CN102776991A CN2012102741979A CN201210274197A CN102776991A CN 102776991 A CN102776991 A CN 102776991A CN 2012102741979 A CN2012102741979 A CN 2012102741979A CN 201210274197 A CN201210274197 A CN 201210274197A CN 102776991 A CN102776991 A CN 102776991A
Authority
CN
China
Prior art keywords
awning
purlin
steel
purline
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102741979A
Other languages
Chinese (zh)
Other versions
CN102776991B (en
Inventor
余继军
周元
肖湘
黄智�
黄宪
张金玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Jinggong Steel Building (Group) Co., Ltd.
Original Assignee
Zhejiang Jinggong Steel Structure Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Co., Ltd. filed Critical Zhejiang Jinggong Steel Structure Co., Ltd.
Priority to CN201210274197.9A priority Critical patent/CN102776991B/en
Publication of CN102776991A publication Critical patent/CN102776991A/en
Application granted granted Critical
Publication of CN102776991B publication Critical patent/CN102776991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention mainly discloses a steel structure canopy. The steel structure canopy comprises a canopy beam, an upper veneer sheet, a lower veneer sheet, purlines and edge contracted plates. The purlines comprise an inner purline and an outer purline, wherein the inner purline is higher than the outer purline, and the height of the outer purline is equal to that of the canopy beam. The lower veneer sheet is fixed with a purline lower flange, and the upper veneer sheet covers on the purlines. The construction method of the steel structure canopy comprises the following steps of: 1, manufacturing the canopy beam; 2, fixing the inner purline and the outer purline on the canopy beam, wherein the height of the outer purline is higher than that of the inner purline; 3, mounting the lower veneer sheet; 4, mounting the edge contracted plates on the front surface and the side surface; 5, mounting the upper veneer sheet; and 6, mounting a flashing contracted edge, namely cutting seams at corresponding positions on a wall plate and a canopy plate, inserting the flashing contracted edge, and fixedly connecting the flashing contracted edge with the wall plate and the upper veneer sheet respectively. The edge contracted plates cover on two sides and the front surface of the canopy beam. The canopy beam is horizontally placed, the lower veneer sheet is vertical to the wall plate, and the upper veneer sheet ensures that the rainwater is smoothly guided to flow through the height difference sloping of the inner purline and the outer purline. The steel structure canopy is easy to construct and convenient to mount and has a beautiful appearance.

Description

A kind of steel work awning and job practices
Technical field
The present invention relates to belong to technical field of building construction, special relevant with a kind of steel work awning and job practices.
Background technology
Along with the progress of architectural engineering technology, the constantly development at home of light Steel-Structure Factory with Steel class building.Safeguard this piece field at light steel, how to do maintenance system more reasonable, economic, practical and attractive in appearance is the target that we explore and pursue always.
Awning is an important composition part of light Steel-Structure Factory with Steel, and the design and installation of engineering is particularly had very material impact in the outward appearance aspect.Some old-fashioned awnings are not very desirable aspect design and installation, and as shown in Figure 1, whole awning beam is tilted-putted, and top plate 10 all is to adopt the tilting structure with lower plywood 20, cause awning at the bottom of uneven sensation constrain.Shingle nail 30 will break off in the awning position, needs to increase relevant construction material, and increases the installation difficulty of plate.It is not attractive in appearance that awning top plate 10 will stretch out the outer, and it is as shown in Figure 2 to receive side plate 40, and moulding is dull, and is all unfavorable to draining and flat appearance degree, and therefore, designing a kind of more attractive in appearance with practical awning is a very urgent technical task.
Summary of the invention
The purpose of this invention is to provide a kind of steel work awning and job practices, awning beam horizontal positioned, lower plywood is vertical with wallboard, and top plate plays the slope through the inside and outside purlin discrepancy in elevation and guarantees the smooth and easy water conservancy diversion of rainwater.And the job practices among the present invention is simple, makes things convenient for the installation of awning.
In order to achieve the above object, the present invention realizes through following technical scheme:
A kind of steel work awning comprises awning beam, top plate, lower plywood, purlin, receipts side plate; Purlin comprises the interior purlin and outer purlin that is installed on the awning beam, and interior purlin is higher than outer purlin, and the height of outer purlin equals the awning depth of beam; Top plate covers on the purlin, and lower plywood and purlin bottom flange are fixed; Receive side plate and be coated on awning beam both sides and front.
Described awning beam adopts the channel-section steel splicing to be made.
Described lower plywood adopts HV-173 type colored steel, and the smooth side of plate face outwardly.
Described top plate adopts HV-173 type colored steel, a side of plate face evagination outwardly, colored steel is connected through self threading pin with purlin to be fixed.
Described receipts side plate bottom has the horizontal sides portion that bends inwards and form, and horizontal sides portion encases the lower plywood edge.
Form olecranon in the middle of the described receipts side plate.
Described top plate is received the limit through flashing and is connected with body of wall.
A kind of job practices of steel work awning may further comprise the steps:
One, the awning beam is made; Two, on the awning beam fixing in purlin and outside purlin, interior purlin height is higher than outer purlin; Three, lower plywood is installed; Four, the side plate installation is received in positive and side; Five, top plate is installed; Six, flashing is received the limit installation, and correspondence position slot above wallboard awning plate inserts flashing and receives the limit, flashing is received the limit be connected fixing with top plate with wallboard respectively.
In the described first step, the awning beam adopts [20a channel-section steel making.
In described second step, the high-order 250mm in cross section in the interior purlin, the high 200mm in cross section in the outer purlin adopts M12 galvanized bolt and the connection of awning beam.
In described the 3rd step, lower plywood adopts HV-173 type colored steel, the smooth side of plate face outwardly, colored steel is connected through self threading pin with purlin to be fixed.
In described the 4th step, receive side plate bottom and encase lower floor's edges of boards, adopt aluminium blind rivet and lower plywood to fix.
In described the 5th step, top plate adopts HV-173 type colored steel, a side of plate face evagination outwardly, colored steel is connected through self threading pin with purlin to be fixed.
After adopting such scheme, the present invention has many beneficial effects:
(1) awning beam horizontal positioned, lower plywood is vertical with wallboard, and the bottom surface is smooth attractive in appearance; Top plate adopts the differing heights cross section to play the slope through inside and outside purlin, guarantees that the awning draining is unobstructed.
(2) side plate and positive consistent being connected as a single entity of side plate external form, the good integrity received are received in the side.Receive the side plate beautiful design, third dimension is strong, and the multiple tracks flanging has increased rigidity and the planeness of receiving side plate.Positive olecranon moulding with receipts limit, side makes water can not flow on the lower plywood along receiving side plate.
(3) it is unique that the flashing of awning and shingle nail is received the limit design, when the shingle nail of shop, need not consider the awning installation, and shingle nail does not need to break off, and waits awning that back on-site cutting seam insertion on shingle nail is installed and get final product, and easy for installation, waterproof is secure.
In sum, this awning all improves to some extent than traditional method on structure, outward appearance, waterproof effect, sequence of construction, operation complexity, significantly has science and advance.
Description of drawings
Fig. 1 prior art constructions sketch map;
The middle receipts side plate sketch map of Fig. 2 prior art;
The whole sectional drawing of Fig. 3 preferred embodiment of the present invention;
The positive side plate sketch map of receiving of Fig. 4 preferred embodiment of the present invention;
The side plate sketch map is received in Fig. 5 preferred embodiment of the present invention side;
Purlin scheme of installation in Fig. 6 preferred embodiment of the present invention;
Lower plywood scheme of installation one in Fig. 7 preferred embodiment of the present invention;
Lower plywood scheme of installation two in Fig. 8 preferred embodiment of the present invention;
The positive limit scheme of installation of receiving in Fig. 9 preferred embodiment of the present invention;
The limit scheme of installation is received in the side in Figure 10 preferred embodiment of the present invention;
Figure 11 preferred embodiment of the present invention is plate scheme of installation one at the middle and upper levels;
Figure 12 preferred embodiment of the present invention is plate scheme of installation two at the middle and upper levels;
Flashing is received the limit scheme of installation in Figure 13 preferred embodiment of the present invention.
The specific embodiment
In conjunction with accompanying drawing, preferred embodiment of the present invention is explained further details.
A kind of steel work awning, in conjunction with Fig. 3 to Fig. 5, the parts that are mainly concerned with comprise awning beam 1, top plate 2, lower plywood 3, purlin 4, receive side plate 5.
Awning beam 1 is the beam body member of whole awning, and [the 20a channel-section steel is made in employing.Purlin 4 is installed on the awning beam 1, and the height of purlin 4 is not less than awning beam 1.Purlin 41 and outer purlin 42 in purlin 4 mainly comprises, and the high 250mm in interior purlin 41 cross sections, the outer purlin high 200mm in 42 cross sections.Lower plywood 2 adopts HV-173 type colored steels, and the smooth side of its plate face is fixed with purlin 4 bottom flanges outwardly.Top plate 2 adopts HV-173 type colored steels, a side of its plate face evagination outwardly, colored steel is connected through self threading pin with purlin 4 to be fixed.Receive side plate 5 and be coated on awning beam 1 both sides and front.Receive side plate 5 bottoms and have the horizontal sides portion 51 that bends inwards and form, horizontal sides portion 51 encases lower plywood 3 edges.In addition, form olecranon 52, like this when the rainwater of top drips, just can prevent that rainwater from taking advantage of a situation down to slide on the lower plywood 2 in the middle part of receiving side plate 5.
Whole construction method of the present invention, may further comprise the steps to shown in Figure 13 like Fig. 6:
One, awning beam 1 is made, and adopts [making of 20a channel-section steel, employing high-strength bolt and post connection.
Two, on awning beam 1 fixing in purlin 41 and outside purlin 42, the outer high 200mm in outer purlin 42 cross sections, the inner high 250mm in interior purlin 41 cross sections, employing M12 galvanized bolt and 1 connection of awning beam.
Three, lower plywood 3 is installed, and lower plywood 3 adopts HV-173 type colored steels, and the smooth side of plate face makes the awning bottom surface seem very smooth outwardly, and colored steel is connected through self threading pin with purlin to be fixed.
Four, side plate 5 installations are received in positive and side, receive the horizontal sides portion 51 of side plate 5 bottoms, encase lower plywood 2 limits, adopt aluminium blind rivet and lower plywood 2 fixing.
Five, top plate 2 is installed, and top plate 2 adopts HV-173 type colored steels, a side of plate face evagination outwardly, and awning top plate 2 plays the slope through inside and outside purlin 41,42 discrepancy in elevation, helps the awning draining, colored steel is connected through self threading pin with purlin 4 to be fixed.
Six, flashing is received the limit installation; Correspondence position slot above wallboard 7; Insert flashing and receive limit 6, with the aluminium blind rivet flashing is received limit 6 and be connected with top plate 2 with wallboard 7 respectively and fix, these flashing receipts limit 6 plates had both guaranteed can not leak between awning and shingle nail; Can strengthen awning installation so far again to wallboard at the slot place.
The foregoing description only is used to the inventive concept of the present invention of explaining, but not to the qualification of rights protection of the present invention, allly utilizes this design that the present invention is carried out the change of unsubstantiality, all should fall into protection scope of the present invention.

Claims (10)

1. a steel work awning is characterized in that: comprise awning beam, top plate, lower plywood, purlin, receipts side plate; Purlin comprises the interior purlin and outer purlin that is installed on the awning beam, and interior purlin is higher than outer purlin, and outer purlin height equals the awning depth of beam; Lower plywood and purlin bottom flange are fixed, and top plate covers on the purlin; Receive side plate and be coated on awning beam both sides and front.
2. a kind of steel work awning as claimed in claim 1 is characterized in that: described awning beam adopts the channel-section steel splicing to be made.
3. a kind of steel work awning as claimed in claim 1 is characterized in that: described lower plywood adopts HV-173 type colored steel, and the smooth side of plate face outwardly; Described top plate adopts HV-173 type colored steel, a side of plate face evagination outwardly, colored steel is connected through self threading pin with purlin to be fixed.
4. a kind of steel work awning as claimed in claim 1 is characterized in that: described receipts side plate bottom has the horizontal sides portion that bends inwards and form, and horizontal sides portion encases the lower plywood edge; Form olecranon in the middle of the described receipts side plate.
5. a kind of steel work awning as claimed in claim 1 is characterized in that: described top plate is received the limit through flashing and is connected with body of wall.
6. the job practices of a steel work awning is characterized in that: may further comprise the steps:
One, the awning beam is made; Two, on the awning beam fixing in purlin and outside purlin, interior purlin height is higher than outer purlin; Three, lower plywood is installed; Four, the side plate installation is received in positive and side; Five, top plate is installed; Six, flashing is received the limit installation, and correspondence position slot above wallboard awning plate inserts flashing and receives the limit, flashing is received the limit be connected fixing with top plate with wallboard respectively.
7. the job practices of a kind of steel work awning as claimed in claim 6 is characterized in that: in the described first step, the awning beam adopts [20a channel-section steel making.
8. the job practices of a kind of steel work awning as claimed in claim 6 is characterized in that: in described second step, and the high-order 250mm in cross section in the interior purlin, the high 200mm in cross section in the outer purlin adopts M12 galvanized bolt and the connection of awning beam.
9. the job practices of a kind of steel work awning as claimed in claim 6 is characterized in that: in described the 3rd step, lower plywood adopts HV-173 type colored steel, the smooth side of plate face outwardly, colored steel is connected through self threading pin with purlin to be fixed; In described the 5th step, top plate adopts HV-173 type colored steel, a side of plate face evagination outwardly, colored steel is connected through self threading pin with purlin to be fixed.
10. the job practices of a kind of steel work awning as claimed in claim 6 is characterized in that: in described the 4th step, receive side plate bottom and encase lower floor's edges of boards, adopt aluminium blind rivet and lower plywood to fix.
CN201210274197.9A 2012-08-03 2012-08-03 Steel structure canopy and construction method Active CN102776991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210274197.9A CN102776991B (en) 2012-08-03 2012-08-03 Steel structure canopy and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210274197.9A CN102776991B (en) 2012-08-03 2012-08-03 Steel structure canopy and construction method

Publications (2)

Publication Number Publication Date
CN102776991A true CN102776991A (en) 2012-11-14
CN102776991B CN102776991B (en) 2014-08-27

Family

ID=47122086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210274197.9A Active CN102776991B (en) 2012-08-03 2012-08-03 Steel structure canopy and construction method

Country Status (1)

Country Link
CN (1) CN102776991B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060780A (en) * 2014-06-30 2014-09-24 安徽富煌钢构股份有限公司 Large-cantilever steel structure wall face canopy and construction method thereof
CN106320618A (en) * 2016-08-24 2017-01-11 安徽瑶海钢构建设集团股份有限公司 Awning used for steel-structured factory building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734530A (en) * 1993-07-20 1995-02-03 Ohbayashi Corp Balcony
CN201486057U (en) * 2009-08-31 2010-05-26 朱生根 Node mechanism for self-water drainage flashing edge-closing plate
CN201574538U (en) * 2010-02-23 2010-09-08 北京北方空间钢结构有限公司 Canopy eave structural system
CN202125029U (en) * 2011-07-04 2012-01-25 管凯华 Awning girder purline mechanism for awning
CN202745289U (en) * 2012-08-03 2013-02-20 浙江精工钢结构有限公司 Steel structure canopy

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734530A (en) * 1993-07-20 1995-02-03 Ohbayashi Corp Balcony
CN201486057U (en) * 2009-08-31 2010-05-26 朱生根 Node mechanism for self-water drainage flashing edge-closing plate
CN201574538U (en) * 2010-02-23 2010-09-08 北京北方空间钢结构有限公司 Canopy eave structural system
CN202125029U (en) * 2011-07-04 2012-01-25 管凯华 Awning girder purline mechanism for awning
CN202745289U (en) * 2012-08-03 2013-02-20 浙江精工钢结构有限公司 Steel structure canopy

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060780A (en) * 2014-06-30 2014-09-24 安徽富煌钢构股份有限公司 Large-cantilever steel structure wall face canopy and construction method thereof
CN106320618A (en) * 2016-08-24 2017-01-11 安徽瑶海钢构建设集团股份有限公司 Awning used for steel-structured factory building

Also Published As

Publication number Publication date
CN102776991B (en) 2014-08-27

Similar Documents

Publication Publication Date Title
CN104775522B (en) A kind of detachable house box
US8402706B2 (en) Pillar part for modular construction
CN106801473B (en) Aluminum alloy structure house
CN202945823U (en) Box-type house
CN207568034U (en) Integrated morphology at the top of aluminium alloy modularized house
US20070130841A1 (en) Construction module system and method
CN105926982B (en) The light steel House on stilts of assembled
CN106320521A (en) Pure part plate combined industrialized house assembling structure which can be rapidly erected
WO2010043091A1 (en) A container-type mobile house with a drainage system
CN104060853A (en) Lightweight steel structure modularized residential building
CN102704712B (en) Integrated bathroom made of composite material and assembly method of integrated bathroom
CN107724561A (en) Assembled wall body structure
CN102776991B (en) Steel structure canopy and construction method
CN214461200U (en) Component combined house with tight connection
CN202745289U (en) Steel structure canopy
CN202577775U (en) Integrated compounded roof
CN206625355U (en) Aluminium alloy structure house
CN105421656A (en) External wall board installation structure of embedded type steel structure assembled house
CN202530780U (en) Modular type assembly single layer dwelling house
CN204238193U (en) Underground Hydro-electric Power Station fitting structure
CN210562843U (en) Connection structure of aluminum plate curtain wall of choosing outward
CN102691458B (en) Large-scale archaistic metal combined moon gate and construction method thereof
CN208870194U (en) Space module house
CN215858242U (en) Assembled container house bathroom chassis structure
CN110984627A (en) Industrial assembled house

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 312030 Zhejiang city of Shaoxing province Shaoxing County Keqiao Jianhu Road No. 1587

Applicant after: ZHEJIANG JINGGONG STEEL STRUCTURE GROUP CO., LTD.

Address before: 312030 Zhejiang city of Shaoxing province Shaoxing County Keqiao Jianhu Road No. 1587

Applicant before: Zhejiang Jinggong Steel Structure Co., ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG JINGGONG STEEL STRUCTURE CO., LTD. TO: ZHEJIANG JINGGONG STEEL STRUCTURE GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170731

Address after: 237000 Changjiang fine industrial zone, Lu'an economic and Technological Development Zone, Anhui

Patentee after: Changjiang Jinggong Steel Building (Group) Co., Ltd.

Address before: 312030 Zhejiang city of Shaoxing province Shaoxing County Keqiao Jianhu Road No. 1587

Patentee before: ZHEJIANG JINGGONG STEEL STRUCTURE GROUP CO., LTD.

TR01 Transfer of patent right