CN102765651A - People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop - Google Patents

People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop Download PDF

Info

Publication number
CN102765651A
CN102765651A CN2012102760823A CN201210276082A CN102765651A CN 102765651 A CN102765651 A CN 102765651A CN 2012102760823 A CN2012102760823 A CN 2012102760823A CN 201210276082 A CN201210276082 A CN 201210276082A CN 102765651 A CN102765651 A CN 102765651A
Authority
CN
China
Prior art keywords
cage
guide rail
suspension
rail bracket
coops
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102760823A
Other languages
Chinese (zh)
Inventor
金涛
孙清祥
夏昶
杜秀园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINGZHOU JINGGONG MACHINERY CO Ltd
Original Assignee
JINGZHOU JINGGONG MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINGZHOU JINGGONG MACHINERY CO Ltd filed Critical JINGZHOU JINGGONG MACHINERY CO Ltd
Priority to CN2012102760823A priority Critical patent/CN102765651A/en
Publication of CN102765651A publication Critical patent/CN102765651A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to a people-goods dual-purpose construction lifter provided with a driving mechanism on the top parts of suspension coops and forming an integral structure with the suspension coops, and belongs to the technical field of a building construction lifting device. The people-goods dual-purpose construction lifter comprises the driving mechanism, the suspension coops, a guide rail bracket, a limiting device, a guiding device, safety hooks, a rack and a suspension coop fixing bracket, wherein the rack is arranged at the middle part of the corresponding two sides of the guide rail bracket; the two suspension coops are fixedly arranged on the suspension coop fixing bracket and are systematically arranged at the two sides of the guide rail bracket; the suspension coop fixing bracket at the top parts of the suspension coops is provided with the driving mechanism; the driving mechanism and the suspension coops are fixedly arranged by the suspension coop fixing bracket to form an integral structure; and the upper part and the lower part of the suspension coop fixing bracket are respectively provided with the guiding device and the safety hooks. The lifter is simple in structure and is easy to manufacture; the precision is more easily controlled; on the condition of guaranteeing safety, the number of guiding pulleys and the number of the safety hooks are reduced, so that the weight of the suspension coops is effectively lightened; and the problems of heavy weight, large driving power and high manufacturing accuracy requirement, resulting from separated arrangement of the driving mechanism and the suspension coops of the existing lifter, are resolved.

Description

Driver train place the cage top and with cage be the dual-purpose building hoist of integrally-built people's goods
Technical field
The present invention relates to a kind of driver train place the cage top and with cage be the dual-purpose building hoist of integrally-built people's goods, belong to building operation jacking equipment technical field.
Background technology
Traditional dual-purpose building hoist of people's goods, its structure are that driver train and cage mechanism are split type absolute construction, connect with the pin type weight sensor between two mechanisms; Driver train drives cage along vertical guide rail frame up-and-down movement, realizes manned and goods purpose up and down.Because the driver train and the cage mechanism of this elevator are split-type structural, parts such as necessary independent installation leading sheave device of driver train and cage and hook with safety tong cause himself Heavy Weight, and driving power is big; Accuracy of manufacture requires high, and manufacture difficulty is big; And the parallelism of two mechanisms is difficult to regulate and puts in place when installing, and is easy to generate vibration during operation and causes serial faults such as the threaded connection place is loosening, and potential safety hazard is obvious.
Summary of the invention
The objective of the invention is to, provide a kind of driver train to be installed on the cage top, driver train and cage are integral structure, and are connected with guide rail bracket through guide piece, by rack-and-gear transmission drive driver train and cage along the guide rail bracket vertical up and down movement; And simple in structure, make, installation, maintenance is convenient, driver train safe in utilization place the cage top and with cage be the dual-purpose building hoist of integrally-built people's goods.
The present invention realizes above-mentioned purpose through following technical scheme:
This driver train place the cage top and with cage be that the dual-purpose building hoist of integrally-built people's goods is made up of underframe, lift trunk protective fence, driver train, cage, guide rail bracket, attached wall frame, electric control system, inhibiting device, guide piece, hook with safety tong, circular guideway, output gear, tooth bar, cage fixed mount and suspension rod; The attached wall frame is installed on the guide rail bracket; One side of guide rail bracket is fixed with suspension rod; The bottom of guide rail bracket is equipped with the lift trunk protective fence, it is characterized in that: described guide rail bracket is installed on the underframe, and guide rail bracket is a rectangular configuration; Four circular guideways of angle for being made into by round steel pipe; Tooth bar is equipped with at the middle part of the corresponding both sides of guide rail bracket, and two cages are installed on the cage fixed mount and are symmetrically placed in the both sides of the tooth bar end of guide rail bracket, on the cage fixed mount at cage top driver train are installed; Driver train and cage are loaded into an integral structure through the cage fixed mount, and driver train is through the engagement of the tooth bar on output gear and the guide rail bracket; The upper and lower of cage fixed mount is equipped with guide piece and hook with safety tong respectively, and the cage fixed mount is connected on the circular guideway of guide rail bracket through guide piece; Described guide piece is made up of head pulley device and sideslip wheel apparatus; The head pulley device is made up of two pulleys up and down; Two pulleys can be around the swing of the anchor shaft between it, and the sideslip wheel apparatus is made up of a pulley, is installed in the above and below of head pulley device; Above the top of cage electric control system is housed, the guide rail bracket upper and lower side is equipped with inhibiting device.
The present invention's beneficial effect compared with prior art is:
This driver train places the cage top and is that the dual-purpose building hoist of integrally-built people's goods unites two into one into an integral body with driver train with cage mechanism with cage, and is connected with guide rail bracket through guide piece, compares its advantage with existing building hoist and is:
1, simplified block construction, make easier, precision be more prone to control.
2, under the situation that guarantees safety, reduced the quantity of parts such as leading sheave, hook with safety tong, structure is optimized more, makes that cage weight is able to effectively alleviate, and has not only saved manufacturing cost, the also corresponding consumption of power that reduced, thus more energy-conservation.
3, because driver train and cage mechanism are integral structure, adopt frock control during manufacturing, the parallelism of slide down wheels has obtained better controlled, makes cage move stationarity more, and noise is lower, vibrates littler.
4, cage fixed mount top and the bottom are fixed with hook with safety tong, guarantee that cage can not break away from tooth bar with the assurance output gear by getaway all the time.
5, dispatch from the factory before disposable bug check put in place, on-the-spot direct mount need not 2 times the debugging, reduced the difficulty that on-the-spot driver train and cage are installed separately debugging.
Description of drawings
Fig. 1 for driver train place the cage top and with cage be the perspective view of the dual-purpose building hoist of integrally-built people's goods;
Fig. 2 for driver train place the cage top and with cage be the structural representation of facing of the dual-purpose building hoist of integrally-built people's goods;
Fig. 3 for driver train place the cage top and with cage be the left TV structure scheme drawing of the dual-purpose building hoist of integrally-built people's goods;
Fig. 4 is the A place enlarged diagram of guide rail bracket;
Fig. 5 is the B place partial enlarged drawing of output gear of head pulley device, sideslip wheel apparatus and the driver train of cage guide piece;
Among the figure: 1, underframe, 2, the lift trunk protective fence, 3, driver train, 4, guide rail bracket, 5, cage; 6, electric control system, 7, inhibiting device, 8, head pulley device, 9, the sideslip wheel apparatus, 10, hook with safety tong; 11, circular guideway, 12, output gear, 13, tooth bar, 14, the cage fixed mount, 15, pulley; 16, anchor shaft, 17, suspension rod, 18, the attached wall frame, 19, building.
The specific embodiment
This driver train place the cage top and with cage be that the dual-purpose building hoist of integrally-built people's goods is made up of underframe 1, lift trunk protective fence 2, driver train 3, guide rail bracket 4, cage 5, electric control system 6, inhibiting device 7, hook with safety tong 10, circular guideway 11, output gear 12, tooth bar 13, cage fixed mount 14, suspension rod 17, attached wall frame 18 and guide piece; Attached wall frame 18 is installed on the guide rail bracket 4; One side of guide rail bracket 4 is fixed with suspension rod 17; Be used for the Assembly &Disassembly standard knot, the bottom of guide rail bracket 4 is equipped with lift trunk protective fence 2.Described guide rail bracket 4 is installed on the underframe 1; Guide rail bracket 4 is a rectangular configuration; Four circular guideways 11 of angle for being made into by round steel pipe; The both sides that 13, two cages 5 of tooth bar are installed on the cage fixed mount 14 and are symmetrically placed in tooth bar 13 ends on the guide rail bracket 4 are equipped with at the middle part of guide rail bracket 4 corresponding both sides, on the cage fixed mount 14 at cage 5 tops driver train 3 are installed; Driver train 3 is loaded into an integral structure with cage 5 through cage fixed mount 14, and driver train 3 is through 13 engagements of the tooth bar on output gear 12 and the guide rail bracket 4.The upper and lower of cage fixed mount 14 is equipped with guide piece and hook with safety tong 10 respectively; Cage fixed mount 14 is connected through guide piece on the circular guideway 11 of guide rail bracket 4, and hook with safety tong 10 works to guarantee that cage fixed mount 14 does not break away from circular guideway 11 and guarantees that output gear 12 does not break away from tooth bar.Described guide piece is made up of head pulley device 8 and sideslip wheel apparatus 9; Head pulley device 8 is made up of two pulleys 15 up and down; Two pulleys 15 can be around 16 swings of the anchor shaft between it; Two pulleys 15 and the circular guideway 11 of guide rail bracket 4 can well be fitted, and sideslip wheel apparatus 9 is made up of a pulley 15, is installed in the above and below of head pulley device 8; Electric control system 6 is housed above the top of cage 5, and the upper and lower side of guide rail bracket 4 is equipped with inhibiting device 7 (referring to accompanying drawing 1~5).
Described guide rail bracket 4 is bearing systems of elevator, forms steel structure formula truss structure by shaped steel and solid drawn pipe Combination Welding; Guide rail bracket 4 is made up of epimerite, coxopodite and standard knot, and guide rail bracket 4 links to each other with building 19 through attached wall frame 18, and rigidity is better; Guide rail bracket 4 supernumerary segments increase by suspension rod 17 and self ancillary system to be accomplished.The setting of said attached wall frame 18 is after the antenna height of the guide rail bracket 4 of building hoist surpasses the free height of design code, in order to guarantee its stability and squareness, couples together guide rail bracket 4 and building 19 with a cover attached wall frame 18 at a certain distance.
This driver train place the cage top and with cage be that the dual-purpose building hoist of integrally-built people's goods directly promotes cage 5; Simplified the structure of cage 5, reduced the quantity of pulley 15 and the quantity of hook with safety tong 10, structure is optimized more; Make easier, precision be more prone to control; Make the weight of cage 5 be able to effectively alleviate, not only saved manufacturing cost, also correspondingly reduced consumption of power, thus more energy-conservation.In addition, because driver train 3 is an integral structure with cage 5, through frock control, the parallelism of head pulley device 8 and sideslip wheel apparatus 9 has obtained better controlled, makes cage move stationarity more during manufacturing, and noise is lower, vibrates littler; Disposable bug check puts in place before dispatching from the factory, and on-the-spot direct mount need not the secondary debugging, has reduced the difficulty that on-the-spot driver train and cage 3 are installed separately debugging.
The above is the specific embodiment of this invention; Above-mentioned casehistory does not constitute restriction to flesh and blood of the present invention; Under the those of ordinary skill of technical field after having read this specification sheets, can make an amendment or be out of shape the above-mentioned specific embodiment, and do not deviate from essence of the present invention and scope.

Claims (1)

  1. A driver train place the cage top and with cage be the dual-purpose building hoist of integrally-built people's goods; It is made up of underframe (1), lift trunk protective fence (2), driver train (3), guide rail bracket (4), cage (5), electric control system (6), inhibiting device (7), guide piece, hook with safety tong (10), circular guideway (11), output gear (12), tooth bar (13), cage fixed mount (14) and suspension rod (17) and attached wall frame (18); Attached wall frame (18) is installed on the guide rail bracket (4); One side of guide rail bracket (4) is fixed with suspension rod (17), and the bottom of guide rail bracket (4) is equipped with lift trunk protective fence (2); It is characterized in that: described guide rail bracket (4) is installed on the underframe (1); Guide rail bracket (4) is a rectangular configuration; Four circular guideways (11) of angle for being made into by round steel pipe; Tooth bar (13) is equipped with at the middle part of the corresponding both sides of guide rail bracket (4); Two cages (5) are installed in the both sides that tooth bar (13) end of guide rail bracket (4) was gone up and be symmetrically placed in to cage fixed mount (14); On the cage fixed mount (14) at cage (5) top driver train (3) is installed, driver train (3) and cage (5) are loaded into an integral structure through cage fixed mount (14), and driver train (3) is through the engagement of the tooth bar (13) on output gear (12) and the guide rail bracket (4); The upper and lower of cage fixed mount (14) is equipped with guide piece and hook with safety tong (10) respectively, and cage fixed mount (14) is connected on the circular guideway (11) of guide rail bracket (4) through guide piece; Described guide piece is made up of head pulley device (8) and sideslip wheel apparatus (9); Head pulley device (8) is made up of two pulleys (15) up and down; Two pulleys (15) can be swung around the anchor shaft between it (16); Sideslip wheel apparatus (9) is made up of a pulley (15), is installed in the above and below of head pulley device (8); Electric control system (6) is housed above the top of cage (5), and guide rail bracket (4) upper and lower side is equipped with inhibiting device (7).
CN2012102760823A 2012-08-05 2012-08-05 People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop Pending CN102765651A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102760823A CN102765651A (en) 2012-08-05 2012-08-05 People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102760823A CN102765651A (en) 2012-08-05 2012-08-05 People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop

Publications (1)

Publication Number Publication Date
CN102765651A true CN102765651A (en) 2012-11-07

Family

ID=47093272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102760823A Pending CN102765651A (en) 2012-08-05 2012-08-05 People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop

Country Status (1)

Country Link
CN (1) CN102765651A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132761A (en) * 2018-10-08 2019-01-04 张家港市荣达建筑机械制造有限公司 A debugging device for driving mechanism of construction elevator
CN112499433A (en) * 2020-11-27 2021-03-16 中国建筑工程(澳门)有限公司 Transportation system applied to building construction site and application method thereof
CN114988252A (en) * 2022-05-30 2022-09-02 浙江崇德建设有限公司 A construction elevator

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0094894B1 (en) * 1982-05-11 1985-08-28 Michel Alain Pichon Construction hoist
JPH1160112A (en) * 1997-08-08 1999-03-02 Kitagawa Iron Works Co Ltd Elevator for construction
CN2672011Y (en) * 2003-12-29 2005-01-19 中国建筑科学研究院建筑机械化研究分院 Multipurpose construction hoist
CN1884032A (en) * 2006-06-27 2006-12-27 陈毅凯 Gear rack type construction elevator
CN2926163Y (en) * 2006-07-05 2007-07-25 广州市京龙工程机械有限公司 Constructing elevator
CN201080399Y (en) * 2007-05-30 2008-07-02 广州市京龙工程机械有限公司 Inverse type mounting construction hoist
CN101423164A (en) * 2008-11-26 2009-05-06 卢元明 Construction elevator without cable for external-use
CN101693495A (en) * 2009-11-04 2010-04-14 杨文德 Construction hoist
CN202829214U (en) * 2012-08-05 2013-03-27 荆州市荆工机械有限公司 Personnel and material construction hoist provided with driving mechanisms at tops of suspension coops

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0094894B1 (en) * 1982-05-11 1985-08-28 Michel Alain Pichon Construction hoist
JPH1160112A (en) * 1997-08-08 1999-03-02 Kitagawa Iron Works Co Ltd Elevator for construction
CN2672011Y (en) * 2003-12-29 2005-01-19 中国建筑科学研究院建筑机械化研究分院 Multipurpose construction hoist
CN1884032A (en) * 2006-06-27 2006-12-27 陈毅凯 Gear rack type construction elevator
CN2926163Y (en) * 2006-07-05 2007-07-25 广州市京龙工程机械有限公司 Constructing elevator
CN201080399Y (en) * 2007-05-30 2008-07-02 广州市京龙工程机械有限公司 Inverse type mounting construction hoist
CN101423164A (en) * 2008-11-26 2009-05-06 卢元明 Construction elevator without cable for external-use
CN101693495A (en) * 2009-11-04 2010-04-14 杨文德 Construction hoist
CN202829214U (en) * 2012-08-05 2013-03-27 荆州市荆工机械有限公司 Personnel and material construction hoist provided with driving mechanisms at tops of suspension coops

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132761A (en) * 2018-10-08 2019-01-04 张家港市荣达建筑机械制造有限公司 A debugging device for driving mechanism of construction elevator
CN109132761B (en) * 2018-10-08 2023-08-22 张家港市荣达建筑机械制造有限公司 A debugging device for driving mechanism of construction hoist
CN112499433A (en) * 2020-11-27 2021-03-16 中国建筑工程(澳门)有限公司 Transportation system applied to building construction site and application method thereof
CN114988252A (en) * 2022-05-30 2022-09-02 浙江崇德建设有限公司 A construction elevator
CN114988252B (en) * 2022-05-30 2023-08-01 浙江崇德建设有限公司 Elevator for construction

Similar Documents

Publication Publication Date Title
CN101693495A (en) Construction hoist
CN202829214U (en) Personnel and material construction hoist provided with driving mechanisms at tops of suspension coops
CN104276484A (en) Lifting transmission device
CN203255838U (en) Single-lifting-point construction lift
CN203582235U (en) small construction hoist
CN205187748U (en) Four hoisting point chain elevators on four posts of car side wall
CN102765651A (en) People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop
CN205820646U (en) A kind of Long travel elevator
CN104609281A (en) Domestic lift
CN204917545U (en) Elevator rope lifting mechanism
CN103991802B (en) A kind of large-scale derrick crane taking driver personnel
CN203497883U (en) Safety lifting device convenient to use and used for operators of tower crane
CN103569827A (en) Novel wall attaching elevator
CN104192681A (en) Integrated transmission device of construction lifter
CN205187803U (en) Disconnected rail lift of two guide pillar four -tapes of aerial reverse hang type
CN202670960U (en) Safe and energy-saving construction elevator
CN204079171U (en) Lifting actuator
CN203612789U (en) Automatic cage curtain door free of brake for vertical shaft lifting cage
CN204434023U (en) The anti-displacement lock of gear type elevator cab
CN205274975U (en) Manned lift
CN204980736U (en) Dedicated pair of cage elevator of building site construction
CN105236249A (en) Elevator without machine room
CN215755827U (en) Hanging basket type lifting platform with rigid guiding function
CN204022222U (en) The integrated driving device of a kind of building hoist
CN205739897U (en) A kind of drag device of household ladder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121107