CN102758483A - 节能节水房 - Google Patents

节能节水房 Download PDF

Info

Publication number
CN102758483A
CN102758483A CN2011101097299A CN201110109729A CN102758483A CN 102758483 A CN102758483 A CN 102758483A CN 2011101097299 A CN2011101097299 A CN 2011101097299A CN 201110109729 A CN201110109729 A CN 201110109729A CN 102758483 A CN102758483 A CN 102758483A
Authority
CN
China
Prior art keywords
pipes
unicom
connects
roof
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101097299A
Other languages
English (en)
Inventor
刘新广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011101097299A priority Critical patent/CN102758483A/zh
Publication of CN102758483A publication Critical patent/CN102758483A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/20Solar thermal

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

节能节水房:将阴面、东面、西面的墙及阴面的窗均做成保温的;在阳面制成框架,框架表面贴太阳能电池,在框架内镶嵌中间有间隔的透光组合式墙窗;房顶做成保温箱式太阳集热器的,房顶的斜坡下端弯翘,太阳集热器的上部与房顶内部联通,它的下部通过水能发电机与房顶内部联通;在房顶的顶设置风力发电机;将房顶汇集的雨水和洗脸盆、地漏、洗菜盆、洗衣机的废水收集起来冲马桶,废水与冲马桶后的脏水冲击污水发电机发电;设置保温水箱,其内有散热器,散热器的上下部用管道、单向阀与组合式墙窗之间隔联通;保温水箱、房顶用管道、单向阀与吸收式空调系统联通联接;在组合式墙窗内设置带活窗的隔热帘子;用下降时能发电的电梯和踩踏式发电地砖。

Description

节能节水房
技术领域
本发明涉及节能节水建筑技术及太阳能、风能、水能利用技术,特别是一种节能节水房。
背景技术
目前有些房子,在屋顶设置太阳能电池或太阳能热水器,墙是双层隔空的或是实体保温的,而窗户是双层夹空玻璃或是隔热反光镀膜玻璃的。这种房部分地利用了太阳能,而且由于墙和窗户具有隔热保温功能,即夏季能阻挡外部热量进入房内部,冬季能阻挡房内部热量向外散发,所以能节能。但是这种房墙和窗户没有利用太阳能,所以算不上好的节能房,也称不得完全的节能房。还有,这种房的双层夹空玻璃,在冬季能采集阳光取暖且保温,但夏季无法阻挡阳光热入室且没有利用太阳能;这种房的隔热反光镀膜玻璃窗户,在夏季能阻挡阳光热入室,可也没有利用太阳能,而冬季不能充分采集阳光取暖且保温性差,而且由于镀膜玻璃透光差,致使室内光线灰暗。目前,几乎没有既节能又节水的房屋。而且太阳能电池昂贵,想在房的朝阳面大面积使用,房的造价将极高,这正是目前难以推广太阳能电池式节能建筑的原因。
发明内容
本发明设计一种节能节水房,克服现有节能房的上述缺陷,能隔热保温节能,还能充分利用太阳能产热水和调节室温,利用风能发电、利用太阳能发电、利用水的势能发电,利用电梯下降时的势能发电、利用人走动踩踏发电地砖发电,能节水,性价比很高。
本发明通过下述技术方案实现。
如图1至图5示。在地基1上建立左保温墙2、右保温墙7、后保温墙13、框架6,后保温墙13的左右端分别与左保温墙2的后部、右保温墙7(从图1看)的后部联结,框架6的左右端分别与左保温墙2的内侧、右保温墙7的内侧、后保温墙13的内侧联结,框架6的朝阳面贴太阳能电池40(图5示);在框架6各层中设置相间隔的前透光保温墙3和后透光保温墙14,前透光保温墙3和后透光保温墙14均与框架6密封联接;在前透光保温墙3和后透光保温墙14上开窗孔,在窗孔镶嵌前窗框4,将外透光保温板16与内透光保温板17间隔一距离并用密封条15将周围密封组成前窗扇5,外透光保温板16、内透光保温板17、密封条15围成一空腔,将前窗扇5安装在前窗框4中,并用两个一号管18将所述空腔的上部下部分别与前透光保温墙3和后透光保温墙14之间隔的上部下部联通联接;在后保温墙13上开窗孔,在此窗孔镶嵌后窗框12,将后透光保温板10与里透光保温板11间隔一距离并用密封条9将周围密封组成后窗扇8,将后窗扇8安装在后窗框12中;前窗扇5、前透光保温墙3、后透光保温墙14构成组合式墙窗;框架6、前窗扇5、前透光保温墙3、后透光保温墙14均朝阳;在左保温墙2、右保温墙7、后保温墙13、框架6的上端联结水平保温板63。
如图5示,导流管62的左端穿过后保温墙13上部、水平保温板63的左端并与它们联接,导流管62的右端穿过顶层的前透光保温墙3和后透光保温墙14的顶部、框架6最上层的水平底板的右端、水平保温板63的右端并与它们联接;一号垂直管46穿过框架6的中部各层水平底板,其上端与导流管62联通联接;二号垂直45管穿过框架6除最上层的各层水平底板且固定在后保温墙13的内侧,在二号垂直管45的下端联通联接污水发电机43,污水发电机43的下端出口用五号管42与污水总管41联通联接;二号管53避开一号垂直管46把洗脸盆54的下水口、洗菜盆55的下水口、洗衣机56的下水口与废水箱51的上部联通;废水箱51的上部用三号管52与一号垂直管46联通联接,三号管52的右端下部伸入一号垂直管46内一部分,但最下层的三号管52仅与一号垂直管46的下端联通联接;四号管50将废水箱51的底部和马桶49的水箱联通联接,马桶49的水箱还外接可控的自来水;马桶49的下水口与二号垂直管45联通联接;地漏48用六号管47与二号垂直管45联通联接;在最下层的废水箱51上部设置溢流管44,溢流管44的左端与二号垂直管45联通联接。
凉水注入管61避开导流管62,凉水注入管61的上端穿过框架6的最上层板后再穿透水平板保温63并与它们联结,在凉水注入管61的下端联通联接注入/排放阀59。
七号管64的穿上端依次穿过框架6的最上层板、水平保温板63并上伸一段,七号管64避开导流管62,在七号管64的下端依次联通联接一号水力发电机60、八号管58,八号管58穿过框架6的中部各层水平底板;九号管65的上端穿过框架6的最上层板后再穿透水平保温板63并与它们联结,九号管65穿过框架6除最下层的各层水平底板,九号管65避开导流管62;十号管57避开九号管65,十号管57的左端与八号管58联通联接,在十号管57的右端依次联通联接一号单向阀19、十一号管20、二号单向阀26、十二号管25,十二号管25的右端穿透保温箱28的上部左侧并与其联结;保温箱28挂在室内靠近后透光保温墙14的墙上或嵌入此墙;十三号管29的上端与十一号管20联通联接,十三号管29的下端与设置在屋内的吸收式空调系统36(该系统已商业化批量生产,它利用热水既能制冷又能制热)的储水箱的进口联通联接,在十三号管29的上部联通联接热水输出阀66,吸收式空调系统36的储水箱能从外界接入水(如自来水);十四号管39的左端与九号管65联通联接,在十四号管39的右端依次联通联接三号单向阀38、十五号管37,十五号管37的右端与吸收式空调系统36的储水箱的出口联通联接;十六号管35的左端与吸收式空调系统36的储水箱的出口联通联接,在十六号管35的右端依次联通联接四号单向阀34、十七号管33,十七号管33的右端穿透保温箱28的下部左侧并与其联结;十八号管22的左端穿过保温箱28的上部右侧与设置在保温箱28内的散热器27的上部联通联接,十八号管22与保温箱28联结,在十八号管22的右端联通联接二号水力发电机24,二号水力发电机24的右端穿透后透光保温墙14的上部并与其联结;十九号管30的左端穿过保温箱28的下部右侧与散热器27的下部联通联接,十九号管30与保温箱28联接,在十九号管30的右端联通联接五号单向阀31,五号单向阀31穿透后透光保温墙14的下部并与其联结,在十九号管30上联通联接工质(如经处理过的水)注入/泄放阀32;一号排气管23的左端穿透前透光保温墙3的上部并与其联结;二号排气管21穿透保温箱28上部并与其联结。
在后透光保温墙14的外面设置能遮挡前窗扇5和后透光保温墙14的保温隔热帘子(图中未画),保温隔热帘子朝后透光保温墙14的一面为深色(如黑、深蓝、墨绿等色),保温隔热帘子与前窗扇5相对的部分做成可开闭的活窗。
在水平保温板63上建中空的保温式太阳集热器房顶,此房顶的斜面的下边缘弯翘,导流管62的端口穿透该弯翘并与其联结;在所述房顶的顶安装垂直轴风力发电机,所述房顶的朝阳面做成太阳集热器的,所述太阳集热器上部与房顶内部联通,所述太阳集热器下部联通联接水能发电机,该水能发电机与所述房顶内部联通;所述房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、所述水能发电机均包在里面;三号排气管穿透所述房顶的上部并与其联结;加热器、温度传感器分别穿透所述房顶的一面伸入所述房顶内,所述加热器、温度传感器均与所述房顶联接。
如图6至图8示,所述房顶的一种为人字形:在水平保温板63上平面联结左斜板69、右斜板71、山墙68,左斜板69的下端和右斜板71的下端均弯翘,导流管62的端口穿透该弯翘并与其联结;左斜板69是保温的,右斜板71、山墙68均做成一号太阳集热器的,左斜板69的顶部与右斜板71的顶部联结形成人字坡面,在人字坡面的两头各联结一面山墙68;水平保温板63、左斜板69、右斜板71、山墙68组成人字形保温箱式一号太阳集热器房顶;左斜板69背阳,右斜板71、山墙68能受到日照;右斜板71上部、山墙68的上部和下部均与人字形保温箱式一号太阳集热器房顶内部联通,右斜板71下部内侧联通联接一号水能发电机74;人字形保温箱式一号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、一号水能发电机74包在里面;加热器72、温度传感器73均穿过山墙68伸入到人字形保温箱式一号太阳集热器房顶内,它们均与山墙68联接;三号排气管67的下端穿透人字形保温箱式一号太阳集热器房顶的顶并与其联通联接。
在人字形保温箱式一号太阳集热器房顶的顶间隔设置若干一号垂直轴风力发电机70(若只设置一台风力发电机,重量太大且集中,将造成房顶结构复杂、受力不佳)。
如图9至图11示,所述房顶的又一种为锥形:在水平保温板63上平面联结锥壳76,锥壳76的下端弯翘,锥壳76做成二号太阳集热器的,它能使内侧锥形空间保温,导流管62的端口穿透所述弯翘并与其联结;锥壳76和水平保温板63组成锥形保温箱式二号太阳集热器房顶;锥壳76上部与锥形保温箱式二号太阳集热器房顶内部联通,锥壳76下部内侧联通联接二号水能发电机77;锥形保温箱式二号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、二号水能发电机77包在里面;加热器72、温度传感器73均穿过锥壳76伸入到锥形保温箱式二号太阳集热器房顶内,它们均与锥壳76联接;排气管67的下端穿透锥形保温箱式二号太阳集热器房顶的上部并与其联通联接。
在锥形保温箱式二号太阳集热器房顶的顶设置二号垂直轴风力发电机75。
如图12至图14示,所述房顶的另一种为单斜坡形:在水平保温板63上平面左边联结垂直保温墙78,垂直保温墙78与后保温墙13上下对齐;在水平保温板63上平面右边联结斜板81,斜板81的上端与垂直保温墙78上部联结,斜板81的下端弯翘,导流管62做成仅右部有端口,而左部缩短到室内且左端口封闭,导流管62的右部端口穿透斜板81的下端弯翘并与其联结;在垂直保温墙78和斜板81的两端分别联结板80;斜板81、板80均做成三号太阳集热器的;水平保温板63、垂直保温墙78、斜板81、板80组成单斜坡形保温箱式三号太阳集热器房顶;斜板81上部、板80的上部和下部均与单斜坡形保温箱式三号太阳集热器房顶内部联通,在斜板81下部内侧联通联接三号水能发电机82;单斜坡形保温箱式三号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、三号水能发电机82包在里面;加热器72、温度传感器73均穿过垂直保温墙78或板80伸入到单斜坡形保温箱式三号太阳集热器房顶内,加热器72、温度传感器73均与垂直保温墙78或板80联接;排气管67的下端穿透单斜坡形保温箱式三号太阳集热器房顶的上部并与其联通联接。
在单斜坡形保温箱式房顶的顶设置若干三号垂直轴风力发电机79。
所述节能节水房的电梯采用下降时能利用势能发电的电梯(如专利号为200920292539.3的节能电梯)。
所述节能节水房的室内地板、走道上铺设踩踏式发电地砖(如申请号为201010595207.X的发电地砖)。
所述垂直轴风力发电机利用任意方向的风发电,在风少或风小的地区可不设置垂直轴风力发电机。
下雨时,雨水从房顶的斜坡流下,并通过斜坡下部弯翘汇入导流管62,继而从一号垂直管46下流,通过各层的三号管52流入各层的废水箱51。洗脸盆54的废水、洗菜盆55的废水、洗衣机56的废水都通过二号管53流入废水箱51,废水箱51中的废水待冲马桶49用。冲完马桶49的污水流入二号垂直管45。当所有废水箱51废水满时,再来的废水就通过最下层的废水箱51上的溢流管44流入二号垂直管45。洗澡废的废水、刷地的脏水均依次通过地漏48、六号管47流入二号垂直管45。二号垂直管45中的废水和马桶49流出的脏水混成污水下流,下流的污水冲击污水发电机43发电后通过五号管42进入污水总管41流走。在通常生活,关闭与马桶49联接的自来水,一般情况下存入废水箱51中的废水是够冲马桶49用,若偶尔不够用,可开自来水用。
通过注入/排放阀59向所述房顶内和所述太阳集热器内注水,维修或清洗房顶内时,通过注入/排放阀59排放。在春季、夏季、秋季,通过吸收式空调系统36的储水箱依次经十六号管35、四号单向阀34、十七号管33给保温箱28注水。在春季、夏季、秋季,通过注入/泄放阀32向前透光保温墙3和后透光保温墙14之间隔、前窗扇5内、散热器27内注入工质(如经处理过的水)。
在春季、夏季、秋季,阳光加热前透光保温墙3和后透光保温墙14之间隔及前窗扇5内的工质,被加热的工质因密度减小而上升到前透光保温墙3和后透光保温墙14之间隔的上部,继而冲击二号水力发电机24发电后经流十八号管22进入散热器27上部,从而增加这里的内部压力,这时散热器27底部的工质获得增压力后经十九号管30冲开五号单向阀31进入前透光保温墙3和后透光保温墙14之间隔下部,填充被加热的工质上升后腾出的空间,散热器27里上面的热工质下流过程中将热量传给保温箱28里的水。随着阳光持续照射,此过程度不断循环,保温箱28里的水被连续加热升温而上升,经十二号管25冲开二号单向阀26,再依次经十一号管20、十三号管29流入吸收式空调系统36的储水箱。无阳光照射或环境变冷时,,前透光保温墙3和后透光保温墙14之间隔及前窗扇5内的工质变冷下压,关闭五号单向阀31,所述循环停止。这时由于工质是热的不良导体,前透光保温墙3和后透光保温墙14之间隔及前窗扇5内的冷工质与散热器27中的热工质被隔离,保温箱28里的水被保温。
阳光照射太阳集热器,使其中的水受热密度变小上升经上汇流管进入房顶内上部,同时房顶内下部的水冲动水能发电机发电后经下汇流管进入太阳集热器下部,由此形成循环,使它们内的水被加热。加热了的水进入七号管64,继而下冲一号水力发电机60发电后依次经八号管58、十号管57、一号单向阀19、十一号管20、十三号管29流入吸收式空调系统36的储水箱。
在夏季或室内闷热时,利用保温箱28和房顶内流入吸收式空调系统36的储热水箱的热水作热媒水,开启吸收式空调系统36为室内制凉,同时吸收式空调系统36依次经十六号管35、四号单向阀34、十七号管33向保温箱28的底部排凉水,吸收式空调系统36还依次经十五号管37、三号单向阀38、十四号管39、九号管65向房顶内泵凉水。要外用热水时可从吸收式空调系统36的储水箱放出或从热水输出阀66放出。
在夏季,拉上所述的在后透光保温墙14的外面设置的保温隔热帘子,使前透光保温墙3和后透光保温墙14之间隔及前窗扇5内的工质吸收更多的阳光热。当然,为了照亮室内,打开帘子上与窗扇5相对的活窗。
在冬季,从注入/泄放阀32放掉前透光保温墙3和后透光保温墙14之间隔及前窗扇5内的工质,白天拉开保温隔热帘子,让阳光透过前透光保温墙3、后透光保温墙14及前窗扇5直接温暖室内,而在晚上拉上帘子保温。在冬季无日照或严寒时,拉上保温隔热帘子,可开启吸收式空调系统36制热,在白天拉上保温隔热帘子但打开其活窗,在晚上拉上保温隔热帘子并关闭其活窗保温。在冬季无日照或严寒时,要用热水,开启房顶内的加热器72,并由温度传感器73检测其水温达到设定值时停止加热,低于另一设定值时又开始加热。
本发明有益的效果:
1、所述节能节水房,在夏季利用太阳能产热,而且大大减少太阳热向室内传播;在冬季,能采取太阳热温暖室内且又保暖;四季的阳光都能很少减弱地通过窗照亮室内,此优点在夏季比现有的拒绝利用太阳能的拉窗帘的玻璃窗、贴隔热反光镀膜的玻璃窗优越得多。
2、设置能利用太阳能的吸收式空调系统作为冷暖空调,总能使室内冬暖夏凉,且比现有的空调机节省电能显著。
3、所述节能节水房含有充当室内用热水器和相当于空调机的吸收式空调系统,室内再不用装必需的热水器和空调机,还能利用太阳能产热水和调节室内气温宜人,它还保温隔热。
4、所述节能节水房,利用房顶、房的朝阳面、吸收式空调系统,构成太阳能空调系统。太阳能电池昂贵,发电效率低,但仅在所述节能节水房的朝阳面的框架的表面使用,与在房顶、房的朝阳面较高效的地采集太阳能相比所占比例很小。所以所述节能节水房充分地、高效地、经济地利用了太阳能。所述节能节水房,利用生活废水和雨水冲马桶,节约了大量的水,而且利用风能发电、利用太阳能电池发电、利用太阳能产热水时发电、利用从房顶内引用热水时发电、利用污水势能发电、利用电梯下降时的势能发电、利用人走动踩踏发电地砖发电,估计这些发电量及利用太阳能产热水折算成总能量为住房人生活所需总能量80%以上,也就是说所述节能节水房节能80%以上。所以所述节能节水房既节能又节水,性价比极高,所述节能节水房是空前的,为制定节能建筑标准提供充分的、新颖的、创新的、实用的素材依据,将在节能建筑上发挥巨大作用。所述节能节水房易推广,且推广意义大。
附图说明
图1为所述节能节水房的房顶以下部分的结构示意图;
图2为图1的左视图;
图3为图2的左视图(即为图1的后视图);
图4为图1的A-A剖面图;
图5为图1的B-B剖视放大图;
图6为本发明的人字形房顶的节能节水房的主视示意图;
图7为图6的左视图;
图8为图6的C-C剖视放大图;
图9为本发明的锥形房顶的节能节水房的主视示意图;
图10为图9的左视图;
图11为图9的D-D剖视放大图;
图12为本发明的单斜坡形房顶的节能节水房的主视示意图;
图13为图12的左视图;
图14为图12的E-E剖视放大图。
具体实施方式
实施例1:
如图1至图5示。在地基1上建立左保温墙2、右保温墙7、后保温墙13、框架6,后保温墙13的左右端分别与左保温墙2的后部、右保温墙7(从图1看)的后部联结,框架6的左右端分别与左保温墙2的内侧、右保温墙7的内侧、后保温墙13的内侧联结,框架6的朝阳面贴太阳能电池40(图5示);在框架6各层中设置相间隔的前透光保温墙3和后透光保温墙14,前透光保温墙3和后透光保温墙14均与框架6密封联接;在前透光保温墙3和后透光保温墙14上开窗孔,在窗孔镶嵌前窗框4,将外透光保温板16与内透光保温板17间隔一距离并用密封条15将周围密封组成前窗扇5,外透光保温板16、内透光保温板17、密封条15围成一空腔,将前窗扇5安装在前窗框4中,并用两个一号管18将所述空腔的上部下部分别与前透光保温墙3和后透光保温墙14之间隔的上部下部联通联接;在后保温墙13上开窗孔,在此窗孔镶嵌后窗框12,将后透光保温板10与里透光保温板11间隔一距离并用密封条9将周围密封组成后窗扇8,将后窗扇8安装在后窗框12中;前窗扇5、前透光保温墙3、后透光保温墙14构成组合式墙窗;框架6、前窗扇5、前透光保温墙3、后透光保温墙14均朝阳;在左保温墙2、右保温墙7、后保温墙13、框架6的上端联结水平保温板63。
如图5示,导流管62的左端穿过后保温墙13上部、水平保温板63的左端并与它们联接,导流管62的右端穿过顶层的前透光保温墙3和后透光保温墙14的顶部、框架6最上层的水平底板的右端、水平保温板63的右端并与它们联接;一号垂直管46穿过框架6的中部各层水平底板,其上端与导流管62联通联接;二号垂直45管穿过框架6除最上层的各层水平底板且固定在后保温墙13的内侧,在二号垂直管45的下端联通联接污水发电机43,污水发电机43的下端出口用五号管42与污水总管41联通联接;二号管53避开一号垂直管46把洗脸盆54的下水口、洗菜盆55的下水口、洗衣机56的下水口与废水箱51的上部联通;废水箱51的上部用三号管52与一号垂直管46联通联接,三号管52的右端下部伸入一号垂直管46内一部分,但最下层的三号管52仅与一号垂直管46的下端联通联接;四号管50将废水箱51的底部和马桶49的水箱联通联接,马桶49的水箱还外接可控的自来水;马桶49的下水口与二号垂直管45联通联接;地漏48用六号管47与二号垂直管45联通联接;在最下层的废水箱51上部设置溢流管44,溢流管44的左端与二号垂直管45联通联接。
凉水注入管61避开导流管62,凉水注入管61的上端穿过框架6的最上层板后再穿透水平板保温63并与它们联结,在凉水注入管61的下端联通联接注入/排放阀59。
七号管64的穿上端依次穿过框架6的最上层板、水平保温板63并上伸一段,七号管64避开导流管62,在七号管64的下端依次联通联接一号水力发电机60、八号管58,八号管58穿过框架6的中部各层水平底板;九号管65的上端穿过框架6的最上层板后再穿透水平保温板63并与它们联结,九号管65穿过框架6除最下层的各层水平底板,九号管65避开导流管62;十号管57避开九号管65,十号管57的左端与八号管58联通联接,在十号管57的右端依次联通联接一号单向阀19、十一号管20、二号单向阀26、十二号管25,十二号管25的右端穿透保温箱28的上部左侧并与其联结;保温箱28挂在室内靠近后透光保温墙14的墙上或嵌入此墙;十三号管29的上端与十一号管20联通联接,十三号管29的下端与设置在屋内的吸收式空调系统36(该系统已商业化批量生产,它利用热水既能制冷又能制热)的储水箱的进口联通联接,在十三号管29的上部联通联接热水输出阀66,吸收式空调系统36的储水箱能从外界接入水(如自来水);十四号管39的左端与九号管65联通联接,在十四号管39的右端依次联通联接三号单向阀38、十五号管37,十五号管37的右端与吸收式空调系统36的储水箱的出口联通联接;十六号管35的左端与吸收式空调系统36的储水箱的出口联通联接,在十六号管35的右端依次联通联接四号单向阀34、十七号管33,十七号管33的右端穿透保温箱28的下部左侧并与其联结;十八号管22的左端穿过保温箱28的上部右侧与设置在保温箱28内的散热器27的上部联通联接,十八号管22与保温箱28联结,在十八号管22的右端联通联接二号水力发电机24,二号水力发电机24的右端穿透后透光保温墙14的上部并与其联结;十九号管30的左端穿过保温箱28的下部右侧与散热器27的下部联通联接,十九号管30与保温箱28联接,在十九号管30的右端联通联接五号单向阀31,五号单向阀31穿透后透光保温墙14的下部并与其联结,在十九号管30上联通联接工质(如经处理过的水)注入/泄放阀32;一号排气管23的左端穿透前透光保温墙3的上部并与其联结;二号排气管21穿透保温箱28上部并与其联结。
在后透光保温墙14的外面设置能遮挡前窗扇5和后透光保温墙14的保温隔热帘子(图中未画),保温隔热帘子朝后透光保温墙14的一面为深色(如黑、深蓝、墨绿等色),保温隔热帘子与前窗扇5相对的部分做成可开闭的活窗。
所述节能节水房的电梯采用下降时能利用势能发电的电梯(如专利号为200920292539.3的节能电梯)。
所述节能节水房的室内地板、走道上铺设踩踏式发电地砖(如申请号为201010595207.X的发电地砖)。
在水平保温板63上建中空的保温式太阳集热器房顶,此房顶的斜面的下边缘弯翘,导流管62的端口穿透该弯翘并与其联结;在所述房顶的顶安装垂直轴风力发电机,所述房顶的朝阳面做成太阳集热器的,所述太阳集热器上部与房顶内部联通,所述太阳集热器下部联通联接水能发电机,该水能发电机与所述房顶内部联通;所述房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、所述水能发电机均包在里面;三号排气管穿透所述房顶的上部并与其联结;加热器、温度传感器分别穿透所述房顶的一面伸入所述房顶内,所述加热器、温度传感器均与所述房顶联接。
实施例2:
如图6至图8示,将实施例1所述房顶做成人字形的:在水平保温板63上平面联结左斜板69、右斜板71、山墙68,左斜板69的下端和右斜板71的下端均弯翘,导流管62的端口穿透该弯翘并与其联结;左斜板69是保温的,右斜板71、山墙68均做成一号太阳集热器的,左斜板69的顶部与右斜板71的顶部联结形成人字坡面,在人字坡面的两头各联结一面山墙68;水平保温板63、左斜板69、右斜板71、山墙68组成人字形保温箱式一号太阳集热器房顶;左斜板69背阳,右斜板71、山墙68能受到日照;右斜板71上部、山墙68的上部和下部均与人字形保温箱式一号太阳集热器房顶内部联通,右斜板71下部内侧联通联接一号水能发电机74;人字形保温箱式一号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、一号水能发电机74包在里面;加热器72、温度传感器73均穿过山墙68伸入到人字形保温箱式一号太阳集热器房顶内,它们均与山墙68联接;三号排气管67的下端穿透人字形保温箱式一号太阳集热器房顶的顶并与其联通联接。
在人字形保温箱式一号太阳集热器房顶的顶间隔设置若干一号垂直轴风力发电机70(若只设置一台风力发电机,重量太大且集中,将造成房顶结构复杂、受力不佳)。
实施例3:
如图9至图11示,将实施例1所述房顶做成锥形的:在水平保温板63上平面联结锥壳76,锥壳76的下端弯翘,锥壳76做成二号太阳集热器的,它能使内侧锥形空间保温,导流管62的端口穿透所述弯翘并与其联结;锥壳76和水平保温板63组成锥形保温箱式二号太阳集热器房顶;锥壳76上部与锥形保温箱式二号太阳集热器房顶内部联通,锥壳76下部内侧联通联接二号水能发电机77;锥形保温箱式二号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、二号水能发电机77包在里面;加热器72、温度传感器73均穿过锥壳76伸入到锥形保温箱式二号太阳集热器房顶内,它们均与锥壳76联接;排气管67的下端穿透锥形保温箱式二号太阳集热器房顶的上部并与其联通联接。
在锥形保温箱式二号太阳集热器房顶的顶设置二号垂直轴风力发电机75。
实施例3:
如图12至图14示,将实施例1所述房顶做成单斜坡形的:在水平保温板63上平面左边联结垂直保温墙78,垂直保温墙78与后保温墙13上下对齐;在水平保温板63上平面右边联结斜板81,斜板81的上端与垂直保温墙78上部联结,斜板81的下端弯翘,导流管62做成仅右部有端口,而左部缩短到室内且左端口封闭,导流管62的右部端口穿透斜板81的下端弯翘并与其联结;在垂直保温墙78和斜板81的两端分别联结板80;斜板81、板80均做成三号太阳集热器的;水平保温板63、垂直保温墙78、斜板81、板80组成单斜坡形保温箱式三号太阳集热器房顶;斜板81上部、板80的上部和下部均与单斜坡形保温箱式三号太阳集热器房顶内部联通,在斜板81下部内侧联通联接三号水能发电机82;单斜坡形保温箱式三号太阳集热器房顶将凉水注入管61的上端、七号管64的穿上端、九号管65的上端、三号水能发电机82包在里面;加热器72、温度传感器73均穿过垂直保温墙78或板80伸入到单斜坡形保温箱式三号太阳集热器房顶内,加热器72、温度传感器73均与垂直保温墙78或板80联接;排气管67的下端穿透单斜坡形保温箱式三号太阳集热器房顶的上部并与其联通联接。
在单斜坡形保温箱式房顶的顶设置若干三号垂直轴风力发电机79。

Claims (4)

1.节能节水房,其特征是:
在地基(1)上建立左保温墙(2)、右保温墙(7)、后保温墙(13)、框架(6),后保温墙(13)的左右端分别与左保温墙(2)的后部、右保温墙(7)的后部联结,框架(6)的左右端分别与左保温墙(2)的内侧、右保温墙(7)的内侧、后保温墙(13)的内侧联结,框架(6)的朝阳面贴太阳能电池(40);在框架(6)各层中设置相间隔的前透光保温墙(3)和后透光保温墙(14),前透光保温墙(3)和后透光保温墙(14)均与框架(6)密封联接;在前透光保温墙(3)和后透光保温墙(14)上开窗孔,在窗孔镶嵌前窗框(4),将外透光保温板(16)与内透光保温板(17)间隔一距离并用密封条(15)将周围密封组成前窗扇(5),外透光保温板(16)、内透光保温板(17)、密封条(15)围成一空腔,将前窗扇(5)安装在前窗框(4)中,并用两个一号管(18)将所述空腔的上部下部分别与前透光保温墙(3)和后透光保温墙(14)之间隔的上部下部联通联接;在后保温墙(13)上开窗孔,在此窗孔镶嵌后窗框(12),将后透光保温板(10)与里透光保温板(11)间隔一距离并用密封条(9)将周围密封组成后窗扇(8),将后窗扇(8)安装在后窗框(12)中;前窗扇(5)、前透光保温墙(3)、后透光保温墙(14)构成组合式墙窗;框架(6)、前窗扇(5)、前透光保温墙(3)、后透光保温墙(14)均朝阳;在左保温墙(2)、右保温墙(7)、后保温墙(13)、框架(6)的上端联结水平保温板(63);
导流管(62)的左端穿过后保温墙(13)上部、水平保温板(63)的左端并与它们联接,导流管(62)的右端穿过顶层的前透光保温墙(3)和后透光保温墙(14)的顶部、框架(6)最上层的水平底板的右端、水平保温板(63)的右端并与它们联接;一号垂直管(46)穿过框架(6)的中部各层水平底板,其上端与导流管(62)联通联接;二号垂直(45)管穿过框架(6)除最上层的各层水平底板且固定在后保温墙(13)的内侧,在二号垂直管(45)的下端联通联接污水发电机(43),污水发电机(43)的下端出口用五号管(42)与污水总管(41)联通联接;二号管(53)避开一号垂直管(46)把洗脸盆(54)的下水口、洗菜盆(55)的下水口、洗衣机(56)的下水口与废水箱(51)的上部联通;废水箱(51)的上部用三号管(52)与一号垂直管(46)联通联接,三号管(52)的右端下部伸入一号垂直管(46)内一部分,但最下层的三号管(52)仅与一号垂直管(46)的下端联通联接;四号管(50)将废水箱(51)的底部和马桶(49)的水箱联通联接,马桶(49)的水箱还外接可控的自来水;马桶(49)的下水口与二号垂直管(45)联通联接;地漏(48)用六号管(47)与二号垂直管(45)联通联接;在最下层的废水箱(51)上部设置溢流管(44),溢流管(44)的左端与二号垂直管(45)联通联接;
凉水注入管(61)避开导流管(62),凉水注入管(61)的上端穿过框架(6)的最上层板后再穿透水平板保温(63)并与它们联结,在凉水注入管(61)的下端联通联接注入/排放阀(59);
七号管(64)的穿上端依次穿过框架(6)的最上层板、水平保温板(63)并上伸一段,七号管(64)避开导流管(62),在七号管(64)的下端依次联通联接一号水力发电机(60)、八号管(58),八号管(58)穿过框架(6)的中部各层水平底板;九号管(65)的上端穿过框架(6)的最上层板后再穿透水平保温板(63)并与它们联结,九号管(65)穿过框架(6)除最下层的各层水平底板,九号管(65)避开导流管(62);十号管(57)避开九号管(65),十号管(57)的左端与八号管(58)联通联接,在十号管(57)的右端依次联通联接一号单向阀(19)、十一号管(20)、二号单向阀(26)、十二号管(25),十二号管(25)的右端穿透保温箱(28)的上部左侧并与其联结;保温箱(28)挂在室内靠近后透光保温墙(14)的墙上或嵌入此墙;十三号管(29)的上端与十一号管(20)联通联接,十三号管(29)的下端与设置在屋内的吸收式空调系统(36)的储水箱的进口联通联接,在十三号管(29)的上部联通联接热水输出阀(66),吸收式空调系统(36)的储水箱能从外界接入水;十四号管(39)的左端与九号管(65)联通联接,在十四号管(39)的右端依次联通联接三号单向阀(38)、十五号管(37),十五号管(37)的右端与吸收式空调系统(36)的储水箱的出口联通联接;十六号管(35)的左端与吸收式空调系统(36)的储水箱的出口联通联接,在十六号管(35)的右端依次联通联接四号单向阀(34)、十七号管(33),十七号管(33)的右端穿透保温箱(28)的下部左侧并与其联结;十八号管(22)的左端穿过保温箱(28)的上部右侧与设置在保温箱(28)内的散热器(27)的上部联通联接,十八号管(22)与保温箱(28)联结,在十八号管(22)的右端联通联接二号水力发电机(24),二号水力发电机(24)的右端穿透后透光保温墙(14)的上部并与其联结;十九号管(30)的左端穿过保温箱(28)的下部右侧与散热器(27)的下部联通联接,十九号管(30)与保温箱(28)联接,在十九号管(30)的右端联通联接五号单向阀(31),五号单向阀(31)穿透后透光保温墙(14)的下部并与其联结,在十九号管(30)上联通联接工质注入/泄放阀(32);一号排气管(23)的左端穿透前透光保温墙(3)的上部并与其联结;二号排气管(21)穿透保温箱(28)上部并与其联结;
在后透光保温墙(14)的外面设置能遮挡前窗扇5和后透光保温墙(14)的保温隔热帘子,保温隔热帘子朝后透光保温墙(14)的一面为深色,保温隔热帘子与前窗扇(5)相对的部分做成可开闭的活窗;
所述节能节水房的电梯采用下降时能利用势能发电的电梯;
所述节能节水房的室内地板、走道上铺设踩踏式发电地砖;
在水平保温板(63)上建中空的保温式太阳集热器房顶,此房顶的斜面的下边缘弯翘,导流管(62)的端口穿透该弯翘并与其联结;在所述房顶的顶安装垂直轴风力发电机,所述房顶的朝阳面做成太阳集热器的,所述太阳集热器上部与房顶内部联通,所述太阳集热器下部联通联接水能发电机,该水能发电机与所述房顶内部联通;所述房顶将凉水注入管(61)的上端、七号管(64)的穿上端、九号管(65)的上端、所述水能发电机均包在里面;三号排气管穿透所述房顶的上部并与其联结;加热器、温度传感器分别穿透所述房顶的一面伸入所述房顶内,所述加热器、温度传感器均与所述房顶联接。
2.根据权利要求1所述节能节水房,其特征是:
所述房顶的一种为人字形:在水平保温板(63)上平面联结左斜板(69)、右斜板(71)、山墙(68),左斜板(69)的下端和右斜板(71)的下端均弯翘,导流管(62)的端口穿透该弯翘并与其联结;左斜板(69)是保温的,右斜板(71)、山墙(68)均做成一号太阳集热器的,左斜板(69)的顶部与右斜板(71)的顶部联结形成人字坡面,在人字坡面的两头各联结一面山墙(68);水平保温板(63)、左斜板(69)、右斜板(71)、山墙(68)组成人字形保温箱式一号太阳集热器房顶;左斜板(69)背阳,右斜板(71)、山墙(68)能受到日照;右斜板(71)上部、山墙(68)的上部和下部均与人字形保温箱式一号太阳集热器房顶内部联通,右斜板(71)下部内侧联通联接一号水能发电机(74);人字形保温箱式一号太阳集热器房顶将凉水注入管(61)的上端、七号管(64)的穿上端、九号管(65)的上端、一号水能发电机(74)包在里面;加热器(72)、温度传感器(73)均穿过山墙(68)伸入到人字形保温箱式一号太阳集热器房顶内,它们均与山墙(68)联接;三号排气管(67)的下端穿透人字形保温箱式一号太阳集热器房顶的顶并与其联通联接;
在人字形保温箱式一号太阳集热器房顶的顶间隔设置若干一号垂直轴风力发电机(70)。
3.根据权利要求1所述节能节水房,其特征是:
所述房顶的又一种为锥形:在水平保温板(63)上平面联结锥壳(76),锥壳(76)的下端弯翘,锥壳(76)做成二号太阳集热器的,它能使内侧锥形空间保温,导流管(62)的端口穿透所述弯翘并与其联结;锥壳(76)和水平保温板(63)组成锥形保温箱式二号太阳集热器房顶;锥壳(76)上部与锥形保温箱式二号太阳集热器房顶内部联通,锥壳(76)下部内侧联通联接二号水能发电机(77);锥形保温箱式二号太阳集热器房顶将凉水注入管(61)的上端、七号管(64)的穿上端、九号管(65)的上端、二号水能发电机(77)包在里面;加热器(72)、温度传感器(73)均穿过锥壳(76)伸入到锥形保温箱式二号太阳集热器房顶内,它们均与锥壳(76)联接;排气管(67)的下端穿透锥形保温箱式二号太阳集热器房顶的上部并与其联通联接;
在锥形保温箱式二号太阳集热器房顶的顶设置二号垂直轴风力发电机(75)。
4.根据权利要求1所述节能节水房,其特征是:
所述房顶的另一种为单斜坡形:在水平保温板(63)上平面左边联结垂直保温墙(78),垂直保温墙(78)与后保温墙(13)上下对齐;在水平保温板(63)上平面右边联结斜板(81),斜板(81)的上端与垂直保温墙(78)上部联结,斜板(81)的下端弯翘,导流管(62)做成仅右部有端口,而左部缩短到室内且左端口封闭,导流管(62)的右部端口穿透斜板(81)的下端弯翘并与其联结;在垂直保温墙(78)和斜板(81)的两端分别联结板(80);斜板(81)、板(80)均做成三号太阳集热器的;水平保温板(63)、垂直保温墙(78)、斜板(81)、板(80)组成单斜坡形保温箱式三号太阳集热器房顶;斜板(81)上部、板(80)的上部和下部均与单斜坡形保温箱式三号太阳集热器房顶内部联通,在斜板(81)下部内侧联通联接三号水能发电机(82);单斜坡形保温箱式三号太阳集热器房顶将凉水注入管(61)的上端、七号管(64)的穿上端、九号管(65)的上端、三号水能发电机(82)包在里面;加热器(72)、温度传感器(73)均穿过垂直保温墙(78)或板(80)伸入到单斜坡形保温箱式三号太阳集热器房顶内,加热器(72)、温度传感器(73)均与垂直保温墙(78)或板(80)联接;排气管(67)的下端穿透单斜坡形保温箱式三号太阳集热器房顶的上部并与其联通联接;
在单斜坡形保温箱式房顶的顶设置若干三号垂直轴风力发电机(79)。
CN2011101097299A 2011-04-29 2011-04-29 节能节水房 Pending CN102758483A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101097299A CN102758483A (zh) 2011-04-29 2011-04-29 节能节水房

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101097299A CN102758483A (zh) 2011-04-29 2011-04-29 节能节水房

Publications (1)

Publication Number Publication Date
CN102758483A true CN102758483A (zh) 2012-10-31

Family

ID=47053115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101097299A Pending CN102758483A (zh) 2011-04-29 2011-04-29 节能节水房

Country Status (1)

Country Link
CN (1) CN102758483A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266782A (zh) * 2013-05-16 2013-08-28 宁夏新航能源环境科技有限公司 环保节能房
CN113107081A (zh) * 2020-01-13 2021-07-13 福建省恒鼎建筑工程有限公司 一种绿色节能建筑的施工方法
CN115059173A (zh) * 2022-06-27 2022-09-16 重庆市聚晟建筑设计有限责任公司 一种建筑生态节能系统

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266782A (zh) * 2013-05-16 2013-08-28 宁夏新航能源环境科技有限公司 环保节能房
CN113107081A (zh) * 2020-01-13 2021-07-13 福建省恒鼎建筑工程有限公司 一种绿色节能建筑的施工方法
CN115059173A (zh) * 2022-06-27 2022-09-16 重庆市聚晟建筑设计有限责任公司 一种建筑生态节能系统

Similar Documents

Publication Publication Date Title
CN104412047B (zh) 中空玻璃式太阳能集热器与采用它的用太阳能供暖和降温的建筑物
CN104025947B (zh) 一种自循环温室大棚
CN109356342B (zh) 一种节能环保的建筑结构
CN101876210A (zh) 主、被动结合式变色太阳房
CN201141209Y (zh) 一种生态民居
CN202039451U (zh) 节能节水房
CN106917519A (zh) 西北地区农村节能建筑住宅设计方法
CN201730353U (zh) 主、被动结合式变色太阳房
CN202081703U (zh) 节能节水建筑
CN102758483A (zh) 节能节水房
CN110984625A (zh) 光伏百叶与太阳能烟囱双发电的楼体温室建筑
CN114246092B (zh) 一种温室大棚蓄热储能装置及其使用方法
CN213448830U (zh) 一种绿色建筑环保屋顶
CN217439641U (zh) 主动式太阳能智能生态公厕
CN202181610U (zh) 节能节水房
CN2937279Y (zh) 利用可再生能源调温的新农村住宅
CN103512214B (zh) 日光加热器与集热管、吸热板及日光集热管专用型材和提高集热效率与防冻结方法
CN102767306A (zh) 节能节水建筑
CN102535940B (zh) 太阳能建筑
CN102110733A (zh) 一种太阳能光伏光热联用装置
CN214424343U (zh) 一种应用于高层建筑的绿色节能窗
CN204804379U (zh) 农村太阳能整体空间模块化拼搭式建筑
CN115075621A (zh) 主动式太阳能智能生态公厕及其建造方法
CN115638550A (zh) 一种节能环保的建筑结构
CN211622335U (zh) 一种集成智能换热系统的bipv屋顶

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121031