CN102568973A - Temporary connecting device for live-line replacement of fuse tube of drop type fuse - Google Patents
Temporary connecting device for live-line replacement of fuse tube of drop type fuse Download PDFInfo
- Publication number
- CN102568973A CN102568973A CN2010106004563A CN201010600456A CN102568973A CN 102568973 A CN102568973 A CN 102568973A CN 2010106004563 A CN2010106004563 A CN 2010106004563A CN 201010600456 A CN201010600456 A CN 201010600456A CN 102568973 A CN102568973 A CN 102568973A
- Authority
- CN
- China
- Prior art keywords
- fuse
- drop
- joints
- fixed
- conductor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Fuses (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种输变电设备的带电作业装置,具体属于一种用于带电更换跌落式熔断器熔丝管的临时连接装置。The invention relates to a live working device for power transmission and transformation equipment, in particular to a temporary connection device for live replacement of a fuse tube of a drop-out fuse.
背景技术 Background technique
跌落式熔断器是一种常用的短路保护开关,它具有成本低、操作方便、户外环境适应性强等特点,被广泛应用于10kV配电线路分支线和配电变压器中。目前,在10kV的高压线路中,跌落式熔断器的熔丝出现问题需要更换熔断器,或者对跌落式熔断器进行检修的时候,通常需要停电进行更换作业,这样就会造成大面积的长时间停电,影响线路供电范围内企事业单位的正常运行和人们的日常生活,给社会效益和经济效益带来巨大的损失。Drop-out fuse is a commonly used short-circuit protection switch. It has the characteristics of low cost, convenient operation, and strong adaptability to outdoor environments. It is widely used in branch lines of 10kV distribution lines and distribution transformers. At present, in the 10kV high-voltage line, if the fuse of the drop-out fuse has a problem and needs to be replaced, or when the drop-out fuse is overhauled, it usually needs to be replaced by a power outage, which will cause a large area and a long time. Power failure affects the normal operation of enterprises and institutions within the line power supply range and people's daily life, and brings huge losses to social and economic benefits.
发明内容 Contents of the invention
本发明要解决的技术问题是提供一种用于跌落式熔断器带电更换熔丝管的临时连接装置,能够在不停电的情况下更换跌落式熔断器的熔丝元件或检修较长线路。The technical problem to be solved by the present invention is to provide a temporary connection device for live replacement of drop-out fuses, which can replace fuse elements of drop-out fuses or repair long lines without power failure.
为解决上述技术问题,本发明的用于跌落式熔断器带电更换熔丝管的临时连接装置,包括绝缘操作件、两个导电接头和导电体,所述导电体安装在两个导电接头之间,所述导电体通过导电接头连接到熔断器所在线路中。In order to solve the above-mentioned technical problems, the temporary connection device for live replacement of drop-out fuses according to the present invention includes an insulating operating part, two conductive joints and a conductor, and the conductor is installed between the two conductive joints , the conductor is connected to the circuit where the fuse is located through a conductive joint.
优选地,所述两个导电接头为固定连接接头,绝缘操作件为安装在两个固定连接接头上的绝缘棒,导电体为一根连接导线,所述连接导线的两端分别固定在两个固定连接接头上。所述一个固定连接接头与线路主导线相连,另一个固定连接接头与熔断器的接线杆相连。Preferably, the two conductive joints are fixed connection joints, the insulating operating part is an insulating rod installed on the two fixed connection joints, the conductor is a connecting wire, and the two ends of the connecting wire are respectively fixed on two Fix the connection on the joint. The one fixed connection joint is connected with the main conductor of the line, and the other fixed connection joint is connected with the wiring rod of the fuse.
优选地,所述绝缘操作件为一根绝缘操作棒,两个导电接头分别为下固定触头和上固定触头,导电体包括一根连接引线、与上固定触头电性连接的过负荷熔断管,所述连接引线一端与过负荷熔断管电性连接,另一端固定连接在下固定触头上,所述过负荷熔断管的下端与安装在下固定触头上的铜质调节管上端相连接,所述铜质调节管的下端外部固定有一个万向接头,所述万向接头与绝缘操作棒上端连接。所述上固定触头连接在熔断器的上桩头上,下固定触头连接在熔断器的下桩头上。Preferably, the insulated operating member is an insulated operating rod, the two conductive joints are respectively the lower fixed contact and the upper fixed contact, and the electrical conductor includes a connecting lead wire and an overload Fuse tube, one end of the connection lead is electrically connected to the overload fuse tube, the other end is fixedly connected to the lower fixed contact, the lower end of the overload fuse tube is connected to the upper end of the copper adjustment tube installed on the lower fixed contact , a universal joint is fixed outside the lower end of the copper regulating tube, and the universal joint is connected to the upper end of the insulating operating rod. The upper fixed contact is connected to the upper pile head of the fuse, and the lower fixed contact is connected to the lower pile head of the fuse.
本发明能够在线路不停电的状态下及时更换存在缺陷的跌落式熔断器熔丝元件,保证了电力的持续供应,对于一些重要用户和专供用户,如医院,学校,部队,或者供电可靠性要求比较高的企业有着极高的实际意义。The present invention can timely replace defective drop-out fuse elements without power failure on the line, ensuring the continuous supply of electric power. For some important users and dedicated users, such as hospitals, schools, troops, or power supply reliability Enterprises with relatively high requirements have extremely high practical significance.
此外,本发明还能够保证较长线路上不停电检修,减少了停电时间,增加了供电量,为企业赢得更好的经济效益和社会效益。In addition, the present invention can also ensure non-stop maintenance on long lines, reduce power outage time, increase power supply, and win better economic and social benefits for enterprises.
附图说明 Description of drawings
下面结合附图与具体实施方式对本发明作进一步详细的说明:Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:
图1是本发明第一实施例的结构示意图;Fig. 1 is the structural representation of the first embodiment of the present invention;
图2是本发明第二实施例的主视图;Fig. 2 is the front view of the second embodiment of the present invention;
图3是本发明第二实施例的侧视图。Fig. 3 is a side view of a second embodiment of the present invention.
其中附图标记说明如下:Wherein the reference signs are explained as follows:
1为固定连接接头;2为绝缘棒;3为连接导线;4为上固定触头;5为下固定触头;6为过负荷熔断管;7为铜质调节管;8为连接引线;9为万向接头。1 is the fixed connection joint; 2 is the insulating rod; 3 is the connecting wire; 4 is the upper fixed contact; 5 is the lower fixed contact; 6 is the overload fuse tube; 7 is the copper regulating tube; 8 is the connecting lead; 9 For universal joints.
具体实施方式 Detailed ways
本发明的用于跌落式熔断器带电更换熔丝管的临时连接装置,包括绝缘操作件、两个导电接头和导电体,所述导电体安装在两个导电接头之间,所述导电体通过导电接头连接到熔断器所在线路中。The temporary connection device for live replacement of drop-out fuses according to the present invention includes an insulating operating part, two conductive joints and a conductor, the conductor is installed between the two conductive joints, and the conductor passes through The conductive joint is connected in the line where the fuse is located.
本发明的第一较佳实施例,如图1所示,所述两个导电接头为固定连接接头1,绝缘操作件为安装在两个固定连接接头1上的绝缘棒2,导电体为一根连接导线3。所述连接导线3的两端分别固定在两个固定连接接头1上,一个固定连接接头1与主导线相连,另一个固定连接接头1与熔断器的接线杆相连。In the first preferred embodiment of the present invention, as shown in Figure 1, the two conductive joints are
该第一实施例主要用于中间电位作业,带负荷更换10kV跌落式熔断器元件。具体作业步骤包括:1)将高架绝缘车停放在合适的位置,工作人员操控绝缘斗臂至合适位置;2)工作人员戴上绝缘手套,通过绝缘棒2将固定连接接头1和主导线、熔断器接线杆连接起来,使之成为一带电体;3)使用绝缘操作棒拉开熔断器的熔丝管,并使用吊绳下放至地面,由地面工作人员调换熔丝管元件;4)将熔丝管重新放入熔断器中,并使用绝缘操作棒合上熔断器;5)拆除临时连接装置,更换熔丝管作业结束。This first embodiment is mainly used for intermediate potential work, and replaces 10kV drop-out fuse elements with load. The specific operation steps include: 1) Park the overhead insulation vehicle at a suitable position, and the staff controls the insulating bucket arm to a suitable position; 2) The staff puts on insulating gloves, and uses the
本发明的第二较佳实施例,如图2、3所示,所述绝缘操作件为一根绝缘操作棒,两个导电接头分别为下固定触头5和上固定触头4,导电体包括一根连接引线8、与上固定触头4电性连接的过负荷熔断管6。所述连接引线8一端与过负荷熔断管6电性连接,另一端固定连接在下固定触头5上。所述过负荷熔断管6的下端与安装在下固定触头5上的铜质调节管7上端相连接,所述铜质调节管7的下端外部固定有一个万向接头9,所述万向接头9与绝缘操作棒上端连接。所述上固定触头4连接在熔断器的上桩头上,下固定触头5连接在熔断器的下桩头上。In the second preferred embodiment of the present invention, as shown in Figures 2 and 3, the insulating operating member is an insulating operating rod, and the two conductive joints are respectively the lower fixed
该第二实施例主要用于地电位作业,带负荷更换10kV跌落式熔断器元件。具体作业步骤包括:1)将临时连接装置的万向接头9装到绝缘操作棒上;2)工作人员登高到合适位置,通过绝缘操作棒将上、下固定触头4、5与熔断器上、下桩头连接起来,形成一个带电体;3)使用绝缘操作棒拉开跌落式熔断器的熔丝管;4)将熔丝管挑出并使用吊绳放至地面,由地面工作人员调换熔丝管元件;5)使用绝缘操作棒将更换后的熔丝管放入熔断器下方的槽口中,并合上熔断器;6)拆除临时连接装置,更换熔丝管作业结束。This second embodiment is mainly used for ground potential work, and replacement of 10kV dropout fuse elements under load. The specific operation steps include: 1) install the universal joint 9 of the temporary connection device on the insulating operating rod; , and the lower pile heads are connected to form a charged body; 3) Use an insulating operating rod to pull the fuse tube of the drop-out fuse; 4) Pick out the fuse tube and use a sling to put it on the ground, and the ground staff will replace it Fuse tube components; 5) Put the replaced fuse tube into the notch below the fuse with an insulating operating rod, and close the fuse; 6) Remove the temporary connection device, and replace the fuse tube.
本发明能够在供电线路正常供电的情况下,及时更换10kV跌落式熔断器元件;保障供电线路的安全正常供电,避免停电给供电企业和电力用户带来的不利影响;同时提高了供电可靠性、售电量,提升了行业服务质量,确保对客户进行不间断供电。The invention can timely replace the 10kV drop-out fuse element when the power supply line is normally powered; it can ensure the safe and normal power supply of the power supply line, and avoid the adverse effects of power failure on power supply enterprises and power users; at the same time, it improves the reliability of power supply, The electricity sales have improved the service quality of the industry and ensured uninterrupted power supply to customers.
以上通过具体实施例对本发明进行了详细的说明,但这些并非构成对本发明的限制。在不脱离本发明原理的情况下,本领域的技术人员可以对连接结构做出许多等效置换和改进,这些也应视为本发明的保护范围。The present invention has been described in detail through specific examples above, but these do not constitute a limitation to the present invention. Without departing from the principle of the present invention, those skilled in the art can make many equivalent replacements and improvements to the connection structure, and these should also be regarded as the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010600456.3A CN102568973B (en) | 2010-12-22 | 2010-12-22 | Temporary connecting device for live-line replacement of fuse tube of drop type fuse |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010600456.3A CN102568973B (en) | 2010-12-22 | 2010-12-22 | Temporary connecting device for live-line replacement of fuse tube of drop type fuse |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102568973A true CN102568973A (en) | 2012-07-11 |
| CN102568973B CN102568973B (en) | 2015-03-11 |
Family
ID=46414107
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201010600456.3A Active CN102568973B (en) | 2010-12-22 | 2010-12-22 | Temporary connecting device for live-line replacement of fuse tube of drop type fuse |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102568973B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104348096A (en) * | 2013-07-30 | 2015-02-11 | 国家电网公司 | Device for replacing fuse |
| CN109378754A (en) * | 2018-11-15 | 2019-02-22 | 国网新疆电力有限公司阿勒泰供电公司 | Telescopic drop fuse insulation pole |
| CN115527816A (en) * | 2022-10-12 | 2022-12-27 | 国网江苏省电力有限公司南通供电分公司 | A drop-out fuse fault bypass processing device |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201191719Y (en) * | 2008-04-30 | 2009-02-04 | 上海市电力公司宝山供电分公司 | A fuse protector for non-stop power operation |
| US20090095610A1 (en) * | 2006-05-05 | 2009-04-16 | Trondheim Energiverk Nett As | Method and device for maintenance of high-voltage switchgear with voltage |
| CN201323399Y (en) * | 2008-11-13 | 2009-10-07 | 江苏省电力公司涟水县供电公司 | Temporary short connector |
| CN201910386U (en) * | 2010-12-22 | 2011-07-27 | 上海市电力公司 | Temporary connecting device for live replacement of fuse tube of drop-out fuse |
-
2010
- 2010-12-22 CN CN201010600456.3A patent/CN102568973B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090095610A1 (en) * | 2006-05-05 | 2009-04-16 | Trondheim Energiverk Nett As | Method and device for maintenance of high-voltage switchgear with voltage |
| CN201191719Y (en) * | 2008-04-30 | 2009-02-04 | 上海市电力公司宝山供电分公司 | A fuse protector for non-stop power operation |
| CN201323399Y (en) * | 2008-11-13 | 2009-10-07 | 江苏省电力公司涟水县供电公司 | Temporary short connector |
| CN201910386U (en) * | 2010-12-22 | 2011-07-27 | 上海市电力公司 | Temporary connecting device for live replacement of fuse tube of drop-out fuse |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104348096A (en) * | 2013-07-30 | 2015-02-11 | 国家电网公司 | Device for replacing fuse |
| CN109378754A (en) * | 2018-11-15 | 2019-02-22 | 国网新疆电力有限公司阿勒泰供电公司 | Telescopic drop fuse insulation pole |
| CN115527816A (en) * | 2022-10-12 | 2022-12-27 | 国网江苏省电力有限公司南通供电分公司 | A drop-out fuse fault bypass processing device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102568973B (en) | 2015-03-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108233243B (en) | Gas insulation switch cabinet | |
| CN106300104B (en) | Universal attachment device and its application of the power supply vehicle of meet an emergency with low pressure aerial condutor | |
| CN202930802U (en) | Movable type distribution transformer allowing uninterruptible power supply mounting and dismounting | |
| CN102568973B (en) | Temporary connecting device for live-line replacement of fuse tube of drop type fuse | |
| CN201910386U (en) | Temporary connecting device for live replacement of fuse tube of drop-out fuse | |
| CN206947588U (en) | Bypass cable applied to cable termination accesses servicing unit | |
| CN105405703A (en) | Three-position isolating and grounding switch | |
| CN102480109A (en) | Method for replacing 10kV distribution line lead under load | |
| CN101436792A (en) | Electricity-fetching method for high voltage overhead transmission line on-line monitoring device | |
| CN108134388A (en) | A kind of electricity-fetching method and device of high voltage iron tower auxiliary equipment | |
| CN202997335U (en) | Ring network cabinet | |
| CN107727893A (en) | Easy-to-replaceable arrester Leakage Current table external member | |
| CN205389012U (en) | Intelligent power distribution coils earthing device | |
| CN202258608U (en) | Combined type compound jacket zinc oxide arrester | |
| CN202259117U (en) | Outdoor AC high-voltage drop type fuse | |
| CN206225847U (en) | The universal attachment means of power supply vehicle of meet an emergency and low pressure aerial condutor | |
| CN204886390U (en) | High pressure dual power supply's wiring circuit | |
| CN205017101U (en) | Switching -on device is divided in a distant place | |
| CN202616126U (en) | Novel outdoor AC high-voltage isolation switch | |
| CN203588919U (en) | Low voltage vacuum contactor applied to power control | |
| CN208078616U (en) | A kind of mobile outdoor repair cable distribution box | |
| CN202127101U (en) | Wiring board of separation switch | |
| CN208570982U (en) | A kind of air switch front end connector | |
| CN103022917A (en) | Uninterruptible assembled/disassembled mobile distribution transformer | |
| CN207318545U (en) | A kind of arrester Leakage Current table easily changes structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121121 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20121121 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: State Grid Corporation of China Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation |
|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |