CN102733498B - High-rise residential building external thermal insulation system construction method - Google Patents

High-rise residential building external thermal insulation system construction method Download PDF

Info

Publication number
CN102733498B
CN102733498B CN2012102300707A CN201210230070A CN102733498B CN 102733498 B CN102733498 B CN 102733498B CN 2012102300707 A CN2012102300707 A CN 2012102300707A CN 201210230070 A CN201210230070 A CN 201210230070A CN 102733498 B CN102733498 B CN 102733498B
Authority
CN
China
Prior art keywords
mortar
warming plate
plate
crab
maxit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2012102300707A
Other languages
Chinese (zh)
Other versions
CN102733498A (en
Inventor
成军
张建华
林敏�
张凯平
许金良
陆俊中
汪良
夏金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Five-Ring Construction Co., Ltd.
Nantong Textile Vocational Technology College
Original Assignee
JIANGSU FIVE-RING CONSTRUCTION Co Ltd
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU FIVE-RING CONSTRUCTION Co Ltd, Nantong Textile Vocational Technology College filed Critical JIANGSU FIVE-RING CONSTRUCTION Co Ltd
Priority to CN2012102300707A priority Critical patent/CN102733498B/en
Publication of CN102733498A publication Critical patent/CN102733498A/en
Application granted granted Critical
Publication of CN102733498B publication Critical patent/CN102733498B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • E04B1/7625Details of the adhesive connection of the insulation to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • E04B1/7629Details of the mechanical connection of the insulation to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Abstract

The invention discloses a high-rise residential building external thermal insulation system construction method. Wall base treatment is first carried out. After the wall base is cleaned up, bulges on the wall are removed and bolt holes in the wall are caulked. An interface agent is used to brush the external wall once and 10mm thick cement mortar is applied for leveling, wherein the cement mortar is doped with 10% of 108 glue by weight. Maxitfacade405 polymer adhesive mortar with thickness of 13 to 15mm is applied, a prior typesetting polystyrene foam insulation board is pasted and the effective contact area ratio of the adhesive mortar to the polystyrene board should not be less than 70%. Maxitfacade410 cover cracking mortar with thickness of 8mm is applied and a hot dipped galvanized iron wire with a diameter of 0.9mm and a grid of 10mm is pressed, anchor bolts with a length of 130mm and a diameter of 8mm are used for fixing, and then maxitfacade410 cover cracking mortar with thickness of 4mm is applied. Finally an elastic line is used for separation and bricks are pasted. The method of the invention has convenient construction and good effect.

Description

High residential building external insulation system job practices
Technical field
The present invention relates to a kind of high residential building external insulation system job practices.
Background technology
Along with people's energy-conservation requirement constantly improves, the continuous renewal of ideas of energy-saving, energy conservation standard constantly perfect, the continuous popularization of power-saving technology, so adopt new energy-saving material must weed out the old and bring forth the new with new power-saving technology construction, could satisfy energy-conservation needs, reach real energy-conservation purpose, really realize the conservation-minded society under the New Times, for promoting the new element of the harmonious injection of Chinese society.Existing high residential building external insulation system construction is complicated, and performance is undesirable.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the high residential building external insulation system job practices of favorable working performance.
Technical solution of the present invention is:
A kind of high residential building external insulation system job practices, it is characterized in that: comprise the following steps: at first, carry out the metope base treatment, after cleaning out, the metope protrusion is rejected, the metope bolt hole is crammed, and wall face brush interfacial agents is smeared 10mm solid cement mortar levelling after together, is mixed with 108 glue of 10% weight in cement mortar; Then smear the thick maxit facade405 of 13~15mm polymer bonding mortar, then the polystyrene foam warming plate after prior typesetting is pasted, adhesive mortar contacts the effective area rate and is not less than 70% with polyphenyl plate; Smear the thick maxit facade410 cover anticracking grout of 8mm, being pressed into diameter is that φ 0.9mm grid is the galvanizing wire gauze of 10mm, and fixes with the crab-bolt that long 130mm, diameter are 8mm again, then smears the thick maxit facade410 cover anticracking grout of 4mm; Last snap the line is separated, binding face tile.
The polystyrene foam warming plate is apparent density 25kg/m 3With the polystyrene foam warming plate of groove, the surface does not scribble fire resistant coating to flame retardant type.
It is auxiliary fixing together with crab-bolt that the warming plate at gable position arranges metal build-in cross band, 7~18 floor interlayers arrange, the above every layer of setting of 18 floors, the build-in cross band adopts L50 * 50 * 4, angle bar length is 100mm, installing space is that the warming plate plate is long, holds in the palm between two plates, and fixedly angle bar adopts 2 Φ 8mm expansion bolts to fix.
Warming plate is fixed with crab-bolt after pasting, and deeply within the walls 〉=4cm is blossom type and arranges, 8 crab-bolts of every square meter; The plate at window place is cut into hilt shape, and staggered interlocking is built in the subsides of place, corner, and the warming plate side is made of grid cloth and turned over the bag processing, and the length of side is not less than 150mm; The plate seam is closely knit with the polyurethane material filling.
Maxit facade410 finish coat mortar is plastered: according to from top to bottom, order is from left to right smeared, and after being coated with whole metope, rubbing with the hands back and forth on metope with the thick stick chi and smears, and goes highly to mend lowly, presses one time with plasterer's trowel more at last, makes surfacing, consistency of thickness; Floating with slurry at insulation surface layer recess, erect to starch it for high spot with trowel and strike off, wait having smeared the insulation surface layer after 30 minutes, catch up with again with trowel the face of plastering a wall, first horizontal vertical, then reach acceptance criteria after detecting with the holder chi.
The fixing means of warming plate: treat that construction of leveling blanket was completed 3~7 days and the qualified crack-resistant layer that carries out later of warming plate paving construction inspection of quality is constructed, smear first pass finish coat mortar maxit facade410, THICKNESS CONTROL is at 8mm, treat to be pressed into the galvanizing wire gauze, crab-bolt stationary heat galvanized wire mesh and polyphenyl plate in its not dried situation, smear again anticracking grout maxit facade410 cover second time, THICKNESS CONTROL is at 4mm, and four jiaos of nets are coated among anticracking grout, and the anticracking grout surface layer is smooth.
Easy construction of the present invention, effective.
Characteristics of the present invention are:
(1) before adhesive mortar maxit facade405 construction, basic unit's levelling is very crucial, if levelling is bad, can cause the significant wastage of adhesive mortar maxit facade405 consumption, causes the significantly rising of engineering cost.Simultaneously, especially to the cramming and to put in place of through-wall bolt hole, in case cram not in placely, construction of exterior insulation system section total quality can be affected, the possibility of water percolation of wall can be occurred.What also should be specifically noted that is, during construction of leveling blanket, before the levelling of concrete metope, except cleaning out, also answers round brush one deck interfacial agents, mixes 108 glue in leveling mortar, and there are reliable adhesion stress in guarantee insulation layer and basic unit like this.
When (2) warming plate was pasted, the plumpness of adhesive mortar will strictly be controlled, and can not waste adhesive mortar, can not leak again stickingly, therefore quality person's inspection work is crucial, must not relax.After warming plate was pasted, the fixing of crab-bolt was also key link, first bores the dark aperture in 1cm left and right with electric drill, and then crab-bolt is screwed into, and stopped crab-bolt is knocked to enter within the walls.
(3) finish coat mortar maxit facade410 construction must divide the both sides construction, and the first pass mortar plays the outer whole levelling effect of warming plate, is only cover second time, therefore should strictly control whole planeness and verticality.
When (4) wire gauze is constructed, be to be pushed down in the not dried situation of first pass finish coat mortar maxit facade410, rather than tiling.
The invention will be further described below in conjunction with embodiment.
The specific embodiment
A kind of high residential building external insulation system job practices, comprise the following steps: at first, carry out the metope base treatment, after cleaning out, the metope protrusion is rejected, the metope bolt hole is crammed, and wall face brush interfacial agents is smeared 10mm solid cement mortar levelling after together, is mixed with 108 glue of 10% weight in cement mortar; Then smear the thick maxit facade405 of 13~15mm polymer bonding mortar, then the polystyrene foam warming plate after prior typesetting is pasted, adhesive mortar contacts the effective area rate and is not less than 70% with polyphenyl plate; Smear the thick maxit facade410 cover anticracking grout of 8mm, being pressed into diameter is that φ 0.9mm grid is the galvanizing wire gauze of 10mm, and fixes with the crab-bolt that long 130mm, diameter are 8mm again, then smears the thick maxit facade410 cover anticracking grout of 4mm; Last snap the line is separated, binding face tile.
The polystyrene foam warming plate is apparent density 25kg/m 3With the polystyrene foam warming plate of groove, the surface does not scribble fire resistant coating to flame retardant type.
It is auxiliary fixing together with crab-bolt that the warming plate at gable position arranges metal build-in cross band, 7~18 floor interlayers arrange, the above every layer of setting of 18 floors, the build-in cross band adopts L50 * 50 * 4, angle bar length is 100mm, installing space is that the warming plate plate is long, holds in the palm between two plates, and fixedly angle bar adopts 2 Φ 8mm expansion bolts to fix.
Warming plate is fixed with crab-bolt after pasting, and deeply within the walls 〉=4cm is blossom type and arranges, 8 crab-bolts of every square meter; The plate at window place is cut into hilt shape, and staggered interlocking is built in the subsides of place, corner, and the warming plate side is made of grid cloth and turned over the bag processing, and the length of side is not less than 150mm; The plate seam is closely knit with the polyurethane material filling.
Maxit facade410 finish coat mortar is plastered: according to from top to bottom, order is from left to right smeared, and after being coated with whole metope, rubbing with the hands back and forth on metope with the thick stick chi and smears, and goes highly to mend lowly, presses one time with plasterer's trowel more at last, makes surfacing, consistency of thickness; Floating with slurry at insulation surface layer recess, erect to starch it for high spot with trowel and strike off, wait having smeared the insulation surface layer after 30 minutes, catch up with again with trowel the face of plastering a wall, first horizontal vertical, then reach acceptance criteria after detecting with the holder chi.
The fixing means of warming plate: treat that construction of leveling blanket was completed 3~7 days and the qualified crack-resistant layer that carries out later of warming plate paving construction inspection of quality is constructed, smear first pass finish coat mortar maxit facade410, THICKNESS CONTROL is at 8mm, treat to be pressed into the galvanizing wire gauze, crab-bolt stationary heat galvanized wire mesh and polyphenyl plate in its not dried situation, smear again anticracking grout maxit facade410 cover second time, THICKNESS CONTROL is at 4mm, and four jiaos of nets are coated among anticracking grout, and the anticracking grout surface layer is smooth.

Claims (1)

1. high residential building external insulation system job practices, it is characterized in that: comprise the following steps: at first, carry out the metope base treatment, after cleaning out, the metope protrusion is rejected, the metope bolt hole is crammed, and wall face brush interfacial agents is smeared 10mm solid cement mortar levelling after together, is mixed with 108 glue of 10% weight in cement mortar; Then smear the thick maxit facade405 of 13~15mm polymer bonding mortar, then the polystyrene foam warming plate after prior typesetting is pasted, adhesive mortar contacts the effective area rate and is not less than 70% with polyphenyl plate; Smear the thick maxit facade410 cover anticracking grout of 8mm, being pressed into diameter is that φ 0.9mm grid is the galvanizing wire gauze of 10mm, and fixes with the crab-bolt that long 130mm, diameter are 8mm again, then smears the thick maxit facade410 cover anticracking grout of 4mm; Last snap the line is separated, binding face tile; The polystyrene foam warming plate is apparent density 25kg/m 3With the polystyrene foam warming plate of groove, the surface does not scribble fire resistant coating to flame retardant type; It is auxiliary fixing together with crab-bolt that the warming plate at gable position arranges metal build-in cross band, 7~18 floor interlayers arrange, the above every layer of setting of 18 floors, the build-in cross band adopts L50 * 50 * 4, angle bar length is 100mm, installing space is that the warming plate plate is long, holds in the palm between two plates, and fixedly angle bar adopts 2 Φ 8mm expansion bolts to fix; Warming plate is fixed with crab-bolt after pasting, and deeply within the walls 〉=4cm is blossom type and arranges, 8 crab-bolts of every square meter; The plate at window place is cut into hilt shape, and staggered interlocking is built in the subsides of place, corner, and the warming plate side is made of grid cloth and turned over the bag processing, and the length of side is not less than 150mm; The plate seam is closely knit with the polyurethane material filling; Maxit facade410 finish coat mortar is plastered: according to from top to bottom, order is from left to right smeared, and after being coated with whole metope, rubbing with the hands back and forth on metope with the thick stick chi and smears, and goes highly to mend lowly, presses one time with plasterer's trowel more at last, makes surfacing, consistency of thickness; Floating with slurry at insulation surface layer recess, erect to starch it for high spot with trowel and strike off, wait having smeared the insulation surface layer after 30 minutes, catch up with again with trowel the face of plastering a wall, first horizontal vertical, then reach acceptance criteria after detecting with the holder chi; The fixing means of warming plate: treat that construction of leveling blanket was completed 3~7 days and the qualified crack-resistant layer that carries out later of warming plate paving construction inspection of quality is constructed, smear first pass finish coat mortar maxit facade410, THICKNESS CONTROL is at 8mm, treat to be pressed into the galvanizing wire gauze, crab-bolt stationary heat galvanized wire mesh and polyphenyl plate in its not dried situation, smear again anticracking grout maxit facade410 cover second time, THICKNESS CONTROL is at 4mm, and four jiaos of nets are coated among anticracking grout, and the anticracking grout surface layer is smooth.
CN2012102300707A 2012-07-05 2012-07-05 High-rise residential building external thermal insulation system construction method Active CN102733498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102300707A CN102733498B (en) 2012-07-05 2012-07-05 High-rise residential building external thermal insulation system construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2012102300707A CN102733498B (en) 2012-07-05 2012-07-05 High-rise residential building external thermal insulation system construction method
PCT/CN2012/086041 WO2014005401A1 (en) 2012-07-05 2012-12-06 External thermal insulation system construction method for high-rise residential buildings

Publications (2)

Publication Number Publication Date
CN102733498A CN102733498A (en) 2012-10-17
CN102733498B true CN102733498B (en) 2013-06-05

Family

ID=46989747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102300707A Active CN102733498B (en) 2012-07-05 2012-07-05 High-rise residential building external thermal insulation system construction method

Country Status (2)

Country Link
CN (1) CN102733498B (en)
WO (1) WO2014005401A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733498B (en) * 2012-07-05 2013-06-05 南通纺织职业技术学院 High-rise residential building external thermal insulation system construction method
CN103114655B (en) * 2013-02-18 2013-11-27 华建耐尔特(北京)低碳科技有限公司 Construction method of vacuum insulation plate wall body
CN104196133B (en) * 2014-08-12 2017-06-16 中国建筑第八工程局有限公司 A kind of heat-preserving energy-saving wall structure and preparation method thereof
CN104481039A (en) * 2014-12-19 2015-04-01 山西省第三建筑工程公司 Building outer wall heat insulation layer with surface simulation decoration effect and construction technology of building outer wall heat insulation layer
CN104895201A (en) * 2015-04-10 2015-09-09 广东电白建设集团有限公司 Construction method for external wall internal warming mortar connecting part
CN109208779B (en) * 2018-10-23 2020-06-09 广东曜坤建设工程有限公司 Energy-saving wall structure
CN109797883A (en) * 2019-01-27 2019-05-24 合肥中地节能科技有限公司 A kind of wall thermal insulating mechanized construction method
CN109958205A (en) * 2019-04-04 2019-07-02 中国十七冶集团有限公司 A kind of inorfil vacuum heat-insulation plate external wall system construction optimization method
CN111877658A (en) * 2020-07-22 2020-11-03 北京城建六建设集团有限公司 Anti-release combined anti-cracking system at joint of latex paint inner wall matrix and construction method

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SI9111132A (en) * 1991-06-27 1997-06-30 Krka Tovarna Zdravil Heat insulating multi-layer facade
US5417023A (en) * 1993-12-27 1995-05-23 Mandish; Theodore O. Building panel apparatus and method
CN1177114C (en) * 2002-11-29 2004-11-24 北京振利高新技术公司 Wall with heat insulating facing polyurethane tile and its construction process
CN2617851Y (en) * 2003-06-18 2004-05-26 北京振利高新技术公司 Tiled wall body with post anchored external thermal insulating layer
CN1458366A (en) * 2003-06-18 2003-11-26 北京振利高新技术公司 Outer heat insulating wall with anchored and adhered tile and its construction process
CN100445483C (en) * 2003-09-19 2008-12-24 杨小平 Composite silicate hard heat preservating thermal insulating wall and its construction method
CN101333858A (en) * 2007-06-28 2008-12-31 王强强 Polyphenyl plate exterior wall outer heat insulation technological process
CN201190380Y (en) * 2007-09-27 2009-02-04 北京世纪百成装饰工程有限公司 Thick plastering system of heated board for face brick wall
CN201128951Y (en) * 2007-11-28 2008-10-08 中铁四局集团建筑工程有限公司 Exterior wall with steel bracket-unloaded external heat-insulating layer
CN101929204B (en) * 2010-06-08 2013-04-24 武汉德欧节能科技有限公司 Polyphenyl board cavity-free fireproofing external wall thermal insulation system
CN102061749A (en) * 2010-11-22 2011-05-18 富思特制漆(北京)有限公司 External wall heat insulation system with fireproofing function and manufacturing method thereof
CN202064463U (en) * 2011-05-06 2011-12-07 北京建筑材料科学研究总院有限公司 Inorganic mineral wool plate external thermal insulation structure of outer walls
CN102733498B (en) * 2012-07-05 2013-06-05 南通纺织职业技术学院 High-rise residential building external thermal insulation system construction method

Also Published As

Publication number Publication date
CN102733498A (en) 2012-10-17
WO2014005401A1 (en) 2014-01-09

Similar Documents

Publication Publication Date Title
CN102733498B (en) High-rise residential building external thermal insulation system construction method
CN104018598B (en) A kind of external wall structure and construction installation method
CN201801979U (en) Aerated concrete building block heat insulating wall
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN103835505B (en) Compound heat-insulation board of outer wall constructional method
WO2012016502A1 (en) Externally insulated wall having machine anchored grid-enforced insulation board
CN107761968A (en) Exterior wall internal insulation mortar joins position construction method
CN103174226A (en) External thermal-insulation wall of mechanical anchoring gridding reinforcing rib inorganic modified foam thermal-insulation board
CN101333858A (en) Polyphenyl plate exterior wall outer heat insulation technological process
CN101105070A (en) Polyphenyl board exterior wall outer thermal insulation construction method
CN102486048A (en) Construction method for exterior heat preserving wall surface of exterior wall of high-rise building
WO2011038654A1 (en) External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device
CN104775541B (en) During Light trabs is installed, plate stitches and the crack resistence processing method of Ban Mian basic unit
CN201109947Y (en) Heat-insulating heat-preserving masonry wall
CN103643754B (en) The waterproof treatment structure of building wall body interface seam crossing and processing method
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN204326384U (en) A kind of gauze wire cloth thin-coat plaster rice straw composite roof board
CN208604859U (en) A kind of steel mesh mould heat-preserving decorative wall plate structure
CN203412157U (en) Heat insulation overhead floor
CN207194353U (en) A kind of prefabricated thermal insulation water-proof decorative external wall panel structure
CN110273490A (en) A kind of embedded lightweight wall plate steel building construction and construction method
CN109057221A (en) A kind of cement insulation board outer heat preservation system construction method
CN104895201A (en) Construction method for external wall internal warming mortar connecting part
CN204510524U (en) A kind of steam pressure sand aerated concrete block combination masonry panel
CN201539061U (en) Fireproofing isolating strip for exterior insulation system of construction exterior wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHENG JUN YU JIAN ZHANGJIANING CHENG LIU JIAHUA HUANG KUNKUN TO: CHENG JUNZHANG JIANHUA LIN MIN ZHANG KAIPING XU JINLIANG LU JUNZHONG WANG LIANG XIA JINRONG

Free format text: CORRECT: ADDRESS; FROM: 226300 NANTONG, JIANGSU PROVINCE TO: 226007 NANTONG, JIANGSU PROVINCE

CB03 Change of inventor or designer information

Inventor after: Cheng Jun

Inventor after: Zhang Jianhua

Inventor after: Lin Min

Inventor after: Zhang Kaiping

Inventor after: Xu Jinliang

Inventor after: Lu Junzhong

Inventor after: Wang Liang

Inventor after: Xia Jinrong

Inventor before: Cheng Jun

Inventor before: Yu Jian

Inventor before: Cheng Zhangjianing

Inventor before: Liu Jiahua

Inventor before: Huang Kunkun

TA01 Transfer of patent application right

Effective date of registration: 20130417

Address after: 226007 No. 105, youth East Road, Jiangsu, Nantong

Applicant after: nantong textile vocational technology college

Applicant after: Jiangsu Five-Ring Construction Co., Ltd.

Address before: Tongzhou District Xingyuan road Jiangsu city of Nantong province sunshine mansion 226300 Building No. 63 room 2208

Applicant before: Cheng Jun

Applicant before: nantong textile vocational technology college

ASS Succession or assignment of patent right

Owner name: JIANGSU FIVE-RING CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: NANTONG TEXTILE PROFESSIONAL TECHNOLOGY COLLEGE

Effective date: 20130417

Owner name: NANTONG TEXTILE PROFESSIONAL TECHNOLOGY COLLEGE

Free format text: FORMER OWNER: CHENG JUN

Effective date: 20130417

C14 Grant of patent or utility model
GR01 Patent grant