CN102817326A - Construction method of bridge construction super-small space double limb pier stud - Google Patents

Construction method of bridge construction super-small space double limb pier stud Download PDF

Info

Publication number
CN102817326A
CN102817326A CN2012103511071A CN201210351107A CN102817326A CN 102817326 A CN102817326 A CN 102817326A CN 2012103511071 A CN2012103511071 A CN 2012103511071A CN 201210351107 A CN201210351107 A CN 201210351107A CN 102817326 A CN102817326 A CN 102817326A
Authority
CN
China
Prior art keywords
bridge construction
pier stud
limb pier
extra small
small spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103511071A
Other languages
Chinese (zh)
Other versions
CN102817326B (en
Inventor
杨寿忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Urban Construction Holdings Group Co., Ltd.
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd filed Critical CHONGQING CONSTRUCTION BRIDGE ENGINEERING Co Ltd
Priority to CN201210351107.1A priority Critical patent/CN102817326B/en
Publication of CN102817326A publication Critical patent/CN102817326A/en
Application granted granted Critical
Publication of CN102817326B publication Critical patent/CN102817326B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a construction method of a bridge construction super-small space double limb pier stud, comprising the following steps of: a, manufacturing whole templates and a tower body template of the bridge construction super-small space double limb pier stud; b, transporting the whole template and the tower body template of the bridge construction super-small space double limb pier stud to a construction field; c, positioning the whole templates of the bridge construction super-small space double limb pier stud by positioning pins, and connecting the whole templates by bolts; d, connecting the whole templates and the tower body templates of two bridge construction super-small space double limb pier studs by pull rods, fixing the whole templates and the tower body templates to an inner mould, and blocking pull rod holes by sponge; e, space fine tunning and fixing are carried out between upper holes of the whole templates of the two bridge construction super-small space double limb pier studs by wedging a steel wedge; f, pouring concrete; g, after the concrete reaches strength, dismantling the whole templates and the tower body template of the bridge construction super-small space double limb pier stud, and brushing a release agent; and h, lifting the whole templates and the tower body templates of the two bridge construction super-small space double limb pier stud, and putting the whole templates and the tower body templates of the two bridge construction super-small space double limb pier stud into a next segment to be used.

Description

The job practices of the two limb pier studs of the extra small spacing of a kind of bridge construction
Technical field
The invention belongs to the technical field of building, relate in particular to the job practices of the two limb pier studs of the extra small spacing of a kind of bridge construction.
Background technology
When the spacing extra small (less than 0.2m) between two limb tower piers; The space is extremely narrow and small between the tower pier; If with common template; Installation, adjustment, dismounting to adjacent towers limb template bring very big difficulty, and in a single day pier shaft concrete defect occurs and can't modify processing, admittedly outward appearance must be good after requiring concrete formation.
Summary of the invention
The technical problem that the present invention will solve provides the job practices of the two limb pier studs of the extra small spacing of a kind of bridge construction, can guarantee that two limb pier studs construct simultaneously, the spacing precision is controlled better.
In order to solve the problems of the technologies described above, the present invention provides following technical scheme: the job practices of the two limb pier studs of the extra small spacing of a kind of bridge construction may further comprise the steps:
A, the two limb pier stud integral mold plates of the extra small spacing of making bridge construction and body of the tower template, wherein, the two limb pier stud integral mold plates of the extra small spacing of bridge construction comprise gad and two external molds;
B, two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template are transported to the job site; By survey crew the creeping formwork template is precisely located before installing; Two external molds of the two limb pier stud integral mold plates of the extra small spacing of bridge construction are provided with dorsad during installation; Form the wedge groove between two external molds, the work plane of two external molds is towards pier shaft to be built;
C, the two limb pier stud integral mold plates of the extra small spacing of bridge construction are located with alignment pin, connect with bolt;
Connect with pull bar between two limb pier stud integral mold plates of d, the extra small spacing of two bridge constructions and the body of the tower template and be fixed on the internal mold, tie rod hole is used the sponge shutoff;
Adopt the gad wedging to carry out the spacing fine setting and fix between the two limb pier stud integral mold plates of e, the extra small spacing of two bridge constructions are suitable for reading;
F, accomplish two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template fixing after, concreting;
G, treat that concrete reaches intensity after, remove two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template, the brushing release agent;
H, the two limb pier stud integral mold plates of the extra small spacing of lifting bridge construction and body of the tower template drop into next sections and use.
Compared with prior art, the invention has the advantages that: 1, the work plane of two external molds embeds gad towards pier shaft to be built between two external molds, to fill up the extra small spacing between two limb pier studs, is applicable to the extremely narrow and small situation in space between the tower pier; 2, extra small spacing body of the tower template does not produce distortion because of dismantling operation is improper; 3, concrete surface is not by scratch, and surface quality is good; 4, build sections construction under treated equal can the input of rear pattern plate at every turn.
Further, the method for said step g stripping does, unclamps gad earlier, unclamps alignment pin again, unclamps Screw arbor with nut at both-ends then, the bolt of dismantling at last.
Description of drawings
Below in conjunction with accompanying drawing and embodiment technical scheme of the present invention is further specified:
Fig. 1 is the structural representation of the two a kind of embodiment of limb pier stud integral mold plate of the extra small spacing of bridge construction among the present invention.
The specific embodiment
As shown in Figure 1, the job practices of the two limb pier studs of the extra small spacing of a kind of bridge construction of the present invention may further comprise the steps:
A, the two limb pier stud integral mold plates of the extra small spacing of making bridge construction and body of the tower template, wherein, the two limb pier stud integral mold plates of the extra small spacing of bridge construction comprise gad and two external molds;
B, two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template are transported to the job site; By survey crew the creeping formwork template is precisely located before installing; Two external molds of the two limb pier stud integral mold plates of the extra small spacing of bridge construction are provided with dorsad during installation; Form the wedge groove between two external molds, the work plane of two external molds is towards pier shaft to be built;
C, when every sections template is installed, the creeping formwork template is precisely located, guarantee that creeping formwork template position error less than 3mm, is detected the template alignment error together with quality inspection, survey crew by engineering department in the template installation process in real time by survey crew;
All use the round steel suspension ring of design to carry out when d, formwork hoisting;
Join brill after e, the two limb pier stud integral mold plates of the extra small spacing of bridge construction and the creeping formwork Template Location aperture examination assembly unit, locate with conical dowel pin during installation; Embed the thick double-sided tape of 1mm between two limb pier stud integral mold plates of the extra small spacing of bridge construction and the creeping formwork template and seal, carry out template with the M16 bolt and connect;
Connect with Φ 16 pull bars between the two limb pier stud integral mold plates of f, the extra small spacing of bridge construction and be fixed on the two tower limb internal molds, pull bar adopts Φ 20 plastic conduits to make sleeve pipe, and the extra small spacing of bridge construction pair limb pier stud integral mold plate collar aperture are carried out reliable shutoff with sponge;
G, adopt special gad wedging to carry out the spacing fine setting by the 50cm spacing in that the two limb pier stud integral mold plates of the extra small spacing of bridge construction are suitable for reading, guarantee the spacing precision; Spacing regulate to be accomplished back tension Screw arbor with nut at both-ends and is carried out the two limb pier stud integral mold plates of the extra small spacing of bridge construction and fix the assurance fixation;
H, accomplish two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template fixing after, concreting;
I, treat that concrete reaches intensity after, remove two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template, the brushing release agent, the method for stripping does, unclamps gad earlier, unclamps alignment pin again, unclamps Screw arbor with nut at both-ends then, the bolt of dismantling at last;
G, the two limb pier stud integral mold plates of the extra small spacing of lifting bridge construction and body of the tower template drop into next sections and use.
Every sections concrete to after the moulding of tower pier has carried out the allowable variation detection, and its result is summarized in table 1:
Figure 2012103511071100002DEST_PATH_IMAGE002
Table 1
See from detecting data, adopt method qualification rate of the present invention to reach 100%, be applicable to the extremely narrow and small situation in space between the tower pier; Extra small spacing body of the tower template does not produce distortion because of dismantling operation is improper; Concrete surface is not by scratch, and surface quality is good; Build sections construction under treated equal can the input of rear pattern plate at every turn.
For a person skilled in the art, under the prerequisite that does not break away from structure of the present invention, can also make some distortion and improvement, these also should be regarded as protection scope of the present invention, and these can not influence effect and practical applicability that the present invention implements.

Claims (2)

1. the job practices of the two limb pier studs of the extra small spacing of bridge construction is characterized in that may further comprise the steps:
A, the two limb pier stud integral mold plates of the extra small spacing of making bridge construction and body of the tower template, wherein, the two limb pier stud integral mold plates of the extra small spacing of bridge construction comprise gad and two external molds;
B, two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template are transported to the job site; By survey crew the creeping formwork template is precisely located before installing; Two external molds of the two limb pier stud integral mold plates of the extra small spacing of bridge construction are provided with dorsad during installation; Form the wedge groove between two external molds, the work plane of two external molds is towards pier shaft to be built;
C, the two limb pier stud integral mold plates of the extra small spacing of bridge construction are located with alignment pin, connect with bolt;
Connect with pull bar between two limb pier stud integral mold plates of d, the extra small spacing of two bridge constructions and the body of the tower template and be fixed on the internal mold, tie rod hole is used the sponge shutoff;
Adopt the gad wedging to carry out the spacing fine setting and fix between the two limb pier stud integral mold plates of e, the extra small spacing of two bridge constructions are suitable for reading;
F, accomplish two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template fixing after, concreting;
G, treat that concrete reaches intensity after, remove two limb pier stud integral mold plates of the extra small spacing of bridge construction and body of the tower template, the brushing release agent;
H, the two limb pier stud integral mold plates of the extra small spacing of lifting bridge construction and body of the tower template drop into next sections and use.
2. the job practices of the two limb pier stud integral mold plates of the extra small spacing of bridge construction as claimed in claim 1 is characterized in that: the method for said step g stripping does, unclamps gad earlier, unclamps alignment pin again, unclamps Screw arbor with nut at both-ends then, the bolt of dismantling at last.
CN201210351107.1A 2012-09-20 2012-09-20 Construction method of bridge construction super-small space double limb pier stud Expired - Fee Related CN102817326B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210351107.1A CN102817326B (en) 2012-09-20 2012-09-20 Construction method of bridge construction super-small space double limb pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210351107.1A CN102817326B (en) 2012-09-20 2012-09-20 Construction method of bridge construction super-small space double limb pier stud

Publications (2)

Publication Number Publication Date
CN102817326A true CN102817326A (en) 2012-12-12
CN102817326B CN102817326B (en) 2015-01-28

Family

ID=47301743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210351107.1A Expired - Fee Related CN102817326B (en) 2012-09-20 2012-09-20 Construction method of bridge construction super-small space double limb pier stud

Country Status (1)

Country Link
CN (1) CN102817326B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277737A (en) * 2018-01-29 2018-07-13 中国建筑第五工程局有限公司 A kind of cross-saddle single-track traffic continuous rigid frame system pier stud construction method and mold
CN108867398A (en) * 2018-08-14 2018-11-23 魏浩峰 A kind of construction method of bridge construction super-small space double limb pier stud
CN110042743A (en) * 2019-05-05 2019-07-23 陕西路桥集团有限公司 The hydraulic climbing die block system of twin legged thin wall hollow pier with synchronize climb construction technology
CN110863432A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Rapid and accurate positioning method for steel structure tower column installation construction
CN112012109A (en) * 2020-08-25 2020-12-01 华恒建设集团有限公司 Construction process of ultra-small-spacing double-limb pier stud
CN112160589A (en) * 2020-09-24 2021-01-01 中国五冶集团有限公司 Synchronous pouring rapid construction method for small-spacing square frame column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766888B1 (en) * 2006-04-15 2007-10-18 (주)스틸엔콘크리트 Prefabricated bridge and construction method using pier coping part by connecting pile column with pillar connecting member
CN101302742A (en) * 2008-07-04 2008-11-12 敬忠诚 Method for building bridge abutment on water
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
JP2010242315A (en) * 2009-04-01 2010-10-28 Sumitomo Mitsui Construction Co Ltd Bridge erection method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766888B1 (en) * 2006-04-15 2007-10-18 (주)스틸엔콘크리트 Prefabricated bridge and construction method using pier coping part by connecting pile column with pillar connecting member
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
CN101302742A (en) * 2008-07-04 2008-11-12 敬忠诚 Method for building bridge abutment on water
JP2010242315A (en) * 2009-04-01 2010-10-28 Sumitomo Mitsui Construction Co Ltd Bridge erection method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277737A (en) * 2018-01-29 2018-07-13 中国建筑第五工程局有限公司 A kind of cross-saddle single-track traffic continuous rigid frame system pier stud construction method and mold
CN108867398A (en) * 2018-08-14 2018-11-23 魏浩峰 A kind of construction method of bridge construction super-small space double limb pier stud
CN108867398B (en) * 2018-08-14 2021-02-02 桂林建安建设集团有限公司 Construction method of bridge construction ultra-small-space double-limb pier stud
CN110042743A (en) * 2019-05-05 2019-07-23 陕西路桥集团有限公司 The hydraulic climbing die block system of twin legged thin wall hollow pier with synchronize climb construction technology
CN110863432A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Rapid and accurate positioning method for steel structure tower column installation construction
CN112012109A (en) * 2020-08-25 2020-12-01 华恒建设集团有限公司 Construction process of ultra-small-spacing double-limb pier stud
CN112160589A (en) * 2020-09-24 2021-01-01 中国五冶集团有限公司 Synchronous pouring rapid construction method for small-spacing square frame column

Also Published As

Publication number Publication date
CN102817326B (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN102817326B (en) Construction method of bridge construction super-small space double limb pier stud
CN204753844U (en) Circular steel tube concrete column sleeve connected node
CN204024679U (en) Buried water stop fastening devices in a kind of tunnel lining hoop
CN105888078A (en) U-shaped building embedded part and construction method of anchoring component of U-shaped building embedded part
CN104912191B (en) Prefabricated concrete prefabricated column splicing device and using method
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN117364656A (en) Hydraulic climbing formwork construction method for highway bridge high pier
CN202830773U (en) Bridge construction super-small space double limb pier stud integral template
CN204282225U (en) For the length of side rapid adjustment template of unidirectional closing slope rectangular pier construction
CN204608825U (en) A kind of three-chip type stone bolt locating rack
CN115012641A (en) Scaffold construction method based on embedded wall connecting piece
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN104695332A (en) Hollow thin-walled pier internal mold bolt ejection removal technology
CN209868938U (en) Prefabricated piping lane forming die
CN103850266A (en) Multipurpose positioning template device for foundation bolt of iron tower and positioning method
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN206600005U (en) The positioning component and positioner of reserved joint bar in shear wall
CN103981893B (en) Gas Turbine Foundation Embedded Bolt Suspension Reinforcing Device and Method
CN108374350A (en) A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit
CN104481142B (en) The construction method of the chain support system of coupled columns template synchronous
CN202755674U (en) Positioning installation component for embedded bolts
CN220058829U (en) Circular column wood formwork reinforcing apparatus
CN217813511U (en) Steel supporting assembly suitable for shield tunnel construction
CN114277849B (en) Construction method of post-cast strip disassembly-free composite water stop template
CN204212445U (en) Lift protects door fastening device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHONGQING CONSTRUCTION ENGINEERING GROUP CO., LTD.

Effective date: 20131113

Owner name: CHONGQING CITY CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: CHONGQING CONSTRUCTION BRIDGE ENGINEERING CO., LTD.

Effective date: 20131113

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Shouzhong

Inventor after: Zhu Guanghua

Inventor after: Tang Jizhong

Inventor after: Liang Chuan

Inventor after: Liu Jianping

Inventor before: Yang Shouzhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG SHOUZHONG TO: YANG SHOUZHONG ZHU GUANGHUA TANG JIZHONG LIANG CHUAN LIU JIANPING

Free format text: CORRECT: ADDRESS; FROM: 400060 NANAN, CHONGQING TO: 400013 YUBEI, CHONGQING

TA01 Transfer of patent application right

Effective date of registration: 20131113

Address after: 400013 No. 8, defending Road, Chongqing, Yubei District

Applicant after: Chongqing Urban Construction Holdings Group Co., Ltd.

Applicant after: Chongqing Construction Engineering Group Co., Ltd.

Address before: 400060 No. 56 Industrial Park, jade horse pond, Nan'an District, Chongqing

Applicant before: CHONGQING CONSTRUCTION BRIDGE ENGINEERING CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20180920