CN102618677B - Method for cleaning materials in large-scale blast furnace in overhaul - Google Patents
Method for cleaning materials in large-scale blast furnace in overhaul Download PDFInfo
- Publication number
- CN102618677B CN102618677B CN2012100754245A CN201210075424A CN102618677B CN 102618677 B CN102618677 B CN 102618677B CN 2012100754245 A CN2012100754245 A CN 2012100754245A CN 201210075424 A CN201210075424 A CN 201210075424A CN 102618677 B CN102618677 B CN 102618677B
- Authority
- CN
- China
- Prior art keywords
- furnace
- excavator
- slag
- hoist
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
大型高炉大修炉内物料清理方法属于炼铁高炉,尤其涉及高炉修理方法。该方法按下列步骤进行:冷炉,设置吊装破碎渣、排渣器械,吊运挖掘机至炉内,炉内机械清料,吊出挖掘机。本发明方法已在五座大型高炉大修中实施,优点是:构思新颖,施工器械简约,扒渣人员大幅度减少,劳动强度降低;扒渣速度快,减少扒渣时间,缩短修炉工期,提高修炉效率,高炉提前投入生产。
The invention discloses a method for cleaning materials in a large-scale blast furnace overhaul furnace, which belongs to ironmaking blast furnaces, and in particular relates to a blast furnace repair method. The method is carried out according to the following steps: cooling the furnace, installing equipment for hoisting broken slag and slag discharge, lifting an excavator into the furnace, mechanically cleaning materials in the furnace, and lifting out the excavator. The method of the present invention has been implemented in the overhaul of five large blast furnaces. The advantages are: novel concept, simple construction equipment, greatly reduced slag removal personnel, and reduced labor intensity; fast slag removal speed, reduced slag removal time, shortened furnace repair period, improved The efficiency of furnace repair was improved, and the blast furnace was put into production ahead of schedule.
Description
技术领域 technical field
本发明属于炼铁高炉,尤其涉及高炉修理方法。 The invention belongs to ironmaking blast furnaces, in particular to a blast furnace repair method.
技术背景 technical background
高炉大修扒炉是首道工序,清除炉膛内部铁垢和铁渣。当前扒炉采用的方法是:高炉冷却后,炉内搭设脚手架;人工扒渣,采用风镐、大锤和钢钎破碎;人工清渣,手挖、肩抬,倒出炉外。其缺陷是:由于炉内铁垢异常结实,又有大量铁渣,作业环境恶劣,劳动强度大,作业人员多达40多人,施工成本高;扒炉时间长,达15-25天,有的长达40余天,修炉工期长,延缓高炉投产时间,严重影响高炉炼铁生产。 Blast furnace overhaul griddle is the first process to remove iron scale and iron slag inside the furnace. The current method used in the griddle is: after the blast furnace is cooled, scaffolding is set up in the furnace; the slag is manually removed and crushed with a pick, sledgehammer and steel braze; the slag is manually removed, dug by hand, lifted on the shoulder, and poured out of the furnace. Its disadvantages are: due to the abnormally strong iron scale in the furnace and a large amount of iron slag, the working environment is harsh, the labor intensity is high, there are more than 40 operators, and the construction cost is high; It took more than 40 days, and the furnace repair period was long, which delayed the blast furnace commissioning time and seriously affected the blast furnace ironmaking production.
发明内容 Contents of the invention
为了克服现有技术存在的缺陷,本发明的目的是提供一种大型高炉大修炉内物料清理方法,炉内设置施工器械,采用机械扒渣,快速清理炉内物料,尽早修炉,减少扒炉时间和人员,缩短修炉工期,降低修炉费用,高炉尽快投入生产。 In order to overcome the defects existing in the prior art, the object of the present invention is to provide a method for cleaning materials in a large-scale blast furnace overhaul. Construction equipment is installed in the furnace, and mechanical slag removal is used to quickly clean materials in the furnace, repair the furnace as soon as possible, and reduce the number of griddles time and personnel, shorten the furnace repair period, reduce the cost of furnace repair, and put the blast furnace into production as soon as possible.
大型高炉大修炉内物料清理方法,按下列步骤进行: The material cleaning method in the large-scale blast furnace overhaul furnace is carried out according to the following steps:
1、冷炉 1. Cold furnace
1)、停止向炉内供料后开始冷炉 由风口和十字测温处向内洒水降温,冷炉时间60-80小时,炉内温度降至30℃以下; 1) After stopping the supply of materials to the furnace, start to cool the furnace. Sprinkle water from the tuyere and cross temperature measuring point to cool down. The cooling time is 60-80 hours, and the temperature in the furnace drops below 30°C;
2)、通风 设置2-3台风机,通风、降温,改善作业环境; 2), Ventilation Set up 2-3 fans to ventilate, cool down, and improve the working environment;
3)、清理溜槽修理孔,打通吊运挖掘机通道,孔高2-2.5m宽1.5-2m,并观察炉顶内壁“挂瘤”状况,防止施工中坠落伤人。 3) Clean the repair hole of the chute and open the passage for lifting the excavator. The height of the hole is 2-2.5m and the width is 1.5-2m. Observe the "hanging tumor" on the inner wall of the furnace roof to prevent falling and hurting people during construction.
2、设置吊装破碎渣、排渣器械 2. Set up equipment for hoisting broken slag and slag discharge
1)、利用炉前行车、炉顶行车,设置手拉葫芦与炉顶行车配合运用; 1) Use the furnace front crane and furnace top crane, and set up chain hoists to cooperate with the furnace top crane;
2)、设置牵引机构,炉顶平台的溜槽检修孔旁设慢卷筒卷扬机,牵引绳经设在高炉外的定滑轮组绕过炉体,由与溜槽检修孔对面的点火孔穿过高炉回至溜槽检修孔旁; 2) Set up a traction mechanism. A slow drum hoist is installed next to the inspection hole of the chute on the furnace top platform. The traction rope bypasses the furnace body through the fixed pulley set outside the blast furnace, and passes through the ignition hole opposite the inspection hole of the chute back to the blast furnace. Next to the manhole of the chute;
3)、设置排渣皮带机,高炉风口小套、中套拆除后,在高炉的对称风口设置皮带机,由炉内伸出炉外。 3) Install the belt conveyor for slag discharge. After the small and middle sleeves of the tuyere of the blast furnace are removed, a belt conveyor is installed at the symmetrical tuyere of the blast furnace, extending from the inside of the furnace to the outside of the furnace.
3、吊运挖掘机至炉内 3. Lift the excavator into the furnace
1)、炉前行车吊运 拆除挖掘机驾驶室外罩,由炉前行车吊至出铁场,挖掘机自行至风口平台,停在炉顶行车吊装孔下方; 1) Hoisting in front of the furnace Remove the cover of the cab of the excavator, hoist it from the driving in front of the furnace to the casting yard, the excavator will go to the tuyere platform by itself, and stop under the hoisting hole of the furnace top;
2)、挖掘机配装破碎锤,挖掘机机身和链带纵向前平齐,臂梁伸直,由手拉葫芦封牢,防止机身转动时,因液压系统锁不紧导致重心改变事故的发生; 2) The excavator is equipped with a breaker, the body of the excavator and the chain belt are aligned longitudinally, the arm beam is straight, and it is sealed by a chain hoist to prevent the center of gravity from changing due to the hydraulic system not being locked tightly when the body is rotating. happened;
3)、确定挖掘机吊挂方式及吊挂点 炉顶行车钩头挂设三根钢丝绳,二根长钢丝绳连接在挖掘机前后的吊装点上,一根短钢丝绳则由臂杆、手拉葫芦吊挂挖掘机臂梁,启动炉顶行车,用手拉葫芦调整挖掘机的平衡状态; 3) Determine the excavator's hanging method and hanging point Three steel wire ropes are hung on the driving hook on the furnace top, two long steel wire ropes are connected to the hoisting points at the front and back of the excavator, and a short steel wire rope is hoisted by the arm lever and chain hoist Hang the boom beam of the excavator, start the driving on the furnace roof, and adjust the balance state of the excavator with the chain hoist;
4)、炉顶行车吊运挖掘机 4) Hoisting the excavator on the top of the furnace
炉顶行车吊挂挖掘机三个吊挂点,调整平衡后,启动炉顶行车,将挖掘机吊至溜槽检修孔上方;调整手拉葫芦,使挖掘机向前倾斜设定角度,机身正对溜槽检修孔;卷扬机牵引钢丝绳拉住机身前吊挂点,开动卷扬机向炉内牵引,行车钩头徐徐下落,卷扬机慢慢牵引,直到挖掘机放到炉膛底部为止。 The three hanging points of the excavator are hung on the furnace top crane. After adjusting the balance, start the furnace roof crane and hoist the excavator above the inspection hole of the chute; adjust the chain block to make the excavator tilt forward at a set angle, and the Check the inspection hole of the chute; the hoist pulls the wire rope to pull the hanging point in front of the fuselage, start the hoist to pull into the furnace, the driving hook head falls slowly, and the hoist slowly pulls until the excavator is placed at the bottom of the furnace.
4、炉内清渣 4. Slag cleaning in the furnace
1)、卸除行车钩头、钢丝绳、手拉葫芦和牵引钢丝绳,装配驾驶室罩,检验和调整挖掘机;开工后,根据高炉容积的大小,安排3-4名挖掘机驾驶员连班作业,保证施工的连续性和效率; 1) Remove the driving coupler, wire rope, chain hoist and traction wire rope, assemble the cab cover, inspect and adjust the excavator; after the start of work, arrange 3-4 excavator drivers to work in consecutive shifts according to the volume of the blast furnace , to ensure the continuity and efficiency of construction;
2)、破渣 开动挖掘机,破碎锤对炉壁四周及底部的铁垢、渣铁进行破碎,渣料高度3-5m,由上至下分层进行,直至风口下沿、铁口和炉腔底部; 2) Slag Breaking Start the excavator, and the hammer breaks the iron scale and slag iron around the furnace wall and the bottom. cavity bottom;
3)、排渣 挖掘机换装挖斗,用挖斗将破碎的铁垢、渣铁,铲到皮带机上,开动皮带机倒运出炉外,然后运出施工现场。 3) The excavator is replaced with a bucket, and the broken iron scale and iron slag are shoveled onto the belt conveyor with the bucket, and then driven out of the furnace by the belt conveyor, and then transported out of the construction site.
5、吊出挖掘机 扒炉结束、炉内清除干净后,将挖掘机由炉内吊运至炉外。 5. Lift out the excavator After the griddle is finished and the furnace is cleaned, the excavator is lifted from the furnace to the outside of the furnace.
本发明方法已在本公司五座高炉大修中实施。 The method of the invention has been implemented in the overhaul of five blast furnaces of our company.
现有技术相比,优点是:构思新颖,施工器械简约,扒渣人员大幅度减少,劳动强度降低;扒渣速度快,减少扒渣时间,缩短修炉工期,提高修炉效率,高炉提前投入生产。 Compared with the existing technology, the advantages are: novel concept, simple construction equipment, greatly reduced slag removal personnel, and reduced labor intensity; fast slag removal speed, reduced slag removal time, shortened furnace repair period, improved furnace repair efficiency, and blast furnace input in advance Production.
附图说明 Description of drawings
下面对照附图对本发明作进一步说明。 The present invention will be further described below with reference to the accompanying drawings.
图1是大型高炉大修炉内物料清理方法施工器械配置示意图(挖掘机入炉前)。 Figure 1 is a schematic diagram of the configuration of construction equipment for the method of cleaning materials in the large-scale blast furnace overhaul (before the excavator enters the furnace).
图2是大型高炉大修炉内物料清理方法施工器械配置示意图(挖掘机入炉后)。 Figure 2 is a schematic diagram of the construction equipment configuration of the material cleaning method in the large-scale blast furnace overhaul (after the excavator enters the furnace).
图3是大型高炉大修炉内物料清理方法施工器械配置示意图(挖掘机入炉底后作业)。 Figure 3 is a schematic diagram of the configuration of construction equipment for the method of cleaning materials in the large-scale blast furnace overhaul (the excavator works after entering the bottom of the furnace).
图中 1.高炉 2.点火孔 3.定滑轮 4.旋转溜槽 5.溜槽检修孔 6.手拉葫芦 7.炉顶行车 8.挖掘机 9.卷扬机 10.牵引钢丝绳 11. 风口平台 12. 炉顶平台13. 临时皮带机 14.铁口平台,15.炉膛底部。
In the figure 1. Blast furnace 2.
具体实施方式 Detailed ways
实施例1 Example 1
本公司2500m3高炉进行大修扒渣方法,采用的施工器具有:卷扬机1台,手拉葫芦3t 2台、钢丝绳中Φ19mm、卸扣 3t、定滑轮2t、挖掘机1台、皮带机1-2台。
The company's 2500m3 blast furnace is overhauled and slag-removed. The construction equipment used includes: 1 hoist, 2 chain hoists 3t, Φ19mm in the wire rope, shackle 3t, fixed
高炉大修炉内物料清理方法,按下列步骤进行: The material cleaning method in the blast furnace overhaul furnace is carried out according to the following steps:
1)、冷炉 高炉停止加料后,开始冷炉,由风口和十字测温处向炉内洒水,冷炉时间72小时,炉内温度降至30℃以下; 1) Cooling furnace After the blast furnace stops charging, start cooling the furnace, sprinkle water into the furnace from the tuyere and cross temperature measuring point, the cooling time is 72 hours, and the temperature in the furnace drops below 30°C;
2)、通风 设置2台风机,通风、降温; 2) Ventilation Set up 2 fans for ventilation and cooling;
3)、清理(揭开)溜槽检修孔5 孔2×1.8㎡,打通吊运挖掘机通道。
3) Clean (uncover) the
2、设置吊装破渣用挖掘机及排渣用皮带机 2. Set up excavators for hoisting and breaking slag and belt conveyors for slag discharge
1)、利用炉前行车(图中未标)、炉顶行车7,手拉葫芦6与炉顶行车配合运用; 1) Use the furnace front crane (not marked in the figure), the furnace top crane 7, and the chain hoist 6 to cooperate with the furnace top crane;
2)、设置牵引机构 溜槽检修孔5旁设卷筒卷扬机9,牵引钢丝绳经炉外四组定滑轮3组导向,绕过炉体,由溜槽对面的点火孔2穿过高炉1回至溜槽检修孔旁;
2) Set the traction mechanism. Set the reel winch 9 beside the
3)设置排渣皮带机13,皮带机长10m、宽0.4m,置于炉体对称风口中,由炉内伸出炉外。 3) Install the slag discharge belt conveyor 13, the belt conveyor is 10m long and 0.4m wide, placed in the symmetrical tuyere of the furnace body, and protrudes from the furnace to the outside of the furnace.
3、吊运挖掘机8,送入炉内
3. Lift the
1)、炉前行车吊运,拆除挖掘机驾驶室外罩,由炉前行车(图中未标)吊至出铁场,自行至风口平台11,停在炉顶行车吊装孔下方;
1) For hoisting by driving in front of the furnace, remove the cab cover of the excavator, hoist it from the driving in front of the furnace (not marked in the figure) to the casting yard, go to the
2)、挖掘机配装破碎锤,机身和链带纵向平齐,臂梁伸直,由手拉葫芦密封; 2) The excavator is equipped with a breaker, the body and the chain belt are vertically aligned, the arm beam is straight, and it is sealed by a chain hoist;
3)、确定挖掘机吊挂方式及吊挂点,炉顶行车钩头下放,钩头上设三根钢丝绳,二根长钢丝绳由卸扣卡装在挖掘机前后的吊装点上,一根短钢丝绳由臂杆、手拉葫芦和卸扣卡装在臂梁上,用手拉葫芦调整挖掘机的平衡状态; 3) Determine the hanging method and hanging point of the excavator. The driving hook head on the furnace top is lowered, and three steel wire ropes are installed on the hook head. The boom, chain hoist and shackle are clamped on the boom beam, and the chain hoist is used to adjust the balance state of the excavator;
4)、炉顶行车吊运挖掘机 4) Hoisting the excavator on the top of the furnace
炉顶行车吊挂挖掘机的三个吊挂点,吊运至溜槽检修孔下方;调整手拉葫芦,使挖掘机前倾一定角度,机身正对溜槽检修孔;卷扬机牵引钢丝绳拉住机身前吊挂点,开动卷扬机向炉内牵引,行车钩头徐徐下落,卷扬机慢慢牵引,放到炉底为止。 The three hanging points of the excavator are hoisted on the top of the furnace, and lifted to the bottom of the chute inspection hole; adjust the chain block so that the excavator is tilted forward at a certain angle, and the body is facing the chute inspection hole; the hoist pulls the wire rope to pull the body At the front hanging point, start the hoist to pull into the furnace, the driving coupler head falls slowly, and the hoist slowly pulls it until it is placed at the bottom of the furnace.
4、炉内清渣 4. Slag cleaning in the furnace
1)、卸除行车钩头、钢丝绳、手拉葫芦和牵引钢丝绳及与吊挂点上的卸扣,装配驾驶室罩,检验和调整挖掘机; 1) Remove the driving coupler, wire rope, hand chain hoist, traction wire rope and the shackle on the hanging point, assemble the cab cover, inspect and adjust the excavator;
2)、破渣 开动挖掘机,破碎锤对炉壁四周及底部的铁垢、渣铁进行破碎,呈块状。由上至下分层清理,直至风口下沿、铁口和炉腔底部; 2) Breaking slag Start the excavator, and the breaking hammer will break the iron scale and slag iron around the furnace wall and the bottom, and it will be in block shape. Clean in layers from top to bottom, until the lower edge of the tuyere, the iron mouth and the bottom of the furnace cavity;
3)、排渣 挖掘机换装挖斗,用挖斗将破碎的铁垢、渣铁,铲到皮带机上,开动皮带机倒运出炉外,然后运出施工现场。 3) The excavator is replaced with a bucket, and the broken iron scale and iron slag are shoveled onto the belt conveyor with the bucket, and then driven out of the furnace by the belt conveyor, and then transported out of the construction site.
5、吊出挖掘机,扒炉结束、炉内清除干净后,将挖掘机由炉内吊运至炉外,以进行修炉下一道工序。 5. Lift out the excavator. After the griddle is finished and the furnace is cleaned, the excavator is lifted from the furnace to the outside of the furnace for the next process of repairing the furnace.
按此方法扒炉清渣,时间由原来20多天缩短到2天,节省施工人员40多人,降低修理费用,高炉提前15天生产。 According to this method, the time for cleaning slag from the griddle was shortened from more than 20 days to 2 days, saving more than 40 construction workers, reducing repair costs, and the blast furnace was produced 15 days in advance.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012100754245A CN102618677B (en) | 2012-03-21 | 2012-03-21 | Method for cleaning materials in large-scale blast furnace in overhaul |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012100754245A CN102618677B (en) | 2012-03-21 | 2012-03-21 | Method for cleaning materials in large-scale blast furnace in overhaul |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102618677A CN102618677A (en) | 2012-08-01 |
| CN102618677B true CN102618677B (en) | 2013-09-18 |
Family
ID=46558879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012100754245A Active CN102618677B (en) | 2012-03-21 | 2012-03-21 | Method for cleaning materials in large-scale blast furnace in overhaul |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102618677B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104726625B (en) * | 2015-02-26 | 2016-08-17 | 河北二十冶建设有限公司 | Waste material and the method for quickly eliminating of residual ferrum in stove in a kind of blast furnace overhaul |
| CN106005936B (en) * | 2016-07-19 | 2018-03-16 | 河北二十冶建设有限公司 | A kind of refractory material is had bad luck into furnace apparatus and refractory material and had bad luck into stove method |
| CN108624730A (en) * | 2018-07-30 | 2018-10-09 | 本钢板材股份有限公司 | Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove |
| CN108642221A (en) * | 2018-08-01 | 2018-10-12 | 本钢板材股份有限公司 | A kind of super-huge blast furnace overhaul quickly takes off furnace system and method |
| CN109735671A (en) * | 2019-02-28 | 2019-05-10 | 上海二十冶建设有限公司 | Three layers of operational method of one are dismounted in the furnace of medium and small blast furnace |
| CN113390462B (en) * | 2021-06-11 | 2022-03-22 | 马鞍山钢铁股份有限公司 | A device for detecting foreign matter jamming and abnormality in the skirt of a walking furnace |
| CN114317857B (en) * | 2021-12-30 | 2022-12-20 | 鞍钢集团工程技术有限公司 | Blast furnace chute gate with ignition hole and ignition method |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2537711Y (en) * | 2002-05-05 | 2003-02-26 | 张店钢铁总厂 | Slag clenaing machine |
| KR100851952B1 (en) * | 2002-06-21 | 2008-08-12 | 주식회사 포스코 | Early release of hard-reducing materials during repair of furnace furnace walls |
| JP4351288B2 (en) * | 2007-08-09 | 2009-10-28 | 新日鉄エンジニアリング株式会社 | Ring block transfer device and blast furnace furnace repair method |
| CN102134620B (en) * | 2010-10-19 | 2012-05-23 | 新兴铸管股份有限公司 | Method for quickly manufacturing lining on upper part of blast furnace shaft by hot wet method |
-
2012
- 2012-03-21 CN CN2012100754245A patent/CN102618677B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN102618677A (en) | 2012-08-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102618677B (en) | Method for cleaning materials in large-scale blast furnace in overhaul | |
| CN103266192B (en) | Hoisting method for replacing cooling wall in overhauling of blast furnace | |
| CN104726625A (en) | Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul | |
| CN107699650A (en) | A method for installing a cooling wall of a blast furnace | |
| CN105177202B (en) | A kind of blast furnace overhaul method | |
| CN209243086U (en) | The device of the quick handling cleaning cupola well of overhaul 2500m3 blast furnace | |
| CN208250348U (en) | A kind of blast furnace replacement sow heat shield traction device | |
| CN108946470A (en) | A kind of replacing options for converter entirety flue | |
| CN114395652A (en) | Process method for online replacement of large-scale blast furnace throat cooling wall protection plate | |
| CN101509728A (en) | Internal maintenance and repair technique for cement kiln and maintenance and repair equipment thereof | |
| CN108015519B (en) | The drawing process covered in blast furnace | |
| CN103571987A (en) | Method for replacing central throat pipe at blast furnace roof | |
| CN201648437U (en) | Converter repair combined device | |
| CN104278126B (en) | A kind of replacing options of slag blocking plate of converter | |
| CN109136436A (en) | The method for replacing large-scale v-bearing titanomagnetite smelting blast furnace taphole | |
| CN208594308U (en) | A large blast furnace overhaul furnace waste cleaning system | |
| CN104195953B (en) | Method and device for overall lateral removal of beam-type supports at the bottom plate of bridges | |
| CN202508761U (en) | Lifting appliance of large-size overhead traveling crane | |
| CN106477350A (en) | The method for dismounting of bridge ship loader-unloader | |
| CN207756266U (en) | Coarse breaking machine boron block processing unit | |
| CN222007063U (en) | Ground-replaceable grab | |
| CN106178857B (en) | A kind of not blowing out coke oven flue gas desulfurizing fly ash technological process | |
| CN217324145U (en) | Special tool for replacing mud gun mud beating mechanism in limited space | |
| CN207159259U (en) | A kind of Ou Ye stoves cupola well residue transports device | |
| CN207313637U (en) | A kind of more changing device of material distribution chute on furnace top of blast furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251103 Address after: 243000 Anhui city of Ma'anshan province Jiuhua Mountain Rain Road No. 8 Patentee after: MAGANG (Group) HOLDING Co.,Ltd. Country or region after: China Patentee after: Ma'anshan Iron and Steel Co.,Ltd. Address before: 243003 Anhui city of Ma'anshan province Jiuhua Mountain Rain Road No. 8 Patentee before: MAGANG (Group) HOLDING Co.,Ltd. Country or region before: China Patentee before: MAANSHAN IRON & STEEL Co.,Ltd. |