CN102587346A - 一种大型无筋地坪地基的建造方法 - Google Patents

一种大型无筋地坪地基的建造方法 Download PDF

Info

Publication number
CN102587346A
CN102587346A CN2012100812518A CN201210081251A CN102587346A CN 102587346 A CN102587346 A CN 102587346A CN 2012100812518 A CN2012100812518 A CN 2012100812518A CN 201210081251 A CN201210081251 A CN 201210081251A CN 102587346 A CN102587346 A CN 102587346A
Authority
CN
China
Prior art keywords
layer
broken stone
graded broken
macromolecule
compacting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100812518A
Other languages
English (en)
Other versions
CN102587346B (zh
Inventor
张谨
路江龙
谈丽华
王迅飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ARTS GROUP CO., LTD.
Original Assignee
Suzhou Industrial Park Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Design & Research Institute Co Ltd filed Critical Suzhou Industrial Park Design & Research Institute Co Ltd
Priority to CN 201210081251 priority Critical patent/CN102587346B/zh
Publication of CN102587346A publication Critical patent/CN102587346A/zh
Application granted granted Critical
Publication of CN102587346B publication Critical patent/CN102587346B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种大型无筋地坪地基的建造方法,包括:(1)将原有场地土方处理压实,得到原土层,要求达到Ev2≥45MN/m2,Ev2/Ev1<2.5;(2)在原土层上铺设2/56级配碎石,并处理压实,得到2/56级配碎石层,要求达到压实系数≥0.97,Ev2≥100MN/m2,Ev2/Ev1<2.5;(3)在2/56级配碎石层上铺设0/45级配碎石,并处理压实,得到0/45级配碎石层,要求达到压实系数≥0.97,Ev2≥120MN/m2,Ev2/Ev1<2.5;(4)在0/45级配碎石层上铺设高分子PE防水膜,高分子PE防水膜的厚度≥0.6mm;(5)在所述高分子PE防水膜上设置C30素混凝土层。本发明施工速度较快、降低成本。

Description

一种大型无筋地坪地基的建造方法
技术领域
[0001] 本发明涉及一种大型无筋地坪地基的建造方法。
背景技术
[0002]目前,随着经济的发展,很多大型场合需要用到地坪地基,例如工业场合或物流场合,为了满足承载力,通常需要铺设钢筋,存在的缺陷是:施工速度较慢、成本较高等。
发明内容
[0003] 为了克服已有地坪地基的建造方法的施工速度较慢、成本较高的不足,本发明提供一种施工速度较快、降低成本的大型无筋地坪地基的建造方法。
[0004] 本发明解决其技术问题所采用的技术方案是:
[0005] 一种大型无筋地坪地基的建造方法,所述大型无筋地坪地基自下而上依次包括压实原土层、2/56级配碎石层、0/45级配碎石层、高分子PE防水膜、C30素混凝土层;所述建造方法包括:
[0006] (I)将原有场地土方处理压实,得到原土层,采用Ev测试技术测试原土层,要求达到 Ev2 彡 45MN/m2,Ev2/Evl < 2. 5 ;
[0007] (2)在原土层上铺设2/56级配碎石,并处理压实,得到2/56级配碎石层,采用Ev 测试技术和压实度试验测试2/56级配碎石层,要求达到压实系数> O. 97,Ev2 ^ 100MN/m2, Ev2/Evl < 2. 5 ;
[0008] (3)在2/56级配碎石层上铺设0/45级配碎石,并处理压实,得到0/45级配碎石层,采用Ev测试技术和压实度试验测试0/45级配碎石层,要求达到压实系数> O. 97, Ev2 彡 120MN/m2,Ev2/Evl < 2. 5 ;
[0009] (4)在0/45级配碎石层上铺设高分子PE防水膜,高分子PE防水膜的厚度 ^ O. 6mm ;
[0010] (5)在所述高分子PE防水膜上设置C30素混凝土层。
[0011 ] 进一步,所述0/45级配碎石层与高分子PE防水膜之间还设有C15素混凝土垫层; 所述步骤(4)中,在0/45级配碎石层上铺设C15素混凝土垫层,所述C15素混凝土垫层上铺设高分子PE防水膜。
[0012] 再进一步,所述步骤(3)中,0/45级配碎石层采用两层结构。
[0013] 所述步骤(4)中,高分子PE防水膜采用两层结构,每层膜厚度> O. 3mm。
[0014] 本发明的技术构思为:大面积无筋工业地坪的发展也日益加强。为确保无钢筋地坪的后期使用质量,其相应的可靠实用的地基处理技术运用而生。
[0015] 通过自下而上的每层回填材料的不同要求的压实,平衡地面传力途径,解决后期使用由于使用荷载不均引起的不均匀沉降及大面积开裂等。其优点是利用Ev测试技术,严格控制每层回填材料的回填压实质量,通过回填厚度及压实要求的修改,可以满足不同的地面要求。
3[0016] Ev测试技术:即通过承载板和加载装置,测得地基的应力及沉降间的关系的技术。一次变形模量Evl :用第一次加载测得的承载板下应力σ和与之对应的承载板中心沉降量S计算的变形模量。二次变形模量Εν2 :用第二次加载测得的承载板下应力σ和与之对应的承载板中心沉降量S计算的变形模量。
[0017] 压实度试验:先取压实前的土样送试验室测定其最佳含水量时的干密度,此为试样干密度。再取由击打实试验后所得的试样最大干密度,用实际干密度除以最大干密度即是土的压实度,即压实系数。
[0018] 本发明的有益效果主要表现在:(I)地坪承载能力大;(2)无大范围裂缝;(3)无整体或不均匀沉降风险;(4)无须绑扎钢筋,施工速度快;(5)检测方便简单,易于控制;(6) 经济性好。
附图说明
[0019] 图I是无筋地坪地基的横向断面图。
具体实施方式
[0020] 下面结合附图对本发明作进一步描述。
[0021 ] 参照图I,一种大型无筋地坪地基的建造方法,所述大型无筋地坪地基自下而上依次包括压实原土层、2/56级配碎石层、0/45级配碎石层、高分子PE防水膜、C30素混凝土层; 所述建造方法包括:
[0022] (I)将原有场地土方处理压实,得到原土层,采用Ev测试技术测试原土层,要求达到 Εν2 彡 45MN/m2,Ev2/Evl < 2. 5 ;
[0023] (2)在原土层上铺设2/56级配碎石,并处理压实,得到2/56级配碎石层,采用Ev 测试技术和压实度试验测试2/56级配碎石层,要求达到压实系数> O. 97,Ev2 ^ 100MN/m2, Ev2/Evl < 2. 5 ;
[0024] (3)在2/56级配碎石层上铺设0/45级配碎石,并处理压实,得到0/45级配碎石层,采用Ev测试技术和压实度试验测试0/45级配碎石层,要求达到压实系数> O. 97, Ev2 彡 120MN/m2,Ev2/Evl < 2. 5 ;
[0025] (4)在0/45级配碎石层上铺设高分子PE防水膜,高分子PE防水膜的厚度 ^ O. 6mm ;
[0026] (5)在所述高分子PE防水膜上设置C30素混凝土层。
[0027] 所述0/45级配碎石层3与高分子PE防水膜5之间还设有C15素混凝土垫层4 ; 所述步骤(4)中,在0/45级配碎石层上铺设C15素混凝土垫层,所述C15素混凝土垫层上铺设高分子PE防水膜。
[0028] 所述步骤(3)中,0/45级配碎石层采用两层结构。当然,也可以采用三层结构等其他形式。
[0029] 所述步骤(4)中,高分子PE防水膜采用两层结构,每层膜厚度> O. 3mm。
[0030] 本实施例通过自下而上的每层回填材料的不同要求的压实,平衡地面传力途径, 解决后期使用由于使用荷载不均引起的不均匀沉降及大面积开裂等。其优点是利用Ev测试技术,严格控制每层回填材料的回填压实质量,通过回填厚度及压实要求的修改,可以满足不同的地面要求。
[0031] 本实施例适用于大型厂房,物流中心的大面积室内地坪的地基处理。

Claims (4)

1. 一种大型无筋地坪地基的建造方法,其特征在于:所述大型无筋地坪地基自下而上依次包括压实原土层、2/56级配碎石层、0/45级配碎石层、高分子PE防水膜、C30素混凝土层;所述建造方法包括:(1)将原有场地土方处理压实,得到原土层,采用Ev测试技术测试原土层,要求达到 Ev2 彡 45MN/m2,Ev2/Evl < 2. 5 ;(2)在原土层上铺设2/56级配碎石,并处理压实,得到2/56级配碎石层,采用Ev测试技术和压实度试验测试2/56级配碎石层,要求达到压实系数彡O. 97,Ev2彡100MN/m2, Ev2/ Evl < 2. 5 ;(3)在2/56级配碎石层上铺设0/45级配碎石,并处理压实,得到0/45级配碎石层,采用Ev测试技术和压实度试验测试0/45级配碎石层,要求达到压实系数> O. 97, Ev2 彡 120MN/m2,Ev2/Evl < 2. 5 ;(4)在0/45级配碎石层上铺设高分子PE防水膜,高分子PE防水膜的厚度> O. 6mm ;(5)在所述高分子PE防水膜上设置C30素混凝土层。
2.如权利要求I所述的大型无筋地坪地基的建造方法,其特征在于:所述0/45级配碎石层与高分子PE防水膜之间还设有C15素混凝土垫层;所述步骤(4)中,在0/45级配碎石层上铺设C15素混凝土垫层,所述C15素混凝土垫层上铺设高分子PE防水膜。
3.如权利要求I或2所述的大型无筋地坪地基的建造方法,其特征在于:所述步骤(3) 中,0/45级配碎石层采用两层结构。
4.如权利要求I或2所述的大型无筋地坪地基的建造方法,其特征在于:所述步骤(4) 中,高分子PE防水膜采用两层结构,每层膜厚度> O. 3mm。
CN 201210081251 2012-03-26 2012-03-26 一种大型无筋地坪地基的建造方法 Active CN102587346B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210081251 CN102587346B (zh) 2012-03-26 2012-03-26 一种大型无筋地坪地基的建造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210081251 CN102587346B (zh) 2012-03-26 2012-03-26 一种大型无筋地坪地基的建造方法

Publications (2)

Publication Number Publication Date
CN102587346A true CN102587346A (zh) 2012-07-18
CN102587346B CN102587346B (zh) 2013-09-18

Family

ID=46476539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210081251 Active CN102587346B (zh) 2012-03-26 2012-03-26 一种大型无筋地坪地基的建造方法

Country Status (1)

Country Link
CN (1) CN102587346B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005240398A (ja) * 2004-02-26 2005-09-08 Sumitomo Osaka Cement Co Ltd 透水性舗装、及び透水性舗装の施工方法
CN1789568A (zh) * 2004-12-15 2006-06-21 贵阳铝镁设计研究院 防碱地坪的施工方法
CN101293763A (zh) * 2008-06-26 2008-10-29 河南国基建设集团有限公司 透水性混凝土及路面施工方法
CN202031001U (zh) * 2011-04-02 2011-11-09 上海德滨环保科技有限公司 一种复合透水道路构造
CN102400429A (zh) * 2010-09-15 2012-04-04 北京中景橙石建筑科技有限公司 一种表面露骨料压印透水水泥混凝土地面结构及其制作方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005240398A (ja) * 2004-02-26 2005-09-08 Sumitomo Osaka Cement Co Ltd 透水性舗装、及び透水性舗装の施工方法
CN1789568A (zh) * 2004-12-15 2006-06-21 贵阳铝镁设计研究院 防碱地坪的施工方法
CN101293763A (zh) * 2008-06-26 2008-10-29 河南国基建设集团有限公司 透水性混凝土及路面施工方法
CN102400429A (zh) * 2010-09-15 2012-04-04 北京中景橙石建筑科技有限公司 一种表面露骨料压印透水水泥混凝土地面结构及其制作方法
CN202031001U (zh) * 2011-04-02 2011-11-09 上海德滨环保科技有限公司 一种复合透水道路构造

Also Published As

Publication number Publication date
CN102587346B (zh) 2013-09-18

Similar Documents

Publication Publication Date Title
CN202247966U (zh) 一种模拟复杂荷载条件下桩承式路堤模型试验装置
Hong et al. Compression behaviour of reconstituted soils at high initial water contents
Hegde et al. Effect of infill materials on the performance of geocell reinforced soft clay beds
Hegde et al. Experimental and numerical studies on footings supported on geocell reinforced sand and clay beds
Fattah et al. Estimation of bearing capacity of floating group of stone columns
Biswas et al. Influence of subgrade strength on the performance of geocell-reinforced foundation systems
Hegde et al. Experimental and analytical studies on soft clay beds reinforced with bamboo cells and geocells
Hegde et al. Behaviour of geocell reinforced soft clay bed subjected to incremental cyclic loading
Ghaaowd et al. Shearing behavior of tire-derived aggregate with large particle size. I: Internal and concrete interface direct shear
Magnani et al. Behaviour of two reinforced test embankments on soft clay
Pierson et al. Laterally loaded shaft group capacities and deflections behind an MSE wall
Latha et al. A multiple regression equation for prediction of bearing capacity of geosynthetic reinforced sand beds
Kumar et al. Model tests of square footing resting on fibre-reinforced sand bed
CN104034306A (zh) 垃圾填埋场下卧土体局部沉陷及衬垫变形试验箱
Kame et al. Pullout capacity of a vertical plate anchor embedded in cohesion-less soil
CN102587346B (zh) 一种大型无筋地坪地基的建造方法
CN202688980U (zh) 大型无筋地坪地基
Vennapusa et al. Influence of support conditions on roller-integrated machine drive power measurements for granular base
CN100480470C (zh) 快速消除不均匀沉降的软地基处理工法
Singh et al. Experimental study of piled raft foundation
Indraratna et al. Soft clay properties for non-Darcian radial drainage with vacuum preloading, based on Rowe cell resting
Al-Neami Reducing settlement of soft soils using local materials
Li et al. CFG compound foundation in high-rise building design and application
Liu et al. Study on vertical bearing capacity of solid and perforated mudmats in clay
Sitharam et al. Effects of base geogrid on geocell-reinforced foundation beds

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu province 215028 Industrial Park Suzhou Bada Street No. 111

Patentee after: ARTS GROUP CO., LTD.

Address before: Suzhou Industrial Park Suzhou City, Jiangsu province 215126 Sheng Pu Zhen Jin Sheng Lu No. 12

Patentee before: Suzhou Industrial Park Design & Research Institute Co., Ltd.

C56 Change in the name or address of the patentee