CN102733437A - Structure assembly counter weight for excavator loader and production method of structure assembly counter weight - Google Patents

Structure assembly counter weight for excavator loader and production method of structure assembly counter weight Download PDF

Info

Publication number
CN102733437A
CN102733437A CN2012101616454A CN201210161645A CN102733437A CN 102733437 A CN102733437 A CN 102733437A CN 2012101616454 A CN2012101616454 A CN 2012101616454A CN 201210161645 A CN201210161645 A CN 201210161645A CN 102733437 A CN102733437 A CN 102733437A
Authority
CN
China
Prior art keywords
inserts
counterweight
shot
sand
structural
Prior art date
Application number
CN2012101616454A
Other languages
Chinese (zh)
Other versions
CN102733437B (en
Inventor
游迪
万顺发
Original Assignee
杭州顺成机械有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杭州顺成机械有限公司 filed Critical 杭州顺成机械有限公司
Priority to CN201210161645.4A priority Critical patent/CN102733437B/en
Publication of CN102733437A publication Critical patent/CN102733437A/en
Application granted granted Critical
Publication of CN102733437B publication Critical patent/CN102733437B/en

Links

Abstract

The invention discloses a structure assembly counter weight for an excavator loader and a production method of the structure assembly counter weight, which aim to overcome the defects of easiness to break, short service life, high gravity and poor stability of a counter weight in the prior art. The structure assembly counter weight comprises a box body and a filling material which is filled in the box body, the filling material consists of the following components by weight percentage: 30-50% of iron sand, 20-30% of iron pills, 12.5-41% of quartz sand, 1-5% of gangue and 2.5-8% of cement, and the filling material is filled layer by layer. The production method of the structure assembly counter weight comprises the following steps of: (1) sequentially weighing each component; (2) preparing the iron sand filling material, filling the filling material at the bottom of the box body and vibrating the filling material; (3) preparing the iron pill filling material, filling the iron pill on the iron san and vibrating the iron pill; and (4) preparing a quartz sand and gangue mixing filling material, filling the mixture on the iron pill filling material, vibrating and air drying. The structure assembly counter weight disclosed by the invention has the advantages of difficulty in breaking, long service life, low gravity and good stability.

Description

A kind of excavator loading machine is with structural member counterweight and production method thereof

Technical field

The present invention relates to counterweight and make the field, especially relate to a kind of excavator loading machine with structural member counterweight and production method thereof.

Background technology

Excavator, loader need be installed counterweight in use on car body, come balancing vehicle, avoid vehicle nose or rollover; The casting of existing excavator, loader casting counterweight needs a large amount of foundry iron and various rare element usually; Also need quartz sand, graphite, alcohol, resin, curing compound, coke etc. in addition, the energy consumption amount is big, and cost is high; The counterweight center of gravity is high, poor stability during use.

Chinese patent notification number CN102407564A discloses the preparation method of a kind of vehicle with concrete weight coating spare April 11 2012 day for announcing, and making step is: (1) is processed basin shape housing with sheet metal through cutting, punching press; (2) weld centre bore pipe, fixing hole pipe and hole for hoist pipe respectively in the inside of basin shape housing; (3) between the inwall and centre bore pipe and fixing hole pipe of basin shape housing, with the webbed metallic framework of welded wire; (4) cement, stone, stone flour, coarse sand, diamond dust, flyash, curing compound, blender and water are not got in the mark score by weight; Each raw material of being got mixed to stir process concrete inserts (5) the concrete inserts that stirs is cast in the basin shape housing natural air drying after the compacting; That the present invention has is with low cost, process simple advantage; Weak point is that inserts is easy to crack, thereby breaks away from housing; Damage housing owing to inertia causes the inserts impact objectives in the use, counterweight is short application life; The counterweight center of gravity is high, poor stability during use.

Summary of the invention

The object of the invention is to overcome that the counterweight of prior art is fragile, application life short, the deficiency of center of gravity high stability difference, provides the excavator loading machine of a kind of not fragile, long service life, the low good stability of center of gravity to use the structural member counterweight.

Another object of the present invention is to provide the production method of a kind of excavator loading machine with the structural member counterweight.

The technical scheme that the present invention solves its technical problem employing is:

A kind of excavator loading machine is used the structural member counterweight; Comprise casing and be filled in the inserts in the said casing, said inserts is processed by following components in weight percentage: iron sand 30 ~ 50%, shot 20 ~ 30%; Quartz sand 12.5 ~ 41%; Gangue 1 ~ 5%, cement 2.5 ~ 8%, said inserts layering is filled.The present invention processes simply, and energy consumption cost is low, and iron sand, quartz sand, gangue wide material sources, raw material are easy to obtain, and with each inserts layering filling, has overcome between the inserts of different rerum naturas and is difficult for mixing, inserts problem easy to crack.

As preferably, be followed successively by the mixing filling bed of material that iron sand is filled the bed of material, the shot filling bed of material and processed by quartz sand and gangue from bottom half to top.Heavy inserts is seated in lower box, and the counterweight center of gravity that makes is low, good stability during use.

As preferably, the proportion of said iron sand is 4.2 ~ 7.2t/m3.

As preferably, said quartz sand particle size 1 ~ 20mm, wherein particle diameter is that the quartz sand percentage by weight of 1 ~ 4mm is 20 ~ 30%, particle diameter is 70 ~ 80% greater than 4mm smaller or equal to the quartz sand percentage by weight of 20mm.The quartz sand thickness combines, and has reduced the void content of mixing inserts, has improved the density of mixing inserts, has also improved the solidifiability that mixes inserts.

As preferably, the inwall plane of symmetry of said casing is welded with the skeleton that is made up of reinforcing bar.Skeleton plays fixation to the inserts that solidifies, and prevents that inserts shrinkage and cabinet wall break away from, and owing to inertia, inserts and cabinet wall collide and the damage casing when avoiding the use of.

As preferably, said cabinet wall is bonded with the elastic caoutchouc liner that thickness is 2 ~ 4cm.The inserts heat of can alleviating the elastic caoutchouc liner rises to the destruction of casing, also can prevent to break away from cabinet wall after the inserts shrinkage, in causing using because inertia inserts damaged in collision casing, but also noise reduction of elastic caoutchouc liner, absorbing, thereby prolong the casing life-span.

A kind of excavator loading machine is with the production method of structural member counterweight, and described production method comprises the steps:

(1) take by weighing required iron sand, shot, quartz sand, gangue and cement successively, said cement is divided into 4 parts;

(2) with iron sand and 1 part of cement mixing, the water mixing that adds iron sand weight 1 ~ 2% is then processed the iron sand inserts, described iron sand inserts is placed bottom half, jolt ramming then;

(3) with shot and 1 part of cement mixing, the water mixing that adds shot weight 1 ~ 2% is then processed the shot inserts, described shot inserts is placed on the iron sand inserts jolt ramming then;

(4) with quartz sand, gangue and 2 parts of cement mixings, the water mixing that adds quartz sand and gangue gross weight 8 ~ 10% is then processed the mixing inserts, described mixing inserts is placed on the shot inserts, and jolt ramming then, natural air drying gets final product.

Each inserts layering is up filled from bottom half successively, and heavy inserts is filled in lower box, and prepared structural member counterweight center of gravity is low, uses good stability.

As preferably, the percentage by weight of each component is following in the step (1): iron sand 30 ~ 50%, and shot 20 ~ 30%, quartz sand 12.5 ~ 41%, gangue 1 ~ 5%, cement 2.5 ~ 8%, the percentage by weight sum of each component is 100%.

As preferably, the inwall plane of symmetry of casing is welded with the skeleton that is made up of reinforcing bar described in the step (2).

As preferably, the inwall of casing described in the step (2) is bonded with the elastic caoutchouc liner that thickness is 2 ~ 4cm.

The present invention has following beneficial effect: (1) processing is simple, and is much lower with existing casting counterweight specific energy consumption; (2) the packing material collocation is reasonable, and proportion is high, can significantly improve the proportion of structural member counterweight; (3) the inwall plane of symmetry of casing is welded with skeleton or is provided with the elastic caoutchouc liner, can avoid or alleviate the rising-heat contracting-cold of inserts, and inserts is not easy to crack, can not separate with cabinet wall, and casing is not fragile, structural member counterweight long service life.

Description of drawings

The structural representation of Fig. 1 embodiment of the invention 1.

The structural representation of Fig. 2 embodiment of the invention 2.

Among the figure: the 1-casing; The 2-skeleton; 3-mixes the filling bed of material; The 4-shot is filled the bed of material; The 5-iron sand is filled the bed of material; 6-elastic caoutchouc liner.

The specific embodiment

Through the specific embodiment,, the present invention is further explained below in conjunction with accompanying drawing.

Embodiment 1

The density of the iron sand that present embodiment adopts is 4.2t/m3, and the density of gangue is 1.5t/m3, and the percentage by weight of each component is seen table 1.20 tonnes digging machine structural element counterweight, 4.5 tons of counterweights, 0.3 ton of box weight, 4.2 tons of inserts weight, tank-volumes 1.48m3, the cabinet wall plane of symmetry is welded with the skeleton that is made up of reinforcing bar, and the production method of said counterweight comprises the steps:

(1) takes by weighing iron sand 1260kg, shot 840kg, quartz sand 1722kg, gangue 42kg and cement 336kg successively; Said cement is divided into 4 parts; Every part of 84kg, in the said quartz sand particle diameter 1 ~ 4mm account for 20%, particle diameter accounts for 80% greater than 4mm smaller or equal to 20mm.

(2) with iron sand and 84kg cement mixing, the water that adds iron sand weight 1.5% then stirs and processes the iron sand inserts, described iron sand inserts is placed bottom half, jolt ramming then.

(3) with shot and 84kg cement mixing, the water that adds shot weight 1.5% then stirs and processes the shot inserts, described shot inserts is placed on the iron sand inserts jolt ramming then.

(4) with quartz sand, gangue and 168kg cement mixing, the water that adds quartz sand and gangue gross weight 9% then stirs and processes the mixing inserts, described mixing inserts is placed on the shot inserts, and jolt ramming then, natural air drying gets final product.

The shared volume of each inserts is following: the iron sand volume: 1260kg ÷ 4200kg/m3=0.3m3; Shot volume=840kg ÷ 6700kg/m3=0.125m3; Quartz sand volume=1722kg ÷ 2650kg/m3=0.650m3; Gangue volume=42kg ÷ 1500kg/m3=0.028; Cement volume=336kg ÷ 1100kg/m3=0.305m3 adds up to inserts volume=1.41m3.

Embodiment 2

The density of the iron sand that present embodiment adopts is 6.0t/m3, and the density of gangue is 1.4t/m3, and the percentage by weight of each component is seen table 1.33 tonnes loader structural member counterweight, 7.7 tons of counterweights, 0.5 ton of box weight, 7.2 tons of inserts weight, tank-volumes are 2.05m3, and said cabinet wall is bonded with the elastic caoutchouc liner that thickness is 2cm, and the production method of said counterweight comprises the steps:

(1) takes by weighing iron sand 2880kg, shot 1800kg, quartz sand 1980kg, gangue 180kg and cement 360kg successively; Said cement is divided into 4 parts; Every part of 90kg, in the said quartz sand particle diameter 1 ~ 4mm account for 30%, particle diameter accounts for 70% greater than 4mm smaller or equal to 20mm.

(2) with iron sand and 90kg cement mixing, the water that adds iron sand weight 2% then stirs and processes the iron sand inserts, described iron sand inserts is placed bottom half, jolt ramming then.

(3) with shot and 90kg cement mixing, the water that adds shot weight 2% then stirs and processes the shot inserts, the shot inserts is placed on the iron sand inserts jolt ramming then.

(4) with quartz sand, gangue and 180kg cement mixing, the water that adds quartz sand and gangue gross weight 10% then stirs and processes the mixing inserts, described mixing inserts is placed on the shot inserts, and jolt ramming then, natural air drying gets final product.

The shared volume of each inserts is following: the iron sand volume: 2880kg ÷ 6000kg/m3=0.48m3; Shot volume=1800kg ÷ 6700kg/m3=0.269m3; Quartz sand volume=1980kg ÷ 2650kg/m3=0.747m3; Gangue volume=180kg ÷ 1400kg/m3=0.128; Cement volume=360kg ÷ 1100kg/m3=0.327m3 adds up to inserts volume=1.95m3.

Embodiment 3

The density of the iron sand that present embodiment adopts is 7.2t/m3, and the density of gangue is 1.2t/m3, and the percentage by weight of each component is seen table 1.46 tonnes digging machine structural element counterweight, 8.6 tons of counterweights, casing weighs 0.6 ton, and 8.0 tons of inserts weight, tank-volumes are 2.42m3, and said cabinet wall is bonded with the elastic caoutchouc liner that thickness is 4cm, and the production method of said counterweight comprises the steps:

(1) takes by weighing iron sand 4000kg, shot 2400kg, quartz sand 1000kg, gangue 400kg and cement 200kg successively; Said cement is divided into 4 parts; Every part of 50kg, in the said quartz sand particle diameter 1 ~ 4mm account for 25%, particle diameter accounts for 75% greater than 4mm smaller or equal to 20mm.

(2) with iron sand and 50kg cement mixing, the water that adds iron sand weight 1% then stirs and processes the iron sand inserts, described iron sand inserts is placed bottom half, jolt ramming then.

(3) with shot and 50kg cement mixing, the water that adds shot weight 1% then stirs and processes the shot inserts, the shot inserts is placed on the iron sand inserts jolt ramming then.

(4) with quartz sand, gangue and 125kg cement mixing, the water that adds quartz sand and gangue gross weight 8% then stirs and processes the mixing inserts, described mixing inserts is placed on the shot inserts, and jolt ramming then, natural air drying gets final product.

The shared volume of each inserts is following: the iron sand volume: 4000kg ÷ 7200kg/m3=0.555m3; Shot volume=2400kg ÷ 6700kg/m3=0.358m3; Quartz sand volume=1000kg ÷ 2650kg/m3=0.377m3; Gangue volume=400kg ÷ 1200kg/m3=0.833; Cement volume=200kg ÷ 1100kg/m3=0.182m3 adds up to inserts volume=2.30m3.

Table 1 inserts each component percentage by weight table

Excavator loading machine of the present invention is low with the center of gravity of structural member counterweight; During use than existing structural member counterweight good stability; Be difficult for sidesway takes place, the more existing cast member counterweight of energy consumption energy consumption has reduced 50-60% in the manufacturing process of structural member counterweight of the present invention, and energy consumption cost is low; The inserts of structural member counterweight of the present invention is not easy to crack, difficult to be separated with cabinet wall, and the application life of structural member counterweight, more existing structural member counterweight prolonged 2 ~ 3 years application life.

Claims (10)

1. an excavator loading machine is used the structural member counterweight, comprises casing and is filled in the inserts in the said casing, it is characterized in that; Said inserts is processed by following components in weight percentage: iron sand 30 ~ 50%; Shot 20 ~ 30%, quartz sand 12.5 ~ 41%, gangue 1 ~ 5%; Cement 2.5 ~ 8%, said inserts layering is filled in the casing.
2. excavator loading machine according to claim 1 is used the structural member counterweight, it is characterized in that, is followed successively by the mixing filling bed of material that iron sand is filled the bed of material, the shot filling bed of material and processed by quartz sand and gangue from bottom half to top.
3. excavator loading machine according to claim 1 and 2 is used the structural member counterweight, it is characterized in that, the proportion of said iron sand is 4.2 ~ 7.2t/m3.
4. excavator loading machine according to claim 1 and 2 is used the structural member counterweight; It is characterized in that; Said quartz sand particle size is 1 ~ 20mm, and wherein particle diameter is that the quartz sand percentage by weight of 1 ~ 4mm is 20 ~ 30%, and particle diameter is 70 ~ 80% greater than 4mm smaller or equal to the quartz sand percentage by weight of 20mm.
5. excavator loading machine according to claim 1 and 2 is used the structural member counterweight, it is characterized in that, the said cabinet wall plane of symmetry is welded with the skeleton that is made up of reinforcing bar.
6. excavator loading machine according to claim 1 and 2 is used the structural member counterweight, it is characterized in that, said cabinet wall is bonded with the elastic caoutchouc liner that thickness is 2 ~ 4cm.
7. the described excavator loading machine of claim 1 is characterized in that with the production method of structural member counterweight described production method comprises the steps:
(1) take by weighing iron sand, shot, quartz sand, gangue and cement successively, said cement is divided into 4 parts;
(2) with iron sand and 1 part of cement mixing, the water mixing that adds iron sand weight 1 ~ 2% is then processed the iron sand inserts, the iron sand inserts is placed bottom half, then jolt ramming;
(3) with shot and 1 part of cement mixing, the water mixing that adds shot weight 1 ~ 2% is then processed the shot inserts, the shot inserts is placed on the iron sand inserts jolt ramming then;
(4) with quartz sand, gangue and 2 parts of cement mixings, the water mixing that adds quartz sand and gangue gross weight 8 ~ 10% is then processed the mixing inserts, and will mix inserts and place on the shot inserts, jolt ramming then, natural air drying gets final product.
8. a kind of excavator loading machine according to claim 7 is with the production method of structural member counterweight; It is characterized in that the percentage by weight of each component is following in the step (1): iron sand 30 ~ 50%, shot 20 ~ 30%; Quartz sand 12.5 ~ 41%; Gangue 1 ~ 5%, cement 2.5 ~ 8%, the percentage by weight sum of each component is 100%.
9. a kind of excavator loading machine according to claim 7 is characterized in that with the production method of structural member counterweight the inwall plane of symmetry of casing is welded with the skeleton that is made up of reinforcing bar described in the step (2).
10. a kind of excavator loading machine according to claim 7 is characterized in that with the production method of structural member counterweight the inwall of casing described in the step (2) is bonded with the elastic caoutchouc liner that thickness is 2 ~ 4cm.
CN201210161645.4A 2012-05-23 2012-05-23 Structure assembly counter weight for excavator loader and production method of structure assembly counter weight CN102733437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210161645.4A CN102733437B (en) 2012-05-23 2012-05-23 Structure assembly counter weight for excavator loader and production method of structure assembly counter weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210161645.4A CN102733437B (en) 2012-05-23 2012-05-23 Structure assembly counter weight for excavator loader and production method of structure assembly counter weight

Publications (2)

Publication Number Publication Date
CN102733437A true CN102733437A (en) 2012-10-17
CN102733437B CN102733437B (en) 2014-07-23

Family

ID=46989692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210161645.4A CN102733437B (en) 2012-05-23 2012-05-23 Structure assembly counter weight for excavator loader and production method of structure assembly counter weight

Country Status (1)

Country Link
CN (1) CN102733437B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102927201A (en) * 2012-11-14 2013-02-13 广西玉柴重工有限公司 Counter weight of aerial work platform
CN109466714A (en) * 2018-10-19 2019-03-15 广州海洋地质调查局 A kind of permanent ballast of cement steel sand mixture

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2771167Y (en) * 2005-03-02 2006-04-12 李林 Combined counterpoise
JP2007132126A (en) * 2005-11-11 2007-05-31 Shin Caterpillar Mitsubishi Ltd Counter weight, manufacturing method of counter weight and working machine
CN101182140A (en) * 2007-11-02 2008-05-21 浙江工业大学 Super slow-setting cement
CN101482219A (en) * 2008-09-09 2009-07-15 夏咸仁 Counterbalance weight of engineering machinery
JP4431102B2 (en) * 2005-11-11 2010-03-10 キャタピラージャパン株式会社 Counterweight, counterweight manufacturing method, and work machine
CN102241493A (en) * 2011-04-19 2011-11-16 广东红墙新材料股份有限公司 Pit backfill material, preparation method thereof and application method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2771167Y (en) * 2005-03-02 2006-04-12 李林 Combined counterpoise
JP2007132126A (en) * 2005-11-11 2007-05-31 Shin Caterpillar Mitsubishi Ltd Counter weight, manufacturing method of counter weight and working machine
JP4431102B2 (en) * 2005-11-11 2010-03-10 キャタピラージャパン株式会社 Counterweight, counterweight manufacturing method, and work machine
CN101182140A (en) * 2007-11-02 2008-05-21 浙江工业大学 Super slow-setting cement
CN101482219A (en) * 2008-09-09 2009-07-15 夏咸仁 Counterbalance weight of engineering machinery
CN102241493A (en) * 2011-04-19 2011-11-16 广东红墙新材料股份有限公司 Pit backfill material, preparation method thereof and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102927201A (en) * 2012-11-14 2013-02-13 广西玉柴重工有限公司 Counter weight of aerial work platform
CN109466714A (en) * 2018-10-19 2019-03-15 广州海洋地质调查局 A kind of permanent ballast of cement steel sand mixture

Also Published As

Publication number Publication date
CN102733437B (en) 2014-07-23

Similar Documents

Publication Publication Date Title
KR101576819B1 (en) Feeder element
CN101476360B (en) Novel energy-consumption shock-absorbing filling wall board used for frame structure
CN102875187B (en) High-strength aerated concrete block
CN102489686B (en) Method for preparing ceramic particle enhanced steel-base composite material cast by evaporative pattern casting die
CN102249609A (en) Arsenic-containing waste slag solidified body and preparation method thereof
CN101259518B (en) Foundry coating prepared from foundry resin sand regeneration power dust, preparation method and use thereof
CN103193429B (en) Iron core tailing curing agent, iron core all-tailing cementing composition containing iron core tailing curing agent and application of iron core all-tailing cementing composition to gob of mine
CN101574725B (en) Molding sand for aluminum casting and preparation technology thereof
CN101649663B (en) Steel slag concrete brick prepared by using steel slag tailings as cement
US9061288B2 (en) Device for recycling molding sand
CN103979884A (en) Method for preparing coal mine filling paste by utilizing waste concrete
EP1174385A3 (en) Process for producing hydrogen absorbing alloy powder, hydrogen absorbing alloy powder, and hydrogen-storing tank for mounting in vehicle
Sajedi Mechanical activation of cement–slag mortars
CN104294728B (en) Prefabricated road deck of assembled RPC unreinforced and preparation method thereof
CN101458186B (en) Mold for crack-containing bolting test
JP5503653B2 (en) Composite impact material for impact crusher
CN101456704A (en) Method for producing silicate product by using molybdenum tailings and hydrothermal method
CN102153358B (en) Slag dart pouring material used for steel-making and vanadium-extracting converter, slag dart and preparation method thereof
CN101637744A (en) Method for recovering and utilizing kiln slag of zinc hydrometallurgy volatilizing kiln
CN102719725A (en) Sintered neodymium iron boron waste remoulding method
CN102159739B (en) Milling cone for a compression crusher
CN106077421A (en) A kind of gravitational casting molding sand and preparing process thereof
CN101239804A (en) Method for manufacturing building material from building garbage
CN103396155B (en) Aerated concrete block and preparation method thereof
CN101148363A (en) Large aggregate penetration pouring material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140723