CN102677824A - Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column - Google Patents
Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column Download PDFInfo
- Publication number
- CN102677824A CN102677824A CN2012101564110A CN201210156411A CN102677824A CN 102677824 A CN102677824 A CN 102677824A CN 2012101564110 A CN2012101564110 A CN 2012101564110A CN 201210156411 A CN201210156411 A CN 201210156411A CN 102677824 A CN102677824 A CN 102677824A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- steel tube
- spiral stirrup
- special
- profiled pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention belongs to the technical field of building structural members, and in particular relates to a special-shaped composite concrete-filled steel tube column matched with spiral stirrups. The special-shaped composite concrete-filled steel tube column comprises three or more steel tubes, one of the steel tubes is used as the central steel tube, the other steel tubes are connected with the central steel tube through connecting plates, a spiral stirrup is placed in each steel tube, concrete is poured in each steel tube, and each connecting plate is provided with a plurality of stiffeners.. By using the special-shaped composite concrete-filled steel tube column with the spiral stirrups, the bearing capacity and the ductility of a member are improved, and meanwhile, the modularized production and assembly of the special-shaped composite concrete-filled steel tube column are realized.
Description
Technical field
The invention belongs to the building structural member technical field, be specifically related to a kind of combined steel pipe concrete profiled pile and preparation method of joining spiral stirrup.
Background technology
Concrete filled steel tube is a fill concrete and forming in the steel pipe, and steel pipe and core concrete thereof can bear the structural element of external load effect jointly.Because the supporting role of fill concrete can prevent that the steel pipe tube wall from too early flexing taking place in advance, steel pipe is to the effect of contraction of core concrete simultaneously, thereby makes concrete filled steel tube have very high bearing capacity; Advantages such as concrete filled steel tube also has plasticity and good toughness simultaneously, and shock resistance is strong.Therefore, concrete filled steel tube has broad application prospects.
Avoid the outstanding influence of room corner post corner angle for satisfying building requirements in the architectural design to sighting within doors and taking up room; Improve the flexibility that premises furniture is arranged; Post jamb and infilled wall have obtained using widely with thick shaped rc columns structure; But concrete is easy to crack, thereby the shearing resistance of post and antitorque bearing capacity are relatively poor, so shock resistance is not enough.Also have at present some scholars to propose the section form of multiple steel pipe concrete profiled pile, but when flakiness ratio is big, exist steel pipe not strong to the concrete restriction ability, easily too early flexing reduces bearing of component.
Summary of the invention
The objective of the invention is to overcome the above-mentioned deficiency of prior art, overcome the defective of existing shaped rc columns, provide a kind of ductility good, the hetermorphiscal column that bearing capacity is higher antidetonation ability and steel core concrete column.Technical scheme of the present invention is following:
A kind of combined steel pipe concrete profiled pile of joining spiral stirrup; Comprise the steel pipe more than three or three; With one of them steel pipe is the center steel pipe, links to each other through junction plate between other each steel pipes and the center steel pipe, in each steel pipe, is placed with spiral stirrup; And being cast with concrete, each junction plate is provided with many stiffening ribs.
As preferred implementation, the stiffening rib that is arranged on each junction plate is vertical each other with junction plate, and many stiffening ribs are Z-shaped; Described steel pipe is square steel pipe or round steel pipe; The cross sectional shape of described combined steel pipe concrete profiled pile is L shaped, T shape or cross.
The present invention provides a kind of above-mentioned preparation method of joining the combined steel pipe concrete profiled pile of spiral stirrup simultaneously, and step is following:
1) prefabricated steel pipe, junction plate, stiffening rib and spiral stirrup;
2) on the different edge of center steel pipe or different parts, be welded to connect plate respectively, again other steel pipes be welded in the other end of different junction plates respectively;
3) between the steel pipe of junction plate both sides, weld some stiffening ribs perpendicular to junction plate;
4) in each steel pipe, place spiral stirrup and middle concreting maintenance in steel pipe, form the combined steel pipe concrete profiled pile of joining spiral stirrup.
The present invention has overcome the deficiency of the hetermorphiscal column of existing concrete filled steel tube; Particularly overcome in the bigger concrete filled steel tube of flakiness ratio steel pipe to the deficiency of core concrete restriction ability; Thereby improved bearing of component and ductility, realized the production of steel pipe concrete profiled pile, the modularization of assembling simultaneously.Construction is made, and designs also simple relatively.Specify as follows:
(1) spiral reinforcement of configuration has strengthened the effect of contraction of steel pipe to core concrete, and concrete plasticity is fully played, and has strengthened the bearing capacity and the ductility of steel pipe concrete profiled pile;
(2) single concrete filled steel tube intercolumniation can be adjusted, and realizes bigger bending rigidity easily, and realizes the equistability of two main shafts easily;
(3) production of steel pipe concrete profiled pile, the modularization of assembling have been realized.Construction is made, and designs also simple relatively.
Description of drawings
To be the present invention form the combined steel pipe concrete profiled pile sketch map of joining spiral stirrup of cross section for " L " shape by three steel pipes, two junction plates, three spiral bars and stiffening rib to Fig. 1;
To be the present invention form the combined steel pipe concrete profiled pile sketch map of joining spiral stirrup of cross section for " T " shape by four steel pipes, three junction plates, four spiral bars and stiffening rib to Fig. 2;
To be the present invention form the combined steel pipe concrete profiled pile sketch map of joining spiral stirrup of cross section for " ten " shape by five steel pipes, four junction plates, five spiral bars and stiffening rib to Fig. 3;
Fig. 4 is a spiral stirrup sketch map of the present invention;
Fig. 5 is the joint construction sketch map of a steel pipe of the present invention and junction plate;
Fig. 6 is the joint construction sketch map of three steel pipes of the present invention and junction plate;
Fig. 7 is the joint construction sketch map of three steel pipes, junction plate and stiffening ribs of the present invention.
Fig. 8 is the joint construction sketch map of three steel pipes, junction plate, stiffening rib and spiral stirrups of the present invention.
Among the figure: 1-steel pipe 2-junction plate 3-concrete 4-stiffening rib 5-spiral stirrup
The specific embodiment
Show that like Fig. 1-3 the present invention provides a kind of combined steel pipe concrete profiled pile of joining spiral stirrup, this post comprises steel pipe 1, junction plate 2, stiffening rib 4, spiral stirrup 5 and builds concrete 3 compositions in it.This post is that the adjacent edge mid point at steel pipe 1 is welded to connect plate 2; Again steel pipe 1 is welded in the other end of junction plate 2; It is L shaped, T shape or cross combined steel pipe hetermorphiscal column that many steel pipes 1 and junction plate 2 are connected into cross sectional shape; Fixedly spiral stirrup 5 and concreting 3 maintenances in steel pipe again, steel pipe 1 adopts by being welded or rolling forming; Junction plate 2 adopts rolling cutting to form with stiffening rib 4; Spiral stirrup adopts plain steel-bar or hot-rolled reinforced bar bending with ribbing to form.The steel pipe that following several embodiment of the present invention adopt is a square steel pipe.In practical application, also can adopt the steel pipe of round steel pipe or other shapes, when adopting round steel pipe, also can be at the center steel pipe around distribute 5 or more other steel pipes.
Said combined steel pipe concrete profiled pile of joining spiral stirrup is meant that member welds after being transported to the scene, is welded to connect plate 2 at the mid point of the adjacent edge of steel pipe 1; Show like Fig. 5, again two steel pipes 1 are welded in the other end of two junction plates 2, as shown in Figure 6; Again with stiffening rib 4 perpendicular to the junction plate 2 equally spaced junction plate both sides that are welded between the steel pipe 1; Three steel pipes 1 and two junction plates 2 are connected into cross sectional shape be L shaped combined steel pipe hetermorphiscal column, as shown in Figure 7, after the fixed in place; In steel pipe 1, place again and fixing spiral stirrup 5, as shown in Figure 8.Concreting 3 maintenances in steel pipe 1 again form L shaped combined steel pipe concrete profiled pile of joining spiral stirrup, and are as shown in Figure 1.
Adopt identical method of attachment, four steel pipes 1 and three junction plates 2 are welded, in steel pipe, place again and fixing spiral stirrup 5; Concreting 3 maintenances in steel pipe 1 again form the combined steel pipe concrete profiled pile that T shape is joined spiral stirrup, and are as shown in Figure 2; Adopt identical method of attachment; Five steel pipes 1 and four junction plates 2 are welded, in steel pipe 1, place and fixing spiral stirrup 5 concreting 3 maintenances in steel pipe 1 more again; Form the combined steel pipe concrete profiled pile that ten shapes are joined spiral stirrup, as shown in Figure 3.
Claims (7)
1. combined steel pipe concrete profiled pile of joining spiral stirrup; Comprise the steel pipe more than three or three; With one of them steel pipe is the center steel pipe, links to each other through junction plate between other each steel pipes and the center steel pipe, in each steel pipe, is placed with spiral stirrup; And being cast with concrete, each junction plate is provided with many stiffening ribs.
2. combined steel pipe concrete profiled pile of joining spiral stirrup according to claim 1 is characterized in that, the stiffening rib that is arranged on each junction plate is vertical each other with junction plate, and many stiffening ribs are Z-shaped.
3. combined steel pipe concrete profiled pile of joining spiral stirrup according to claim 1 is characterized in that described steel pipe is square steel pipe or round steel pipe.
4. combined steel pipe concrete profiled pile of joining spiral stirrup according to claim 1 is characterized in that, described combined steel pipe concrete profiled pile is connected into by three steel pipes and two junction plates, and cross sectional shape is L shaped.
5. combined steel pipe concrete profiled pile of joining spiral stirrup according to claim 1 is characterized in that, described combined steel pipe concrete profiled pile is connected into by four steel pipes and three junction plates, and cross sectional shape is a T shape.
6. combined steel pipe concrete profiled pile of joining spiral stirrup according to claim 1 is characterized in that, described combined steel pipe concrete profiled pile is connected into by five steel pipes and four junction plates, and cross sectional shape is a cross.
7. the described preparation method of joining the combined steel pipe concrete profiled pile of spiral stirrup of claim 1, step is following:
1) prefabricated steel pipe, junction plate, stiffening rib and spiral stirrup;
2) on the different edge of center steel pipe or different parts, be welded to connect plate respectively, again other steel pipes be welded in the other end of different junction plates respectively;
3) between the steel pipe of junction plate both sides, weld some stiffening ribs perpendicular to junction plate;
4) in each steel pipe, place spiral stirrup and middle concreting maintenance in steel pipe, form the combined steel pipe concrete profiled pile of joining spiral stirrup.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101564110A CN102677824A (en) | 2012-05-17 | 2012-05-17 | Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101564110A CN102677824A (en) | 2012-05-17 | 2012-05-17 | Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102677824A true CN102677824A (en) | 2012-09-19 |
Family
ID=46810343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101564110A Pending CN102677824A (en) | 2012-05-17 | 2012-05-17 | Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102677824A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061566A (en) * | 2013-01-17 | 2013-04-24 | 杨众 | Latticed high-strength concrete wind-resistant column with steel tubes |
CN103615071A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Concrete-filled square steel tubular column with built-in spiral stirrup |
CN104234314A (en) * | 2014-09-29 | 2014-12-24 | 南京工业大学 | Honeycomb-shaped web crossed-section special-shaped steel column |
CN104234322A (en) * | 2014-09-29 | 2014-12-24 | 南京工业大学 | Honeycomb-shaped steel web and steel pipe concrete flange combined T-shaped section column |
CN105442754A (en) * | 2015-12-28 | 2016-03-30 | 天津大学 | Assembled double-plate-connected concrete-filled steel tube composite special-shaped column |
CN105507495A (en) * | 2015-05-07 | 2016-04-20 | 天津大学 | Special T-shaped concrete-filled steel tubular composite column applicable to industrial production |
CN105507496A (en) * | 2015-05-07 | 2016-04-20 | 天津大学 | Special L-shaped concrete-filled steel tubular composite applicable to industrial production |
CN105544869A (en) * | 2015-05-07 | 2016-05-04 | 天津大学 | Steel pipe and concrete combination special-shaped column suitable for industrial production |
CN105649272A (en) * | 2015-12-28 | 2016-06-08 | 天津大学 | Unribbed double-plate-connection concrete-filled steel tube combined special-shaped column |
CN106760202A (en) * | 2016-12-30 | 2017-05-31 | 河南奥斯派克科技有限公司 | Internal forked connection tongue and groove square tube coupled column |
CN106836642A (en) * | 2017-01-20 | 2017-06-13 | 天津大学 | A kind of concrete filled steel tube combined special-shaped column of anti-buckling cant timber connection |
CN107747383A (en) * | 2017-11-21 | 2018-03-02 | 华北水利水电大学 | A kind of building detached column and its construction method with recovery capability |
CN108204039A (en) * | 2018-02-01 | 2018-06-26 | 福建工程学院 | A kind of assembled architecture truss structure |
CN113585533A (en) * | 2021-08-16 | 2021-11-02 | 扬州大学 | Flange connection assembly type shear wall structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5012622A (en) * | 1985-03-05 | 1991-05-07 | Shimizu Construction Co., Ltd. | Structural filler filled steel tube column |
CN2895592Y (en) * | 2006-04-06 | 2007-05-02 | 沈阳建筑大学 | Steel-tube concrete special-shape column |
CN200964654Y (en) * | 2006-09-28 | 2007-10-24 | 贵州大学 | Profiled steel pipe concrete combined column |
CN201411825Y (en) * | 2009-05-27 | 2010-02-24 | 天津大学 | Indirect assembled steel pipe concrete combination special-shaped column |
CN101565969B (en) * | 2009-05-27 | 2011-01-19 | 天津大学 | Indirect assembly concrete-filled steel tube combined special-shaped column and production method thereof |
CN102003042A (en) * | 2010-10-26 | 2011-04-06 | 天津大学 | Spiral-stirrup square steel tube concrete column and manufacturing method thereof |
-
2012
- 2012-05-17 CN CN2012101564110A patent/CN102677824A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5012622A (en) * | 1985-03-05 | 1991-05-07 | Shimizu Construction Co., Ltd. | Structural filler filled steel tube column |
CN2895592Y (en) * | 2006-04-06 | 2007-05-02 | 沈阳建筑大学 | Steel-tube concrete special-shape column |
CN200964654Y (en) * | 2006-09-28 | 2007-10-24 | 贵州大学 | Profiled steel pipe concrete combined column |
CN201411825Y (en) * | 2009-05-27 | 2010-02-24 | 天津大学 | Indirect assembled steel pipe concrete combination special-shaped column |
CN101565969B (en) * | 2009-05-27 | 2011-01-19 | 天津大学 | Indirect assembly concrete-filled steel tube combined special-shaped column and production method thereof |
CN102003042A (en) * | 2010-10-26 | 2011-04-06 | 天津大学 | Spiral-stirrup square steel tube concrete column and manufacturing method thereof |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061566A (en) * | 2013-01-17 | 2013-04-24 | 杨众 | Latticed high-strength concrete wind-resistant column with steel tubes |
CN103615071A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Concrete-filled square steel tubular column with built-in spiral stirrup |
CN104234314A (en) * | 2014-09-29 | 2014-12-24 | 南京工业大学 | Honeycomb-shaped web crossed-section special-shaped steel column |
CN104234322A (en) * | 2014-09-29 | 2014-12-24 | 南京工业大学 | Honeycomb-shaped steel web and steel pipe concrete flange combined T-shaped section column |
CN105507496A (en) * | 2015-05-07 | 2016-04-20 | 天津大学 | Special L-shaped concrete-filled steel tubular composite applicable to industrial production |
CN105507495A (en) * | 2015-05-07 | 2016-04-20 | 天津大学 | Special T-shaped concrete-filled steel tubular composite column applicable to industrial production |
CN105544869A (en) * | 2015-05-07 | 2016-05-04 | 天津大学 | Steel pipe and concrete combination special-shaped column suitable for industrial production |
CN105442754A (en) * | 2015-12-28 | 2016-03-30 | 天津大学 | Assembled double-plate-connected concrete-filled steel tube composite special-shaped column |
CN105649272A (en) * | 2015-12-28 | 2016-06-08 | 天津大学 | Unribbed double-plate-connection concrete-filled steel tube combined special-shaped column |
CN106760202A (en) * | 2016-12-30 | 2017-05-31 | 河南奥斯派克科技有限公司 | Internal forked connection tongue and groove square tube coupled column |
CN106760202B (en) * | 2016-12-30 | 2023-04-11 | 河南奥斯派克科技有限公司 | Combined column with internal fork-shaped connection concave-convex groove square rectangular tube |
CN106836642A (en) * | 2017-01-20 | 2017-06-13 | 天津大学 | A kind of concrete filled steel tube combined special-shaped column of anti-buckling cant timber connection |
CN107747383A (en) * | 2017-11-21 | 2018-03-02 | 华北水利水电大学 | A kind of building detached column and its construction method with recovery capability |
CN108204039A (en) * | 2018-02-01 | 2018-06-26 | 福建工程学院 | A kind of assembled architecture truss structure |
CN113585533A (en) * | 2021-08-16 | 2021-11-02 | 扬州大学 | Flange connection assembly type shear wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677824A (en) | Special-shaped composite concrete-filled steel tube column matched with spiral stirrups and making method of special-shaped composite concrete-filled steel tube column | |
CN102587577A (en) | Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof | |
CN107090925B (en) | Reinforced precast reinforced concrete shear wall, structural system and construction method thereof | |
CN104929281A (en) | Steel bar truss stiffened steel concrete composite shear wall | |
CN211774635U (en) | Assembly and splicing structure for reverse bending points between precast concrete columns | |
CN102747781B (en) | Fiber reinforce plastic (FRP) combination structure frame where integral type node is adopted and construction method thereof | |
US9856614B1 (en) | Aseismic combined pier | |
CN104988989B (en) | Movable building structure and making method thereof | |
CN101215855A (en) | Combination beam | |
CN102444224A (en) | Concrete composite shear wall | |
CN106284644A (en) | A kind of residential architecture structural system being applicable to industrialized production and method of construction thereof | |
CN203684526U (en) | PBL stiffened rectangular steel tube concrete space truss | |
CN112538931A (en) | Large-span trapezoidal space steel pipe truss concrete floor structure | |
CN108204039A (en) | A kind of assembled architecture truss structure | |
KR101174548B1 (en) | Column system of concrete filled steel tube | |
CN111119376A (en) | Reinforced multi-cavity concrete filled steel tube shear wall, system and construction method | |
CN102182244A (en) | Double-column residential steel structure | |
CN105275120A (en) | Prefabricated light steel concrete plate column structure and construction method thereof | |
CN204691011U (en) | The steel concrete compound shear wall that steel bar girder is put more energy into | |
CN214220084U (en) | Row-shaped steel concrete shear wall and assembly type building structure system thereof | |
CN108589921A (en) | A kind of connection method applied between columns supported module | |
CN114108808A (en) | PVC-FRP (polyvinyl chloride-fiber reinforced plastic) pipe concrete column and concrete composite beam combined structure with adjustable connecting nodes and installation method thereof | |
CN106088398A (en) | A kind of combined wall board | |
CN202039454U (en) | Double-column type residential steel structure | |
CN104234189A (en) | Four-pipe truss structure of prefabricated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120919 |