CN102587406A - 一种混凝土填充式塔吊基础格构柱的浇筑施工方法 - Google Patents

一种混凝土填充式塔吊基础格构柱的浇筑施工方法 Download PDF

Info

Publication number
CN102587406A
CN102587406A CN2012100652928A CN201210065292A CN102587406A CN 102587406 A CN102587406 A CN 102587406A CN 2012100652928 A CN2012100652928 A CN 2012100652928A CN 201210065292 A CN201210065292 A CN 201210065292A CN 102587406 A CN102587406 A CN 102587406A
Authority
CN
China
Prior art keywords
lattice column
steel wire
construction method
tower crane
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100652928A
Other languages
English (en)
Inventor
刘玉涛
华学严
陈正立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2012100652928A priority Critical patent/CN102587406A/zh
Publication of CN102587406A publication Critical patent/CN102587406A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明提供了一种混凝土填充式塔吊基础格构柱的浇筑施工方法,包括以下步骤:步骤一:焊接制作格构柱;步骤二:将镀锌钢丝网包裹并固定在格构柱外围;步骤三:安装格构柱和格构柱基础桩的钢筋笼,浇捣格构柱基础桩至桩位超灌标高以后,格构柱外部填碎石,同时口字型空腔内浇灌填满混凝土至桩顶。格构柱施工完成面干净,格构柱整体强度和刚度提高,施工操作简便,适用范围广。

Description

一种混凝土填充式塔吊基础格构柱的浇筑施工方法
技术领域
本发明涉及建筑工程领域,具体涉及一种混凝土填充式塔吊基础格构柱的浇筑施工方法。
背景技术
为了满足施工需要,考虑有些塔吊必须在地下室底板完成前安装,塔吊基础采用格构柱形式。目前,施工现场格构柱形式断面为口字型,采用四根角钢围成,口字内部为空腔,格构柱整体强度和刚度较差。
发明内容
本发明所要解决的技术问题在于提供一种混凝土填充式塔吊基础格构柱的浇筑施工方法,格构柱施工完成面干净,格构柱整体强度和刚度提高,施工操作简便,适用范围广。
为解决上述现有的技术问题,本发明采用如下方案:一种混凝土填充式塔吊基础格构柱的浇筑施工方法,包括以下步骤:
步骤一:焊接制作格构柱;
步骤二:将镀锌钢丝网包裹并固定在格构柱外围;
步骤三:安装格构柱和格构柱基础桩的钢筋笼,浇捣格构柱基础桩至桩位超灌标高以后,格构柱外部填碎石,空腔内浇灌填满混凝土至桩顶。
作为优选,所述步骤二中,在将镀锌钢丝网包裹并固定在格构柱外围时,先将镀锌钢丝网包裹在格构柱外围,将镀锌钢丝网与格构柱点焊在一起,再将镀锌钢丝网的外围每隔一段距离用钢箍箍紧。能使镀锌钢丝网包裹更牢靠。
作为优选,所述步骤三中,在安装格构柱和格构柱基础桩时,先将格构柱的下端伸入用做格构柱基础桩骨架的钢筋笼中并与之焊接,再将格构柱与钢筋笼一起下放至设计标高,然后进行浇筑。安装方便省力,桩基牢靠稳固,成本低。
作为优选,所述格构柱的水平截面为口字形。口字形可由4根角钢围成,便于取材和加工。
有益效果:
本发明采用上述技术方案提供的一种混凝土填充式塔吊基础格构柱的浇筑施工方法,格构柱施工完成面干净,格构柱整体强度和刚度提高,施工操作简便,适用范围广。
附图说明
图1为本发明施工时的结构示意图;
图2为本发明的格构柱水平截面示意图;
图3为本发明的镀锌钢丝网的结构示意图。
具体实施方式
如图1至3所示,一种混凝土填充式塔吊基础格构柱的浇筑施工方法,包括以下步骤:
步骤一:焊接制作格构柱1;
步骤二:将镀锌钢丝网2包裹并固定在格构柱1外围;
步骤三:安装格构柱1和格构柱基础桩4的钢筋笼,浇捣格构柱基础桩至桩位超灌标高以后,格构柱1外部填碎石3,同时口字型空腔内浇灌填满混凝土11至桩顶。
所述步骤二中,在将镀锌钢丝网2包裹并固定在格构柱1外围时,先将镀锌钢丝网2包裹在格构柱1外围,将镀锌钢丝网2与格构柱1点焊在一起,再将镀锌钢丝网2的外围每隔一段距离用钢箍6箍紧。所述步骤三中,在安装格构柱1和格构柱基础桩4时,先将格构柱1的下端伸入用做格构柱基础桩4骨架的钢筋笼41中并与之焊接,再将格构柱1与钢筋笼41一起下放至设计标高,然后进行浇筑。所述格构柱1的水平截面为口字形。
首先,将四根等边角钢和缀板焊接成口字型的格构柱1,格构柱1外围包裹镀锌钢丝网2,在格构柱1转角部位采用点焊暂时将镀锌钢丝网2固定,然后采用圆钢制成的钢箍6,每隔450mm焊接一个;当浇捣格构柱基础桩时,先吊放格构柱基础桩钢筋笼41,并暂时固定在桩护筒上,然后将格构柱1与钻孔灌注桩桩钢筋笼41焊接,格构柱伸入钢筋笼41大于3米,再将格构柱1与钢筋笼41一起下放至设计标高,浇灌混凝土至桩位超灌标高以后,格构柱1外部填碎石3,同时内部浇灌混凝土11,将口字型空腔内填满混凝土。
本发明中,格构柱施工完成面干净,格构柱整体强度和刚度提高,施工操作简便,适用范围广。本发明结构简单、制造简便、成本低,实用性强。

Claims (4)

1.一种混凝土填充式塔吊基础格构柱的浇筑施工方法,其特征在于:包括以下步骤:
步骤一:焊接制作格构柱(1);
步骤二:将镀锌钢丝网(2)包裹并固定在格构柱(1)外围;
步骤三:安装格构柱(1)和格构柱基础桩(4)的钢筋笼,浇捣格构柱基础桩至桩位超灌标高以后,格构柱(1)外部填碎石(3),空腔内浇灌填满混凝土(11)至桩顶。
2.根据权利要求1所述的一种混凝土填充式塔吊基础格构柱的浇筑施工方法,其特征在于:所述步骤二中,在将镀锌钢丝网(2)包裹并固定在格构柱(1)外围时,先将镀锌钢丝网(2)包裹在格构柱(1)外围,然后将镀锌钢丝网(2)与格构柱(1)点焊在一起,再将镀锌钢丝网(2)的外围每隔一段距离用钢箍(6)箍紧。
3.根据权利要求1所述的一种混凝土填充式塔吊基础格构柱的浇筑施工方法,其特征在于:所述步骤三中,在安装格构柱(1)和格构柱基础桩(4)时,先将格构柱(1)的下端伸入用做格构柱基础桩(4)骨架的钢筋笼(41)中并与之焊接,再将格构柱(1)与钢筋笼(41)一起下放至设计标高,然后进行浇筑。
4.根据权利要求1所述的一种混凝土填充式塔吊基础格构柱的浇筑施工方法,其特征在于:所述格构柱(1)的水平截面为口字形。
CN2012100652928A 2012-03-13 2012-03-13 一种混凝土填充式塔吊基础格构柱的浇筑施工方法 Pending CN102587406A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100652928A CN102587406A (zh) 2012-03-13 2012-03-13 一种混凝土填充式塔吊基础格构柱的浇筑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100652928A CN102587406A (zh) 2012-03-13 2012-03-13 一种混凝土填充式塔吊基础格构柱的浇筑施工方法

Publications (1)

Publication Number Publication Date
CN102587406A true CN102587406A (zh) 2012-07-18

Family

ID=46476597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100652928A Pending CN102587406A (zh) 2012-03-13 2012-03-13 一种混凝土填充式塔吊基础格构柱的浇筑施工方法

Country Status (1)

Country Link
CN (1) CN102587406A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132537A (zh) * 2013-02-04 2013-06-05 中天建设集团有限公司 钢格构柱回字型混凝土承台组合式塔吊基础结构及施工方法
CN104005414A (zh) * 2014-06-12 2014-08-27 广州市城市规划勘测设计研究院 大直径钢筋混凝土灌注桩支撑立柱的施工方法
CN106677170A (zh) * 2017-01-24 2017-05-17 上海长凯岩土工程有限公司 一种钢构件结合水泥浆形成受力体的施工方法
CN106836264A (zh) * 2017-01-09 2017-06-13 国网山东省电力公司烟台供电公司 一种杆塔基础施工方法
CN109183812A (zh) * 2018-11-01 2019-01-11 深圳市工勘岩土集团有限公司 组合式深基坑支护结构的施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064305A (ja) * 1998-08-26 2000-02-29 Susumu Takamatsu 鉄塔基礎構造とその製法
JP2002146810A (ja) * 2000-11-10 2002-05-22 Chugoku Electric Power Co Inc:The 無停電高架基礎切替工法
CN101240550A (zh) * 2007-12-26 2008-08-13 浙江省长城建设集团股份有限公司 格构式钢柱塔吊基础座的施工方法
CN201254432Y (zh) * 2008-07-31 2009-06-10 南通建筑工程总承包有限公司 深基坑工程的塔吊支撑结构
CN201428139Y (zh) * 2009-06-17 2010-03-24 中达建设集团股份有限公司 钢格构架式塔式起重机基础结构
CN201896318U (zh) * 2010-11-24 2011-07-13 浙江中成建工集团有限公司 塔吊基础节与钢格构柱的连接结构
CN102312424A (zh) * 2011-07-04 2012-01-11 绍兴文理学院 软土地基lcsg桩与堆载预压联合处理方法及其装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064305A (ja) * 1998-08-26 2000-02-29 Susumu Takamatsu 鉄塔基礎構造とその製法
JP2002146810A (ja) * 2000-11-10 2002-05-22 Chugoku Electric Power Co Inc:The 無停電高架基礎切替工法
CN101240550A (zh) * 2007-12-26 2008-08-13 浙江省长城建设集团股份有限公司 格构式钢柱塔吊基础座的施工方法
CN201254432Y (zh) * 2008-07-31 2009-06-10 南通建筑工程总承包有限公司 深基坑工程的塔吊支撑结构
CN201428139Y (zh) * 2009-06-17 2010-03-24 中达建设集团股份有限公司 钢格构架式塔式起重机基础结构
CN201896318U (zh) * 2010-11-24 2011-07-13 浙江中成建工集团有限公司 塔吊基础节与钢格构柱的连接结构
CN102312424A (zh) * 2011-07-04 2012-01-11 绍兴文理学院 软土地基lcsg桩与堆载预压联合处理方法及其装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁勇祥等: "塔吊钢格构柱连桩基础的应用", 《建筑施工》 *
余涛等: "钢格构柱式塔吊基础在基坑中的应用", 《浙江建筑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132537A (zh) * 2013-02-04 2013-06-05 中天建设集团有限公司 钢格构柱回字型混凝土承台组合式塔吊基础结构及施工方法
CN104005414A (zh) * 2014-06-12 2014-08-27 广州市城市规划勘测设计研究院 大直径钢筋混凝土灌注桩支撑立柱的施工方法
CN104005414B (zh) * 2014-06-12 2016-06-08 广州市城市规划勘测设计研究院 大直径钢筋混凝土灌注桩支撑立柱的施工方法
CN106836264A (zh) * 2017-01-09 2017-06-13 国网山东省电力公司烟台供电公司 一种杆塔基础施工方法
CN106677170A (zh) * 2017-01-24 2017-05-17 上海长凯岩土工程有限公司 一种钢构件结合水泥浆形成受力体的施工方法
CN109183812A (zh) * 2018-11-01 2019-01-11 深圳市工勘岩土集团有限公司 组合式深基坑支护结构的施工方法

Similar Documents

Publication Publication Date Title
CN102587406A (zh) 一种混凝土填充式塔吊基础格构柱的浇筑施工方法
CN202012088U (zh) 一种塔吊的基础结构
CN105008636A (zh) 滑动模板成形的混凝土塔
CN102864781A (zh) 一种斜桩基坑支护方法
CN202055249U (zh) 一种微型管桩结合复合土钉墙支护结构
CN103043543B (zh) 沿海区域塔吊加固装置
CN203834926U (zh) 清水混凝土地下室外墙模板支模结构
CN202139846U (zh) 应用于玻璃钢圆柱模板的固定系统
CN108589709B (zh) 空心无箍筋摩擦桩及其施工方法
CN104594360A (zh) 一种复合式双排桩基坑支护结构
CN203821381U (zh) 矩形预应力灌注桩
CN104818729A (zh) 可供大小塔吊转换的共用基础
EP3006639B1 (en) Module for slabs and metho to make said module
CN104278689B (zh) 箱式变电站与风力发电设施共用基础装置及其施工方法
CN204080793U (zh) 钢筋笼吊装装置
CN105971196A (zh) 砌体结构内嵌式方钢管混凝土圈梁-构造柱建造方法
CN203603149U (zh) 一种多用途可变强度预应力预制桩
CN201915411U (zh) 一种土钉墙支护结构
CN203066060U (zh) 钻孔灌注桩钢筋笼
CN102817376B (zh) 大体积片石混凝土沉降缝施工方法
CN105155573A (zh) 海上风机筒中筒基础
CN201809974U (zh) 玻璃钢圆柱模板装置
CN204780892U (zh) 一种高强度的管桩裂缝补强结构
CN204139190U (zh) 一种可吊装预制砖胎膜
CN204662486U (zh) 可供大小塔吊转换的共用基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718