CN102677680A - 一种混凝土腰梁的拆除方法 - Google Patents

一种混凝土腰梁的拆除方法 Download PDF

Info

Publication number
CN102677680A
CN102677680A CN2012101398820A CN201210139882A CN102677680A CN 102677680 A CN102677680 A CN 102677680A CN 2012101398820 A CN2012101398820 A CN 2012101398820A CN 201210139882 A CN201210139882 A CN 201210139882A CN 102677680 A CN102677680 A CN 102677680A
Authority
CN
China
Prior art keywords
waist rail
waist beam
segmentation
dismounting
dismantling method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101398820A
Other languages
English (en)
Inventor
李龙送
彭小林
李才波
刘庆兰
陈啸
严振豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Blasting Engineering Co Ltd
GUANGDONG PROV FOUNDATION ENGINEERING Co
Original Assignee
Guangdong Blasting Engineering Co Ltd
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Blasting Engineering Co Ltd, GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical Guangdong Blasting Engineering Co Ltd
Priority to CN2012101398820A priority Critical patent/CN102677680A/zh
Publication of CN102677680A publication Critical patent/CN102677680A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明公开了一种混凝土腰梁的拆除方法,此混凝土腰梁的拆除方法将腰梁截为若干分段,后通过在各分段中凿设凹槽,在凹槽内放入千斤顶顶开腰梁分段以对腰梁进行逐段拆除,支撑架和/或者悬吊装置在腰梁脱离后可防止腰梁下落至地面,此拆除方法可安全快速的对混凝土腰梁进行拆除,在有效节省施工成本的同时,可更好的保障施工安全,此发明用于建筑施工领域。

Description

一种混凝土腰梁的拆除方法
技术领域
本发明涉及一种建筑施工方法,特别是涉及一种腰梁的拆除方法。
背景技术
在基坑工程中,传统的深基坑支护常常采用桩锚或者锚墙护壁结构,在护坡桩或者墙之间做若干道预应力锚杆,通过腰梁与护坡桩锚固在一起。腰梁可以把支撑挡墙的斜撑一端固定在腰梁上,这样可以使得斜撑对挡墙的支撑从一个点变成一条线,从而提高挡墙的稳定性。
支撑作为临时结构,当施工到腰梁部位时,就必须将其拆除,而此时,爆破拆除的施工周期长,且危险性较大,常常耽误工期。
发明内容
为解决上述问题,本发明提供一种可安全进行混凝土腰梁拆除的方法。
本发明解决其技术问题所采用的技术方案是:
一种混凝土腰梁的拆除方法,其特征在于,包括以下步骤:
1)  在腰梁下方搭设支撑架和/或者在腰梁上面安装悬吊装置;
2)  沿腰梁所在的长度方向将腰梁断开为若干节;
3)  在断开的腰梁分段上凿设凹槽;
4)  在所述凹槽内放入千斤顶,通过千斤顶加压顶推,使腰梁分段与基坑围护结构脱离;
5)  通过吊机吊出腰梁分段。
进一步作为本发明技术方案的改进,步骤1)中支撑架顶端距离腰梁底部的距离大于15cm。
进一步作为本发明技术方案的改进,支撑架包括若干垂直于地面安装的支撑管及搭设在支撑管上水平放置的木板。
本发明的有益效果:此混凝土腰梁的拆除方法将腰梁截为若干分段,后通过在各分段中凿设凹槽,在凹槽内放入千斤顶顶开腰梁分段以对腰梁进行逐段拆除,支撑架和/或者悬吊装置在腰梁脱离后可防止腰梁下落至地面,此拆除方法可安全快速的对混凝土腰梁进行拆除,在有效节省施工成本的同时,可更好的保障施工安全。
附图说明
下面结合附图对本发明作进一步说明:
图1是本发明实施例施工过程侧面结构示意图;
图2是本发明实施例施工前侧面结构示意图;
图3是本发明实施例中腰梁阶段后结构示意图;
图4是本发明实施例中腰梁分段上凿设凹槽后结构示意图。
具体实施方式
参照图1~图4,本发明为一种混凝土腰梁的拆除方法,其特征在于,包括以下步骤:
1)  在腰梁3下方搭设支撑架和/或者在腰梁3上面安装悬吊装置;
2)  沿腰梁3所在的长度方向将腰梁3断开为若干节;
3)  在断开的腰梁分段上凿设凹槽4;
4)  在所述凹槽4内放入千斤顶5,通过千斤顶加压顶推,使腰梁分段与基坑围护结构脱离;
5)  通过吊机吊出腰梁分段。
此混凝土腰梁的拆除方法将腰梁3截为若干分段,后通过在各分段中凿设凹槽4,在凹槽4内放入千斤顶5顶开腰梁分段以对腰梁3进行逐段拆除,支撑架和/或者悬吊装置在腰梁脱离后可防止腰梁下落至地面,此拆除方法可安全快速的对混凝土腰梁进行拆除,在有效节省施工成本的同时,可更好的保障施工安全。
腰梁在进行截断前,若腰梁上设有锚索,可先将锚索切断,再进行腰梁切断作业。
作为本发明优选的实施方式,步骤1)中支撑架顶端距离腰梁底部的距离大于15cm。
此距离一般预留为20cm,该预留距离主要为方便腰梁在脱离维护桩或者连续墙后翻转下沉的余量。
作为本发明优选的实施方式,支撑架包括若干垂直于地面安装的支撑管1及搭设在支撑管1上水平放置的木板2。
此拆除方法也可仅在腰梁下方搭设支撑架,在腰梁分段脱离维护桩或者连续墙后,腰梁分段即下落在支撑架上,后通过吊机将腰梁分段吊出基坑。
当然,本发明创造并不局限于上述实施方式,熟悉本领域的技术人员在不违背本发明精神的前提下还可作出等同变形或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。

Claims (3)

1.一种混凝土腰梁的拆除方法,其特征在于,包括以下步骤:
1)在腰梁下方搭设支撑架和/或者在腰梁上面安装悬吊装置;
2)沿腰梁所在的长度方向将腰梁断开为若干节;
3)在断开的腰梁分段上凿设凹槽;
4)在所述凹槽内放入千斤顶,通过千斤顶加压顶推,使腰梁分段与基坑围护结构脱离;
5)通过吊机吊出腰梁分段。
2.根据权利要求1所述的混凝土腰梁的拆除方法,其特征在于:所述步骤1)中支撑架顶端距离腰梁底部的距离大于15cm。
3.根据权利要求1或2所述的混凝土腰梁的拆除方法,其特征在于:所述支撑架包括若干垂直于地面安装的支撑管(1)及搭设在支撑管(1)上水平放置的木板(2)。
CN2012101398820A 2012-05-08 2012-05-08 一种混凝土腰梁的拆除方法 Pending CN102677680A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101398820A CN102677680A (zh) 2012-05-08 2012-05-08 一种混凝土腰梁的拆除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101398820A CN102677680A (zh) 2012-05-08 2012-05-08 一种混凝土腰梁的拆除方法

Publications (1)

Publication Number Publication Date
CN102677680A true CN102677680A (zh) 2012-09-19

Family

ID=46810199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101398820A Pending CN102677680A (zh) 2012-05-08 2012-05-08 一种混凝土腰梁的拆除方法

Country Status (1)

Country Link
CN (1) CN102677680A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774676A (zh) * 2014-02-18 2014-05-07 中建三局第二建设工程有限责任公司 一种基坑腰梁拆除的施工方法
CN110700276A (zh) * 2019-10-24 2020-01-17 深圳市福田建安建设集团有限公司 后浇带预置撑架基坑腰梁内支撑转换体系及施工方法
CN111795207A (zh) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 超大始发井顶管施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050632A (zh) * 2007-05-18 2007-10-10 北京建工集团有限责任公司 预应力腰梁拆除代换结构及方法
CN101705687B (zh) * 2009-10-23 2011-07-13 广东省基础工程公司 一种深基坑钢筋混凝土腰梁拆除装置及施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050632A (zh) * 2007-05-18 2007-10-10 北京建工集团有限责任公司 预应力腰梁拆除代换结构及方法
CN101705687B (zh) * 2009-10-23 2011-07-13 广东省基础工程公司 一种深基坑钢筋混凝土腰梁拆除装置及施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774676A (zh) * 2014-02-18 2014-05-07 中建三局第二建设工程有限责任公司 一种基坑腰梁拆除的施工方法
CN110700276A (zh) * 2019-10-24 2020-01-17 深圳市福田建安建设集团有限公司 后浇带预置撑架基坑腰梁内支撑转换体系及施工方法
CN110700276B (zh) * 2019-10-24 2021-07-13 深圳市福田建安建设集团有限公司 后浇带预置撑架基坑腰梁内支撑转换体系及施工方法
CN111795207A (zh) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 超大始发井顶管施工方法
CN111795207B (zh) * 2020-07-17 2022-03-22 中铁十二局集团有限公司 超大始发井顶管施工方法

Similar Documents

Publication Publication Date Title
CN106088148B (zh) 综合管廊模板及其应用
CN210164206U (zh) 一种高陡岩石边坡脚手架搭设转换装置
CN104652298B (zh) 一种基于桥面支撑的整跨箱梁下放拆除系统及其施工方法
CN203794498U (zh) 一种内置式自升塔吊装置
CN112746569B (zh) 旧桥生态拆除结构及施工方法
CN104727236A (zh) 一种基于地面支撑的整跨桥梁下放拆除系统及其施工方法
CN202945798U (zh) 一种悬挑式脚手架角部装置
CN102677680A (zh) 一种混凝土腰梁的拆除方法
CN104179121B (zh) 一种移动模架托架四提升自拼装方法
CN116122189A (zh) 一种拱桥拆除方法
CN104533106B (zh) 单层立体预制随基坑开挖装配下沉式施工爬梯及施工方法
CN103967332B (zh) 一种建筑工地围挡的施工方法
JP5794539B2 (ja) 床版の撤去方法
CN208618838U (zh) 一种安全防护装置
CN203361170U (zh) 一种建筑基坑围护用的支撑立柱桩
CN214459762U (zh) 旧桥生态拆除结构
CN201722700U (zh) 塔式起重机基础结构
CN102828472B (zh) 用绳锯割除连续梁桥临时支座的方法
CN117328382A (zh) 箱梁拆除工艺
CN211622545U (zh) 一种自卡式电梯井内作业防护平台
CN211143731U (zh) 一种后浇带支撑结构
CN108999100B (zh) 一种小跨度铁路桥梁梁体拆除方法
CN211547739U (zh) 用于绳锯静力切割钢筋混凝土内撑的支撑结构
CN216865149U (zh) 一种快速控制型钢插入标准的卡具装置
CN205296216U (zh) 一种地下厂房岩锚吊车梁的临时操作平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120919