CN102756975A - 轧机牌坊的吊装方法 - Google Patents
轧机牌坊的吊装方法 Download PDFInfo
- Publication number
- CN102756975A CN102756975A CN2012102540359A CN201210254035A CN102756975A CN 102756975 A CN102756975 A CN 102756975A CN 2012102540359 A CN2012102540359 A CN 2012102540359A CN 201210254035 A CN201210254035 A CN 201210254035A CN 102756975 A CN102756975 A CN 102756975A
- Authority
- CN
- China
- Prior art keywords
- rolling mill
- mill housing
- housing
- milling train
- hoisted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000005096 rolling process Methods 0.000 title abstract description 17
- 238000003801 milling Methods 0.000 claims description 18
- 241001669679 Eleotris Species 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明公开了一种轧机牌坊的吊装方法,包括以下步骤:一)在轧机牌坊吊装前,在轧机换辊小车轨道上固定一牌坊支撑架,并在其远离轧机底板的一端设置挡块,所述牌坊支撑架上设有倾斜支撑面板,在所述轧机底板上安放枕木;起吊处于倾斜状态的轧机牌坊至轧机换辊小车轨道上,并使其中心线与轧机中心线重合,底部落放在所述枕木上,上部落放在所述倾斜支撑面板上;二)将吊索设置在轧机牌坊的上端,用吊车把轧机牌坊立直,并将其水平吊移至所述轧机底板上的预定位置,落放到所述轧机底板上,完成轧机牌坊的吊装就位。本发明能够克服施工现场所配天车主钩起升高度不足的困难,并且保证吊装的安全、平稳、可靠。
Description
技术领域
本发明涉及一种机件的吊装方法,特别是涉及一种轧机牌坊的吊装方法。
背景技术
在轧机安装过程中轧机牌坊的吊装是一关键工序,由于部分机组厂房所配天车主钩起升高度不足,在轧机牌坊施工中无法采用天车竖直吊装轧机牌坊,使轧机牌坊一次吊装就位。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种轧机牌坊的吊装方法,该方法能够在施工现场所配天车主钩起升高度不足的情况下,利用现场所配天车主钩将轧机牌坊吊装就位,并保证吊装的安全、平稳、可靠。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种轧机牌坊的吊装方法,包括以下步骤:
一)在轧机牌坊吊装前,在轧机换辊小车轨道上固定一牌坊支撑架,并在其远离轧机底板的一端设置挡块,所述牌坊支撑架上设有倾斜支撑面板,在所述轧机底板上安放枕木;
起吊处于倾斜状态的轧机牌坊至轧机换辊小车轨道上,并使其中心线与轧机中心线重合,底部落放在所述枕木上,上部落放在所述倾斜支撑面板上;
二)将吊索设置在轧机牌坊的上端,用吊车把轧机牌坊立直,并将其水平吊移至所述底板上的预定位置,落放到所述轧机底板上,完成轧机牌坊的吊装就位。
所述倾斜支撑面板的倾斜角与轧机牌坊的吊装倾角相同。
本发明具有的优点和积极效果是:在轧机牌坊进入基坑前,采用使其处于倾斜状态进行吊装,并在进入基坑后,采用使其处于直立状态进行吊装,克服了施工现场所配天车主钩起升高度不足的困难,并且保证了吊装的安全、平稳、可靠。并且,本发明操作安全、劳动强度低,经济、实用。
附图说明
图1为本发明步骤一)的示意图;
图2和图3为本发明步骤二)的示意图。
图中:1、吊车,2、吊索,3、轧机牌坊,4、枕木,5、轧机底板,6、牌坊支撑架,7、挡块,8、倾斜支撑面板。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1~图3,一种轧机牌坊的吊装方法,包括以下步骤:
一)在轧机牌坊吊装前,在轧机换辊小车轨道上固定一牌坊支撑架6,并在其远离轧机底板5的一端设置挡块7,以防止吊装过程中,牌坊支撑架6移动,牌坊支撑架6上设有倾斜支撑面板8,倾斜支撑面板8的倾斜角最好与轧机牌坊3的吊装倾角相同;在轧机底板5上安放枕木4;
用吊车1和吊索2起吊处于倾斜状态的轧机牌坊3至轧机换辊小车轨道上,并使其中心线与轧机中心线重合,底部落放在枕木4上,上部落放在倾斜支撑面板8上;
二)将吊索2设置在轧机牌坊3的上端,用吊车1把轧机牌坊3立直,并将其水平吊移至轧机底板5上的预定位置,落放到轧机底板5上,完成轧机牌坊3的吊装就位。
为便于轧机牌坊3立直、水平运输和回落,在步骤二)中用于起吊轧机牌坊3的吊索2的两端均设有卸扣。
牌坊3的吊装应缓慢、平稳,不宜对轧机底板5造成大的冲击,以避免震动造成轧机底板5的移动。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式,这些均属于本发明的保护范围之内。
Claims (2)
1.一种轧机牌坊的吊装方法,其特征在于,包括以下步骤:
一)在轧机牌坊吊装前,在轧机换辊小车轨道上固定一牌坊支撑架,并在其远离轧机底板的一端设置挡块,所述牌坊支撑架上设有倾斜支撑面板,在所述轧机底板上安放枕木;
起吊处于倾斜状态的轧机牌坊至轧机换辊小车轨道上,并使其中心线与轧机中心线重合,底部落放在所述枕木上,上部落放在所述倾斜支撑面板上;
二)将吊索设置在轧机牌坊的上端,用吊车把轧机牌坊立直,并将其水平吊移至所述轧机底板上的预定位置,落放到所述轧机底板上,完成轧机牌坊的吊装就位。
2.根据权利要求1所述的轧机牌坊的吊装方法,其特征在于,所述倾斜支撑面板的倾斜角与轧机牌坊的吊装倾角相同。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102540359A CN102756975A (zh) | 2012-07-20 | 2012-07-20 | 轧机牌坊的吊装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102540359A CN102756975A (zh) | 2012-07-20 | 2012-07-20 | 轧机牌坊的吊装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102756975A true CN102756975A (zh) | 2012-10-31 |
Family
ID=47051674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102540359A Pending CN102756975A (zh) | 2012-07-20 | 2012-07-20 | 轧机牌坊的吊装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102756975A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103496631A (zh) * | 2013-09-29 | 2014-01-08 | 中冶陕压重工设备有限公司 | 一种轧机牌坊竖立的起吊方法 |
CN103964309A (zh) * | 2014-05-09 | 2014-08-06 | 山东电力建设第二工程公司 | 双联低压加热器的安装方法 |
CN104512804A (zh) * | 2013-09-27 | 2015-04-15 | 中国二十冶集团有限公司 | 一种防止特大型轧机吊装直立时发生摆动的方法 |
CN104909258A (zh) * | 2014-03-14 | 2015-09-16 | 五冶集团上海有限公司 | 一种改进的酸连轧轧机牌坊吊装方法 |
CN105293322A (zh) * | 2015-11-17 | 2016-02-03 | 中国三冶集团有限公司 | 一种轧机牌坊吊装方法 |
CN105776022A (zh) * | 2014-12-24 | 2016-07-20 | 中国二十冶集团有限公司 | 轧机牌坊搬迁时的拆卸方法 |
CN108131018A (zh) * | 2017-12-21 | 2018-06-08 | 北京首钢建设集团有限公司 | 一种大型轧机牌坊安装和拆除的施工方法 |
IT201700110571A1 (it) * | 2017-10-03 | 2019-04-03 | Zanetti Solution S R L | Sistema ribaltamento presse o p.t.d |
CN110270593A (zh) * | 2019-06-27 | 2019-09-24 | 中国二十冶集团有限公司 | 一种避免轧机机架顶升时干涉的安装方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5557312A (en) * | 1978-10-20 | 1980-04-28 | Hitachi Ltd | Method and apparatus for roll changing of head open type rolling mill |
JPH01278926A (ja) * | 1988-05-02 | 1989-11-09 | Sumitomo Metal Ind Ltd | 重量物反転方法および装置 |
CN101518784A (zh) * | 2009-04-03 | 2009-09-02 | 中冶实久建设有限公司 | 大型轧机牌坊在吊装高度受限下的吊装方法 |
CN101537973A (zh) * | 2009-04-21 | 2009-09-23 | 武汉冶建安装工程有限责任公司 | 利用液压顶推提升连续吊装轧机牌坊方法 |
CN101664762A (zh) * | 2009-09-11 | 2010-03-10 | 上海同济宝冶建设机器人有限公司 | 一种超大型牌坊侧立旋转安装工艺 |
CN201495027U (zh) * | 2009-04-14 | 2010-06-02 | 中冶实久建设有限公司 | 轧机牌坊吊装工具 |
CN102240680A (zh) * | 2011-05-06 | 2011-11-16 | 天津二十冶建设有限公司 | 轧机垂直度调整方法 |
-
2012
- 2012-07-20 CN CN2012102540359A patent/CN102756975A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5557312A (en) * | 1978-10-20 | 1980-04-28 | Hitachi Ltd | Method and apparatus for roll changing of head open type rolling mill |
JPH01278926A (ja) * | 1988-05-02 | 1989-11-09 | Sumitomo Metal Ind Ltd | 重量物反転方法および装置 |
CN101518784A (zh) * | 2009-04-03 | 2009-09-02 | 中冶实久建设有限公司 | 大型轧机牌坊在吊装高度受限下的吊装方法 |
CN201495027U (zh) * | 2009-04-14 | 2010-06-02 | 中冶实久建设有限公司 | 轧机牌坊吊装工具 |
CN101537973A (zh) * | 2009-04-21 | 2009-09-23 | 武汉冶建安装工程有限责任公司 | 利用液压顶推提升连续吊装轧机牌坊方法 |
CN101664762A (zh) * | 2009-09-11 | 2010-03-10 | 上海同济宝冶建设机器人有限公司 | 一种超大型牌坊侧立旋转安装工艺 |
CN102240680A (zh) * | 2011-05-06 | 2011-11-16 | 天津二十冶建设有限公司 | 轧机垂直度调整方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104512804A (zh) * | 2013-09-27 | 2015-04-15 | 中国二十冶集团有限公司 | 一种防止特大型轧机吊装直立时发生摆动的方法 |
CN103496631A (zh) * | 2013-09-29 | 2014-01-08 | 中冶陕压重工设备有限公司 | 一种轧机牌坊竖立的起吊方法 |
CN104909258A (zh) * | 2014-03-14 | 2015-09-16 | 五冶集团上海有限公司 | 一种改进的酸连轧轧机牌坊吊装方法 |
CN104909258B (zh) * | 2014-03-14 | 2017-06-30 | 五冶集团上海有限公司 | 一种改进的酸连轧轧机牌坊吊装方法 |
CN103964309A (zh) * | 2014-05-09 | 2014-08-06 | 山东电力建设第二工程公司 | 双联低压加热器的安装方法 |
CN103964309B (zh) * | 2014-05-09 | 2015-09-09 | 山东电力建设第二工程公司 | 双联低压加热器的安装方法 |
CN105776022A (zh) * | 2014-12-24 | 2016-07-20 | 中国二十冶集团有限公司 | 轧机牌坊搬迁时的拆卸方法 |
CN105293322A (zh) * | 2015-11-17 | 2016-02-03 | 中国三冶集团有限公司 | 一种轧机牌坊吊装方法 |
IT201700110571A1 (it) * | 2017-10-03 | 2019-04-03 | Zanetti Solution S R L | Sistema ribaltamento presse o p.t.d |
CN108131018A (zh) * | 2017-12-21 | 2018-06-08 | 北京首钢建设集团有限公司 | 一种大型轧机牌坊安装和拆除的施工方法 |
CN110270593A (zh) * | 2019-06-27 | 2019-09-24 | 中国二十冶集团有限公司 | 一种避免轧机机架顶升时干涉的安装方法 |
CN110270593B (zh) * | 2019-06-27 | 2021-04-16 | 中国二十冶集团有限公司 | 一种避免轧机机架顶升时干涉的安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102756975A (zh) | 轧机牌坊的吊装方法 | |
CN205387439U (zh) | 一种桅杆起吊装置 | |
CN106006425B (zh) | 一种超高层建筑地下机房大型设备吊装运输方法 | |
CN104652298B (zh) | 一种基于桥面支撑的整跨箱梁下放拆除系统及其施工方法 | |
CN104895337B (zh) | 砼框架内大型卧式设备的安装方法 | |
CN206486233U (zh) | 一种安装工程专用升降机 | |
CN106121255A (zh) | 一种超高层玻璃幕墙安装设备装置 | |
CN107954306A (zh) | 预制楼梯吊装系统及吊装方法 | |
CN105019664A (zh) | 箱房式电气室的高空滑移安装法 | |
CN211447720U (zh) | 爬升式电梯井道施工操作平台 | |
CN105733613A (zh) | 焦炉炉门安装装置及方法 | |
CN103821084B (zh) | 梁底作业设备及梁底作业方法 | |
CN205637622U (zh) | 垂直单元式玻璃幕墙吊装系统 | |
CN203143872U (zh) | 电梯安装施工移动平台 | |
CN102963817A (zh) | 一种无溜尾力的大型设备吊装垂直脱排方法 | |
CN103086276B (zh) | 一种吊装高层井塔型建筑物内桥式起重机的施工方法 | |
CN105253793B (zh) | 一种镀锌车间锌锅牵引运输吊装的施工方法 | |
CN103011031A (zh) | 立柱式360度旋转油罐维护平台 | |
CN107458965B (zh) | 一种大型设备吊装方法 | |
CN109455626A (zh) | 一种自升门架式双向提升机 | |
JP2011132012A (ja) | エレベータ巻き上げ機の据え付け方法 | |
CN203998745U (zh) | 塔机吊钩冲顶断绳防落装置 | |
CN207699024U (zh) | 预制楼梯吊装系统 | |
CN214942249U (zh) | 一种新型室内墙面施工装置 | |
CN205894715U (zh) | 一种封闭结构下轻型钢结构半自动自爬升吊装机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121031 |