CN102720297B - Method for rapidly positioning and installing hanging bars - Google Patents
Method for rapidly positioning and installing hanging bars Download PDFInfo
- Publication number
- CN102720297B CN102720297B CN201210227008.2A CN201210227008A CN102720297B CN 102720297 B CN102720297 B CN 102720297B CN 201210227008 A CN201210227008 A CN 201210227008A CN 102720297 B CN102720297 B CN 102720297B
- Authority
- CN
- China
- Prior art keywords
- tube connector
- muscle
- electric hammer
- pright stanchion
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 claims abstract description 19
- 230000000875 corresponding Effects 0.000 claims abstract description 9
- 210000003205 Muscles Anatomy 0.000 claims description 40
- 239000002184 metal Substances 0.000 claims description 13
- 235000004443 Ricinus communis Nutrition 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 4
- 238000009510 drug design Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 210000002345 respiratory system Anatomy 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Abstract
The invention discloses a method for rapidly positioning and installing hanging bars, wherein perpendicular corresponding points of drilling points designed on a ceiling are marked on the ground; a mobile precise-positioning hanging bar drilling device is used for not only positioning the drilling points on the ceiling through the perpendicular corresponding points, but also drilling; and a convenient hanging bar installer is used for installing the hanging bars in eye holes at the drilling points. The method for rapidly positioning and installing the hanging bars has the beneficial effects of simple structure and rational design, known according to the descriptions of the scheme. Operations such as positioning, drilling and installation are performed by operators on the ground, so that the potential safety hazards are reduced. The operators can drill the ceiling and install the hanging bars on the ceiling even on the ground, without standing on a herringbone ladder; since the operators do not need to move, adjust or climb the herringbone ladder, the working efficiency is increased. Furthermore, the operators do not work in high-places resulting in operation inconvenience, so that the working quality is improved.
Description
Technical field
The present invention relates to a kind of installation decoration process method, relate in particular to a kind of muscle location and mounting method fast of hanging.
Background technology
Along with social development, decorative effect pattern is installed more and more, also become increasingly complex, ornamental work amount is installed on ceiling ceiling increasing, quality requirement is also more and more stricter.Ceiling ceiling install to be decorated and first will be installed and hang muscle, is then hanging on muscle the article such as mounted lamp again.
The current muscle that hangs is installed, from boring with to install be all that staff stands in double ladder and operates.Staff is first according to the line boring of putting well at the bottom of floor in advance, and double ladder is moved in hole of every brill one time; It is also like this that muscle is hung in installation, and one of every installation is hung muscle and moved double ladder one time.Personnel are frequent upper and lower, move double ladder, have increased a lot of workloads, make efficiency low; Operation aloft, often operation inconvenience, this also has influence on boring and installation work quality; Personnel's high-rise working, potential safety hazard is also large.
Summary of the invention
The present invention be directed to the existing deficiency of prior art, and provide a kind of simple in structure, reasonable in design, improved operating efficiency and work quality, reduced the muscle that hangs of potential safety hazard and located fast and mounting method.
To achieve these goals, the invention provides a kind of muscle location and mounting method fast of hanging, it is characterized in that, comprise the following steps:
Step 1: according to design boring point on ceiling, mark on the ground the vertical corresponding points of projection;
Step 2: aim at one of them vertical corresponding points by being positioned at lower end and vertically disposed positioner, then control and be positioned at upper end and its center line is holed to ceiling with the drilling equipment that the center line of described positioner overlaps;
The equipment that this step is used accurately hangs muscle drilling equipment in location for movable type, comprises the bracing frame of foot wheel, and support frame as described above top is provided with upper pright stanchion, and described upper pright stanchion upper end is provided with electric hammer, and the below of described electric hammer is provided with positioner;
Support frame as described above comprises expanded metal lath chassis, and rear portion, upper surface, described expanded metal lath chassis is provided with lower vertical rod, and front portion, upper surface, described expanded metal lath chassis is provided with arm-rest frame, is connected with the support bar of level between described lower vertical rod middle part and described arm-rest frame upper end;
Described expanded metal lath is provided with described castor below chassis;
Described lower vertical rod top and described upper pright stanchion bottom are provided with equally distributed pin-and-hole;
Between described lower vertical rod and described upper pright stanchion, with bearing pin, be connected with control lever and junction plate, described junction plate is positioned at described control lever below;
On described control lever, be provided with power knob, described power knob connects described electric hammer by wire.
Step 3: by hang muscle upper end expansion bolt partial insertion step 2 drilling hole in the eyes, fastening nut then.
Wherein, it is characterized in that, described upper pright stanchion top one side is provided with supporting plate, and described electric hammer is arranged on described supporting plate and is fixedly attached on described upper pright stanchion; Between described supporting plate and described electric hammer, and be provided with electro-insulating rubber pad between described upper pright stanchion and described electric hammer.
Described positioner comprises the messenger wire that its center line overlaps with the center line of described electric hammer drill, and the lower end of described messenger wire is hung with vertical pin.
Described lower vertical rod bottom is provided with chute, and described vertical pin top is arranged in described chute.
The equipment that described step 3 is used, for Convenient type hangs muscle erector, comprises tube connector, and described tube connector lower end is provided with handle, and described tube connector upper end is provided with inner tooth sleeve cylinder.
Further, described tube connector comprises lower tube connector and upper tube connector, and insert in described lower tube connector described upper tube connector bottom; Described lower tube connector top is respectively arranged with described upper tube connector bottom a plurality of screws that spacing is identical, and described lower tube connector is connected by the described screw bolt through wherein any one combination with described upper tube connector;
Described handle is arranged on described lower tube connector lower end;
Described inner tooth sleeve cylinder is arranged on described upper tube connector upper end.
The beneficial effect of this programme can be learnt according to the narration to such scheme, simple in structure, reasonable in design.Location, boring, fitting operation, staff carries out on the ground, has reduced potential safety hazard.Staff just can hole on the ground and be arranged on ceiling hanging muscle on ceiling, no longer needs to stand in the enterprising line operate of double ladder, has saved the Job Operations that moves, adjusts and climb double ladder, has increased operating efficiency.And staff has avoided causing unhandy high-rise working environment, has improved work quality.Adopt portable accurately location to hang muscle drilling equipment, staff also, away from the bore position that flashes of dust, has protected eyes, face and respiratory system.Portable accurately location is hung muscle drilling equipment and is connected to descend the control lever of vertical rod and upper pright stanchion can also play the effect of lever by bearing pin, staff is holed more laborsaving.The highly different floor of equally distributed pin-and-hole reply on lower vertical rod and upper pright stanchion.The crown that hangs down is located the point of holing on ceiling according to ground point, chute guarantees moving when of the present invention or during work, vertical pin does not rock everywhere.Convenient type hangs the structure that muscle erector adopts upper tube connector and the socket of lower tube connector, facilitates the length adjustment of tube connector, to meet the floor operation of differing heights.Muscle drilling equipment and Convenient type are hung in portable accurately location, and to hang muscle erector area occupied all little, and the requirements of installation space needing is little, can in the numerous space of pipeline, keel, install and hang muscle.
Accompanying drawing explanation
Fig. 1 is the structural representation that in the present invention, muscle drilling equipment is hung in portable accurately location.
Fig. 2 is the structural representation that in the present invention, Convenient type hangs muscle erector.
In figure, 101, bracing frame; 102, expanded metal lath chassis; 103, lower vertical rod; 104, arm-rest frame; 105, support bar; 106, castor; 107, upper pright stanchion; 108, supporting plate; 109, electro-insulating rubber pad; 110, electric hammer; 111, hook hair and paste bandage; 112, pin-and-hole; 113, bearing pin; 114, control lever; 115, junction plate; 116, power knob; 117, messenger wire; 118, vertical pin; 119, chute; 201, tube connector; 202, lower tube connector; 203, upper tube connector; 204, screw; 205, bolt; 206, handle; 207, inner tooth sleeve cylinder; 208, hang muscle; 209, thread is installed; 210, screw thread is installed.
The specific embodiment
For clearly demonstrating the technical characterstic of this programme, below by the specific embodiment, this programme is set forth.
The present invention is a kind of muscle location and mounting method fast of hanging, and uses two kinds of special equipments: portable accurately location hangs muscle drilling equipment and Convenient type hangs muscle erector.
As shown in Figure 1, portable accurately location is hung muscle drilling equipment and is comprised bracing frame 101, and bracing frame 101 comprises expanded metal lath chassis 102, and expanded metal lath chassis 102 is provided with castor 106 below.102 rear portions, upper surface, expanded metal lath chassis are provided with lower vertical rod 103, and 102 front portions, upper surface, expanded metal lath chassis are provided with arm-rest frame 104, are connected with the support bar 105 of level between lower vertical rod 103 middle parts and arm-rest frame 104 upper ends;
Bracing frame 101 tops are provided with upper pright stanchion 107, and upper pright stanchion 107 top one sides are provided with supporting plate 108, are provided with electric hammer 110 on supporting plate 108, and electric hammer 110 use hook hair subsides bandage 111 and are fixedly attached on upper pright stanchion 107; Between supporting plate 108 and electric hammer 110, and be provided with electro-insulating rubber pad 109 between upper pright stanchion 107 and electric hammer 110.The below of electric hammer 110 is provided with the messenger wire 117 that its center line overlaps with the center line of electric hammer 110 drill bits, and the lower end of messenger wire 117 is hung with the pin 118 that hangs down.Lower vertical rod 103 bottoms are provided with chute 119, and pin 118 tops of hanging down are arranged in chute 119.
Lower vertical rod 103 tops and upper pright stanchion 108 bottoms are provided with equally distributed pin-and-hole 114, between lower vertical rod 103 and upper pright stanchion 108, with bearing pin 113, be connected with control lever 114 and junction plate 115, junction plate 115 is positioned at control lever 114 belows, on control lever 114, be provided with power knob 116, power knob 116 connects electric hammer 110 by wire.
As shown in Figure 2, Convenient type hangs muscle erector and comprises tube connector 201, and tube connector 201 comprises lower tube connector 202 and upper tube connector 203, and insert in lower tube connector 202 upper tube connector 203 bottoms; Lower tube connector 202 tops are respectively arranged with upper tube connector 203 bottoms a plurality of screws 204 that spacing is identical, and lower tube connector 202 is connected by screw 204 bolts 205 through wherein any one combination with upper tube connector 203; Lower tube connector 202 lower ends are provided with handle 206, and upper tube connector 203 upper ends are provided with inner tooth sleeve cylinder 207.
Step of the present invention is as follows:
Step 1: according to design boring point on ceiling, mark on the ground the vertical corresponding points of projection.
Step 2: use portable accurately location to hang muscle drilling equipment to the boring of design boring point location, concrete grammar is as follows:
(1) according to story height and operating personnel's height, select pin-and-hole 112, with control lever 114, by bearing pin 113, be connected lower vertical rod 103 and upper pright stanchion 107 with junction plate 115.Position, 1 hole, interval at least between junction plate 115 and control lever 114.
(2) according to the vertical corresponding points that mark, mobile the present invention also passes through to adjust, and the pin 118 that makes to hang down is over against these vertical corresponding points.Castor 106 is stepped on to die and fixed, opening power button 116, operating personnel are according to the i.e. up-hole on ceiling of control lever 114.
Step 3: first will hang muscle 208 and penetrate in tube connector 201, and hang the installation thread 209 on muscle 208 tops and put into inner tooth sleeve cylinder 207, and the installation screw thread 210 that hangs muscle 208 upper ends be aligned to the installation screw of ceiling, then rotating handles completes installation.
The present invention can pass through or adopt existing techniques in realizing without the technical characterictic of describing; do not repeat them here; certainly; above-mentioned explanation is not limitation of the present invention; the present invention is also not limited in above-mentioned giving an example; the variation that those skilled in the art make in essential scope of the present invention, remodeling, interpolation or replacement, also should belong to protection scope of the present invention.
Claims (6)
1. hang muscle location and a mounting method fast, it is characterized in that, comprise the following steps:
Step 1: according to design boring point on ceiling, mark on the ground the vertical corresponding points of projection;
Step 2: aim at one of them vertical corresponding points by being positioned at lower end and vertically disposed positioner, then control and be positioned at upper end and its center line is holed to ceiling with the drilling equipment that the center line of described positioner overlaps;
The equipment that this step is used accurately hangs muscle drilling equipment in location for movable type, comprises the bracing frame of foot wheel, and support frame as described above top is provided with upper pright stanchion, and described upper pright stanchion upper end is provided with electric hammer, and the below of described electric hammer is provided with positioner;
Support frame as described above comprises expanded metal lath chassis, and rear portion, upper surface, described expanded metal lath chassis is provided with lower vertical rod, and front portion, upper surface, described expanded metal lath chassis is provided with arm-rest frame, is connected with the support bar of level between described lower vertical rod middle part and described arm-rest frame upper end;
Described expanded metal lath is provided with described castor below chassis;
Described lower vertical rod top and described upper pright stanchion bottom are provided with equally distributed pin-and-hole;
Between described lower vertical rod and described upper pright stanchion, with bearing pin, be connected with control lever and junction plate, described junction plate is positioned at described control lever below;
On described control lever, be provided with power knob, described power knob connects described electric hammer by wire;
Step 3: by hang muscle upper end expansion bolt partial insertion step 2 drilling hole in the eyes, fastening nut then.
2. muscle location and the mounting method fast of hanging according to claim 1, is characterized in that, described upper pright stanchion top one side is provided with supporting plate, and described electric hammer is arranged on described supporting plate and is fixedly attached on described upper pright stanchion; Between described supporting plate and described electric hammer, and be provided with electro-insulating rubber pad between described upper pright stanchion and described electric hammer.
3. muscle location and the mounting method fast of hanging according to claim 1 and 2, is characterized in that, described positioner comprises the messenger wire that its center line overlaps with the center line of described electric hammer drill, and the lower end of described messenger wire is hung with vertical pin.
4. muscle location and the mounting method fast of hanging according to claim 3, is characterized in that, described lower vertical rod bottom is provided with chute, and described vertical pin top is arranged in described chute.
5. the muscle that hangs according to claim 1 and 2 is located and mounting method fast, it is characterized in that, the equipment that described step 3 is used, for Convenient type hangs muscle erector, comprises tube connector, described tube connector lower end is provided with handle, and described tube connector upper end is provided with inner tooth sleeve cylinder.
6. muscle location and the mounting method fast of hanging according to claim 5, is characterized in that, described tube connector comprises lower tube connector and upper tube connector, and insert in described lower tube connector described upper tube connector bottom; Described lower tube connector top is respectively arranged with described upper tube connector bottom a plurality of screws that spacing is identical, and described lower tube connector is connected by the described screw bolt through wherein any one combination with described upper tube connector;
Described handle is arranged on described lower tube connector lower end;
Described inner tooth sleeve cylinder is arranged on described upper tube connector upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210227008.2A CN102720297B (en) | 2012-07-03 | 2012-07-03 | Method for rapidly positioning and installing hanging bars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210227008.2A CN102720297B (en) | 2012-07-03 | 2012-07-03 | Method for rapidly positioning and installing hanging bars |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102720297A CN102720297A (en) | 2012-10-10 |
CN102720297B true CN102720297B (en) | 2014-09-03 |
Family
ID=46946151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210227008.2A Active CN102720297B (en) | 2012-07-03 | 2012-07-03 | Method for rapidly positioning and installing hanging bars |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720297B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102990789B (en) * | 2012-11-21 | 2014-12-03 | 江苏省电力公司淮安供电公司 | Hand-held electric hammer uphole drilling device |
CN102979457A (en) * | 2012-12-07 | 2013-03-20 | 中铁十九局集团电务工程有限公司 | High-altitude drill positioning method of building |
CN103015891B (en) * | 2012-12-27 | 2014-11-26 | 歌山建设集团有限公司 | Movable roof expansion bolt punching device |
GB201419182D0 (en) * | 2014-10-28 | 2014-12-10 | Nlink As | Mobile robotic drilling apparatus and method for drilling ceillings and walls |
CN106760415A (en) * | 2015-11-20 | 2017-05-31 | 中冶天工集团有限公司 | The method that expansion bolt is efficiently installed on concrete roof |
CN106351572B (en) * | 2016-09-26 | 2019-06-25 | 中国一冶集团有限公司 | Top plate positioning device and drilling equipment, grouting device and method including it |
CN107347287B (en) * | 2017-06-06 | 2019-10-08 | 辽宁生态工程职业学院 | A kind of soil stabilizing apparatus and method of potting xylophyta |
CN107268868B (en) * | 2017-06-24 | 2019-01-18 | 荆门创佳机械科技有限公司 | A kind of ceiling hanger rod mounting device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04323462A (en) * | 1991-04-24 | 1992-11-12 | Hazama Gumi Ltd | Floor system, joining device thereof, and laying method thereof |
KR20050073984A (en) * | 2004-01-13 | 2005-07-18 | 주식회사 혜원까치종합건축사사무소 | Hanger for the ceiling member capable of adjusting height and method for installing the ceiling member using the hanger |
CN2889602Y (en) * | 2005-11-15 | 2007-04-18 | 方大集团股份有限公司 | Drill bracket for top plate drilling |
CN102071791A (en) * | 2010-12-03 | 2011-05-25 | 中建四局第一建筑工程有限公司 | Quick perforation method and device for suspended ceiling |
CN201883940U (en) * | 2010-12-13 | 2011-06-29 | 刘汉华 | Electrically-driven lifting punching machine |
CN102296828A (en) * | 2011-05-18 | 2011-12-28 | 常熟市金龙装饰有限责任公司 | Construction method of boom before building ceiling or pipelining |
-
2012
- 2012-07-03 CN CN201210227008.2A patent/CN102720297B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04323462A (en) * | 1991-04-24 | 1992-11-12 | Hazama Gumi Ltd | Floor system, joining device thereof, and laying method thereof |
KR20050073984A (en) * | 2004-01-13 | 2005-07-18 | 주식회사 혜원까치종합건축사사무소 | Hanger for the ceiling member capable of adjusting height and method for installing the ceiling member using the hanger |
CN2889602Y (en) * | 2005-11-15 | 2007-04-18 | 方大集团股份有限公司 | Drill bracket for top plate drilling |
CN102071791A (en) * | 2010-12-03 | 2011-05-25 | 中建四局第一建筑工程有限公司 | Quick perforation method and device for suspended ceiling |
CN201883940U (en) * | 2010-12-13 | 2011-06-29 | 刘汉华 | Electrically-driven lifting punching machine |
CN102296828A (en) * | 2011-05-18 | 2011-12-28 | 常熟市金龙装饰有限责任公司 | Construction method of boom before building ceiling or pipelining |
Also Published As
Publication number | Publication date |
---|---|
CN102720297A (en) | 2012-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102720297B (en) | Method for rapidly positioning and installing hanging bars | |
CN204304278U (en) | Relaying maintenance Special lift truck | |
CN202517082U (en) | Ceiling drilling machine and tool with adjustable height | |
KR20150083471A (en) | Wall-mounted Tower Crane Climbing Device | |
CN203495283U (en) | Drilling tool for drilling of indoor decorative suspended ceilings | |
CN104110119B (en) | A kind of construction ceiling suspension rod locating mounting method and easy device | |
CN202825751U (en) | Movable accurate positioning hanging bar drilling device | |
CN204843050U (en) | High altitude drilling equipment | |
CN204290129U (en) | A kind of New Type Isolating Switch repairing frame | |
CN213827159U (en) | Simple punching device for top plate hanging hole | |
CN203081321U (en) | Mechanical device capable of being used for carrying out ceiling drilling operations on ground | |
CN205087828U (en) | Simple and easy lifting device of 35kV circuit breaker | |
CN212343196U (en) | Suspension wire installation device | |
CN104084623A (en) | Ceiling punching machine | |
CN205907994U (en) | Elevating gear is used in construction of architectural decoration engineering | |
CN203565916U (en) | Drilling tool with rear-mounted member | |
CN203412518U (en) | Indoor ceiling drilling device capable of freely adjusting drilling height | |
CN204135402U (en) | Ceiling drilling device | |
CN207239655U (en) | A kind of bracket assembles equipment | |
CN204711271U (en) | A kind of portable high-rise working crosshead | |
CN204770810U (en) | Special telescoping device of electric tool top drilling | |
CN206335166U (en) | Roof perforate specific purpose tool | |
CN204148563U (en) | A kind of top plate drilling servicing unit | |
CN203156100U (en) | Drilling instrument for suspended ceiling construction | |
CN203640251U (en) | Climbing type building construction operating platform outside building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |