CN102826450A - 一种大型钢结构件滑轮翻身装置 - Google Patents
一种大型钢结构件滑轮翻身装置 Download PDFInfo
- Publication number
- CN102826450A CN102826450A CN2012103159523A CN201210315952A CN102826450A CN 102826450 A CN102826450 A CN 102826450A CN 2012103159523 A CN2012103159523 A CN 2012103159523A CN 201210315952 A CN201210315952 A CN 201210315952A CN 102826450 A CN102826450 A CN 102826450A
- Authority
- CN
- China
- Prior art keywords
- shaft coupling
- plate
- pulley
- trough
- axle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 22
- 239000010959 steel Substances 0.000 title claims abstract description 22
- 230000001808 coupling Effects 0.000 claims abstract description 28
- 238000010168 coupling process Methods 0.000 claims abstract description 28
- 238000005859 coupling reaction Methods 0.000 claims abstract description 28
- 239000002965 rope Substances 0.000 claims abstract description 14
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N copper Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052802 copper Inorganic materials 0.000 claims description 3
- 239000010949 copper Substances 0.000 claims description 3
- 238000005755 formation reaction Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 12
- 241000227287 Elliottia pyroliflora Species 0.000 abstract 1
- 230000001788 irregular Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000003447 ipsilateral Effects 0.000 description 2
- 231100000817 safety factor Toxicity 0.000 description 2
- 206010033799 Paralysis Diseases 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 230000000630 rising Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
一种大型钢结构件空中翻身系统,包括联轴板、带槽滑轮、轴、铜套、垫圈,承重环形钢丝绳放置于带槽滑轮上组装为一体,具有结构简单、成本低方便、生产车间具备两台主钩副钩吊装设备可及部位都可翻身、提高生产效率、节约生产时间成本独特、简单、可靠、实用、效率高的优点。
Description
ー种大型钢结构件滑轮翻身装置
技术领域
[0001] 本发明涉及空中翻身系统,尤其涉及大型钢结构件翻身装置。
背景技术
[0002] 在重工机械生产制造行业里,生产很多种大型エ件,其长度达几十米,重达几十吨,在生产制作过程中,因装配、焊接、打磨、油漆、吊装发运需要将エ件进行翻身,需完成以上生产过程工作,现在生产制作过程中,一般都是更据图纸要求在エ件上焊接吊耳或临时焊接吊耳,然后通过行车、吊车将エ件吊起,并通过主钩、副钩升降配合将エ件翻身,不规则大件需要两台行车配合翻身的,目前制作加工単位的行车配置都是ー个大吨位行车加ー个小吨位的行车起吊是主钩与副钩都是前后成交叉配置的翻身时同一侧吊钩的功率大小不等、升降速度不一致、及行车エ,配合达不到一致,会出现以下不良影响:同侧面主钩副钩达不到相同速度时使エ件扭曲变形,在重量的情况下承重钢丝绳与エ件产生反向摩擦,导致 エ件受力点变形、钢丝绳拉毛、断裂、造成严重的后果。同侧面主钩副钩达不到相同速度升降エ件重心点在不停变动会摇摆不定安全系数减小,使用主钩副钩派和翻身如遇吨位很大的エ件两台行车的副钩配置底严重超负荷,(I)很容易使副钩的升降机构瘫痪,刹车失灵
[2]滑轮轴变形、钢丝绳断裂,导致严重的后果。翻不规则的超长、超宽的部件,会使同一平台行车的主钩与副钩间距増大,钢丝绳的角度也同时变化升降时钢丝绳会与行走小车平台预留孔边产生不同程度的摩擦导致滑轮钢丝绳拉毛、断裂、造成严重的后果,以上翻身步骤不安全,且浪费生产时间。有待改进。 发明内容
[0003] 本发明针对现有技术的不足,提供了ー种结构简单、生产成本低、翻身系统灵活和翻身角度位置,从而达到保护エ件的大型钢结构件翻身装置。
[0004] 本发明为解决上述技术问题,提供了以下技术方案:ー种大型钢结构件滑轮翻身装置,其特征在于包括联轴板、带槽滑轮、轴、以及环形钢丝,所述的联轴板为两块相互对应的长条形板体,上端各自向内弯折配合紧固连接,构成ー联轴壳体,所述两块联轴板近底端对应开设有一通孔,带槽滑轮套于轴上、卡钳于两联轴板间,轴两端各自与联轴板上通孔固定连接,所述的环形钢丝绳穿入两联轴板构成的联轴壳体内,放置于带槽滑轮上,所述带槽滑轮与轴间设置有铜套,轴两端设置有连轴板,所述连轴板为相互扣合的两块,轴端卡合于连轴板间,连轴板与联轴板螺栓紧固连接。
[0005] 本发明有益效果:可选用翻身滑轮及环形钢丝绳的大小及环形长度,根据エ件的大小及重量确定,它不局限与圆筒、长方体、不规则エ件翻身稳定エ件翻身时只需两台行车主钩吊上翻身滑轮钢丝绳套在需要翻身的エ件上,根据エ件的方向角度需要、选用行车的副钩、副钩上的钢丝绳、卸扣固定吊耳或临时吊耳上,启动副钩エ件就会灵活转动你角度需要的位置,这样在行车可及的位置翻身エ件不会摇摆很平稳的转动保证エ件与相邻作业区エ件撞坏,钢丝绳的损坏程度減少,增长使用寿命节约生产成本,增大生产作业的安全系数。
附图说明
[0006] 图I为本发明的结构示意图。
[0007] 图2为本发明实施例I的示意图。
[0008] 图3为本发明实施例2的示意图。
[0009] 图4为本发明实施例3的示意图。
具体实施方式
[0010] 如图I所示ー种大型钢结构件滑轮翻身装置,包括联轴板001、带槽滑轮002、轴 003、以及环形钢丝004,所述的联轴板001为两块相互对应的长条形板体,上端各自向内弯折配合紧固连接,构成ー联轴壳体,所述两块联轴板001近底端对应开设有一通孔,带槽滑轮002套于轴003上、卡钳于两联轴板001间,轴003两端各自与联轴板001上通孔固定连接,所述的环形钢丝绳004穿入两联轴板001构成的联轴壳体内,放置于带槽滑轮002上,所述带槽滑轮002与轴003间设置有铜套005,轴003两端设置有连轴板006,所述连轴板006为相互扣合的两块,轴003端卡合于连轴板006间,连轴板006与联轴板001螺栓紧固连接。
[0011] 实施例广3 :如:图2、图3、图4所示ー种大型钢结构件滑轮翻身装置,可选用带槽滑轮及环形钢丝绳的大小及环形长度,根据エ件的大小及重量确定,不局限于圆筒、长方体、不规则エ件,エ件翻身时只需两台行车主钩吊上本发明的滑轮翻身装置,钢丝绳套在需要翻身的エ件上,根据エ件的方向角度需要、选用行车的副钩、副钩上的钢丝绳、卸扣固定吊耳或临时吊耳上,启动副钩时,上下调节副钩高度时就可使エ件灵活转动到需要的角度和位置,这样在行车可及的位置翻身エ件时不会造成エ件摇摆,很平稳的转动有效的防止エ件与相邻作业区的エ件碰撞。
Claims (3)
1. ー种大型钢结构件滑轮翻身装置,其特征在于包括联轴板、带槽滑轮、轴、以及环形钢丝,所述的联轴板为两块相互对应的长条形板体,上端各自向内弯折配合紧固连接,构成一联轴壳体,所述两块联轴板近底端对应开设有一通孔,带槽滑轮套于轴上、卡钳于两联轴板间,轴两端各自与联轴板上通孔固定连接,所述的环形钢丝绳穿入两联轴板构成的联轴壳体内,放置于带槽滑轮上。
2.根据权利要求I所述的ー种大型钢结构件滑轮翻身装置,其特征在于带槽滑轮与轴间设置有铜套。
3.根据权利要求I所述的ー种大型钢结构件滑轮翻身装置,其特征在于轴两端设置有连轴板,所述连轴板为相互扣合的两块,轴端卡合于连轴板间,连轴板与联轴板螺栓紧固连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103159523A CN102826450A (zh) | 2012-08-31 | 2012-08-31 | 一种大型钢结构件滑轮翻身装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103159523A CN102826450A (zh) | 2012-08-31 | 2012-08-31 | 一种大型钢结构件滑轮翻身装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102826450A true CN102826450A (zh) | 2012-12-19 |
Family
ID=47329802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012103159523A Pending CN102826450A (zh) | 2012-08-31 | 2012-08-31 | 一种大型钢结构件滑轮翻身装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102826450A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07101670A (ja) * | 1993-10-07 | 1995-04-18 | Takenaka Komuten Co Ltd | 重量長尺物の吊り起こし方法 |
JPH07323989A (ja) * | 1994-06-02 | 1995-12-12 | Yamakawa Eng Kk | クレーン作業用平衡装置 |
JPH10194666A (ja) * | 1997-01-16 | 1998-07-28 | Ando Corp | 資材の吊り装置 |
CN201151614Y (zh) * | 2007-12-10 | 2008-11-19 | 渤海船舶重工有限责任公司 | 一种钢板翻身夹具 |
CN201325823Y (zh) * | 2008-08-08 | 2009-10-14 | 广东力特工程机械有限公司 | 用于大型吊机的新型吊具 |
CN101759101A (zh) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | 非对称结构空中姿态调整方法 |
CN202754718U (zh) * | 2012-08-31 | 2013-02-27 | 江苏丹帝龙重工有限公司 | 一种大型钢结构件滑轮翻身装置 |
-
2012
- 2012-08-31 CN CN2012103159523A patent/CN102826450A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07101670A (ja) * | 1993-10-07 | 1995-04-18 | Takenaka Komuten Co Ltd | 重量長尺物の吊り起こし方法 |
JPH07323989A (ja) * | 1994-06-02 | 1995-12-12 | Yamakawa Eng Kk | クレーン作業用平衡装置 |
JPH10194666A (ja) * | 1997-01-16 | 1998-07-28 | Ando Corp | 資材の吊り装置 |
CN201151614Y (zh) * | 2007-12-10 | 2008-11-19 | 渤海船舶重工有限责任公司 | 一种钢板翻身夹具 |
CN201325823Y (zh) * | 2008-08-08 | 2009-10-14 | 广东力特工程机械有限公司 | 用于大型吊机的新型吊具 |
CN101759101A (zh) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | 非对称结构空中姿态调整方法 |
CN202754718U (zh) * | 2012-08-31 | 2013-02-27 | 江苏丹帝龙重工有限公司 | 一种大型钢结构件滑轮翻身装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201419967Y (zh) | 用于大型构件的吊具 | |
CN104444762A (zh) | 风电基础环翻转装置及使用该装置进行基础环翻转的方法 | |
CN203006738U (zh) | 型材吊装工具 | |
CN201901526U (zh) | 移动式起重机及其支脚垫板 | |
CN201889616U (zh) | 箱型梁翻转装置 | |
CN202124416U (zh) | 吊梁工装 | |
CN201756399U (zh) | 吊运装备 | |
CN202321980U (zh) | 一种钢管专用吊钩 | |
CN202754718U (zh) | 一种大型钢结构件滑轮翻身装置 | |
CN206810994U (zh) | 冲压模具安装装置 | |
CN202912593U (zh) | 一种塔式起重机分体式顶升套架 | |
CN102826450A (zh) | 一种大型钢结构件滑轮翻身装置 | |
CN101717034A (zh) | 一种吊装索具装置 | |
CN205045694U (zh) | 一种受力均匀的船板吊具 | |
CN201665466U (zh) | 一种翻转吊具 | |
CN210702528U (zh) | 一种大型板坯连铸机大包回转台回转臂的临时固定装置 | |
CN103420281A (zh) | 起重机及其附属结构的拆装装置、拆卸方法及安装方法 | |
CN105480861A (zh) | 一种翻转吊具 | |
CN102935980A (zh) | 一种小型立式工位折臂吊 | |
CN201228193Y (zh) | 脱节万向轴导运抱紧器 | |
CN102583167A (zh) | 桅杆起重机 | |
CN205590168U (zh) | 一种翻转吊具 | |
CN102060231A (zh) | 一种用于工作辊或中间辊的起吊方法及装置 | |
CN207209840U (zh) | 一种多功能吊架 | |
CN204198234U (zh) | 一种风电基础环翻转装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121219 |