Summary of the invention
The object of the present invention is to provide a kind of leak testing process of secondary air pressure of oil-immersed power transformer, avoided making because of leakage of oil transformer cisco unity malfunction problem.
The present invention adopts following technical scheme:
The leak testing process of secondary air pressure of oil-immersed power transformer, is characterized in that comprising the following steps:
(1) first the oil tank of transformer that welded is rejected to welding slag, check whether rosin joint and pore of outward appearance, oil tank of transformer is sealed;
(2) to aerating leak test in above-mentioned oil tank of transformer, pressure is that the above air pressure of 315KVA is 0.2MPa, 315KVA and following air pressure are 0.25MPa, after leak test 3-4 hour, check and have ne-leakage, if ne-leakage is by earth pressure release and be evacuated to-0.05MPa, keep again pressure being returned to initial pressure after 2.5-3.5 hour and keep 5 hours, the oil tank of transformer that there is no seepage is carried out to acid washing phosphorization processing, then carry out primer spray and finish paint;
(3) dry and fastening good transformer body is put into fuel tank hitch box along, add the transformer oil of figure paper weight 70%;
(4) above-mentioned transformer being lifted up into vacuum drying room be evacuated to-0.04MPa keeps hanging out vacuum drying room after 2 hours, transformer oil is added to the position needing, carry out secondary air pressure leak test, the above air pressure of 315KVA is 0.15MPa, 315KVA and following air pressure are 0.2MPa, keep after 10-14 hour, ne-leakage transformer can be put in storage.
The leak testing process of described secondary air pressure of oil-immersed power transformer, it is characterized in that: the pressure of twice described leak test gas and technique is difference to some extent all, that the above air pressure of 315KVA is 0.2MPa for the first time, 315KVA and following air pressure are 0.25MPa, leak test order is: be just pressed onto negative pressure and arriving malleation again, be that the above air pressure of 315KVA is 0.15MPa for the second time, 315KVA and following air pressure are 0.20MPa, and leak test order is: negative pressure is to malleation.
Beneficial effect of the present invention:
The inventive method simplicity of design, principle is clear, by twice leak test, can get rid of completely because of fuel tank weld strength defect and assembling handling process collision or fitting tight part improper, cause Leakage in Transformer oil, leak test is effective, cost is low, safe and reliable.
Embodiment
Embodiment 1: the leak testing process of secondary air pressure of oil-immersed power transformer, comprises the following steps:
(1) first the oil tank of transformer that welded is rejected to welding slag, check whether rosin joint and pore of outward appearance, oil tank of transformer is sealed;
(2) to aerating leak test in above-mentioned oil tank of transformer, pressure is that the above air pressure of 315KVA is 0.2MPa, 315KVA and following air pressure are 0.25MPa, after leak test 3-4 hour, check and have ne-leakage, if ne-leakage is by earth pressure release and be evacuated to-0.05MPa, keep again pressure being returned to initial pressure after 2.5-3.5 hour and keep 5 hours, the oil tank of transformer that there is no seepage is carried out to acid washing phosphorization processing, then carry out primer spray and finish paint;
(3) dry and fastening good transformer body is put into fuel tank hitch box along, add the transformer oil of figure paper weight 70%;
(4) above-mentioned transformer being lifted up into vacuum drying room be evacuated to-0.04MPa keeps hanging out vacuum drying room after 2 hours, transformer oil is added to the position needing, carry out secondary air pressure leak test, the above air pressure of 315KVA is 0.15MPa, 315KVA and following air pressure are 0.2MPa, keep after 10-14 hour, ne-leakage transformer can be put in storage.