CN102674174A - Hoisting frame of 110kV line lightning arrester - Google Patents

Hoisting frame of 110kV line lightning arrester Download PDF

Info

Publication number
CN102674174A
CN102674174A CN2012101496397A CN201210149639A CN102674174A CN 102674174 A CN102674174 A CN 102674174A CN 2012101496397 A CN2012101496397 A CN 2012101496397A CN 201210149639 A CN201210149639 A CN 201210149639A CN 102674174 A CN102674174 A CN 102674174A
Authority
CN
China
Prior art keywords
pulley
ring
wire rope
hoisting frame
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101496397A
Other languages
Chinese (zh)
Inventor
江辉
东志清
范乐松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIMEN POWER SUPPLY CO Ltd JIANGSU ELECTRIC POWER CO Ltd
State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
HAIMEN POWER SUPPLY CO Ltd JIANGSU ELECTRIC POWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIMEN POWER SUPPLY CO Ltd JIANGSU ELECTRIC POWER CO Ltd filed Critical HAIMEN POWER SUPPLY CO Ltd JIANGSU ELECTRIC POWER CO Ltd
Priority to CN2012101496397A priority Critical patent/CN102674174A/en
Publication of CN102674174A publication Critical patent/CN102674174A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了110kV线路避雷器吊装构架,该吊装构架包括主杆、吊环滑轮和抱箍,所述主杆下部通过两个固定套环分别与两个抱箍连接,两个抱箍套接于支柱上下,所述主杆顶部安装有角钢,所述角钢上安装有吊环滑轮,所述主杆顶部还固定有浪风环,所述浪风环通过固定抱箍固定于主杆上,所述吊环滑轮内穿入有钢丝绳一端,所述钢丝绳穿过浪风环,所述支柱下部安装有滑轮,所述钢丝绳另一端穿入该滑轮。本发明的优点是:使用该工具后,降低了施工人员劳动强度;减少停电范围,提高供电可靠性。

Figure 201210149639

The invention discloses a hoisting frame for a 110kV line arrester. The hoisting frame includes a main rod, a ring pulley and a hoop. The lower part of the main rod is respectively connected to two hoops through two fixed collars, and the two hoops are sleeved on the pillar. Up and down, angle steel is installed on the top of the main pole, and a lifting ring pulley is installed on the angle steel. The top of the main pole is also fixed with a wave and wind ring. One end of a steel wire rope is threaded into the pulley, and the steel wire rope passes through the wind wave ring. A pulley is installed on the lower part of the pillar, and the other end of the steel wire rope passes through the pulley. The invention has the advantages that: after using the tool, the labor intensity of construction personnel is reduced; the scope of power failure is reduced, and the reliability of power supply is improved.

Figure 201210149639

Description

110kV线路避雷器吊装构架110kV line surge arrester hoisting frame

技术领域 technical field

本发明涉及一种吊装工具,尤其涉及一种110kV线路避雷器吊装构架。 The invention relates to a hoisting tool, in particular to a hoisting frame of a 110kV line arrester.

背景技术 Background technique

?  变避雷器调换工程施工过程中,通常采用的吊装工具有吊车和扒杆,吊车为防止误碰运行设备,相邻间隔需停电,扩大了停电范围;扒杆安全风险大,需要的人力、材料都很多,组装、安置也极不方便,而浪风绳的固定也同样临近受带电设备的限制。采用这两种吊装工具扩大了停电范围,增大了安全风险,所需的人力、材料也较多。因此,需要提供一种新的技术方案来解决上述问题。 ? During the construction of the lightning arrester replacement project, cranes and pick-up poles are usually used for hoisting tools. In order to prevent the crane from accidentally touching the operating equipment, power outages are required at adjacent intervals, which expands the scope of power outages; pick-up poles have high safety risks and require manpower and materials. There are many, and it is extremely inconvenient to assemble and install, and the fixation of the wave and wind rope is also close to the restriction of live equipment. The use of these two hoisting tools expands the scope of power outages, increases safety risks, and requires more manpower and materials. Therefore, it is necessary to provide a new technical solution to solve the above problems.

发明内容 Contents of the invention

??本发明的目的是提供一种减少停电范围,提高供电可靠性的110kV线路避雷器吊装构架。 ?? The purpose of the present invention is to provide a 110kV line lightning arrester hoisting structure that reduces the scope of power failure and improves the reliability of power supply.

??本发明采用的技术方案是: The technical scheme adopted in the present invention is:

?  110kV线路避雷器吊装构架,该吊装构架包括主杆、吊环滑轮和抱箍,所述主杆下部通过两个固定套环分别与两个抱箍连接,两个抱箍套接于支柱上下,所述主杆顶部安装有角钢,所述角钢上安装有吊环滑轮,所述主杆顶部还固定有浪风环,所述浪风环通过固定抱箍固定于主杆上,所述吊环滑轮内穿入有钢丝绳一端,所述钢丝绳穿过浪风环,所述支柱下部安装有滑轮,所述钢丝绳另一端穿入该滑轮。 ? 110kV line surge arrester hoisting frame, the hoisting frame includes a main pole, a ring pulley and a hoop, the lower part of the main pole is connected to two hoops through two fixed collars, and the two hoops are sleeved on the upper and lower pillars. An angle steel is installed on the top of the main pole, and a lifting ring pulley is installed on the angle steel. A wave and wind ring is also fixed on the top of the main pole. One end of the steel wire rope is inserted, and the steel wire rope passes through the wave wind ring, and a pulley is installed at the lower part of the pillar, and the other end of the steel wire rope passes through the pulley.

所述吊环滑轮形状为U型。 The shape of the ring pulley is U-shaped.

本发明的优点是: The advantages of the present invention are:

a、改进了以往设备吊装方式的不足,减少停电范围,降低安全风险。 a. Improve the shortcomings of the previous equipment hoisting methods, reduce the scope of power outages, and reduce safety risks.

b、使用该工具后,降低了施工人员劳动强度。 b. After using this tool, the labor intensity of construction personnel is reduced.

c、提高了工作效率,为单位减少了劳动成本,节约了费用支出。 c. Improve work efficiency, reduce labor costs for the unit, and save expenses.

d、减少停电范围,提高供电可靠性。 d. Reduce the scope of power outages and improve the reliability of power supply.

附图说明 Description of drawings

图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

其中:1、抱箍,2、固定套环,3、主杆,4、固定抱箍,5、浪风环,6、角钢,7、吊环滑轮,8、钢丝绳,9、支柱,10、滑轮。 Among them: 1. Hoop, 2. Fixed collar, 3. Main pole, 4. Fixed hoop, 5. Wave wind ring, 6. Angle steel, 7. Ring pulley, 8. Wire rope, 9. Pillar, 10. Pulley .

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本发明作进一步详细叙述。 The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

如图1所示,本发明的110kV线路避雷器吊装构架,该吊装构架包括主杆3、吊环滑轮7和抱箍1,主杆3下部通过两个固定套环2分别与两个抱箍1连接,两个抱箍1套接于支柱9上下,主杆3顶部安装有角钢6,角钢6上安装有吊环滑轮7,主杆3顶部还固定有浪风环5,浪风环5通过固定抱箍4固定于主杆3上,吊环滑轮7内穿入有钢丝绳8一端,钢丝绳8穿过浪风环5,支柱9下部安装有滑轮10,钢丝绳8另一端穿入该滑轮10。 As shown in Figure 1, the hoisting frame of the 110kV line arrester of the present invention includes a main pole 3, a ring pulley 7 and a hoop 1, and the lower part of the main pole 3 is respectively connected with two hoops 1 through two fixed collars 2 , two hoops 1 are sleeved on the top and bottom of the pillar 9, an angle steel 6 is installed on the top of the main pole 3, and a lifting ring pulley 7 is installed on the angle steel 6, and a wave and wind ring 5 is also fixed on the top of the main pole 3, and the wave and wind ring 5 is fixed by holding Hoop 4 is fixed on the main rod 3, and wire rope 8 one end is penetrated in the suspension ring pulley 7, and wire rope 8 passes wave wind ring 5, and pulley 10 is installed on pillar 9 bottom, and wire rope 8 other ends penetrate this pulley 10.

根据所要吊装设备的高度,可通过移动支柱9下部的抱箍1来调整吊装构架的高度,将钢丝绳8穿入上部的吊环滑轮7,为防止起重设备时发生倾斜或倾倒,使设备能垂直上下起吊,在所安装设备主杆3的下部另装一个滑轮10,使钢丝绳8穿入此滑轮10,人员在地面操作时可直立向上拉钢丝绳8,操作方便,保证起吊物的平稳上下。 According to the height of the equipment to be hoisted, the height of the hoisting frame can be adjusted by moving the hoop 1 at the lower part of the pillar 9, and the wire rope 8 is inserted into the upper ring pulley 7 to prevent the equipment from tilting or toppling when lifting the equipment, so that the equipment can be vertical For lifting up and down, a pulley 10 is installed at the bottom of the main pole 3 of the installed equipment, so that the steel wire rope 8 can pass through the pulley 10, and the personnel can pull the wire rope 8 upright when operating on the ground, which is easy to operate and ensures the smooth up and down of the lifting object.

选择合适的起吊部位,用钢丝绳8套好所要起吊设备,慢慢拉动钢丝绳8,使设备到达所用安装的高度,转动构架使设备到主杆3上方并慢慢放下,设备安装好后可拆下吊装构架。使用该工具后,降低了施工人员劳动强度,减少停电范围,提高了供电可靠性。 Choose a suitable lifting position, set up the lifting equipment with 8 wire ropes, slowly pull the wire rope 8 to make the equipment reach the installation height, turn the frame to make the equipment above the main pole 3 and lower it slowly, and the equipment can be removed after installation Lifting frame. After using this tool, the labor intensity of construction personnel is reduced, the scope of power outage is reduced, and the reliability of power supply is improved.

Claims (2)

1.110kV the leakage conductor lifting framework is characterized in that: this lifting framework comprises mobile jib, suspension ring pulley and anchor ear, and said mobile jib bottom is connected with two anchor ears respectively through two retaining collars; Two anchor ears are socketed on about the pillar, and said mobile jib top is equipped with angle steel, and the suspension ring pulley is installed on the said angle steel; Said mobile jib top also is fixed with unrestrained vane; Said unrestrained vane is fixed on the mobile jib through fixing anchor ear, has penetrated steel rope one end in the said suspension ring pulley, said steel wire penetrating wave vane; Said pillar bottom is equipped with pulley, and the said steel rope other end penetrates this pulley.
2. 110kV leakage conductor lifting framework according to claim 1 is characterized in that: said suspension ring pulley shape is the U type.
CN2012101496397A 2012-05-15 2012-05-15 Hoisting frame of 110kV line lightning arrester Pending CN102674174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101496397A CN102674174A (en) 2012-05-15 2012-05-15 Hoisting frame of 110kV line lightning arrester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101496397A CN102674174A (en) 2012-05-15 2012-05-15 Hoisting frame of 110kV line lightning arrester

Publications (1)

Publication Number Publication Date
CN102674174A true CN102674174A (en) 2012-09-19

Family

ID=46806825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101496397A Pending CN102674174A (en) 2012-05-15 2012-05-15 Hoisting frame of 110kV line lightning arrester

Country Status (1)

Country Link
CN (1) CN102674174A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107492824A (en) * 2017-10-25 2017-12-19 国网河南省电力公司孟津县供电公司 One kind is used for electric power apparatus examination Portable lifting device
CN111252685A (en) * 2020-03-24 2020-06-09 国网冀北电力有限公司承德供电公司 lifting device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2620692A1 (en) * 1987-09-17 1989-03-24 Perennes Rene Device for lifting and handling heavy items
CN2039471U (en) * 1988-05-12 1989-06-14 范文林 Multi-functional combined round tube clasper
CN201219181Y (en) * 2008-07-07 2009-04-08 江西鹰潭供电公司 Multifunctional portable binding type safety hoisting jack
CN102040166A (en) * 2009-10-13 2011-05-04 辽宁省电力有限公司大连供电公司 Hoisting tool for equipment on pillar
CN202657876U (en) * 2012-05-15 2013-01-09 江苏省电力公司海门市供电公司 110kV line surge arrester hoisting frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2620692A1 (en) * 1987-09-17 1989-03-24 Perennes Rene Device for lifting and handling heavy items
CN2039471U (en) * 1988-05-12 1989-06-14 范文林 Multi-functional combined round tube clasper
CN201219181Y (en) * 2008-07-07 2009-04-08 江西鹰潭供电公司 Multifunctional portable binding type safety hoisting jack
CN102040166A (en) * 2009-10-13 2011-05-04 辽宁省电力有限公司大连供电公司 Hoisting tool for equipment on pillar
CN202657876U (en) * 2012-05-15 2013-01-09 江苏省电力公司海门市供电公司 110kV line surge arrester hoisting frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107492824A (en) * 2017-10-25 2017-12-19 国网河南省电力公司孟津县供电公司 One kind is used for electric power apparatus examination Portable lifting device
CN111252685A (en) * 2020-03-24 2020-06-09 国网冀北电力有限公司承德供电公司 lifting device

Similar Documents

Publication Publication Date Title
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN102359303A (en) Extra-high voltage common circuit iron tower assembling method
CN103613031A (en) Simple transformer hoisting device
CN205294663U (en) Hoisting device for isolation switch
CN102040166A (en) Hoisting tool for equipment on pillar
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN103523704A (en) Detachable support applied to lifting of small-sized electric power device and construction method thereof
CN202657876U (en) 110kV line surge arrester hoisting frame
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN205222518U (en) Outdoor equipment hoisting accessory
CN102674174A (en) Hoisting frame of 110kV line lightning arrester
CN203284128U (en) Hoisting tool of main mechanism of switch blade
CN207330175U (en) Detachable gin pole
CN202729645U (en) Tower crane with elevator
CN202429945U (en) Hoisting device for power supply facility
CN204384733U (en) Bus plug-in strip Lift-on/Lift-off System
CN202840363U (en) 1000kV UHV AC Line Tension Insulator String Insulation Lifting Bracket
CN204040598U (en) The two rocker pole of a kind of remote control hydraulic
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN205442452U (en) Convenient hoisting accessory of substation equipment safety
CN208120600U (en) A kind of quick provision for disengagement of large size inside-climbing tower crane
CN102570325B (en) A kind of light hoisting device for converting station
CN103896153A (en) Zig-zag derrick for replacing disconnecting link
CN203065072U (en) Lifting device for substation outdoor equipment
CN203905426U (en) Steel coal scuttle butt-connection installation construction operation table

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121128

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121128

Address after: 226100, No. 656, Renmin West Road, Haimen, Jiangsu, Nantong

Applicant after: Haimen Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

Applicant after: Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 226100, No. 656, Renmin West Road, Haimen, Jiangsu, Nantong

Applicant before: Haimen Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120919