CN102709841B - Assembled suspension bridge outlet device - Google Patents

Assembled suspension bridge outlet device Download PDF

Info

Publication number
CN102709841B
CN102709841B CN201210177581.7A CN201210177581A CN102709841B CN 102709841 B CN102709841 B CN 102709841B CN 201210177581 A CN201210177581 A CN 201210177581A CN 102709841 B CN102709841 B CN 102709841B
Authority
CN
China
Prior art keywords
assembly type
standard knot
assembled
suspension bridge
type standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210177581.7A
Other languages
Chinese (zh)
Other versions
CN102709841A (en
Inventor
刘博�
苏秀成
徐国庆
王小松
肖峰
王艳
任永平
郎福堂
梅丰
王志勇
刘春田
杜伟
杨广玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Ac Engineering Construction Co
State Grid Corp of China SGCC
Beijing Electric Power Transmission and Transformation Co
Original Assignee
State Grid Ac Engineering Construction Co
State Grid Corp of China SGCC
Beijing Electric Power Transmission and Transformation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Ac Engineering Construction Co, State Grid Corp of China SGCC, Beijing Electric Power Transmission and Transformation Co filed Critical State Grid Ac Engineering Construction Co
Priority to CN201210177581.7A priority Critical patent/CN102709841B/en
Publication of CN102709841A publication Critical patent/CN102709841A/en
Application granted granted Critical
Publication of CN102709841B publication Critical patent/CN102709841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The embodiment of the invention provides an assembled suspension bridge outlet device, which structurally comprises two fixed supports and a plurality of assembled mast sections, wherein the fixed supports are fixed on fittings at the two ends of composite insulator strings; the assembled mast sections between the two fixed supports form an assembled suspension bridge; the assembled master sections are connected through clamping grooves and wire dowels, or the assembled mast sections are connected with the fixed supports through the clamping grooves and the wire dowels; and each assembled mast section comprises two racks which are suspended on two adjacent composite insulator strings.

Description

一种组装式吊桥出线装置An assembled suspension bridge outlet device

技术领域 technical field

本发明设计输电线路技术领域,特别涉及一种组装式吊桥出线装置。The invention relates to the technical field of power transmission line design, in particular to an assembled suspension bridge outlet device.

背景技术 Background technique

近年来,随着电力需求的日益增加和输电技术的发展,800kV、1000kV等特高压输电线路已经开始在国内进行建设并投入运行。在污秽等级较重地区,采用复合绝缘子对提高输电线路耐污闪能力,防止和遏制污闪事故的发生均能够起到积极作用,且复合绝缘子具有成本低、免维护等优点,在特高压工程中推广应用,效益显著。In recent years, with the increasing demand for electricity and the development of transmission technology, UHV transmission lines such as 800kV and 1000kV have begun to be constructed and put into operation in China. In areas with heavy pollution levels, the use of composite insulators can play a positive role in improving the pollution flashover resistance of transmission lines and preventing and curbing the occurrence of pollution flashover accidents, and composite insulators have the advantages of low cost and maintenance-free. The popularization and application in China will bring remarkable benefits.

但常规耐张绝缘子串一般采用玻璃绝缘子(或瓷绝缘子),工作人员需要进行出线操作的时候,可以通过直接踩踏攀爬传统的玻璃(或陶瓷)绝缘子串,从输电杆塔爬到导线上进行操作。However, conventional strain insulator strings generally use glass insulators (or porcelain insulators). When workers need to carry out outgoing operations, they can directly step on and climb the traditional glass (or ceramic) insulator strings, and climb from the transmission tower to the wires for operation. .

特高压耐张串采用复合绝缘子后,由于复合绝缘子物力强度较差,易损坏,不能承受作业人员的攀爬和踩踏。这也就使得在特高压输电线路中,工作人员无法按照传统的方式,通过攀爬绝缘子串进行出线操作,为检修等工作带来了极大的不便。After composite insulators are used in UHV tension strings, composite insulators have poor physical strength and are easily damaged, so they cannot withstand the climbing and trampling of workers. This also makes it impossible for workers to climb the insulator strings in the UHV transmission line according to the traditional method, which brings great inconvenience to maintenance and other work.

上述技术问题在现阶段一部分采用了复合绝缘子串的电压等级在500kV以下的高压输电线路中也存在。但由于这部分500kV的输电线路电压等级较低,所以复合绝缘子长度较小(一般在5米以内),所以能够通过安装整体吊桥的方式解决。但是在特高压输电线路中,复合绝缘子串的长度一般在10米以上。可想而知在高空安装10米跨度的整体吊桥是及其繁琐,难以实现的;即使勉强实现,安全性和实用性也根本无法保证,并且成本过高。The above-mentioned technical problems also exist in high-voltage transmission lines with a voltage level below 500kV that partially use composite insulator strings at this stage. However, due to the low voltage level of this part of the 500kV transmission line, the length of the composite insulator is relatively small (generally within 5 meters), so it can be solved by installing an integral suspension bridge. However, in UHV transmission lines, the length of composite insulator strings is generally more than 10 meters. It is conceivable that installing an integral suspension bridge with a span of 10 meters at high altitude is extremely cumbersome and difficult to realize; even if it is barely realized, safety and practicality cannot be guaranteed at all, and the cost is too high.

所以现阶段缺少一种出线装置,能实现在不损坏复合绝缘子串的前提下,帮助工作人员完成出线过程。Therefore, there is a lack of an outlet device at this stage, which can help the staff to complete the outlet process without damaging the composite insulator string.

发明内容 Contents of the invention

有鉴于此,本发明的目的在于提供一种组装式吊桥出线装置,实现在不损坏复合绝缘子串的前提下,帮助工作人员完成出线过程。In view of this, the purpose of the present invention is to provide an assembled suspension bridge cable outlet device, which can help workers complete the cable outlet process without damaging the composite insulator string.

为实现上述目的,本发明有如下技术方案:To achieve the above object, the present invention has the following technical solutions:

一种组装吊桥出线装置,所述装置具体结构如下:所述装置包括,两个固定支座和多个组装式标准节;所述固定支座固定在复合绝缘子串两端的金具上,两个固定支座之间由组装式标准节组成组装式吊桥;组装式标准节之间或组装式标准节与固定支座之间通过卡槽和穿钉相连;所述组装式标准节包括两条挂具,所述两条挂具悬挂在相邻两条符合绝缘子串上。An assembly suspension bridge outlet device, the specific structure of the device is as follows: the device includes two fixed supports and a plurality of assembled standard joints; the fixed supports are fixed on the fittings at both ends of the composite insulator string, and the two fixed The assembled standard sections form the assembled suspension bridge between the supports; the assembled standard sections or between the assembled standard sections and the fixed support are connected by card slots and nails; the assembled standard sections include two hangers, The two hangers are suspended on two adjacent insulator strings.

所述固定支座为L型,一端固定在复合绝缘子串一端的三角联板上,另一端通过卡槽和穿钉连接组装式标准节。The fixed support is L-shaped, one end is fixed on the triangular joint plate at one end of the composite insulator string, and the other end is connected to the assembled standard section through a slot and a nail.

所述组装式标准节为条型,组装式标准节通过卡槽和穿钉连接固定支座或连接其他组装式标准节。The assembled standard section is strip-shaped, and the assembled standard section is connected to a fixed support or connected to other assembled standard sections through card slots and nails.

与固定支座连接的组装式标准节设有加长螺栓孔,用于调节组装式吊桥的长度。The assembled standard section connected with the fixed support is provided with an extended bolt hole for adjusting the length of the assembled suspension bridge.

所述组装式标准节选材为玻璃钢、铝合金或不锈钢。The material of the assembled standard section is glass fiber reinforced plastic, aluminum alloy or stainless steel.

所述挂具带有抱箍,所述挂具通过抱箍悬挂在复合绝缘子串上。The hanger has a hoop, and the hanger is suspended on the composite insulator string through the hoop.

所述抱箍带有抱箍内衬,抱箍内衬的材质为乙烯-醋酸乙烯共聚物。The hoop has a hoop lining, and the material of the hoop lining is ethylene-vinyl acetate copolymer.

通过以上技术方案可知,本发明存在的有益效果是,利用本发明所述组装式吊桥出线装置的固定支座固定到复合绝缘子串两端的金具上,在两个固定支座之间利用组装式标准节构成组装式吊桥,同时组装式标准节利用挂具悬挂在复合绝缘子串上,工作人员即可在所述组装式吊桥上通行完成出线过程,避免了对于复合绝缘子串的踩踏和攀爬;另外,所述挂具在悬挂时,利用了抱箍与衬垫的设计,更加有效的保护了复合绝缘子串,不会导致复合绝缘子串的损坏。It can be seen from the above technical solutions that the beneficial effect of the present invention is that the fixed support of the assembled suspension bridge outlet device of the present invention is fixed to the fittings at both ends of the composite insulator string, and the assembled standard is used between the two fixed supports. At the same time, the assembled standard section is suspended on the composite insulator string with a hanger, and the staff can pass on the assembled suspension bridge to complete the outgoing process, avoiding trampling and climbing on the composite insulator string; , when the hanger is suspended, the design of the hoop and the pad is used to more effectively protect the composite insulator string without causing damage to the composite insulator string.

附图说明 Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are For some embodiments of the present invention, those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本发明实施例所述组装式吊桥出线装置结构示意图;Fig. 1 is a structural schematic diagram of an assembly-type suspension bridge outlet device according to an embodiment of the present invention;

图2为本发明实施例所述固定支座结构示意图;Fig. 2 is a schematic diagram of the structure of the fixed support according to the embodiment of the present invention;

图3为本发明实施例所述组装式标准节结构示意图。Fig. 3 is a schematic diagram of the structure of the assembled standard section described in the embodiment of the present invention.

具体实施方式 Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

参照图1所述为本发明所述组装式吊桥出线装置的具体实施例。本实施例中,所述装置包括:两个固定支座和多个组装式标准节;所述固定支座固定在复合绝缘子串两端的金具上,本实施例中所述金具具体为三角联板;两个固定支座之间由组装式标准节组成组装式吊桥;组装式标准节之间或组装式标准节与固定支座之间通过卡槽和穿钉相连;所述组装式标准节包括两条挂具,所述两条挂具悬挂在相邻两条符合绝缘子串上。也就是说,该组装式吊桥安装在相邻两条复合绝缘子串之间,并且高度低于复合绝缘子串,工作人员能够在组装式标准节组成的吊桥之上通行,以符合绝缘子串作为扶手,完成出线过程。Referring to Fig. 1, it is a specific embodiment of the assembly type suspension bridge outlet device of the present invention. In this embodiment, the device includes: two fixed supports and a plurality of assembled standard sections; the fixed supports are fixed on the fittings at both ends of the composite insulator string, and the fittings described in this embodiment are specifically delta joints The assembled suspension bridge is composed of assembled standard sections between two fixed supports; the assembled standard sections or between the assembled standard sections and the fixed supports are connected by card slots and nails; the assembled standard sections include two The two hangers are hung on two adjacent insulator strings. That is to say, the assembled suspension bridge is installed between two adjacent composite insulator strings, and its height is lower than that of the composite insulator strings. Workers can pass on the suspension bridge composed of assembled standard sections, using the insulator strings as handrails. Complete the exit process.

参照图2所述为本实施例中所述固定支座结构示意图,图3为组装式标准节的结构示意图,本实施例中所述固定支座呈L型,其上端固定在复合绝缘子串一端的三角联板上,前端通过卡槽和穿钉连接组装式标准节;所述组装式标准节为条型,组装式标准节之间同样通过卡槽和穿钉连接,组装式标准节能够以穿钉为轴旋转调整角度。Referring to Figure 2, it is a schematic structural diagram of the fixed support in this embodiment, and Figure 3 is a schematic structural diagram of the assembled standard section. The fixed support in this embodiment is L-shaped, and its upper end is fixed at one end of the composite insulator string On the triangular joint plate, the front end is connected to the assembled standard section through a slot and a nail; Thread the nail to adjust the angle for the shaft rotation.

另外,对于上述实施例还可以进行如下的优化设计:In addition, the following optimization design can also be carried out for the above-mentioned embodiment:

由于复合绝缘子串的长度往往会存在一定的误差,所以所述组装式吊桥的长度需要相应的调整。本实施例中,在与固定支座相连接的组装式标准节上设有加长螺栓孔,能够在所述加长螺栓孔的长度范围内实现长度的调整。本实施例中带有加长螺栓孔的组装式标准节设置在组装式吊桥的末节,起到连接作用的穿钉可以固定在加长螺栓孔的任意位置,所以能够实现在加长螺栓孔的范围之内多长度进行调节。Since the length of the composite insulator string often has certain errors, the length of the assembled suspension bridge needs to be adjusted accordingly. In this embodiment, an elongated bolt hole is provided on the assembled standard section connected to the fixed support, and the length can be adjusted within the length range of the elongated bolt hole. In this embodiment, the assembled standard section with the extended bolt hole is set at the end section of the assembled suspension bridge, and the nails that play a connecting role can be fixed at any position of the extended bolt hole, so it can be realized within the scope of the extended bolt hole Multiple lengths can be adjusted.

所述挂具通过抱箍悬挂在复合绝缘子串上,所述抱箍带有内衬,内衬材质为乙烯-醋酸乙烯共聚物(ethylene-vinyl acetate copolymer简称:EVA)。The hanger is suspended on the composite insulator string through hoops, and the hoops are lined with ethylene-vinyl acetate copolymer (ethylene-vinyl acetate copolymer for short: EVA).

所述组装式标准节选材为玻璃钢、铝合金或不锈钢。The material of the assembled standard section is glass fiber reinforced plastic, aluminum alloy or stainless steel.

所述组装式吊桥出线装置需要在保证强度的前提下合理的制定其尺寸,尽可能降低装置的重量,一般单个组装式标准节的长度为0.6m-1m。以下给出本实施例中所述组装式吊桥出线装置的具体参数:The outlet device of the assembled suspension bridge needs to be reasonably dimensioned on the premise of ensuring the strength, and the weight of the device should be reduced as much as possible. Generally, the length of a single assembled standard section is 0.6m-1m. The specific parameters of the assembled suspension bridge outlet device described in the present embodiment are given below:

组装式标准节单节长度:800mm;单节重量:3.5kg;固定支座高度:500mm;组装式吊桥出线装置整体长度:10200mm;可调节长度(即加长螺栓孔长度)150mm;标准节数:12节;组装式标准节材质:铝合金,断面100mm×80mm;抱箍内衬:EVA。Assembled standard section single section length: 800mm; single section weight: 3.5kg; fixed support height: 500mm; overall length of assembled suspension bridge outlet device: 10200mm; adjustable length (that is, lengthening bolt hole length) 150mm; standard section number: 12 sections; assembled standard section material: aluminum alloy, section 100mm×80mm; hoop lining: EVA.

此外,本发明中对于所述组装式吊桥出线装置的安装方法有如下公开:In addition, the installation method of the assembled suspension bridge outlet device in the present invention is disclosed as follows:

先将铁塔端的固定支座固定在复合绝缘子串的连接铁塔一端的三角联板上,将第一节组装式标准节通过卡槽和穿钉连接到固定支座前端,并将组装式标准节调整至水平角度;将挂具悬挂到相邻的两串复合绝缘子串上;再将第二节组装式标准节通过卡槽和穿钉连接到第一节组装式标准节,并将组装式标准节调整至水平角度;将挂具悬挂到相邻的两串复合绝缘子串上;依此类推,直到最后一节组装式标准节安装完成;将导线端的固定支座固定在复合绝缘子串导线一端的三角联板上,并通过卡槽和穿钉连接导线端的固定支座与最后一节组装式标准节。First, fix the fixed support at the end of the iron tower to the triangular joint plate at the end of the composite insulator string connected to the iron tower, connect the first assembled standard section to the front end of the fixed support through slots and nails, and adjust the assembled standard section to the horizontal angle; hang the hanger on the adjacent two strings of composite insulator strings; then connect the second assembled standard section to the first assembled standard section through slots and nails, and connect the assembled standard section Adjust to the horizontal angle; hang the hanger on the adjacent two strings of composite insulator strings; and so on until the installation of the last assembled standard section is completed; fix the fixed support at the end of the wire to the triangle at the end of the composite insulator string Connect the connecting plate, and connect the fixed support of the wire end and the last assembled standard section through the card slot and the nail.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that, for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.

Claims (6)

1. assemble a suspension bridge outlet device, it is characterized in that, described device concrete structure is as follows: described device comprises, two hold-down supports and multiple assembly type standard knot; Described hold-down support is fixed on the gold utensil at composite insulator string two ends, forms assembly type suspension bridge between two hold-down supports by assembly type standard knot; Between assembly type standard knot or assembly type standard knot be connected with drift bolt by draw-in groove with between hold-down support; Described assembly type standard knot comprises two hangers, and described two hangers are suspended on adjacent two composite insulator strings; The assembly type standard knot be connected with hold-down support is provided with Lengthened bolt hole, for regulating the length of assembly type suspension bridge.
2. device according to claim 1, it is characterized in that: described hold-down support is L-type, one end is fixed on the triangle yoke plate of composite insulator string one end, and the other end assembles formula standard knot by draw-in groove and drift bolt.
3. device according to claim 2, it is characterized in that: described assembly type standard knot is stripe shape, assembly type standard knot is connected and fixed bearing by draw-in groove and drift bolt or is connected other assembly type standard knots.
4. device according to claim 1-3 any one, is characterized in that: the selection of described assembly type standard knot is fiberglass, aluminium alloy or stainless steel.
5. device according to claim 1, is characterized in that: described hanger is with anchor ear, and described hanger is suspended on composite insulator string by anchor ear.
6. device according to claim 5, is characterized in that: described anchor ear is with anchor ear liner, and the material of anchor ear liner is ethylene-vinyl acetate copolymer.
CN201210177581.7A 2012-05-31 2012-05-31 Assembled suspension bridge outlet device Active CN102709841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210177581.7A CN102709841B (en) 2012-05-31 2012-05-31 Assembled suspension bridge outlet device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210177581.7A CN102709841B (en) 2012-05-31 2012-05-31 Assembled suspension bridge outlet device

Publications (2)

Publication Number Publication Date
CN102709841A CN102709841A (en) 2012-10-03
CN102709841B true CN102709841B (en) 2015-05-13

Family

ID=46902460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210177581.7A Active CN102709841B (en) 2012-05-31 2012-05-31 Assembled suspension bridge outlet device

Country Status (1)

Country Link
CN (1) CN102709841B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683090B (en) * 2013-11-15 2017-01-04 国网山东省电力公司青岛供电公司 A kind of Double-bundle conductor lifter

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961442Y (en) * 2006-11-06 2007-10-17 辽宁省电力有限公司阜新供电公司 High voltage operation insulation ladder
CN201671529U (en) * 2010-05-12 2010-12-15 新疆电力公司奎屯电业局 Line maintenance horizontal suspension ladder
CN201758253U (en) * 2010-06-29 2011-03-09 山西省电力公司晋城供电分公司 Overhaul frame
CN202031469U (en) * 2011-01-22 2011-11-09 安徽省电力公司马鞍山供电公司 Horizontal hanging ladder used for maintenance of overhead transmission line
CN102412521A (en) * 2010-09-26 2012-04-11 河南省电力公司焦作供电公司 Live working equipment for high-voltage transmission line
CN202258580U (en) * 2011-09-14 2012-05-30 海东供电公司 Wire incoming and outgoing rack for 110kV line strain composite insulator string
CN202737383U (en) * 2012-05-31 2013-02-13 国家电网公司 Assembled-type suspension bridge wire take-out device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195925U (en) * 1983-06-02 1984-12-26 藤井電工株式会社 Telescopic ladder for working at heights
JPS6263400U (en) * 1985-10-09 1987-04-20
KR20090006200U (en) * 2007-12-18 2009-06-23 한전케이피에스 주식회사 Ladder for Polymer Insulation Maintenance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961442Y (en) * 2006-11-06 2007-10-17 辽宁省电力有限公司阜新供电公司 High voltage operation insulation ladder
CN201671529U (en) * 2010-05-12 2010-12-15 新疆电力公司奎屯电业局 Line maintenance horizontal suspension ladder
CN201758253U (en) * 2010-06-29 2011-03-09 山西省电力公司晋城供电分公司 Overhaul frame
CN102412521A (en) * 2010-09-26 2012-04-11 河南省电力公司焦作供电公司 Live working equipment for high-voltage transmission line
CN202031469U (en) * 2011-01-22 2011-11-09 安徽省电力公司马鞍山供电公司 Horizontal hanging ladder used for maintenance of overhead transmission line
CN202258580U (en) * 2011-09-14 2012-05-30 海东供电公司 Wire incoming and outgoing rack for 110kV line strain composite insulator string
CN202737383U (en) * 2012-05-31 2013-02-13 国家电网公司 Assembled-type suspension bridge wire take-out device

Also Published As

Publication number Publication date
CN102709841A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN103643637B (en) Original position construction method for lifting whole after the first vertical transfer of Long-Span Concrete Filled Steel Tubular Arch Bridges
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN103311865A (en) Rack-type adjusting elbow
CN207813170U (en) Electric pole auxiliary stay fixing device
CN207251148U (en) A kind of 10kv overhead transmission lines insulation brace rod
CN102709841B (en) Assembled suspension bridge outlet device
CN203480947U (en) Improved rod-type composite insulator string and connection structure
CN205282192U (en) Direct-connected suspension composite insulator assembly
CN106448952B (en) Y types strain insulator string and anchor support
CN203617651U (en) Steady and reliable abacus connector
CN103259234B (en) Electric transmission line rigid jumper asymmetric V-shaped insulator chain setting structure
CN109347038B (en) High-voltage wire jumper windproof partial suspension weight device
CN112049502A (en) Double-loop steel pipe pole tower overhead line direct-pulling down structure
CN206091530U (en) Big leap iron tower of single loop
CN202737383U (en) Assembled-type suspension bridge wire take-out device
CN216774076U (en) Live installation system for switches on poles of 10 kV distribution lines
CN206667891U (en) A kind of safe concurrent
CN216109881U (en) High-voltage line protection device
CN209298858U (en) +/-1100 KV direct-current line tension tower lightning arrester device
CN202678841U (en) Fast rush repair tower of high-voltage transmission lines
CN107346873A (en) A kind of New insulated crossing frame
CN203924870U (en) Queen post is bored more pylon structure
CN103311863B (en) A kind of bolt type adjusting elbow
CN203684100U (en) Upper and lower reinforcement connection device in bridge pier column reinforcement cage
CN202970094U (en) Guyed tower applied to transmission line project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant