CN102644261A - 阻抗与溢流相结合的调压井建造方法 - Google Patents
阻抗与溢流相结合的调压井建造方法 Download PDFInfo
- Publication number
- CN102644261A CN102644261A CN2012101316924A CN201210131692A CN102644261A CN 102644261 A CN102644261 A CN 102644261A CN 2012101316924 A CN2012101316924 A CN 2012101316924A CN 201210131692 A CN201210131692 A CN 201210131692A CN 102644261 A CN102644261 A CN 102644261A
- Authority
- CN
- China
- Prior art keywords
- surge shaft
- shaft
- surge
- overflow
- stilling pool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本发明公开了一种阻抗与溢流相结合的调压井建造方法,调压井井筒高度根据库水位确定,以高出校核洪水位为准,井筒内径D依据托马准则计算的调压井稳定断面面积确定,井筒壁厚度根据满足混凝土抗裂要求及轴心受力要求确定;调压井顶部口沿做成圆弧状溢流堰;围绕调压井井筒周边建造环形消力池,消力池底宽依据调压井溢流时的跌落水水舌长度Ld确定,消力池底的高程为完整基岩高程,根据消力池中水深情况进行衬护;在消力池的一侧建造与其连通的泄水道,泄水道底部开挖至基岩面;在调压井的底部垂直向下开挖与引水发电洞相连通的连接管,对周边做好固结灌浆;连接管的直径根据阻抗孔要求确定。本发明优点在于结构简单紧凑、工程量少、投资节省。
Description
技术领域
本发明涉及水电工程中引水发电洞调压井,尤其是涉及阻抗与溢流相结合的调压井建造方法。
背景技术
在水电站工程中,机组负荷变化时会引起压力引水隧洞产生水锤压力。为减轻水锤压力,使机组负荷变化时能稳定运行,以确保发电质量,常在有压引水隧洞与压力管道衔接处建造调压室。对于长引水隧洞水电站,如果两岸山体较低,根据调压井最高涌波确定的调压井顶部高程可能会高出原地面很多。为降低调压井高度,减少投资,同时也使机组反应迅速及时,更快恢复稳定,就需要降低调压井最高涌波。阻抗式调压井具有削减调压井最高水位和抬高最低水位,以及使水位波动很快衰减的作用。但是,由于阻抗作用过大会导致调压井反射水锤波作用减小,从而导致水锤波穿井率高,所以,单靠设阻抗孔来降低调压井涌波是有限度的。而传统的溢流式调压井又因顶部溢流后需设堰下水室而使得结构过于复杂。因此,合适的调压井结构形式对减少工程投资、降低调压井最高涌波及使机组稳定运行至关重要。
发明内容
本发明目的在于提供一种阻抗与溢流相结合的调压井建造方法,从而更有效、更简便地降低最高涌波。
为实现上述目的,本发明可采取以下技术方案:
本发明所述阻抗与溢流相结合的调压井建造方法,包括调压井井筒、调压井顶部溢流堰、井筒周边消力池、泄水道、调压井井筒与引水发电洞之间起阻抗作用的连接管的建造;
一、调压井的建造:调压井井筒高度根据库水位确定,以高出校核洪水位为宜,井筒内径D依据托马准则计算的调压井稳定断面面积确定,井筒采用钢筋混凝土结构,井壁厚度根据满足混凝土抗裂要求及轴心受力要求;调压井顶部口沿做成圆弧状溢流堰,圆弧直径参考井筒顶部厚度选取;
二、消力池的建造:
围绕井筒周边建造环形消力池,消力池底宽依据调压井溢流时井周的跌落水水舌长度Ld确定,消力池底的高程为完整基岩高程,池壁边坡根据地质情况确定的稳定边坡开挖,并根据消力池中水深情况进行衬护;跌落水水舌长度Ld计算公式为:
Ld=4.3D0.27P;其中: ;
式中:q—— 为单宽流量,m3/s;为安全计,取调压井甩负荷时的最大引用流量除以调压井顶口周长;
p——为井顶至池底板的高差,m;
g——重力加速度,m/s2;
D——调压井井筒直径;
三、泄水道的建造:
在消力池的一侧建造与其连通的泄水道,泄水道深度依据调压井所在位置的地层覆盖层厚度确定,泄水道底板开挖至基岩面,宽度根据水力计算结果确定,原则不能使井周消力池水深过高而四处漫流,泄水道要将调压井溢出的水向河边或天然水沟处排泄;
四、连接管的建造:
在调压井的底部垂直向下开挖与引水发电洞相连通的连接管,连接管位于基岩内,采用钢筋混凝土衬砌,并对周边做好固结灌浆,防止调压井渗水对周围建筑物产生影响;连接管的直径根据阻抗孔要求确定,不宜过小,以免影响调压井反射水锤波作用。
本发明的优点在于调压井布置紧凑、结构简单、工程量少,投资节省。电站机组甩荷时调压井井筒水位抬高,水位超出井筒堰顶高程后开始溢流,水流通过空中掺气消能后,跌入井周消力池,在消力池中进一步消能,然后通过泄水道排入原河道(或附近排水沟),由于阻抗及溢流作用,调压井水位壅高大幅降低,机组运行很快趋于稳定,隧洞内水锤压力也较小。电站机组增荷时调压井向隧洞补水,井筒水位开始降低,由于连接管尺寸较小,对水流起阻抗作用,调压井水位波动小,机组运行稳定。具体体现为:
1、阻抗与溢流相结合,使调压井最高涌波大幅度下降,同时又适当抬高了调压井最低水位,有效地改善了电站机组的运行条件。
2、调压井最高涌波的大幅度降低,使调压井高度也大幅度降低,井筒混凝土及配筋量相应减少很多;由于调压井顶部四周直接进行空中溢流,利用水流在空气中掺气消能,自流跌落到井周消力池后又利用水池中水深的水垫作用再进一步消能。
附图说明
图1是本发明的调压井平面布置图。
图2是图1的A-A向剖面图。
图3是图1的B-B向剖面图。
具体实施方式
如图1、图2、图3所示,本发明所示阻抗与溢流相结合的调压井建造方法,包括调压井井筒1、调压井顶部溢流堰2、调压井井筒1周边消力池3、泄水道4、调压井井筒1与引水发电洞5之间起阻抗作用的连接管6的建造;
一、调压井的建造:调压井井筒1高度根据库水位确定,以高出校核洪水位为宜,井筒1内径D依据托马准则计算的调压井稳定断面面积确定,井筒1采用钢筋混凝土结构,井壁厚度根据满足混凝土抗裂要求及轴心受力要求;调压井顶部口沿做成圆弧状溢流堰2,圆弧直径参考井筒顶部厚度选取;
二、消力池的建造:
围绕井筒1周边建造环形消力池3,消力池3底宽依据调压井溢流时井周的跌落水水舌长度Ld确定,消力池3底部的高程为完整基岩高程,池壁边坡根据地质情况确定的稳定边坡开挖,并根据消力池3中水深情况进行衬护;跌落水水舌长度Ld计算公式为:
式中:q—— 为单宽流量,m3/s;为安全计,取调压井甩负荷时的最大引用流量除以调压井顶口周长;
p——为井顶至池底板的高差,m;
g——重力加速度,m/s2;
D——调压井井筒直径;
三、泄水道的建造:
在消力池3的一侧建造与其连通的泄水道4,泄水道4深度依据调压井所在位置的地层覆盖层厚度确定,泄水道4底板开挖至基岩面7,宽度根据水力计算结果确定,原则不能使井周消力池3水深过高而四处漫流,泄水道要将调压井溢出的水向河边或天然水沟处排泄;
四、连接管的建造:
在调压井的底部垂直向下开挖与引水发电洞5相连通的连接管6,连接管6位于基岩内,采用钢筋混凝土衬砌,并对周边做好固结灌浆孔8进行固结灌浆,防止调压井渗水对周围建筑物产生影响;连接管6的直径根据阻抗孔要求确定,不宜过小,以免影响调压井反射水锤波作用。
Claims (1)
1.一种阻抗与溢流相结合的调压井建造方法,其特征在于:
一、调压井的建造:
调压井井筒高度根据库水位确定,以高出校核洪水位为准,井筒内径D依据托马准则计算的调压井稳定断面面积确定,井筒采用钢筋混凝土结构,井筒壁厚度根据满足混凝土抗裂要求及轴心受力要求确定;调压井顶部口沿做成圆弧状溢流堰,该圆弧直径根据井筒顶部壁厚选取;
二、消力池的建造:
围绕调压井井筒周边建造环形消力池,消力池底宽依据调压井溢流时的跌落水水舌长度Ld确定,消力池底的高程为完整基岩高程,池壁边坡根据地质情况确定的稳定边坡开挖,并根据消力池中水深情况进行衬护;跌落水水舌长度Ld计算公式为:
Ld=4.3D0.27P;其中: ;
式中:q—— 为单宽流量,m3/s;取调压井甩负荷时的最大引用流量除以调压井井口周长;
p——为井顶至池底板的高差,m;
g——重力加速度,m/s2;
D——调压井井筒内直径;
三、泄水道的建造:
在消力池的一侧建造与其连通的泄水道,泄水道的深度依据调压井所在位置的地层覆盖层厚度确定,泄水道底部开挖至基岩面,宽度根据水力计算结果确定;
四、连接管的建造:
在调压井的底部垂直向下开挖与引水发电洞相连通的连接管,采用钢筋混凝土衬砌,并对周边做好固结灌浆;连接管的直径根据阻抗孔要求确定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210131692.4A CN102644261B (zh) | 2012-05-02 | 2012-05-02 | 阻抗与溢流相结合的调压井建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210131692.4A CN102644261B (zh) | 2012-05-02 | 2012-05-02 | 阻抗与溢流相结合的调压井建造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102644261A true CN102644261A (zh) | 2012-08-22 |
CN102644261B CN102644261B (zh) | 2014-10-22 |
Family
ID=46657324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210131692.4A Active CN102644261B (zh) | 2012-05-02 | 2012-05-02 | 阻抗与溢流相结合的调压井建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102644261B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195033A (zh) * | 2013-04-12 | 2013-07-10 | 中国水电顾问集团北京勘测设计研究院 | 一种开敞式调压井的施工方法 |
CN110941868A (zh) * | 2019-11-19 | 2020-03-31 | 南昌大学 | 一种水电站调压室临界稳定断面的计算方法 |
CN112627129A (zh) * | 2020-12-31 | 2021-04-09 | 河南省水利第二工程局 | 一种水电站用调压室装置 |
CN114541344A (zh) * | 2022-04-02 | 2022-05-27 | 中国电建集团北京勘测设计研究院有限公司 | 一种采用溢流降压减小闸门挡水水头的泄水洞布置结构 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09177654A (ja) * | 1995-12-22 | 1997-07-11 | Koken Boring Mach Co Ltd | 多段式水力発電方式 |
CN101126233A (zh) * | 2007-08-17 | 2008-02-20 | 吴昊 | 复阻抗式水电站调压室结构 |
-
2012
- 2012-05-02 CN CN201210131692.4A patent/CN102644261B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09177654A (ja) * | 1995-12-22 | 1997-07-11 | Koken Boring Mach Co Ltd | 多段式水力発電方式 |
CN101126233A (zh) * | 2007-08-17 | 2008-02-20 | 吴昊 | 复阻抗式水电站调压室结构 |
Non-Patent Citations (4)
Title |
---|
何华法: "泰顺三插溪二级水电站调压井设计", 《浙江水利科技》 * |
文南廷等: "空中溢流式调压塔在小型水电站中的应用", 《中国农村水利水电》 * |
武汉水利电力学院水力学教研室: "《水力计算手册》", 31 December 1980, 水利电力出版社 * |
郭文晨,吕贵生: "西沟水电站调压室优化设计", 《东北水利水电》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195033A (zh) * | 2013-04-12 | 2013-07-10 | 中国水电顾问集团北京勘测设计研究院 | 一种开敞式调压井的施工方法 |
CN110941868A (zh) * | 2019-11-19 | 2020-03-31 | 南昌大学 | 一种水电站调压室临界稳定断面的计算方法 |
CN112627129A (zh) * | 2020-12-31 | 2021-04-09 | 河南省水利第二工程局 | 一种水电站用调压室装置 |
CN114541344A (zh) * | 2022-04-02 | 2022-05-27 | 中国电建集团北京勘测设计研究院有限公司 | 一种采用溢流降压减小闸门挡水水头的泄水洞布置结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102644261B (zh) | 2014-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9163606B2 (en) | Hydro-electric tube generation | |
CN102644261B (zh) | 阻抗与溢流相结合的调压井建造方法 | |
CN202323895U (zh) | 用于阶梯式水利枢纽的尾水渠结构 | |
CN102296629B (zh) | 一种适用于海洋工程的塔筒式结构物及其安装方法 | |
CN104264624B (zh) | 一种堰塞湖开渠泄流的方法 | |
CN201952787U (zh) | 潜水起旋墩竖井旋流消能泄洪洞 | |
CN103526732A (zh) | 一种大坝泄水结构 | |
CN106381903A (zh) | 一种井群地下水回灌自动分流系统 | |
CN202164862U (zh) | 一种适用于海洋工程的塔筒式结构物 | |
CN108677894A (zh) | 一种利用管道型岩溶地下水发电系统及设计方法 | |
CN202577250U (zh) | 阻抗与溢流相结合的调压井结构 | |
CN203559405U (zh) | 一种大坝泄水结构 | |
JP6675633B2 (ja) | 発電装置 | |
CN203808019U (zh) | 深厚软基高水头多功能坝的布置结构 | |
CN202148535U (zh) | 一种适用于海洋工程的混凝土重力式基础 | |
CN105421288A (zh) | 一种大库盘水库淤滩冲沙结构及其施工方法 | |
CN106013238B (zh) | 一种软弱地层大覆土明挖隧道沉降控制方法 | |
CN103161142A (zh) | 一种在现有库区水中建立的双向潜水发电的闸坝 | |
CN105421308B (zh) | 多管聚流无坝连锁水力发电站 | |
CN209429064U (zh) | 一种台阶式消能结构 | |
JP2012145090A (ja) | 人工水路式水車発電機による発電方法と海水干満式水車発電機による発電方法と人工水路式水車発電機と海水干満式水車発電機と下掛け水車発電機用の人工水路と人工水路式灌漑用水車。 | |
CN102359117A (zh) | 一种适用于海洋工程的混凝土重力式基础及其安装方法 | |
CN212223801U (zh) | 一种水工消能结构 | |
CN220704465U (zh) | 一种利用截水沟汇水泄放生态流量的结构 | |
CN204080759U (zh) | 沟水处理排水洞 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: Yellow River Engineering Consulting Co., Ltd. |