CN102561407A - 潮间带钢构风机基础牺牲阳极块安装工艺 - Google Patents
潮间带钢构风机基础牺牲阳极块安装工艺 Download PDFInfo
- Publication number
- CN102561407A CN102561407A CN2012100321802A CN201210032180A CN102561407A CN 102561407 A CN102561407 A CN 102561407A CN 2012100321802 A CN2012100321802 A CN 2012100321802A CN 201210032180 A CN201210032180 A CN 201210032180A CN 102561407 A CN102561407 A CN 102561407A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe pile
- sacrificial anode
- anode piece
- expendable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Prevention Of Electric Corrosion (AREA)
Abstract
本发明涉及一种潮间带钢构风机基础牺牲阳极块安装工艺,具体为:(1)在退潮或涨潮时先将未安装牺牲阳极块的钢管桩进行沉桩,(2)利用退潮时间,将钢管桩旁的海泥挖出形成坑,(3)将牺牲阳极块放入钢管桩旁挖出的坑中,再将牺牲阳极块的焊脚与钢管桩外壁实施焊接连接,牺牲阳极块位于海泥水平面下方。钢管桩为直立的圆管,钢管桩内壁圆周处安装有5根边导管,5根边导管相邻之间由导管架支撑连接形成五边形,钢管桩的内腔中心处安装有中心导管,中心导管与5根边导管之间分别由导管架连接。安装好的牺牲阳极块能保证无论涨潮、退潮,都淹没在海水中,从而对风机基础发挥阴极保护的作用。
Description
技术领域
本发明涉及海上风电行业的阴极保护防腐施工工程技术领域,具体涉及潮间带钢构风机基础牺牲阳极块安装工艺。
背景技术
潮间带涨潮、退潮,涨潮时风机下部基础全部淹没水中,退潮时风机基础基本裸露于海洋大气。牺牲阳极块的安装高度直接影响到阴极保护作用的发挥。目前国内尚无在该区域使用牺牲阳极块进行阴极保护的先例,为能实现在该区域的牺牲阳极块的阴极保护,需要研发适用于该区域的牺牲阳极块安装工艺。
发明内容
本发明要解决的技术问题是:克服现有技术的不足,提供一种潮间带钢构风机基础牺牲阳极块安装工艺,安装的风机基础牺牲阳极块对风机基础发挥较好的阴极保护的作用。
本发明解决其技术问题所采用的技术方案是:一种潮间带钢构风机基础牺牲阳极块安装工艺,具体为:(1)在退潮或涨潮时先将未安装牺牲阳极块的钢管桩进行沉桩,(2)利用退潮时间,将钢管桩旁的海泥挖出形成坑,(3)将牺牲阳极块放入钢管桩旁挖出的坑中,再将牺牲阳极块的焊脚与钢管桩外壁实施焊接连接,牺牲阳极块位于海泥水平面下方。
所述的钢管桩为直立的圆管,钢管桩壁面圆周处安装有5根边导管,5根边导管相邻之间由导管架支撑连接形成五边形,钢管桩的内腔中心处安装有中心导管,中心导管与5根边导管之间分别由导管架连接。
所述的牺牲阳极块数量为5个,5个牺牲阳极块与钢管桩外壁的焊接位置分别与5根边导管与钢管桩壁面的安装位置相应。
所述的钢管桩的高度、导管架的高度、牺牲阳极块安装的高度根据风机位置处的海泥标高、高潮位水面标高、低潮位水面标高进行计算,风机基础的钢管桩和导管架上需要安装牺牲阳极块的高度和焊接点进行计算和定位后测量高潮位、低潮位的阴极保护电位。
本发明的有益效果是:在退潮或涨潮时先将未安装牺牲阳极块的钢管桩进行沉桩,利用退潮时间,将钢管桩旁的海泥挖出形成坑,将牺牲阳极块放入钢管桩旁挖出的坑中,再将牺牲阳极块的焊脚与钢管桩外壁实施焊接连接。安装好的牺牲阳极块能保证无论涨潮、退潮,都淹没在海水中,从而对风机基础发挥阴极保护的作用。
附图说明
下面结合附图对本发明进一步说明。
图1是本发明中牺牲阳极块的安装示意图;
图2是本发明中钢管桩与导管架的安装示意图;
其中:1.钢管桩,2.牺牲阳极块。
具体实施方式
现在结合附图对本发明作进一步的说明。这些附图均为简化的示意图仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1图2所示,一种潮间带钢构风机基础牺牲阳极块安装工艺,具 体为:(1)在退潮或涨潮时先将未安装牺牲阳极块的钢管桩1进行沉桩,(2)利用退潮时间,将钢管桩1旁的海泥挖出形成坑,(3)将牺牲阳极块2放入钢管桩1旁挖出的坑中,再将牺牲阳极块2的焊脚与钢管桩1外壁实施焊接连接,牺牲阳极块2位于海泥水平面下方。
钢管桩1为直立的圆管,钢管桩1壁面圆周处安装有5根边导管,5根边导管相邻之间由导管架支撑连接形成五边形,钢管桩1的内腔中心处安装有中心导管,中心导管与5根边导管之间分别由导管架连接。
牺牲阳极块2数量为5个,5个牺牲阳极块2与钢管桩1外壁的焊接位置分别与5根边导管与钢管桩1壁面的安装位置相应。
钢管桩1的高度、导管架的高度、牺牲阳极块2安装的高度根据风机位置处的海泥标高、高潮位水面标高、低潮位水面标高进行计算,风机基础的钢管桩1和导管架上需要安装牺牲阳极块2的高度和焊接点进行计算和定位后测量高潮位、低潮位的阴极保护电位。
安装好的牺牲阳极块2能保证无论涨潮、退潮,都淹没在海水中,从而对风机基础发挥阴极保护的作用。以及独特的导管架结构,使钢管桩直立更牢固,不易受潮水冲力倾斜。
本发明的潮间带钢构风机基础牺牲阳极块安装工艺有效、安全的解决了潮间带风机基础的潮差区、全浸区和泥下区域的腐蚀防护难题。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。
Claims (4)
1.一种潮间带钢构风机基础牺牲阳极块安装工艺,具体为:(1)在退潮或涨潮时先将未安装牺牲阳极块的钢管桩进行沉桩,(2)利用退潮时间,将钢管桩旁的海泥挖出形成坑,(3)将牺牲阳极块放入钢管桩旁挖出的坑中,再将牺牲阳极块的焊脚与钢管桩外壁实施焊接连接,牺牲阳极块位于海泥水平面下方。
2.根据权利要求1所述的潮间带钢构风机基础牺牲阳极块安装工艺,其特征在于:所述的钢管桩为直立的圆管,钢管桩壁面圆周处安装有5根边导管,5根边导管相邻之间由导管架支撑连接形成五边形,钢管桩的内腔中心处安装有中心导管,中心导管与5根边导管之间分别由导管架连接。
3.根据权利要求2所述的潮间带钢构风机基础牺牲阳极块安装工艺,其特征在于:所述的牺牲阳极块数量为5个,5个牺牲阳极块与钢管桩外壁的焊接位置分别与5根边导管与钢管桩壁面的安装位置相应。
4.根据权利要求2所述的潮间带钢构风机基础牺牲阳极块安装工艺,其特征在于:所述的钢管桩的高度、导管架的高度、牺牲阳极块安装的高度根据风机位置处的海泥标高、高潮位水面标高、低潮位水面标高进行计算,风机基础的钢管桩和导管架上需要安装牺牲阳极块的高度和焊接点进行计算和定位后测量高潮位、低潮位的阴极保护电位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210032180.2A CN102561407B (zh) | 2012-02-14 | 2012-02-14 | 潮间带钢构风机基础牺牲阳极块安装工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210032180.2A CN102561407B (zh) | 2012-02-14 | 2012-02-14 | 潮间带钢构风机基础牺牲阳极块安装工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102561407A true CN102561407A (zh) | 2012-07-11 |
CN102561407B CN102561407B (zh) | 2016-01-20 |
Family
ID=46407886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210032180.2A Active CN102561407B (zh) | 2012-02-14 | 2012-02-14 | 潮间带钢构风机基础牺牲阳极块安装工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102561407B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153387A (zh) * | 2014-07-17 | 2014-11-19 | 河海大学 | 一种减小波浪力和海水腐蚀的钢管组合桩 |
CN106677204A (zh) * | 2017-01-09 | 2017-05-17 | 河海大学 | 一种减少海洋工程钢管桩基础振动的装置 |
CN108179423A (zh) * | 2016-12-08 | 2018-06-19 | 中石化石油工程技术服务有限公司 | 适用于海洋平台外加电流阴极保护系统中辅助阳极装置及安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4941775A (en) * | 1988-02-26 | 1990-07-17 | Benedict Risque L | Cathodic protection of critical offshore marine structure critical components by making the critical component noble (passive) to the balance of the platform |
CN2729149Y (zh) * | 2004-06-04 | 2005-09-28 | 中国海洋大学 | 钢管桩防腐用圈连悬焊式牺牲阳极 |
CN101130874A (zh) * | 2006-08-23 | 2008-02-27 | 中国科学院金属研究所 | 一种钢管桩牺牲阳极的固定方法 |
CN201513303U (zh) * | 2009-09-25 | 2010-06-23 | 中国水电顾问集团华东勘测设计研究院 | 多桩钢构架海上风电机组基础结构 |
-
2012
- 2012-02-14 CN CN201210032180.2A patent/CN102561407B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4941775A (en) * | 1988-02-26 | 1990-07-17 | Benedict Risque L | Cathodic protection of critical offshore marine structure critical components by making the critical component noble (passive) to the balance of the platform |
CN2729149Y (zh) * | 2004-06-04 | 2005-09-28 | 中国海洋大学 | 钢管桩防腐用圈连悬焊式牺牲阳极 |
CN101130874A (zh) * | 2006-08-23 | 2008-02-27 | 中国科学院金属研究所 | 一种钢管桩牺牲阳极的固定方法 |
CN201513303U (zh) * | 2009-09-25 | 2010-06-23 | 中国水电顾问集团华东勘测设计研究院 | 多桩钢构架海上风电机组基础结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153387A (zh) * | 2014-07-17 | 2014-11-19 | 河海大学 | 一种减小波浪力和海水腐蚀的钢管组合桩 |
CN104153387B (zh) * | 2014-07-17 | 2016-01-06 | 河海大学 | 一种减小波浪力和海水腐蚀的钢管组合桩 |
CN108179423A (zh) * | 2016-12-08 | 2018-06-19 | 中石化石油工程技术服务有限公司 | 适用于海洋平台外加电流阴极保护系统中辅助阳极装置及安装方法 |
CN106677204A (zh) * | 2017-01-09 | 2017-05-17 | 河海大学 | 一种减少海洋工程钢管桩基础振动的装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102561407B (zh) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201649118U (zh) | 导管架式海上风电机组基础结构 | |
NZ618105A (en) | Installing submerged support structures | |
CN206234474U (zh) | 一种海底hdpe管道压重块 | |
CN109372006B (zh) | 海上风机基础防冲刷保护结构及其施工方法 | |
CN209636841U (zh) | 海上风机基础防冲刷保护结构 | |
CN102561407A (zh) | 潮间带钢构风机基础牺牲阳极块安装工艺 | |
CN102296629B (zh) | 一种适用于海洋工程的塔筒式结构物及其安装方法 | |
CN106381881A (zh) | 一种重力式单桩基础 | |
CN203010098U (zh) | 防沉板式水下基础 | |
GB2524460A (en) | Offshore foundation | |
CN202201980U (zh) | 一种海洋工程结构物阴极保护用牺牲阳极串 | |
CN102535522B (zh) | 潮间带钢构风机基础外加电流装置安装工艺 | |
JP2016084660A (ja) | 洋上風力発電装置の基礎構造 | |
CN104234950A (zh) | 深水区用的风力发电机塔筒的底座 | |
CN204608823U (zh) | 一种锚杆束嵌岩式海上风机高桩承台基础 | |
CN104002936A (zh) | 一种滨海浅滩钻探平台 | |
CA2942788A1 (en) | Method for installing overhead transmission line supports on permafrost soils | |
CN204491567U (zh) | 预制钢管桩风力发电平台 | |
CN204491638U (zh) | 一种滨海超深厚软土地基浮置式钢板桩围堰 | |
CN206847612U (zh) | 一种离岸微型验潮仪安装装置 | |
CN207261176U (zh) | 一种海上风电平台插桩固定装置 | |
DK177711B1 (en) | A pumped storage facility | |
CN202787292U (zh) | 海上预制混凝土沉箱或筒式风电基础导流取土沉放装置 | |
CN104695411B (zh) | 预制组合结构钢管桩风力发电平台 | |
CN204803412U (zh) | 一种深海环境用多单元辅助阳极 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |