CN102761068A - Electricity testing switching operation integrated device - Google Patents

Electricity testing switching operation integrated device Download PDF

Info

Publication number
CN102761068A
CN102761068A CN201210274935XA CN201210274935A CN102761068A CN 102761068 A CN102761068 A CN 102761068A CN 201210274935X A CN201210274935X A CN 201210274935XA CN 201210274935 A CN201210274935 A CN 201210274935A CN 102761068 A CN102761068 A CN 102761068A
Authority
CN
China
Prior art keywords
electricity testing
electrical verification
electroscope
operator
link rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210274935XA
Other languages
Chinese (zh)
Inventor
熊波
易建
张晓德
杨中银
李毅
冯霞
刘锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Electric Power Corp. Wanzhou Power Supply Bureau
State Grid Corp of China SGCC
Original Assignee
CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU filed Critical CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
Priority to CN201210274935XA priority Critical patent/CN102761068A/en
Publication of CN102761068A publication Critical patent/CN102761068A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an electricity testing switching operation integrated device which comprises an electricity testing device and an operating rod. The electricity testing device is fixedly connected at the front end of the operating rod through a connection piece. Due to the fact that the electricity testing device is arranged on the operating rod, an operator delivers the electricity testing device to the high position to conduct electricity testing on an electrification body through the operating rod, and tower climbing height of the operator can be reduced to test electricity. The device can reduce working intensity of the operator, saves electricity testing time and can ensure safety of the operator due to the fact that the operator is far away from the electrification body in the electricity testing process. Simultaneously, the operating rod is used for conducting switching operation after electricity testing is finished, and electricity testing and the switching operation are finished through one tool. The electricity testing switching operation integrated device is simple and convenient to operate and high in working efficiency.

Description

Electrical verification grid switching operation integration apparatus
Technical field
The present invention relates to a kind of instrument, particularly a kind of instrument that is used for electrical verification, back brake.
Background technology
Along with distribution operation science, rationalization, the distribution operational mode is more flexible and changeable, and the distribution grid switching operation will be more frequent, and power supply reliability and power supply service are proposed bigger challenge.
In the real work, all need electrical verification before stopping sending electric grid switching operation, the electrical verification operation mainly contains following several kinds of situation:
1, before the operation during electrical verification, operating personnel need step on bar to certain altitude can electrical verification, and distribution line generally adopts 15 meters and above electric pole, and electric pole often has at certain altitude and attaches the extension thing, time-consuming, the effort of the process of crossing.
When 2, joint using circuit to the direct electrical verification of upper layer device, human body and charging equipment safe distance are difficult to guarantee.
Summary of the invention
In view of this; The purpose of this invention is to provide a kind of electrical verification grid switching operation integration apparatus; It can help operating personnel at remote electrical verification and the grid switching operation carried out, with solution ascend a height length consuming time, labour intensity that electrical verification exists high, be difficult to guarantor and band point device safe distance etc. problem.The concrete scheme of electrical verification grid switching operation integration apparatus of the present invention is:
Electrical verification grid switching operation integration apparatus of the present invention comprises electroscope and link rod, and said electroscope is fixedly connected on the front end of link rod through connector; The end that the operator gripped when the rear end of link rod was work, the end that link rod contacted with electrified body when the front end of link rod was work.
Further, said electroscope is through the detachable front end that is fixedly connected on link rod of connector;
Further; Said connector comprises plug that is fixedly connected on the link rod front end and the adapter sleeve that is fixedly connected on the electroscope rear end; Said plug is plugged in the adapter sleeve and with it and is slidingly matched; Said plug is provided with annular spacing groove, and said adapter sleeve is provided with the bolt with its threaded engagement, and the end of said bolt is arranged in the annular spacing groove;
Further, said plug and adapter sleeve are processed by nylon material;
Further, said plug is fixedly connected through rivet with link rod, and said adapter sleeve also is fixedly connected through rivet with electroscope.
Beneficial effect of the present invention: electrical verification grid switching operation integration apparatus of the present invention; Electroscope is arranged on the link rod, and the operator delivers to eminence to the electrified body electrical verification through link rod with electroscope, thereby makes operator no longer carry out electrical verification with the climbing shaft tower; Can reduce operator's working strength; Practice thrift the electrical verification time, and operator and electrified body distance during electrical verification, can guarantee operating personnel's safety; After electrical verification, through the link rod back brake, electrical verification and back brake are accomplished through same instrument, and be easy and simple to handle, high efficiency simultaneously.
Description of drawings
Fig. 1 is the structural representation of electrical verification grid switching operation integration apparatus of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further described.
As shown in Figure 1, present embodiment electrical verification grid switching operation integration apparatus comprises electroscope 1 and link rod 2, and said electroscope 1 is fixedly connected on the front end of link rod 2 through connector.
During work, the operator delivers to eminence to the electrified body electrical verification through link rod 2 with electroscope 1, thereby makes operator no longer carry out electrical verification with the climbing shaft tower; Can reduce operator's working strength; Practice thrift the electrical verification time, and operator and electrified body distance during electrical verification, can guarantee operating personnel's safety; After electrical verification, through link rod 2 back brakes, electrical verification and back brake are accomplished through same instrument, and be easy and simple to handle, high efficiency simultaneously.
In the present embodiment, said electroscope 1 after electrical verification and grid switching operation completion, can be pulled down appropriate placement through the detachable front end that is fixedly connected on link rod 2 of connector with electroscope, can protect electroscope not to be damaged.
In this enforcement; Said connector comprises plug 3 that is fixedly connected on link rod 2 front ends and the adapter sleeve 4 that is fixedly connected on electroscope 1 rear end; Said plug 3 is plugged in the adapter sleeve 4 and with it and is slidingly matched; Said plug 3 is provided with annular spacing groove 3a, and said adapter sleeve 4 is provided with the bolt 5 with its threaded engagement, and the end of said bolt 5 is arranged among the annular spacing groove 3a.This structural connection skids off from adapter sleeve 4 to limit plug 3 through bolt 5 is inserted among the annular spacing groove 3a, and is simple in structure; After operation is accomplished, bolt 5 is screwed out from annular spacing groove 3a, can electroscope 1 be pulled down easy accessibility from link rod 2.
In the present embodiment, said plug 3 and adapter sleeve 4 are processed by nylon material, and the wear-resisting and good insulating of nylon material can guarantee that the useful life of this electrical verification grid switching operation integration apparatus is long and safe to use.
In the present embodiment, said plug 3 and link rod 2 are fixedly connected through rivet, and said adapter sleeve 4 also is fixedly connected through rivet with electroscope 1, and firm and reliable connection can guarantee to use for a long time electroscope 1 and link rod 2 can not come off.
Explanation is at last; Above embodiment is only unrestricted in order to technical scheme of the present invention to be described; Although with reference to preferred embodiment the present invention is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention; And not breaking away from the aim and the scope of technical scheme of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (5)

1. electrical verification grid switching operation integration apparatus, it is characterized in that: comprise electroscope and link rod, said electroscope is fixedly connected on the front end of link rod through connector.
2. electrical verification grid switching operation integration apparatus according to claim 1 is characterized in that: said electroscope is through the detachable front end that is fixedly connected on link rod of connector.
3. electrical verification grid switching operation integration apparatus according to claim 2; It is characterized in that: said connector comprises plug that is fixedly connected on the link rod front end and the adapter sleeve that is fixedly connected on the electroscope rear end; Said plug is plugged in the adapter sleeve and with it and is slidingly matched; Said plug is provided with annular spacing groove, and said adapter sleeve is provided with the bolt with its threaded engagement, and the end of said bolt is arranged in the annular spacing groove.
4. electrical verification grid switching operation integration apparatus according to claim 3, it is characterized in that: said plug and adapter sleeve are processed by nylon material.
5. electrical verification grid switching operation integration apparatus according to claim 4, it is characterized in that: said plug is fixedly connected through rivet with link rod, and said adapter sleeve also is fixedly connected through rivet with electroscope.
CN201210274935XA 2012-08-03 2012-08-03 Electricity testing switching operation integrated device Pending CN102761068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210274935XA CN102761068A (en) 2012-08-03 2012-08-03 Electricity testing switching operation integrated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210274935XA CN102761068A (en) 2012-08-03 2012-08-03 Electricity testing switching operation integrated device

Publications (1)

Publication Number Publication Date
CN102761068A true CN102761068A (en) 2012-10-31

Family

ID=47055428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210274935XA Pending CN102761068A (en) 2012-08-03 2012-08-03 Electricity testing switching operation integrated device

Country Status (1)

Country Link
CN (1) CN102761068A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377580A (en) * 2014-11-24 2015-02-25 国家电网公司 Device for conveying testing tools of large power transformation equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101478087A (en) * 2008-12-31 2009-07-08 湖北省电力公司咸宁供电公司 High-voltage earthing tool
CN201490031U (en) * 2009-09-07 2010-05-26 河南省电力公司濮阳供电公司 Integrated electricity-testing manipulator
CN102013343A (en) * 2009-09-07 2011-04-13 河南省电力公司濮阳供电公司 Integrated-type operator
CN202120771U (en) * 2011-07-01 2012-01-18 段健鹏 Multifunctional insulating rod
KR20120021556A (en) * 2010-08-09 2012-03-09 한전케이피에스 주식회사 Insulator change device for power cable
CN202712719U (en) * 2012-08-03 2013-01-30 重庆市电力公司万州供电局 Electricity testing and switching operation integration device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101478087A (en) * 2008-12-31 2009-07-08 湖北省电力公司咸宁供电公司 High-voltage earthing tool
CN201490031U (en) * 2009-09-07 2010-05-26 河南省电力公司濮阳供电公司 Integrated electricity-testing manipulator
CN102013343A (en) * 2009-09-07 2011-04-13 河南省电力公司濮阳供电公司 Integrated-type operator
KR20120021556A (en) * 2010-08-09 2012-03-09 한전케이피에스 주식회사 Insulator change device for power cable
CN202120771U (en) * 2011-07-01 2012-01-18 段健鹏 Multifunctional insulating rod
CN202712719U (en) * 2012-08-03 2013-01-30 重庆市电力公司万州供电局 Electricity testing and switching operation integration device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377580A (en) * 2014-11-24 2015-02-25 国家电网公司 Device for conveying testing tools of large power transformation equipment
CN104377580B (en) * 2014-11-24 2017-08-08 国家电网公司 A kind of large-scale transformer test instrument transmitting device

Similar Documents

Publication Publication Date Title
CN203732572U (en) Telescopic high-altitude wire clamp
CN202929093U (en) Multifunctional high-voltage electricity-testing device
CN202712719U (en) Electricity testing and switching operation integration device
CN204011803U (en) A kind of cable end grounding wire device
CN203300937U (en) High-hitching ground wire operating lever
CN102761068A (en) Electricity testing switching operation integrated device
CN203799882U (en) Multifunctional link bar
CN202384516U (en) Secondary voltage drop live-line wiring device
CN202491196U (en) Electrification overhaul spanner
CN203289003U (en) Multifunctional insulating operating lever of transformer station
CN203135277U (en) Nest dismantling apparatus
CN203589245U (en) High-altitude wiring clamp
CN103669977B (en) Adjustable stem position instrument in a kind of charged pole operation
CN203224532U (en) Multi-purpose joint used for measuring mechanical characteristics of circuit breaker
CN202616424U (en) Power cable grounding device
CN202757990U (en) Length-increasing electroscope
CN202572183U (en) Large-current telescopic high-altitude cable connecting clamp
CN204789734U (en) Electrician's utensil is tested to portable high pressure
CN202339404U (en) Insulating telescopic point-polarity pole
CN203455394U (en) Electroscope
CN204144779U (en) Insulation board
CN203640379U (en) Pole position correcting tool for live pole erecting working
CN205123087U (en) Overhaul tool assembly
CN203932337U (en) A kind of grounding pin
CN202957495U (en) Charged fastener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121130

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121130

Address after: 404000 Chongqing city Wanzhou District Dragon Plaza No.

Applicant after: Chongqing Electric Power Corp. Wanzhou Power Supply Bureau

Applicant after: State Grid Corporation of China

Address before: 404000 Chongqing city Wanzhou District Dragon Plaza No.

Applicant before: Chongqing Electric Power Corp. Wanzhou Power Supply Bureau

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031