CN102556906A - 新型换辐射管吊具 - Google Patents
新型换辐射管吊具 Download PDFInfo
- Publication number
- CN102556906A CN102556906A CN2012100171557A CN201210017155A CN102556906A CN 102556906 A CN102556906 A CN 102556906A CN 2012100171557 A CN2012100171557 A CN 2012100171557A CN 201210017155 A CN201210017155 A CN 201210017155A CN 102556906 A CN102556906 A CN 102556906A
- Authority
- CN
- China
- Prior art keywords
- radiant tube
- dolly
- mainframe
- machine frame
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003780 insertion Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000000137 annealing Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005097 cold rolling Methods 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
Abstract
本发明涉及一种新型换辐射管吊具,主要包括一个行车起吊用的主机架和固定支撑辐射管的插杆;所述的插杆上下两杆平行并可分别插入辐射管的两水平管段内;其特征在于在主机架上设置可沿主机架内空间水平移动的小车,小车的水平端头与插杆连接;所述的主机架内空间配置为可容纳小车和辐射管一起水平移动和/或垂直升降;小车自身带配置箱;辐射管要插入的炉墙上还设置有与主机架相平齐的安装平台,所述的主机架能够放置于所述平台上,所述的小车能在所述平台上移动前进。将行车机架与插杆分离,利用小车控制插杆前进进行精细动作插管,减小了因行车前移过度造成辐射管插入过量的风险;尺寸小,适宜空间较小的厂房内安装辐射管。
Description
新型换辐射管吊具
技术领域
[0001] 本发明涉及一种带钢立式连续退火炉的W型辐射管安装、更换拆装用的吊具装置。
背景技术
[0002] 国内各钢厂大型冷轧带钢连退机组,在大型立式连续退火炉的安装、日常维护和检修工作中,特别是安装阶段,由于退火炉辐射管数量多,操作平台空间小,炉内无法吊挂, 辐射管安装维护需要高空作业,在这种情况下拆装、更换辐射管需要使用专用的吊具设备。
[0003] 常用简易杆式换辐射管吊具工作原理为一带配重的机架,在端头用插杆插入W型辐射管内部,支撑住辐射管,并用法兰处螺栓固定好,行车起吊机架,升到安装高度后,行车移动带动机架向前移动,将辐射管穿入炉膛内。该吊具的简易操作方式安装时不方便,在装入炉膛内时行车前移力度不好控制,如行车控制不好,会存在辐射管插入炉膛过量的风险, 特别是对于厂房内行车较高时,行车钩头甩动,用行车钩头小车前移控制辐射管吊具前移更不好控制。
发明内容
[0004] 本发明要解决的技术问题是提供一种新型换辐射管吊具,该吊具尺寸小、操作简便、适宜空间较小的厂房内安装辐射管,并可减小因行车前移过度造成辐射管插入过量的风险。
[0005] 本发明为解决上述技术问题所采用的技术方案为:
[0006] 新型换辐射管吊具,主要包括一个行车起吊用的主机架和固定支撑辐射管的插杆;所述的插杆上下两杆平行并可分别插入辐射管的两水平管段内;其特征在于在主机架上设置可沿主机架内空间水平移动的小车,小车的水平端头与插杆连接;所述的主机架内空间配置为可容纳小车和辐射管一起水平移动和/或垂直升降;小车自身带配置箱;辐射管要插入的炉墙上还设置有与主机架相平齐的安装平台,所述的主机架能够放置于所述平台上,所述的小车能在所述平台上移动前进。
[0007] 所述的主机架上还设置有传动齿轮机,所述的传动齿轮机通孔链条与小车相连并控制小车的前进和后退。
[0008] 所述的主机架上还设置有与小车和主机架分别电气连接的电气控制箱。
[0009] 所述的安装平台配置为当主机架升到安装平台后,机架停放在平台上不动,而小车慢慢前行通过插杆将辐射管插入炉膛内。
[0010] 操作时,通过操作按钮控制电气控制箱,来实现小车的前进,小车前进后利用插杆将辐射管固定住,并和小车一起退回到机架空间内;然后利用行车吊起主机架,当主机架升到与炉墙连接的安装平台平齐后,机架停放在平台上,此时行车和主机架不动,控制小车慢慢前行,将辐射管插入炉膛内。
[0011] 本新型换辐射管吊具将行车机架与插杆分离,利用小车控制插杆前进进行精细动作插管,减小了因行车前移过度造成辐射管插入过量的风险;其次,由于采用了小车与插杆连接,尺寸小,适宜空间较小的厂房内安装辐射管。
附图说明:
[0012] 图1为本发明优选实施例的新型换辐射管吊具结构示意图;
[0013] 图中各标记对应如下:福射管1、炉墙2、钢结构平台3、插杆4、小车5、传动齿轮机 6、配置箱7、主机架8、电气控制箱9。
具体实施方式:
[0014] 以下结合实施实例及附图对本发明作进一步说明,但不限定本发明。
[0015] 图1所示为根据本发明实施的新型换辐射管吊具,其特征在于主要包括一个行车起吊用的主机架8,小车5设置在主机架8上并可沿机架8移动;主机架8的空间内小车5 端头连接有固定支撑辐射管的插杆4,小车5自身带配置箱7,小车5可以在机架8上通过传动齿轮机6带动链条来控制小车的前进和后退。
[0016] 操作时,通过操作按钮控制电气控制箱9,来实现小车的前进,小车前进后将辐射管1固定住,并将小车5退回到机架空间内;然后利用行车吊起主机架8,当主机架8升到与炉墙2连接的安装平台3后,机架8停放在平台2上,此时行车和主机架8不动,控制小车5慢慢前行,将辐射管1插入炉膛内。
[0017] 以上所揭露的仅为本发明的较佳实施例而已,当然不能以此来限定本发明之权利范围,因此依本发明申请专利范围所作的等效变化,仍属本发明的保护范围。
Claims (5)
1.新型换辐射管吊具,主要包括一个行车起吊用的主机架和固定支撑辐射管的插杆; 所述的插杆上下两杆平行并可分别插入辐射管的两水平管段内;其特征在于在主机架上设置可沿主机架内空间水平移动的小车,小车的水平端头与插杆连接;所述的主机架内空间配置为可容纳小车和辐射管一起水平移动和/或垂直升降;小车自身带配置箱;辐射管要插入的炉墙上还设置有与主机架相平齐的安装平台,所述的主机架能够放置于所述平台上,所述的小车能在所述平台上移动前进。
2.根据权利要求1所述的新型换辐射管吊具,其特征在于:所述的主机架上还设置有传动齿轮机,所述的传动齿轮机通孔链条与小车相连并控制小车的前进和后退。
3.根据权利要求1或2所述的新型换辐射管吊具,其特征在于:所述的主机架上还设置有与小车和主机架分别电气连接的电气控制箱。
4.根据权利要求1或2所述的新型换辐射管吊具,其特征在于:所述的安装平台配置为当主机架升到安装平台后,机架停放在平台上不动,而小车慢慢前行通过插杆将辐射管插入炉膛内。
5.根据权利要求3所述的新型换辐射管吊具,其特征在于:所述的安装平台配置为当主机架升到安装平台后,机架停放在平台上不动,而小车慢慢前行通过插杆将辐射管插入炉膛内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100171557A CN102556906A (zh) | 2012-01-18 | 2012-01-18 | 新型换辐射管吊具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100171557A CN102556906A (zh) | 2012-01-18 | 2012-01-18 | 新型换辐射管吊具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102556906A true CN102556906A (zh) | 2012-07-11 |
Family
ID=46403757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100171557A Pending CN102556906A (zh) | 2012-01-18 | 2012-01-18 | 新型换辐射管吊具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102556906A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014009875A (ja) * | 2012-06-29 | 2014-01-20 | Jfe Steel Corp | 連続焼鈍炉におけるラジアントチューブ交換装置 |
CN109837368A (zh) * | 2017-11-29 | 2019-06-04 | 中冶宝钢技术服务有限公司 | 一种辐射管更换用装置及方法 |
US10464176B2 (en) | 2017-06-06 | 2019-11-05 | WTX Oil Fields Services, LLC | Fire tube installation and removal tool |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4673350A (en) * | 1986-08-26 | 1987-06-16 | Eclipse, Inc. | Burner assembly for radiant tube heating system |
JPH0717240A (ja) * | 1993-07-06 | 1995-01-20 | Toyota Autom Loom Works Ltd | フォークリフトのキャビン暖房装置 |
CN1899948A (zh) * | 2006-07-27 | 2007-01-24 | 大连新兴起重设备有限公司 | 一种吊运超长重轨的起重机联合吊运系统 |
CN201071261Y (zh) * | 2007-07-24 | 2008-06-11 | 杭州华新机电工程有限公司 | 岸边桥式永磁吊宽厚板起重机 |
CN201172599Y (zh) * | 2007-12-14 | 2008-12-31 | 中铁大桥局股份有限公司 | 重型架梁起重机 |
CN201209157Y (zh) * | 2008-06-05 | 2009-03-18 | 武汉钢铁(集团)公司 | 可调性平衡配重装置 |
CN201330127Y (zh) * | 2009-01-21 | 2009-10-21 | 中国核电工程有限公司 | 一种抓取燃料组件用的装卸料机 |
CN101898680A (zh) * | 2010-03-03 | 2010-12-01 | 王瑜 | 远程数控多用上下坡小车 |
CN201761494U (zh) * | 2010-06-28 | 2011-03-16 | 中铁电气化局集团有限公司 | 一种感应板铺装车 |
CN202065598U (zh) * | 2011-05-10 | 2011-12-07 | 鞍钢股份有限公司 | 一种便于更换的辐射管补偿器 |
-
2012
- 2012-01-18 CN CN2012100171557A patent/CN102556906A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4673350A (en) * | 1986-08-26 | 1987-06-16 | Eclipse, Inc. | Burner assembly for radiant tube heating system |
JPH0717240A (ja) * | 1993-07-06 | 1995-01-20 | Toyota Autom Loom Works Ltd | フォークリフトのキャビン暖房装置 |
CN1899948A (zh) * | 2006-07-27 | 2007-01-24 | 大连新兴起重设备有限公司 | 一种吊运超长重轨的起重机联合吊运系统 |
CN201071261Y (zh) * | 2007-07-24 | 2008-06-11 | 杭州华新机电工程有限公司 | 岸边桥式永磁吊宽厚板起重机 |
CN201172599Y (zh) * | 2007-12-14 | 2008-12-31 | 中铁大桥局股份有限公司 | 重型架梁起重机 |
CN201209157Y (zh) * | 2008-06-05 | 2009-03-18 | 武汉钢铁(集团)公司 | 可调性平衡配重装置 |
CN201330127Y (zh) * | 2009-01-21 | 2009-10-21 | 中国核电工程有限公司 | 一种抓取燃料组件用的装卸料机 |
CN101898680A (zh) * | 2010-03-03 | 2010-12-01 | 王瑜 | 远程数控多用上下坡小车 |
CN201761494U (zh) * | 2010-06-28 | 2011-03-16 | 中铁电气化局集团有限公司 | 一种感应板铺装车 |
CN202065598U (zh) * | 2011-05-10 | 2011-12-07 | 鞍钢股份有限公司 | 一种便于更换的辐射管补偿器 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014009875A (ja) * | 2012-06-29 | 2014-01-20 | Jfe Steel Corp | 連続焼鈍炉におけるラジアントチューブ交換装置 |
US10464176B2 (en) | 2017-06-06 | 2019-11-05 | WTX Oil Fields Services, LLC | Fire tube installation and removal tool |
CN109837368A (zh) * | 2017-11-29 | 2019-06-04 | 中冶宝钢技术服务有限公司 | 一种辐射管更换用装置及方法 |
CN109837368B (zh) * | 2017-11-29 | 2021-02-05 | 中冶宝钢技术服务有限公司 | 一种辐射管更换用装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201417657Y (zh) | 室内变压器的安装装置 | |
CN102556906A (zh) | 新型换辐射管吊具 | |
CN102040158B (zh) | 一种吊装用炉辊吊具 | |
CN203833466U (zh) | 一种用于平板类零件吊装的起重机及其翻转吊具 | |
CN203865931U (zh) | 一种配电变压器吊装组合工具 | |
CN202415097U (zh) | 带移动小车的换辐射管吊具 | |
CN201923766U (zh) | 一种吊装用炉辊吊具 | |
CN203545565U (zh) | 可万向移动行吊 | |
CN206091354U (zh) | 一种高铁站幕墙维护设备 | |
CN202185976U (zh) | 一种用于预制梁板的预应力张拉工作支架 | |
CN110371868A (zh) | 一种pc装配式混凝土构件用的吊装机构 | |
CN205257816U (zh) | 一种用于风力发电机组机舱内提升机 | |
CN206219071U (zh) | 一种开关柜安装用起吊设备 | |
CN109573806A (zh) | 新型换辐射管吊具 | |
CN204939550U (zh) | 一种用于更换炉内辊子组件的换辊装置 | |
CN202542677U (zh) | 一种用于蒸发器管束支撑板安装装置 | |
CN103322826A (zh) | 可移动式炉缸 | |
CN204953537U (zh) | 一种定径机轧辊拆装装置 | |
CN201485204U (zh) | 煤气柜吊装装置 | |
CN203190788U (zh) | 电极装置 | |
CN204324689U (zh) | 高炉冷却壁更换专用吊装工具 | |
CN203740958U (zh) | 一种托举式升降机构及同步升降机构 | |
CN204022195U (zh) | 电梯轿厢与对重合用导轨支架 | |
CN203222014U (zh) | 一种烧嘴更换专用小车 | |
CN103010943A (zh) | 一种大型风力发电机组变桨减速机吊具及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120711 |