
| CN110057274A (en) * | 2018-01-17 | 2019-07-26 | 兰州兰石重型装备股份有限公司 | Pressure container cylinder internal diameter and ovality detecting tool and its application method |
| CN108296810B (en) * | 2018-01-22 | 2019-11-08 | 中信重工机械股份有限公司 | A kind of sleeping carriage cylinder attachment device |
| CN109227013A (en) * | 2018-10-10 | 2019-01-18 | 乔盘池 | A kind of barrel of magnetic separator and flange weld tooling |
| CN113878373A (en) * | 2021-10-31 | 2022-01-04 | 浙江水泵总厂有限公司 | Pump body connecting frame machining tool and method thereof |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09509621A (en) * | 1994-11-24 | 1997-09-30 | フィリップス エレクトロニクス ネムローゼ フェンノートシャップ | Method for machining drum-shaped workpiece, X-ray diagnostic apparatus provided with drum-shaped carrier manufactured by such method, and photocopier |
| CN2377001Y (en) * | 1999-07-02 | 2000-05-10 | 东南大学 | Continuous dry star ball mill |
| CN1106264C (en) * | 1999-10-08 | 2003-04-23 | 陈建文 | Circular mold manufacturing process for V-belt vulcanization |
| CN201409056Y (en) * | 2009-03-13 | 2010-02-17 | 中船重工电机科技股份有限公司 | Tooling equipment for machining the outer circle of the motor stator core |
| CN201807906U (en) * | 2010-07-27 | 2011-04-27 | 卫华集团有限公司 | Winding drum processing tooling |
| CN202137599U (en) * | 2011-07-18 | 2012-02-08 | 山西多智管模制造有限公司 | Fixture for cylindrical workpieces |
| CN202877920U (en) * | 2012-09-26 | 2013-04-17 | 济南重工股份有限公司 | Mill cylinder body machining tool |
-
2012
- 2012-09-26 CN CN201210363735.1A patent/CN102837204B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN102837204A (en) | 2012-12-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102837204B (en) | Processing tool for cylinders of mills and installation and use method thereof | |
| CN202556106U (en) | Large-scale tire clamp for whole milling sealed impeller of five-coordinate boring and milling machining center | |
| CN202571938U (en) | Miller processing clamp base | |
| CN202296847U (en) | Large-sized part hoisting tool | |
| CN105364710B (en) | The grinding and clamping device of large hollow axial workpiece | |
| CN202684458U (en) | Home-made bearing detachment fixture | |
| CN201313106Y (en) | Special trolley for vertical roll mill inspection and maintenance | |
| CN202877920U (en) | Mill cylinder body machining tool | |
| CN219725056U (en) | A kind of roller frame tooling mechanism | |
| CN104511876A (en) | Dismounting device for parts on shaft | |
| CN203140815U (en) | Special jig | |
| CN204470864U (en) | A kind of slewing tower rotary tooling | |
| CN202897875U (en) | Welding-free type pulley wheel rope baffle device | |
| CN216464338U (en) | Special tools for rolling bearing and wheel disassembly | |
| CN219341396U (en) | A Turning Support Mechanism for Large Circular Thin-walled Workpieces | |
| CN206047935U (en) | A kind of large-scale bearing ring automatic sand-blasting machine has with support smelting | |
| CN204748512U (en) | Bearing dismouting device | |
| CN205363378U (en) | Anchor clamps are used in processing of drum spare | |
| CN210475757U (en) | Gear clamp adopting coaxial positioning auxiliary mode and being suitable for different inner diameters | |
| CN204604213U (en) | The special extractor of conticaster rear portion roller-way reductor | |
| CN204867891U (en) | Hoist solid of revolution support assembly welding jig | |
| CN116313486B (en) | A device and method for manufacturing a shunt reactor core pull rod | |
| CN204381760U (en) | A kind of arm welding rotary tooling | |
| CN202655920U (en) | Special clamp for rotary disc | |
| CN202825178U (en) | Machine pump coupling removal tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A grinding machine barrel processing fixture and its installation and usage method Effective date of registration: 20230324 Granted publication date: 20150311 Pledgee: Ji'nan rural commercial bank Limited by Share Ltd. high tech branch Pledgor: JINAN HEAVY MACHINERY JOINT-STOCK Co.,Ltd. Registration number: Y2023980035835 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20150311 Pledgee: Ji'nan rural commercial bank Limited by Share Ltd. high tech branch Pledgor: JINAN HEAVY MACHINERY JOINT-STOCK Co.,Ltd. Registration number: Y2023980035835 |