CN102658478B - Leaf spring assembly line - Google Patents

Leaf spring assembly line Download PDF

Info

Publication number
CN102658478B
CN102658478B CN201210146467.8A CN201210146467A CN102658478B CN 102658478 B CN102658478 B CN 102658478B CN 201210146467 A CN201210146467 A CN 201210146467A CN 102658478 B CN102658478 B CN 102658478B
Authority
CN
China
Prior art keywords
assembly
leaf spring
frame
mount support
pressure head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210146467.8A
Other languages
Chinese (zh)
Other versions
CN102658478A (en
Inventor
李忠山
许本峰
李忠亮
白芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Haihua Auto Parts Manufacturing Co ltd
Original Assignee
SHANDONG HAIHUA AUTO PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HAIHUA AUTO PARTS Co Ltd filed Critical SHANDONG HAIHUA AUTO PARTS Co Ltd
Priority to CN201210146467.8A priority Critical patent/CN102658478B/en
Publication of CN102658478A publication Critical patent/CN102658478A/en
Application granted granted Critical
Publication of CN102658478B publication Critical patent/CN102658478B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Automatic Assembly (AREA)

Abstract

一种板簧流水装配线,属于汽车零部件制造设备领域。包括装配支架(5)和机架,其特征在于:装配支架(5)水平固定,在装配支架(5)中间位置支撑安装竖直的机架,靠近装配支架(5)一侧安装水平放置的装卡总成,在装配支架(5)两端安装码片装置,装配支架(5)上平面滑动安装两组预压小车。与现有技术相比,该板簧流水装配线能实现板簧流水化组装,提高生产效率,节省人力物力,有利于工厂现代化管理,并在码片、穿中心螺栓工序实现双工位同时工作,加快板簧组装速度。

A leaf spring assembly line belongs to the field of auto parts manufacturing equipment. It includes an assembly bracket (5) and a rack, and is characterized in that: the assembly bracket (5) is fixed horizontally, supports and installs a vertical rack in the middle of the assembly bracket (5), and installs a horizontal rack near the side of the assembly bracket (5). As for the card loading assembly, chipping devices are installed at both ends of the assembly bracket (5), and two sets of preloading trolleys are installed on the upper plane of the assembly bracket (5). Compared with the existing technology, the leaf spring flow assembly line can realize the flow assembly of the leaf spring, improve production efficiency, save manpower and material resources, facilitate the modern management of the factory, and realize double-station simultaneous work in the process of chipping and threading the central bolt. Speed up leaf spring assembly.

Description

一种板簧流水装配线A leaf spring assembly line

技术领域 technical field

一种板簧流水装配线,属于属于汽车零部件制造设备领域,具体涉及一种自动化汽车板簧流水装配线。A leaf spring assembly line belongs to the field of auto parts manufacturing equipment, and in particular relates to an automated automobile leaf spring assembly line.

背景技术 Background technique

现阶段,对于汽车用板簧的装配大都还利用人工进行装配,有些具有现代化流水装配线的生产厂家在对板簧进行变换工位等工作时还是需要进行人工搬运,并没有一种系统的自动装配线。这样的生产工作效率较低,而且由于板簧重量较重,体积较大,搬运不方便,需要较多的人力来完成工作,比较浪费人力物力,装配效率极低,影响了整体的工作效率。At this stage, the assembly of leaf springs for automobiles is mostly done manually. Some manufacturers with modern assembly lines still need to carry out manual handling when changing positions for leaf springs, and there is no systematic automatic assembly line. . Such production work efficiency is low, and because leaf spring weight is heavier, and volume is bigger, and carrying is inconvenient, needs more manpower to finish work, compares waste of manpower and material resources, and assembly efficiency is extremely low, has influenced overall work efficiency.

发明内容 Contents of the invention

本发明要解决的技术问题是:克服现有技术的不足,提供一种能实现板簧流水化组装,提高工作效率,节省人力物力的板簧流水装配线。The technical problem to be solved by the present invention is: to overcome the deficiencies of the prior art, and to provide a leaf spring assembly line that can realize assembly of leaf springs, improve work efficiency, and save manpower and material resources.

本发明解决其技术问题所采用的技术方案是:该一种板簧流水装配线,包括装配支架和机架,其特征在于:装配支架水平固定,在装配支架中间位置支撑安装竖直的机架,靠近装配支架一侧安装水平放置的装卡总成,在装配支架两端安装码片装置,装配支架上平面滑动安装两组预压小车。板簧在装配支架两端的码片装置上同时完成码片组装,穿中心螺栓并拧紧,实现双工位同时工作,在中间机架进行预压,在装卡总成安装卡子螺栓,修正板簧并检查总成。The technical solution adopted by the present invention to solve the technical problem is: the plate spring assembly line includes an assembly bracket and a frame, and is characterized in that: the assembly bracket is fixed horizontally, and the vertical frame is supported and installed in the middle of the assembly bracket, A horizontal clamping assembly is installed near one side of the assembly bracket, a chipping device is installed at both ends of the assembly bracket, and two sets of preloading trolleys are installed on the plane slidingly on the assembly bracket. The plate spring completes chip assembly on the chip devices at both ends of the assembly bracket at the same time, passes through the center bolt and tightens it, realizes double-station work at the same time, performs preloading on the middle frame, installs clip bolts on the clamping assembly, and corrects the leaf spring And check the assembly.

所述的机架包括两根竖直固定的机架立柱和支撑在机架立柱上方的横梁,横梁中心位置安装可上下移动的压头,压头的正下方安装可上下移动的托头。板簧下端通过托头托住,压头向下压紧进行预压缩工艺。The frame includes two vertically fixed frame columns and a crossbeam supported above the frame column, a pressure head that can move up and down is installed at the center of the beam, and a support head that can move up and down is installed directly below the pressure head. The lower end of the leaf spring is supported by the support head, and the pressure head is pressed downward to carry out the pre-compression process.

所述的压头下端设置两根竖直的压腿,上端通过螺纹孔与液压油缸输出轴相连接。两根压腿在液压油缸带动下压紧板簧。The lower end of the pressure head is provided with two vertical pressing legs, and the upper end is connected with the output shaft of the hydraulic cylinder through a threaded hole. The two pressing legs are driven by the hydraulic cylinder to compress the leaf spring.

所述的装卡总成包括装卡机架、链轮组、链条和减速电机,装卡机架水平固定在装配支架一侧,一端与装配支架连接,链条平铺在装卡机架上方并与链轮组相啮合传动,装卡机架一端的下方设置减速电机与链轮组相连接。链条和链轮组实现链条链轮传动可带动板簧向前传动,减速电机能够进行调速。The card loading assembly includes a card loading frame, a sprocket group, a chain and a geared motor, the card loading frame is horizontally fixed on one side of the assembly bracket, and one end is connected to the assembly bracket, the chain is laid flat on the top of the card loading frame and It is engaged with the sprocket set for transmission, and a deceleration motor is arranged below one end of the card loading frame to connect with the sprocket set. The chain and the sprocket set realize the chain sprocket transmission and can drive the leaf spring to drive forward, and the reduction motor can regulate the speed.

所述的装卡机架靠近装配支架的一端上方安装拉钩,拉钩靠近装配支架一端设有方向朝上的钩子,另一端连接有液压油缸。拉钩通过液压油缸提供动力可将板簧拉到链条上,进行下一步工作。A draw hook is installed above one end of the card loading frame close to the assembly bracket, an upward hook is provided at one end of the draw hook close to the assembly support, and a hydraulic oil cylinder is connected to the other end. The hook is powered by a hydraulic cylinder to pull the leaf spring onto the chain for the next step.

所述的码片装置包括中心销和中心销正上方的压紧压头,中心销下端连接液压油缸,压紧压头通过一侧的油缸支架支撑固定在装配支架上。中心销为一根竖直放置的直杆,底端连接在液压油缸的输出轴上,中心销可将多片簧片串起来,下端液压油缸顶起簧片后,中心销自动退出,然后将中心螺栓穿入簧片中心孔。The chipping device includes a center pin and a compression head directly above the center pin, the lower end of the center pin is connected to a hydraulic cylinder, and the compression head is supported and fixed on the assembly bracket by one side of the cylinder bracket. The center pin is a straight rod placed vertically. The bottom end is connected to the output shaft of the hydraulic cylinder. The center pin can connect multiple reeds in series. The center bolt passes through the center hole of the reed.

所述的中心销为一根竖直放置的直杆,底端连接在液压油缸的输出轴上。The center pin is a straight rod placed vertically, the bottom end of which is connected to the output shaft of the hydraulic cylinder.

所述的预压小车包括车架、车轮和支撑轴,车架通过车轮滑动支撑在装配支架上平面,车架上端通过角块安装支撑轴。预压小车用于支撑簧片,并将组装好的簧片运送至中间机架处。The preloading trolley includes a vehicle frame, wheels and support shafts, the vehicle frame is slidably supported on the upper plane of the assembly bracket through the wheels, and the support shaft is installed on the upper end of the vehicle frame through corner blocks. The pre-pressing trolley is used to support the reeds and transport the assembled reeds to the middle frame.

与现有技术相比,本发明的一种板簧流水装配线所具有的有益效果是:Compared with the prior art, the beneficial effects of a leaf spring assembly line of the present invention are:

1、实现板簧流水化组装,提高生产效率:设置装配支架、机架和装卡总成,并在装配支架上设置可滑动的两组预压小车,在装卡总成上设置链条、链轮组和拉钩,实现板簧在各个工序间的自动搬运,使板簧码片、穿中心螺栓并拧紧、预压,安装卡子螺栓、修正板簧在一条流水组装线快速完成,提高了生产效率;1. Realize the streamlined assembly of leaf springs and improve production efficiency: set up assembly brackets, racks and clamping assemblies, and set two sets of slidable preloading trolleys on the assembly brackets, and set chains and sprockets on the clamping assemblies The group and the hook realize the automatic transportation of the leaf spring between various processes, so that the leaf spring chip, the center bolt is tightened, pre-pressed, the clip bolt is installed, and the leaf spring is corrected quickly in one assembly line, which improves the production efficiency;

2、码片、穿中心螺栓工序实现双工位同时工作,加快组装速度:在装配支架两端设置两套码片装置,使两个工位同时工作,使板簧码片、穿中心螺栓的速度提高一倍,加快了板簧组装速度;2. The process of chipping and threading the center bolt realizes double-station work at the same time and speeds up the assembly speed: two sets of chipping devices are installed at both ends of the assembly bracket to make the two stations work at the same time, so that the leaf spring codes and the center bolt The speed is doubled, which speeds up the assembly of leaf springs;

3、节省人力物力,有利于工厂现代化管理:利用预压小车和链条、链轮组及拉钩来实现板簧各个工序间的运输传送,节省了人力物力,降低人力成本,有利于工厂现代化管理。3. Save manpower and material resources, which is conducive to the modern management of the factory: the use of pre-pressing trolleys, chains, sprocket sets and hooks to realize the transportation and transmission of leaf springs between various processes saves manpower and material resources, reduces labor costs, and is conducive to the modern management of the factory.

附图说明 Description of drawings

图1是本发明结构示意图主视图。Fig. 1 is a schematic front view of the structure of the present invention.

图2是本发明结构示意图左视图。Fig. 2 is a left view of the structure diagram of the present invention.

图3是本发明结构示意图俯视图。Fig. 3 is a schematic top view of the structure of the present invention.

图4是图3的A-A向视图。Fig. 4 is a view along the line A-A of Fig. 3 .

其中:1、机架立柱 2、横梁 3、压头 4、托头 5、装配支架 6、装卡机架 7、链轮组 8、链条 9、减速电机 10、拉钩 11、中心销 12、压紧压头 13、油缸支架 14、车架 15、车轮 16、支撑轴 17、角块 18、簧片。Among them: 1. Rack column 2. Beam 3. Pressure head 4. Support head 5. Assembly bracket 6. Card loading frame 7. Sprocket set 8. Chain 9. Geared motor 10. Pull hook 11. Center pin 12. Compression head 13, oil cylinder bracket 14, frame 15, wheel 16, support shaft 17, corner block 18, reed.

图1~4是本发明一种板簧流水装配线的最佳实施例,下面结合附图1~4对本发明做进一步说明:Fig. 1~4 is the preferred embodiment of a kind of leaf spring assembly line of the present invention, below in conjunction with accompanying drawing 1~4 the present invention is described further:

具体实施方式 Detailed ways

参照附图1:该一种板簧流水装配线,包括装配支架5、机架、装卡总成和码片装置。装配支架5水平固定,垂直装配支架5在装配支架5中间位置安装竖直的机架和水平的装卡总成,在装配支架5两端位置固定安装码片装置,装配支架5上平面滑动安装多组预压小车。多片簧片18在装配支架5两端的码片装置上完成码片组装,穿中心螺栓并拧紧,在中间机架进行预压,在装卡总成安装卡子螺栓,修正簧片18并检查总成。With reference to accompanying drawing 1: this a kind of leaf spring flow assembly line, comprises assembly bracket 5, frame, clamping assembly and chipping device. The assembly bracket 5 is fixed horizontally, and the vertical assembly bracket 5 is installed with a vertical rack and a horizontal clamping assembly at the middle position of the assembly bracket 5, and a chip device is fixedly installed at both ends of the assembly bracket 5, and the upper plane of the assembly bracket 5 is slidingly installed Multiple sets of preloading trolleys. The multi-leaf reeds 18 are assembled on the chipping devices at the two ends of the assembly bracket 5, and the central bolt is threaded and tightened, preloaded on the middle frame, and the clip bolts are installed on the clamping assembly, and the reeds 18 are corrected and checked. become.

机架包括两根竖直固定的机架立柱1和支撑在机架立柱1上方的横梁2,横梁2中心位置安装可上下移动的压头3,压头3下端设置两根竖直的压腿,上端通过螺纹孔与液压油缸输出轴相连接,两根压腿在液压油缸带动下压紧板簧两端。压头3的正下方安装可上下移动的托头4。板簧下端通过托头4托住,压头3向下压紧进行预压缩工艺。The frame includes two vertically fixed frame columns 1 and a beam 2 supported above the frame column 1. A pressure head 3 that can move up and down is installed at the center of the beam 2, and two vertical pressure legs are arranged at the lower end of the pressure head 3. , the upper end is connected with the output shaft of the hydraulic cylinder through the threaded hole, and the two pressing legs are driven by the hydraulic cylinder to press the two ends of the leaf spring. The supporting head 4 that can move up and down is installed directly below the pressure head 3. The lower end of the leaf spring is supported by the support head 4, and the pressure head 3 is pressed downward to carry out the pre-compression process.

装卡总成包括装卡机架6、链轮组7、链条8和减速电机9,装卡机架6水平固定在装配支架5一侧,一端与装配支架5连接,链条8平铺在装卡机架6上方并与链轮组7相啮合传动,装卡机架6一端的下方设置减速电机9与链轮组7相连接。链条8和链轮组7实现链条链轮传动可带动板簧向前传动,减速电机9能够进行调速。装卡机架6靠近装配支架5的一端上方安装拉钩10,拉钩10靠近装配支架5一端设有方向朝上的钩子,另一端连接有液压油缸。拉钩10通过液压油缸提供动力可将板簧拉到链条8上,进行下一步工作。The card loading assembly includes a card loading frame 6, a sprocket group 7, a chain 8 and a reduction motor 9. The card loading frame 6 is horizontally fixed on one side of the assembly bracket 5, and one end is connected with the assembly bracket 5, and the chain 8 is laid flat on the assembly bracket 5. The top of the card frame 6 is engaged with the sprocket wheel set 7 for transmission, and the lower part of the card loading frame 6 is provided with a reduction motor 9 to be connected with the sprocket wheel set 7 . Chain 8 and chain wheel group 7 realize chain sprocket transmission and can drive plate spring to drive forward, and reduction motor 9 can carry out speed regulation. A draw hook 10 is installed on the card loading frame 6 near one end of the assembly support 5, and the draw hook 10 is provided with an upward hook near the assembly support 5 end, and the other end is connected with a hydraulic oil cylinder. Pull hook 10 provides power by hydraulic oil cylinder and leaf spring can be pulled on the chain 8, carries out next step work.

码片装置包括中心销11和中心销11正上方的压紧压头12,中心销11下端连接液压油缸,压紧压头12通过一侧的油缸支架13支撑固定在装配支架5上。中心销11为一根竖直放置的直杆,底端连接在液压油缸的输出轴上,中心销11可将多片簧片18串起来,下端液压油缸顶起簧片后,中心销11自动退出,然后将中心螺栓穿入簧片18中心孔。The chipping device includes a center pin 11 and a compression head 12 directly above the center pin 11. The lower end of the center pin 11 is connected to a hydraulic cylinder, and the compression head 12 is supported and fixed on the assembly bracket 5 by a cylinder bracket 13 on one side. The central pin 11 is a straight rod placed vertically, the bottom end of which is connected to the output shaft of the hydraulic cylinder. The central pin 11 can connect multiple reeds 18 in series. After the hydraulic cylinder at the lower end lifts the reeds, the central pin 11 automatically Back out, then thread the center bolt through the center hole of reed 18.

预压小车包括车架14、车轮15和支撑轴16,车架14通过车轮15滑动支撑在装配支架5上平面,车架14上端通过角块17安装支撑轴16。支撑轴16用于支撑簧片18。预压小车共设置两组,每组设置对称的两个。两个预压小车同时工作,可支撑簧片18,并将组装好的多片簧片18运送至中间机架处。The preloading trolley includes a vehicle frame 14, wheels 15 and support shafts 16. The vehicle frame 14 is slidably supported on the upper plane of the assembly bracket 5 by the wheels 15, and the support shaft 16 is installed on the vehicle frame 14 upper end through corner blocks 17. The support shaft 16 is used to support the reed 18 . There are two groups of pre-pressing trolleys, each group is equipped with two symmetrical ones. Two pre-pressing trolleys work at the same time, can support the reed 18, and transport the assembled multi-leaf reed 18 to the middle frame place.

工作过程如下:The working process is as follows:

第一步:码片、穿中心螺栓并拧紧螺栓。将两组需要组装成板簧的多片簧片18分别放至装配支架5两端位置的预压小车上,两个预压小车支撑簧片18,中心销11穿入簧片18中心孔并将多片簧片18串起来,下端液压油缸顶起簧片18后,中心销11自动退出,然后将中心螺栓穿入簧片18中心孔,上端压紧压头12通过液压油缸提供动力压紧多片簧片18,然后工人利用气动扳手拧紧螺母。Step 1: Chip, thread the center bolt and tighten the bolt. Two groups of multi-leaf reeds 18 that need to be assembled into leaf springs are placed on the preloaded trolleys at the two ends of the assembly bracket 5 respectively. Connect multiple reeds 18 in series, after the lower end hydraulic cylinder jacks up the reeds 18, the center pin 11 will withdraw automatically, then insert the center bolt into the center hole of the reeds 18, and the upper end compression head 12 will provide power to compress through the hydraulic cylinder Multi-leaf reed 18, then the worker utilizes the pneumatic wrench to tighten the nut.

第二步:预压缩工艺处理。移动预压小车并带动穿好螺栓后的板簧至中间机架处,托头4通过液压油缸提供动力,向上移动,托住板簧,压头3通过液压油缸提供动力向下预压板簧,完成预压缩工艺。The second step: pre-compression process. Move the preloading trolley and drive the leaf spring after the bolts have been threaded to the middle frame. The support head 4 is powered by the hydraulic cylinder to move upward to hold the leaf spring. The pressure head 3 is powered by the hydraulic cylinder to pre-press the leaf spring downward. Complete the pre-compression process.

第三步:安装卡子,修正板簧,打紧中心螺栓扭矩,总体检查。预压缩完成后的板簧,通过拉钩10移动至装卡总成的链条8上方,链条8和链轮组7实现链条链轮传动带动板簧向前传动并最终运送至总成喷漆线,板簧运送速度可调,并在运送的过程中由工人安装卡子,并对板簧进行修正,打紧中心螺栓至规定扭矩,并检查板簧,无质量问题后进入总成喷漆线,整个板簧流水装配线的工作完成。Step 3: Install the clamp, correct the leaf spring, tighten the center bolt to torque, and check overall. After the pre-compression is completed, the leaf spring is moved to the top of the chain 8 of the clamping assembly through the pull hook 10. The chain 8 and the sprocket group 7 realize the transmission of the chain sprocket to drive the leaf spring forward and finally transport it to the painting line of the assembly. The delivery speed of the spring is adjustable, and during the delivery process, the worker installs the clips, and corrects the leaf spring, tightens the central bolt to the specified torque, and checks the leaf spring. After there is no quality problem, it enters the assembly painting line, and the entire leaf spring is flowing Assembly line work done.

以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention to other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or modify the equivalent of equivalent changes. Example. However, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still belong to the protection scope of the technical solution of the present invention.

Claims (4)

1. a leaf spring assembly belt, comprise mount support (5) and frame, it is characterized in that: mount support (5) level is fixed, in mount support (5) centre position, support vertical frame is installed, near mount support (5) one sides, the assembly that is installed of horizontal positioned is installed, chip device is installed at mount support (5) two ends, and two groups of precompressed dollies are installed in the upper planar slide of mount support (5);
Frame comprises two vertical fixing framework pillars (1) and is supported on the crossbeam (2) of framework pillar (1) top, and pressure head moving up and down (3) is installed in crossbeam (2) center, and prop head moving up and down (4) is installed under pressure head (3);
The assembly that is installed comprises the frame that is installed (6), chain wheel set (7), chain (8) and reducing motor (9), the frame that is installed (6) is horizontally fixed on mount support (5) one sides, one end is connected with mount support (5), chain (8) is laid in the frame that is installed (6) top the transmission that is meshed with chain wheel set (7), and the below of the frame that is installed (6) one end arranges reducing motor (9) and is connected with chain wheel set (7);
Chip device comprises the compression pressure head (12) directly over centrepin (11) and centrepin (11), centrepin (11) lower end connecting fluid compressing cylinder, and compression pressure head (12) is supported and fixed on mount support (5) by the cylinder bracket (13) of a side;
Precompressed dolly comprises vehicle frame (14), wheel (15) and back shaft (16), and vehicle frame (14) is slidably supported on the upper plane of mount support (5) by wheel (15), and back shaft (16) is installed by hornblock (17) in vehicle frame (14) upper end.
2. a kind of leaf spring assembly belt according to claim 1, is characterized in that: described pressure head (3) lower end arranges two vertical leg pressings, and upper end is connected with hydraulic jack output shaft by screwed hole.
3. a kind of leaf spring assembly belt according to claim 1, it is characterized in that: the described frame that is installed (6) is installed drag hook (10) near the top, one end of mount support (5), drag hook (10) is provided with near mount support (5) one end the hook being directed upwardly, and the other end is connected with hydraulic jack.
4. a kind of leaf spring assembly belt according to claim 1, is characterized in that: described centrepin (11) is a straight-bar of vertically placing, and bottom is connected on the output shaft of hydraulic jack.
CN201210146467.8A 2012-05-11 2012-05-11 Leaf spring assembly line Expired - Fee Related CN102658478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210146467.8A CN102658478B (en) 2012-05-11 2012-05-11 Leaf spring assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210146467.8A CN102658478B (en) 2012-05-11 2012-05-11 Leaf spring assembly line

Publications (2)

Publication Number Publication Date
CN102658478A CN102658478A (en) 2012-09-12
CN102658478B true CN102658478B (en) 2014-11-05

Family

ID=46768131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210146467.8A Expired - Fee Related CN102658478B (en) 2012-05-11 2012-05-11 Leaf spring assembly line

Country Status (1)

Country Link
CN (1) CN102658478B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130049523A (en) 2011-11-04 2013-05-14 오수미 Apparatus for generating intra prediction block
CN104002132B (en) * 2014-06-06 2016-08-24 清华大学 The assembly system of integrated double aircraft product
CN106181363B (en) * 2016-08-20 2019-05-10 山东雷帕得汽车技术股份有限公司 Automobile leaf spring assembly line
CN107127574B (en) * 2017-06-28 2019-06-28 山东雷帕得汽车技术股份有限公司 A kind of multi-functional leaf spring assembly line
CN107900679B (en) * 2017-12-28 2024-06-07 山东森德数控机械有限公司 Plate spring duplex position assembly line
CN112338870B (en) * 2019-09-28 2022-04-29 泰富特钢悬架(济南)有限公司 Automatic plate spring assembling equipment
CN111761325A (en) * 2019-11-14 2020-10-13 平湖市超凯科技有限公司 Semi-automatic plate spring assembling equipment
CN110961904A (en) * 2019-12-27 2020-04-07 长春一东离合器股份有限公司 Automatic rotary riveting double station equipment
CN112264491A (en) * 2020-09-25 2021-01-26 湖北东风钢板弹簧有限公司 Mechanical preformer with adjustable leaf spring pre-compaction stroke
CN112427927B (en) * 2020-11-30 2022-12-23 淄博凯雷得汽车零部件有限公司 Online bush pressure equipment of leaf spring
CN114905274A (en) * 2022-05-21 2022-08-16 河南恒赛尔汽配有限公司 An automatic assembly system for the end clamp of an automobile leaf spring
CN117102849B (en) * 2023-09-15 2024-02-02 济南润成信德机械制造有限公司 Mining car plate spring seat installation frock

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102179690A (en) * 2011-04-13 2011-09-14 东风汽车股份有限公司 Assembly tool equipment and assembly method for U-shaped bolt of automobile plate spring suspension system
CN201990182U (en) * 2010-12-30 2011-09-28 宝钢集团新疆八一钢铁有限公司 Loading and unloading suspending tool for non-lug and non-clamp plate spring assemblies
CN202639821U (en) * 2012-05-11 2013-01-02 山东海华汽车部件有限公司 Plate spring assembly belt

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10203127A (en) * 1997-01-17 1998-08-04 Hino Motors Ltd Tandem suspension
US7290758B2 (en) * 2005-08-29 2007-11-06 Melvin Svendsen Leaf spring assembly with retaining device
CA2553518A1 (en) * 2005-09-14 2007-03-14 Standens Ltd. Leaf spring assembly having safety spring with retaining elements

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201990182U (en) * 2010-12-30 2011-09-28 宝钢集团新疆八一钢铁有限公司 Loading and unloading suspending tool for non-lug and non-clamp plate spring assemblies
CN102179690A (en) * 2011-04-13 2011-09-14 东风汽车股份有限公司 Assembly tool equipment and assembly method for U-shaped bolt of automobile plate spring suspension system
CN202639821U (en) * 2012-05-11 2013-01-02 山东海华汽车部件有限公司 Plate spring assembly belt

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平10-203127A 1998.08.04 *

Also Published As

Publication number Publication date
CN102658478A (en) 2012-09-12

Similar Documents

Publication Publication Date Title
CN102658478B (en) Leaf spring assembly line
CN204322925U (en) Tire lifting device
CN106271550B (en) A kind of shock absorber strut assembly pressing machine
CN101934456B (en) Welding clamping device for front tripod of bicycle
CN114261696A (en) Section bar framing production line and framing method thereof
CN107522138A (en) A kind of hand-push manpower pitches goods device
CN106695297B (en) Automobile gearbox gear axis assembly bench
CN206029116U (en) Left side longeron rear portion assembly air jig
CN208964136U (en) A kind of double handgrip automatic loading machines of planer-type
CN116372861A (en) Valve accessory equipment integration equipment
CN202639821U (en) Plate spring assembly belt
CN207089091U (en) A kind of multi-functional fast demountable formula caravan
CN219900844U (en) Automatic welding mechanism and system for container
CN113458232B (en) Tensile bucket production system
CN207450365U (en) A kind of automobile lamp film sticking apparatus
CN207121198U (en) Squirrel-cage tipper
CN207548120U (en) A kind of automatic fastening device of vibration damper complement assembly machine
CN209838872U (en) Automobile glass front bumper metal stud assembling tool
CN206010357U (en) A kind of suspension spring compacting machine
CN215143696U (en) Bidirectional extrusion device for thin and long thin-wall pipe
CN114100972A (en) Intelligent gluing device for electronic components
CN211615007U (en) Efficient automatic feeding and discharging device
CN204161511U (en) A kind of fixing device for automobile rear floor Flexible production
CN209007824U (en) One kind using stamping device for rubber product production
CN208813366U (en) A kind of fixed commerce and trade freight wagon of pneumatic clamping

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Baita Town, Boshan District of Zibo City, Shandong Province, Yin Ma Village 255200

Patentee after: SHANDONG BEIQI HAI HUA AUTOMOBILE PARTS CO.,LTD.

Address before: Baita Town, Boshan District of Zibo City, Shandong Province, Yin Ma Village 255200

Patentee before: SHANDONG HAIHUA AUTO PARTS Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20221215

Address after: 255200 Bai TA Zhen Yin Ma Cun, Boshan District, Zibo City, Shandong Province

Patentee after: Shandong Haihua Auto Parts Manufacturing Co.,Ltd.

Address before: 255200 Bai TA Zhen Yin Ma Cun, Boshan District, Zibo City, Shandong Province

Patentee before: SHANDONG BEIQI HAI HUA AUTOMOBILE PARTS CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

CF01 Termination of patent right due to non-payment of annual fee