CN102709934A - 发电机经二降压独立母线并网方法 - Google Patents
发电机经二降压独立母线并网方法 Download PDFInfo
- Publication number
- CN102709934A CN102709934A CN2012101118995A CN201210111899A CN102709934A CN 102709934 A CN102709934 A CN 102709934A CN 2012101118995 A CN2012101118995 A CN 2012101118995A CN 201210111899 A CN201210111899 A CN 201210111899A CN 102709934 A CN102709934 A CN 102709934A
- Authority
- CN
- China
- Prior art keywords
- line
- power
- reduction
- grid
- electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
发电机经二降压独立母线并网方法,属于供电领域,供电局500kV甲变电站220kV系统供出220kV乙1#、2#两回线,经过15.6公里的双分列架空线路,送电至220kV九降压220kV系统,通过3台220/110主变,变压为110kV系统,供出110kV二降线,经1.2公里的架空线路送电至110kV二降压110kV系统,通过1台110/10主变,变压为10kV系统,供出10kV二联1#、2#、3#线,经1.32公里的直配电缆送电至二电部10kV母线,6台发电机输出10kV电压,并网与二电部10kV母线上。本发明将一个电气系统分割成两个电气系统,故障率降低,系统电容电流,故障率低。
Description
技术领域
本发明属于电力系统变配电降压站、变电所供电领域。
背景技术
太钢发电机组是配套公司生产使用蒸汽而建设的热电联产机组,建在厂区内部,主要由总装机容量76MW的6台机组组成,1#机12MW、2#机12MW、3#机12MW、4#机3MW、5#机12MW、6#机25MW;其中1#、2#、3#机为抽凝机组,4#、5#机为背压机组、6#机为凝汽机组,6台发电机额定输出电压10kV,并网于二电部10kV母线,经过10kV二联一、二联二、二联三至110kV二降压10kV东母,经10kV/110kV 1#主变至二降压110kV东母,经110kV二降线至220kV九总降压110kV东母,经110kV/220kV 1#主变和2#主变并入太原市供电公司供电网络。
二降压位于太钢厂区中部,主要负荷有型材厂主轧机、径锻机、电渣炉,不锈线材厂650轧机、高速线材轧机,不锈热轧厂轧机动力,冷轧硅钢厂,二钢南区转炉连铸动力,林德公司3#、4#空压机,能源动力总厂燃气四变电、供水五泵站,技术中心及与发电机的联络线等。
能源动力总厂二电部10kV母线,主要负荷有炼铁三高炉动力及TRT、四高炉动力及TRT,特钢整模,二钢热水泵房、南区转炉连铸动力,能源动力总厂余热发电、供水开闭所、四泵站等。
由于历史原因,6台发电机所并接的二电部10kV母线,和三回10kV二联线、二降压10kV东母组成一个庞大的电气网络,该网络供电分路近30个,系统电容电流130A以上,有时可达160A,在二电侧和二降压东母系统分别配置一套消弧。该系统负荷重,分路多,且多数为架空线路、直埋电缆,接地跳闸事故多发,在系统发生接地时易造成大面积接地,接地电容电流很大,过电压事故频发。由于太钢生产的特殊性,不能对接地线路采取突然拉闸停电的措施,而要采取将用电设备不停电倒至无故障供电系统,这样将原本运行正常的供电系统也一并影响,进一步扩大系统异常范围,电容电流进一步增大,往往引发事故,为此,我们经过对供电系统的分析,提出独立并网构想。
在原110/35主变及35kV母线拆除后,实现发电机独立并网的条件基本具备。在更换110/10主变,新建10kV独立并网母线及联络线出线开关后,发电机独立并网具备了条件;经过对系统短路阻抗、零序阻抗测算,符合系统技术规范,在2011年8月10日前,全部设备建设完成,试验合格,独立并网真正具备条件。
6台发电机所并接的二电部10kV母线,和三回10kV二联线、二降压10kV东母组成一个庞大的电气网络,该网络供电分路近30个,系统电容电流130A以上,有时可达160A,在二电侧和二降压东母系统分别配置一套消弧。该系统负荷重,分路多,且多数为架空线路、直埋电缆,接地跳闸事故多发,在系统发生接地时易造成大面积接地,接地电容电流很大,过电压事故频发。由于太钢生产的特殊性,不能对接地故障线路采取突然拉闸停电的方法切除故障点,必须采取将用电设备不停电倒至无故障供电系统的方法转移负荷后方可对存在故障可能的设备逐一排除,这样将原本运行正常的供电系统也一并影响,进一步扩大系统异常范围,电容电流进一步增大,往往引发事故。
发明内容
为了避免上述现象的发生,本发明提供发电机经二降压独立母线并网方法。
本发明的技术方案是:供电局500kV甲变电站220kV系统供出220kV乙1#、2#两回线,经过15.6公里的双分列架空线路,送电至220kV九降压220kV系统,通过3台220/110主变,变压为110kV系统,供出110kV二降线,经1.2公里的架空线路送电至110kV二降压110kV系统,通过1台110/10主变,变压为10kV系统,供出10kV二联1#、2#、3#线,经1.32公里的直配电缆送电至二电部10kV母线,6台发电机输出10kV电压,并网与二电部10kV母线上;
其中,220kV九降压3台220/110主变中1台主变的220侧中性点和110侧中性点直接接地,110kV二降压1台110/10主变的110侧中性点直接接地。
110kV二降压10kV系统分路包括三回联络线、转炉4#线、开闭所1#、2#线、三轧线、水保隔离变、连铸2#线、初轧1#、2#、3#线、电渣炉1#、2#线、五轧1#线、六轧3#线、技中1#、2#线、煤气1#、2#线;二电部10kV系统分路包括三回联络线、转炉1#线、四泵1#、2#线、给水3#线、整模线、连铸1#、5#线、三高炉1#线、四高炉1#线、6台高厂变、6台低厂变。
本发明发电机独立并网,10kV并网电力系统实现电气割离,电气故障波及面小,对生产影响小。
将一个电气系统分割成两个电气系统,故障率降低,系统电容电流,故障率低。
具体实施方式
(1)太钢发电机组是配套公司生产使用蒸汽而建设的热电联产机组,由总装机容量76MW的6台机组组成,并网于二电部10kV母线,由3回10kV二联线至110kV二降压10kV东母,经10kV/110kV 1#主变至二降压110kV东母并入太原供电网络。
供电局500kV甲变电站220kV系统供出220kV乙1#、2#两回线,经过15.6公里的双分列架空线路,送电至220kV九降压220kV系统,通过3台220/110主变,变压为110kV系统,供出110kV二降线,经1.2公里的架空线路送电至110kV二降压110kV系统,通过1台110/10主变,变压为10kV系统,供出10kV二联1#、2#、3#线,经1.32公里的直配电缆送电至二电部10kV母线,6台发电机输出10kV电压,并网与二电部10kV母线上;
其中,220kV九降压3台220/110主变中1台主变的220侧中性点和110侧中性点直接接地,110kV二降压1台110/10主变的110侧中性点直接接地。
110kV二降压10kV系统分路包括三回联络线、转炉4#线、开闭所1#、2#线、三轧线、水保隔离变、连铸2#线、初轧1#、2#、3#线、电渣炉1#、2#线、五轧1#线、六轧3#线、技中1#、2#线、煤气1#、2#线;二电部10kV系统分路包括三回联络线、转炉1#线、四泵1#、2#线、给水3#线、整模线、连铸1#、5#线、三高炉1#线、四高炉1#线、6台高厂变、6台低厂变。
具体施工方法是:将退用的35kV母线及馈线开关柜拆除,在原址新建10kV并网母线,安装6面开关柜,其中变压器二次进线柜1面、PT柜1面、母联柜1面、并网联络线开关柜3面。
技术要求:
①、6面开关柜全部采用采用GG1A型,配真空断路器,并网联络开关柜安装上刀闸,取消下刀闸,在下刀闸电缆室中加装线路PT,配PT刀闸、熔断器;
②、利用现291、292、293联络线保护屏中光差保护装置,从新开关柜新敷保护、控制电缆至现保护屏,符合配置要求;
③、将原291、292、293间隔命名为256、263、269备用间隔,具备带分路条件,按分路保护配置;
④、联络线限流电抗器装在发电侧;
3、保护整定
根据二降压及其上级电网九降压的短路容量,重新核算新3#主变保护定值,核算新母联277开关保护定值,核算二联1#、2#、3#线两侧保护定值,同时参照阳钢2#线的作为备用并网线路,复核3#主变在阳钢2#线并网的定值后备保护,满足带负荷的能力。
4、确定相序
由于太钢二降压系统为负序,所以在连接277间隔电缆时,经过详细核定,确认了新系统和旧系统相序间的差异,找到对应相。
5、正常运行方式:
二降线241间隔——二降压 3#主变(合中性点2480)——10kV并网母线——二联1#2#3#——二电部10kV母线——6台发电机。
6、特殊运行方式:
在3#主变检修时:二降线241间隔——二降压 1#主变(合中性点2460)——10kV东母——母联277——10kV并网母线——二联1#2#3#线——二电部10kV母线——6台发电机。
在10kV并网母线检修时:一降线107间隔——一降压 3#主变(合中性点1030)——10kV3段——一联东西线——二电部10kV母线——6台发电机。
1、对6面开关柜、真空断路器,线路PT、母线PT、刀闸交接试验;
2、调整291、292、293联络线光差保护定值,调整3#主变保护定值;
3、空出110kV西母,投3#主变全部保护,投110kV母联充电保护,冲击变压器5次,送10kV并网母线,测基准相位,然后用277母联送电定相;
4、测定环流
在电力系统中,由于某些支路阻抗异常,或者变压器分接头的调节等原因,系统中可能会出现循环潮流,即环流。环流将导致网络损耗的增加及输电网传输能力的下降,因此有必要针对有环流的网络采用特殊的处理方式。在定相正确后,退3#主变差动保护,合环测环流、测相量,正确后投保护。
5、倒联络线
将二联线倒接至并网母线出线开关柜,同时二电侧将串联电抗器在定相正确后,退差动保护,合环测环流、测相量,正确后投保护。
Claims (1)
1.发电机经二降压独立母线并网方法,供电局500kV甲变电站220kV系统供出220kV乙1#、2#两回线,经过15.6公里的双分列架空线路,送电至220kV九降压220kV系统,通过3台220/110主变,变压为110kV系统,供出110kV二降线,经1.2公里的架空线路送电至110kV二降压110kV系统,通过1台110/10主变,变压为10kV系统,供出10kV二联1#、2#、3#线,经1.32公里的直配电缆送电至二电部10kV母线,6台发电机输出10kV电压,并网与二电部10kV母线上;其中,220kV九降压3台220/110主变中1台主变的220侧中性点和110侧中性点直接接地,110kV二降压1台110/10主变的110侧中性点直接接地。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012101118995A CN102709934A (zh) | 2012-04-17 | 2012-04-17 | 发电机经二降压独立母线并网方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012101118995A CN102709934A (zh) | 2012-04-17 | 2012-04-17 | 发电机经二降压独立母线并网方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102709934A true CN102709934A (zh) | 2012-10-03 |
Family
ID=46902550
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012101118995A Pending CN102709934A (zh) | 2012-04-17 | 2012-04-17 | 发电机经二降压独立母线并网方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102709934A (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107612031A (zh) * | 2017-09-30 | 2018-01-19 | 安徽海螺建材设计研究院 | 余热发电并网系统 |
| CN111624426A (zh) * | 2020-06-02 | 2020-09-04 | 西安热工研究院有限公司 | 一种双母线系统接线方式母差保护极性的校验系统及方法 |
| CN111934317A (zh) * | 2020-08-11 | 2020-11-13 | 广东电网有限责任公司 | 一种强台风情况下重点区域电网保底电网优化方法 |
| CN113937721A (zh) * | 2020-07-14 | 2022-01-14 | 南京南瑞继保工程技术有限公司 | 一种含限流电抗器的输电线路的继电保护系统 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201887482U (zh) * | 2010-12-24 | 2011-06-29 | 上海追日电气有限公司 | 一种变电站型电压无功综合控制的动态无功补偿装置 |
| EP2408083A1 (en) * | 2009-03-12 | 2012-01-18 | Vpec, Inc. | Autonomous distributed ac power system |
-
2012
- 2012-04-17 CN CN2012101118995A patent/CN102709934A/zh active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2408083A1 (en) * | 2009-03-12 | 2012-01-18 | Vpec, Inc. | Autonomous distributed ac power system |
| CN201887482U (zh) * | 2010-12-24 | 2011-06-29 | 上海追日电气有限公司 | 一种变电站型电压无功综合控制的动态无功补偿装置 |
Non-Patent Citations (5)
| Title |
|---|
| 《山西电力》 20060430 杨杰等 太原电网"十一五"规划主网架结构探讨 第1-4页 1 , 第131期 * |
| 周耀烈等: "分布式发电机组并网10kV开关站的保护新逻辑", 《高电压技术》 * |
| 李晓霞: "太原西部电网运行分析", 《山西电力》 * |
| 杨杰等: "太原电网"十一五"规划主网架结构探讨", 《山西电力》 * |
| 韩佩雯等: "太原地区110kV网中变压器中性点保护", 《山西电力》 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107612031A (zh) * | 2017-09-30 | 2018-01-19 | 安徽海螺建材设计研究院 | 余热发电并网系统 |
| CN107612031B (zh) * | 2017-09-30 | 2024-01-23 | 安徽海螺建材设计研究院 | 余热发电并网系统 |
| CN111624426A (zh) * | 2020-06-02 | 2020-09-04 | 西安热工研究院有限公司 | 一种双母线系统接线方式母差保护极性的校验系统及方法 |
| CN113937721A (zh) * | 2020-07-14 | 2022-01-14 | 南京南瑞继保工程技术有限公司 | 一种含限流电抗器的输电线路的继电保护系统 |
| CN111934317A (zh) * | 2020-08-11 | 2020-11-13 | 广东电网有限责任公司 | 一种强台风情况下重点区域电网保底电网优化方法 |
| CN111934317B (zh) * | 2020-08-11 | 2024-06-14 | 广东电网有限责任公司 | 一种强台风情况下重点区域电网保底电网优化方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205231835U (zh) | 一种大型火力发电厂机组高压厂用电源互为备用的结构 | |
| Shiles et al. | Microgrid protection: An overview of protection strategies in North American microgrid projects | |
| CN203895766U (zh) | 基于双母线双分段的变电站主接线系统 | |
| CN103001195A (zh) | 快速切除变压器死区故障的继电保护方法 | |
| CN109995015A (zh) | 220kv两电两充直流系统 | |
| CN106451771A (zh) | 高压直流输电系统控制保护系统 | |
| CN104767195A (zh) | 超高压自耦变压器中性点小抗接地时小抗阻值选择的方法 | |
| CN102709934A (zh) | 发电机经二降压独立母线并网方法 | |
| CN102496916B (zh) | 一种利用电网广域信息的开关失灵保护方法 | |
| CN103227468B (zh) | 一种变电站主接线配串优化方法 | |
| CN206992714U (zh) | 小汽轮发电机接入高压厂用电系统的接线结构以及接线系统 | |
| CN110277771B (zh) | 一种线路t接方式提高变电站短路电流开断能力的方法 | |
| CN218886001U (zh) | 一种具备延时保护功能的所用变低压侧空载冲击试验装置 | |
| CN114407734B (zh) | 一种柔性牵引供电系统及保护方法 | |
| CN204577857U (zh) | 一种采用新型接线方式的110kV变电站 | |
| CN201298734Y (zh) | 变频启动二拖一燃气-蒸汽联合循环机组的主接线 | |
| CN205319698U (zh) | 一种运用于火电厂脱硫改造的脱硫电气主接线 | |
| CN210957782U (zh) | 一种基于混合型超导限流器的35kV变电站分段母线系统 | |
| CN204465015U (zh) | 一种发电厂单回出线时无需外引电源的接线系统 | |
| CN202405780U (zh) | 一种中压配电网的“三双”接线结构 | |
| CN210224772U (zh) | Gis接线及布置结构 | |
| CN202094512U (zh) | 一种检修中使主变压器中压侧不断电的机构 | |
| CN204696788U (zh) | 一种大型火力发电厂高压厂用电源三电源自动切换接线结构 | |
| CN205992744U (zh) | 一种220千伏升压站系统 | |
| CN202534944U (zh) | 无备品低压开关上并联连接有旁路开关的变电系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121003 |