Summary of the invention
The objective of the invention is: for continuous back-up sand separate stratum fracfturing technology provides one one kinds to visit the method for sand face and confirm the effective packing of interlayer through trying to squeeze the sand plug.This method confirms that through trying to squeeze sand plug pressure rising situation whether construction layer is by effective shutoff; Effectively visiting the sand face after the shutoff just can directly transform following one deck less than the sand face to waiting to transform five meters spies below the interval; When guaranteeing the effective packing of interlayer; Practice thrift the engineering time, realized the efficient pressure break of coiled tubing to a certain extent; Solved coiled tubing simultaneously and visited less than the sand face, perhaps visited the risk of sand process bit freezing with tradition spy sand face (the real sand face position of visiting).
Technical scheme of the present invention is: a kind of method of squeezing sand plug spy sand face through examination, and it is characterized by: this method may further comprise the steps at least:
The first step: wait for sand setting;
Second step: the sand plug is squeezed in examination;
The 3rd step: visit the sand face;
Said wait sand setting: treat to squeeze the sand plug by oil jacket infusion examination simultaneously after sand setting is accomplished; If repeatedly examination is squeezed; Pressure rises to the above 10Mpa of perforated interval fracture pressure that constructs; Then confirm to have constructed perforated interval by effective shutoff; Adopt coiled tubing to carry the downhole tool string at last and visit the sand face to waiting to transform below the perforated interval five meters; If do not meet sand face, the transformation that then can wait to transform perforated interval.
Described examination is waited for sand setting 4 hours before squeezing the sand plug.
The sand plug is squeezed in described examination, and whether the perforated interval of confirming to have constructed is during by effective shutoff, and coiled tubing float amount 100-150L/min, annular space are with 0.3m
3The discharge capacity of/min, pump notes boosting sand plug puts in place simultaneously, if the sand plug puts in place; Termination of pumping when pressure rises to the above 10Mpa of the perforated interval fracture pressure of constructing; After pressure dropped to below the 20Mpa, the sand plug was squeezed in examination once more, and pressure reaches 10Mpa on the perforated interval fracture pressure of having constructed once more; Confirm that then the sand plug puts in place, the perforated interval of promptly having constructed is by effective packing.
During described spy sand face, following coiled tubing is visited the sand face to waiting to transform perforated interval below five meters, if visit less than the sand face, then can wait to transform the transformation of perforated interval, if perforated interval is buried, or pocket stay inadequately, then carry out the sand washing operation.
Beneficial effect of the present invention: particularly important link is promptly confirmed the special use spy sand surface technology of the validity of sand plug layering in a kind of suitable coiled tubing back-up sand separate stratum fracfturing; Changed in the past according to directly transferring the real limitation of visiting the method for sand face of tubing string behind the sand setting; Utilize examination to squeeze in the sand plug process pressure rising situation and wait to transform below the interval five meters whether have the sand plug, confirm the validity of interlayer packing layering.This method can guarantee to transform the packing effect of layer on the one hand, can not damage transforming layer on the other hand.This method is as a kind of new spy sand face method; Do not find the domestic correlation theory research that has at present as yet; Visit sand face method through trying to squeeze the sand plug; For in the back-up sand layering reliability of coiled tubing back-up sand separate stratum fracfturing technology foundation is provided to a certain extent, for this new technology applying in the straight well directional well played certain facilitation.
The specific embodiment
Embodiment 1
A kind of method of squeezing sand plug spy sand face through examination, it is characterized by: this method may further comprise the steps at least:
The first step: wait for sand setting;
Second step: the sand plug is squeezed in examination;
The 3rd step: visit the sand face;
Said wait sand setting: treat to squeeze the sand plug by oil jacket infusion examination simultaneously after sand setting is accomplished; If repeatedly examination is squeezed; Pressure rises to the above 10Mpa of perforated interval 1 fracture pressure that constructs; Then confirm to have constructed perforated interval 1 by effective shutoff; Adopt coiled tubing to carry the downhole tool string at last and visit the sand face to waiting to transform below the perforated interval five meter 4; If do not meet sand face 2, the transformation that then can wait to transform perforated interval 3.
Embodiment 2
As shown in Figure 1, carried out coiled tubing back-up sand separate stratum fracfturing shakedown to Su Lige gas field a bite development well SD3-69xx well in May, 2012, the disposable success of sand plug layering.Special-purpose wellhead assembly of the coiled tubing pressing crack construction of long celebrating down-hole independent research and downhole tool are adopted in test; The validity of the sand plug layering new-type spy sand face method of having recovered the oil is confirmed in construction midway; I.e. examination is squeezed the sand plug and is visited sand face method, every layer of sand plug pressure testing twice, and pressure rises obviously; Visit the sand face after the pressure testing to waiting to transform below the interval five meter 4, do not meet sand.
Three layers of this well constructions, twice back-up sand layering, the 2 times main pressing crack constructions in mountain finish on back-up sand layering mountain, back 2 times, the mountain 2; On the mountain 2 main pressing crack construction finish on the back-up sand layering mountain, back 2,8 layers in box.
Existing with on this well mountain 2,8 liang of interlayers of box squeeze the sand plug through examination and visit sand face method invention is done with explanation.
(1) main pressure break finishes on the mountain 2, sand setting after the back-up sand.
On the mountain 2: 2964.0-2964.5m presses the back through owing to replace formation sand plug, coiled tubing
On carry 200 meters and wait for sand setting to the 2264m closing well.
The back-up sand concluding time (closed-in time) on the mountain 2: on May 22nd, 2012 17:00;
(2) the sand plug is squeezed in examination.
Examination is for the first time squeezed: on May 22nd, 2012 19:30, promptly sand setting is 2.5 hours.
Oil jacket squeezes sand plug, sleeve pipe discharge capacity 0.3m with annotating examination
3/ min, coiled tubing discharge capacity 0.15m
3/ min pressure testing, the sand of compacting simultaneously plug changes judgement through pressure test pressure, and there is the unlatching phenomenon in the lower floor crack, sand plug sedimentations such as termination of pumping continuation.
The unsuccessful analysis of causes of sand plug is squeezed in examination: 2.5 hours sand setting time, the sand setting time is not enough.
Reagent for the second time: on May 22nd, 2012 21:00, promptly add up sand setting 4 (2.5+1.5) hour.
Sleeve pipe discharge capacity 0.3m
3/ min, coiled tubing discharge capacity 0.15m
3/ min pressure testing, the sand of compacting simultaneously plug, twice pressure testing rises to 42MPa (fracture pressure 31.8MPa on the mountain 2), and pressure testing is qualified, prepares to visit the sand face;
Sand setting above 10MPa of fracture pressure on pressure testing to the construction section mountain 2 after 4 hours, the crowded sand plug of examination is qualified.
(3) visit the sand face.
Coiled tubing is taken the downhole tool string and is visited the sand face, coiled tubing lowering velocity 13m/min,
(being not more than 15 m/min in theory), continuous repeatedly oil pipe discharge capacity 100L/min, following coiled tubing to 2850 meter (about 80 meters) apart from design sand face position; Stopping the coiled tubing pump annotates; Continue probing sand face down, visit to 2970 meters coiled tubing suspending weight no change; Explain and wait to transform 8 layers in layer box not by sand plug landfill, and box 8 perforated intervals: leave five Gueldenstaedtia vernas below the 2964-2964.5m at least.
Before in other work progresss; Adopted direct spy to the method for transforming aspect, but this method damages easily to transformation face, make original packing face produce the cavity; Therefore adopted and visited to method apart from five meters in packing face; The result shows that this method is respond well, can not damage packing face.
To sum up, squeeze sand plug spy sand face method with examination and can satisfy fully in the coiled tubing back-up sand separate stratum fracfturing technology, coiled tubing is visited the sand face and is confirmed the effective packing situation of interlayer.
NM structure among the present invention, device and processing step are known technology in the industry, do not give unnecessary details one by one at this.