CN102505637A - 连续箱梁桥的支座布置方法 - Google Patents

连续箱梁桥的支座布置方法 Download PDF

Info

Publication number
CN102505637A
CN102505637A CN2011103351665A CN201110335166A CN102505637A CN 102505637 A CN102505637 A CN 102505637A CN 2011103351665 A CN2011103351665 A CN 2011103351665A CN 201110335166 A CN201110335166 A CN 201110335166A CN 102505637 A CN102505637 A CN 102505637A
Authority
CN
China
Prior art keywords
bridge
pier
bridge pier
bearing
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103351665A
Other languages
English (en)
Other versions
CN102505637B (zh
Inventor
赵运输
林宪广
庞广彬
刘鸿韬
杨阳
胡艳霞
何瑞玺
秦伟峰
温俊魁
刘志磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Original Assignee
HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd filed Critical HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Priority to CN 201110335166 priority Critical patent/CN102505637B/zh
Publication of CN102505637A publication Critical patent/CN102505637A/zh
Application granted granted Critical
Publication of CN102505637B publication Critical patent/CN102505637B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种连续箱梁桥的支座平面布置方法。其步骤如下:按其桥墩处地质条件和桥墩下部构造计算桥墩顶的抗推刚度
Figure 2011103351665100004DEST_PATH_IMAGE001
,根据各墩的抗推刚度计算箱梁的不动点S.P.,根据桥墩顶恒载支反力R,计算墩顶水平力
Figure 671071DEST_PATH_IMAGE002
,计算支座滑动时桥墩顶的最大水平位移
Figure DEST_PATH_IMAGE003
,计算各桥墩的收缩变形量
Figure 982098DEST_PATH_IMAGE004
,离不动点S.P.最近的桥墩处布置固定支座,其余桥墩若,则该桥墩处布置固定支座,反之则采用单向滑动支座。本发明方法可提高大纵坡桥梁的纵向抗推能力,间接提高桥墩的抗力,提高桥梁的横向限位能力2~4倍,有效的防止弯桥、大横坡箱梁的横向滑移;该方法不改变原有结构的受力体系及支座承载力,并对其受力体系进行有效的利用,不增加造价。

Description

连续箱梁桥的支座布置方法
技术领域
本发明涉及桥梁建筑领域,具体涉及一种连续箱梁桥的支座平面布置方法。
背景技术
桥梁在温度变化、各种荷载特别是交通荷载引起的弹性应变的作用下会发生移动。在古代,桥梁是用石头、砖或者木材建造的,大多数石桥的伸缩受温度的升降影响很小,木桥规模小且有天然的纹缝,整个桥的伸缩因各个部分的伸缩而分散了,故古代的桥可以没有支座。但现代随着钢结构以及后来的钢筋混凝土和预应力混凝土的使用,桥梁支座得到了广泛的应用。
桥梁支座一般分为固定支座和活动支座,固定支座既要固定主梁在墩台上的位置并传递竖向压力和水平力,又要保证主梁发生挠曲时支撑处能自由转动;活动支座只传递竖向压力,它要保证主梁在支撑处既能自由转动又能水平移动。在一座桥梁上各个位置所需选用的支座类型主要取决于下列因素:竖向荷载、水平荷载、位移要求、转动要求、桥梁的结构型式、桥梁墩台和上部构造的尺寸、各支点所需支座个数、地基条件以及基础沉降的可能性、桥长等。
桥梁支座的布置主要和桥梁的结构形式有关。通常在布置支座时需要考虑以下的基本原则:①支座应能同时适应桥梁顺桥向(X方向)和横桥向(Y方向)的变形;②支座应使由于梁体变形所产生的纵向位移、横向位移和纵、横向转角应尽可能不受约束;③桥梁通常必须在每联梁体上设置一个固定支座;④在同一桥墩上的几个支座应具有相近的转动刚度。总之,桥梁支座的布置原则是既要便于传递支座反力,又要使支座能充分适应梁体的自由变形。
现有的支座布置方法:在每联梁体上设置一个固定支座,其它为单向或双向滑动支座,如图1所示。这种布置方法的缺点在于:①部分桥墩安装滑动支座并不会滑动,滑动支座并未起到应有的作用;②因安装滑动支座,降低了桥墩的抗推刚度。
发明内容
本发明要解决的技术问题是提供一种连续箱梁桥的支座平面布置方法,该方法在不改变原有的结构受力体系的情况下可提高桥梁的横向限位能力,有效的防止弯桥、大横坡箱梁的横向滑移。
为解决上述技术问题,本发明采用的技术方案是:
一种连续箱梁桥的支座布置方法,包括以下步骤:
(1)按其桥墩处地质条件和桥墩下部构造计算桥墩顶的抗推刚度                                                
Figure 2011103351665100002DEST_PATH_IMAGE001
(2)根据各墩的抗推刚度计算箱梁的不动点S.P.;
(3)根据桥墩顶恒载支反力R,计算墩顶水平力
Figure 410143DEST_PATH_IMAGE002
(4)计算支座滑动时桥墩顶的最大水平位移
Figure 2011103351665100002DEST_PATH_IMAGE003
(5)计算各桥墩的收缩变形量
Figure 533957DEST_PATH_IMAGE004
(6)将离不动点S.P.最近的桥墩处布置为固定支座,其余桥墩若
Figure 2011103351665100002DEST_PATH_IMAGE005
,则该桥墩处布置固定支座,反之则采用单向滑动支座。
上述计算方法可采用常规计算方法,如《公路桥涵地基与基础设计规范》(JTG D63—2007)等等。
以桩柱式桥墩为例,上述连续箱梁桥的支座布置方法包括以下步骤:
(1)按其桥墩处地质条件和桥墩下部构造计算桥墩顶的抗推刚度
Figure 631357DEST_PATH_IMAGE001
Figure 106201DEST_PATH_IMAGE006
式中,h为桥墩墩柱的高度,EI为墩柱的抗弯刚度,
Figure 2011103351665100002DEST_PATH_IMAGE007
为桩顶单位水平力产生的水平位移,
Figure 445784DEST_PATH_IMAGE008
为桩顶单位水平力产生的转角位移,为桩顶单位弯矩产生的水平位移,
Figure 689683DEST_PATH_IMAGE010
为桩顶单位弯矩产生的转角位移,n为桥墩墩柱的个数;
(2)根据各墩的抗推刚度计算箱梁的不动点S.P.(Stagnant Point);
Figure 2011103351665100002DEST_PATH_IMAGE011
式中,C为收缩系数,降温35℃时,C=0.00001×35=0.00035;μR为桥台的摩擦阻力,其中R为桥台恒载支反力,μ为摩阻系数,μ一般取值0.06;正负号确定方法:先假定不动点S.P.在桥中部的某一点,μR在该点以左取负号,以右取正号;
Figure 692406DEST_PATH_IMAGE012
为桥墩至0号桥台的距离;x为不动点S.P.至0号桥台的距离;
(3)根据桥墩顶恒载支反力R,计算墩顶水平力
Figure 535170DEST_PATH_IMAGE002
=μR
(4)计算支座滑动时桥墩顶的最大水平位移
Figure 2011103351665100002DEST_PATH_IMAGE013
(5)计算各桥墩的收缩变形量
Figure 259730DEST_PATH_IMAGE004
(6)离不动点S.P.最近的桥墩处布置固定支座,其余桥墩若,则该桥墩处布置固定支座,反之则采用单向滑动支座;
(7)对于横向较宽的桥梁,按上述步骤进行横桥向计算。
对于其它类型的桥墩(空心墩、双柱式桥墩及各式柔性墩等),上述各计算参数按与其类型相对应的现有计算方法或规范进行计算即可。
本发明具有积极有益的效果:
1.提高桥梁的横向限位能力2~4倍,有效的防止弯桥、大横坡箱梁的横向滑移;
2.提高大纵坡桥梁的纵向抗推能力,间接提高桥墩的抗力;
3.本发明不改变原有结构的受力体系,并对其受力体系进行有效的利用;
4.本发明不改变支座承载力,不增加造价。
附图说明
图1为现有常规的连续箱梁桥的支座平面布置示意图;
图2为芒山互通式立交E匝道桥的支座平面布置示意图。
具体实施方式
以下结合具体实施例进一步阐述本发明。下述实施例中无特别说明或阐述的计算方法或实施步骤,均为常规方法或步骤。
实施例1  济宁至祁门高速公路永城段芒山互通式立交E匝道桥为4-16连续箱梁,桥梁宽度10.5m,桩柱式桥墩,中间三个桥墩墩高分别为8.5m、9m、9.5m,柱径为1.3m,查计算书0~4号墩台恒载支反力分别为1619kN、4395kN、3937kN、4875kN、1893kN。
(1)各墩的抗推刚度
根据《公路桥涵地基与基础设计规范》(JTG D63—2007)附录P计算:
EI=3.1404×106kN·m2
Figure 2011103351665100002DEST_PATH_IMAGE015
=1.0543×10-5m
Figure 94196DEST_PATH_IMAGE008
=2.2313×10-6rad
Figure 953568DEST_PATH_IMAGE009
=2.2313×10-6m
Figure 562404DEST_PATH_IMAGE010
=7.6434×10-7rad
n=2
Figure 548945DEST_PATH_IMAGE016
Figure 2011103351665100002DEST_PATH_IMAGE017
Figure 936458DEST_PATH_IMAGE018
=1.44×104kN/m
Figure 2011103351665100002DEST_PATH_IMAGE019
Figure 779780DEST_PATH_IMAGE020
=1.27×104kN/m
Figure 2011103351665100002DEST_PATH_IMAGE021
Figure 938229DEST_PATH_IMAGE022
=1.13×104kN/m
(2)计算桥梁的不动点S.P.(Stagnant Point)
支座摩阻系数按0.03
温度下降20℃,收缩徐变按降温15℃计算。
C=35×0.00001=0.00035
Figure 2011103351665100002DEST_PATH_IMAGE023
Figure 961417DEST_PATH_IMAGE024
Figure 2011103351665100002DEST_PATH_IMAGE025
(3)计算墩顶水平力
Figure 888922DEST_PATH_IMAGE026
Figure 2011103351665100002DEST_PATH_IMAGE027
(4)计算支座滑动时桥墩顶的最大水平位移
Figure 903146DEST_PATH_IMAGE003
Figure 2011103351665100002DEST_PATH_IMAGE029
(5)计算各墩的收缩变形量
Figure 62522DEST_PATH_IMAGE030
Figure 2011103351665100002DEST_PATH_IMAGE031
经计算支座滑动时1、3号墩柱顶的位移分别为9.2mm、12.9mm,墩顶的最大位移分别为5.4mm、5.6mm,远小于需要设置滑动支座的位移,因此中间三个墩设置固定支座,如图2所示。
该桥梁工程建成使用至今,横向限位能力、桥墩的抗力等各项性能指标满足设计要求,且使用效果良好,有效的防止了大横坡箱梁的横向滑移。
改变上述实施例中的各个具体的数值参数,或者是计算方法的等同替换,可形成多个具体的实施例,均为本发明的常见变化范围,在此不再一一详述。

Claims (4)

1.一种连续箱梁桥的支座布置方法,包括以下步骤:
(1)按其桥墩处地质条件和桥墩下部构造以常规方法计算桥墩顶的抗推刚度                                                
Figure 2011103351665100001DEST_PATH_IMAGE001
(2)根据各墩的抗推刚度以常规方法计算箱梁的不动点S.P.;
(3)根据桥墩顶恒载支反力R,以常规方法计算墩顶水平力
Figure 291483DEST_PATH_IMAGE002
(4)以常规方法计算支座滑动时桥墩顶的最大水平位移
Figure 2011103351665100001DEST_PATH_IMAGE003
(5)以常规方法计算各桥墩的收缩变形量
Figure 303433DEST_PATH_IMAGE004
(6)将离不动点S.P.最近的桥墩处布置为固定支座,其余桥墩若,则该桥墩处布置固定支座,反之则采用单向滑动支座。
2.根据权利要求1所述连续箱梁桥的支座平面布置方法,其特征在于,所述桥墩为桩柱式,包括以下步骤:
(1)按其桥墩处地质条件和桥墩下部构造计算桥墩顶的抗推刚度
Figure 34629DEST_PATH_IMAGE001
Figure 342507DEST_PATH_IMAGE006
式中,h为桥墩墩柱的高度,EI为墩柱的抗弯刚度,
Figure 2011103351665100001DEST_PATH_IMAGE007
为桩顶单位水平力产生的水平位移,
Figure 159153DEST_PATH_IMAGE008
为桩顶单位水平力产生的转角位移,
Figure 2011103351665100001DEST_PATH_IMAGE009
为桩顶单位弯矩产生的水平位移,
Figure 709214DEST_PATH_IMAGE010
为桩顶单位弯矩产生的转角位移,n为桥墩墩柱的个数;
(2)根据各墩的抗推刚度计算箱梁的不动点S.P.;
Figure 2011103351665100001DEST_PATH_IMAGE011
式中,C为收缩系数;μR为桥台的摩擦阻力,其中R为桥台恒载支反力,μ为摩阻系数,正负号确定方法:先假定不动点S.P.在桥中部的某一点,μR在该点以左取负号,以右取正号;
Figure 606501DEST_PATH_IMAGE012
为桥墩至0号桥台的距离;x为不动点S.P.至0号桥台的距离;
(3)根据桥墩顶恒载支反力R,计算墩顶水平力
Figure 36345DEST_PATH_IMAGE002
Figure 340287DEST_PATH_IMAGE002
=μR
(4)计算支座滑动时桥墩顶的最大水平位移
Figure 615411DEST_PATH_IMAGE003
Figure 2011103351665100001DEST_PATH_IMAGE013
(5)计算各桥墩的收缩变形量
Figure 469414DEST_PATH_IMAGE014
(6)离不动点S.P.最近的桥墩处布置固定支座,其余桥墩若
Figure 512850DEST_PATH_IMAGE005
,则该桥墩处布置固定支座,反之则采用单向滑动支座。
3.根据权利要求2所述连续箱梁桥的支座平面布置方法,其特征在于,在所述步骤(1)中,降温35℃时,所述收缩系数C=0.00001×35=0.00035。
4.根据权利要求2所述连续箱梁桥的支座平面布置方法,其特征在于,在所述步骤(1)中,所述摩阻系数μ取值0.06。
CN 201110335166 2011-10-31 2011-10-31 连续箱梁桥的支座布置方法 Expired - Fee Related CN102505637B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110335166 CN102505637B (zh) 2011-10-31 2011-10-31 连续箱梁桥的支座布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110335166 CN102505637B (zh) 2011-10-31 2011-10-31 连续箱梁桥的支座布置方法

Publications (2)

Publication Number Publication Date
CN102505637A true CN102505637A (zh) 2012-06-20
CN102505637B CN102505637B (zh) 2013-09-25

Family

ID=46217766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110335166 Expired - Fee Related CN102505637B (zh) 2011-10-31 2011-10-31 连续箱梁桥的支座布置方法

Country Status (1)

Country Link
CN (1) CN102505637B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590328A (zh) * 2013-11-26 2014-02-19 中铁第四勘察设计院集团有限公司 横向弹性限位、纵向液压熔断阻尼组合支座体系
CN107794843A (zh) * 2017-10-24 2018-03-13 山西省交通科学研究院 一种桥梁减震限位器实施方法
CN108345764A (zh) * 2018-03-30 2018-07-31 中交路桥北方工程有限公司 弯桥桥墩设计系统及方法
CN110904820A (zh) * 2019-11-28 2020-03-24 中铁大桥勘测设计院集团有限公司 分离式桥墩支座的水平约束系统
CN111400810A (zh) * 2020-03-31 2020-07-10 中铁二院工程集团有限责任公司 一种微型桩加固运营线路不稳定斜坡设计方法
CN112878168A (zh) * 2021-01-08 2021-06-01 中铁大桥勘测设计院集团有限公司 一种变摩阻大跨长联连续梁体系
CN113742959A (zh) * 2021-08-05 2021-12-03 中铁大桥勘测设计院集团有限公司 一种大跨长联结构的计算方法、装置及可读存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0410120A (ja) * 1990-04-27 1992-01-14 Gon Min Yan 文字符号の図元による入力方法及びそのキーボード
JPH09210120A (ja) * 1996-02-07 1997-08-12 Hitachi Ltd 円柱構造物の防振構造
CN101824802A (zh) * 2010-02-08 2010-09-08 铁道第三勘测设计院集团有限公司 调节型桥梁钢支座现场调试安装的方法及配套的钢支座
CN102080356A (zh) * 2010-12-17 2011-06-01 中铁大桥局集团第四工程有限公司 一种箱梁定位临时支座及箱梁定位施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0410120A (ja) * 1990-04-27 1992-01-14 Gon Min Yan 文字符号の図元による入力方法及びそのキーボード
JPH09210120A (ja) * 1996-02-07 1997-08-12 Hitachi Ltd 円柱構造物の防振構造
CN101824802A (zh) * 2010-02-08 2010-09-08 铁道第三勘测设计院集团有限公司 调节型桥梁钢支座现场调试安装的方法及配套的钢支座
CN102080356A (zh) * 2010-12-17 2011-06-01 中铁大桥局集团第四工程有限公司 一种箱梁定位临时支座及箱梁定位施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590328A (zh) * 2013-11-26 2014-02-19 中铁第四勘察设计院集团有限公司 横向弹性限位、纵向液压熔断阻尼组合支座体系
CN107794843A (zh) * 2017-10-24 2018-03-13 山西省交通科学研究院 一种桥梁减震限位器实施方法
CN108345764A (zh) * 2018-03-30 2018-07-31 中交路桥北方工程有限公司 弯桥桥墩设计系统及方法
CN108345764B (zh) * 2018-03-30 2019-07-23 中交路桥北方工程有限公司 弯桥桥墩设计系统及方法
CN110904820A (zh) * 2019-11-28 2020-03-24 中铁大桥勘测设计院集团有限公司 分离式桥墩支座的水平约束系统
CN111400810A (zh) * 2020-03-31 2020-07-10 中铁二院工程集团有限责任公司 一种微型桩加固运营线路不稳定斜坡设计方法
CN112878168A (zh) * 2021-01-08 2021-06-01 中铁大桥勘测设计院集团有限公司 一种变摩阻大跨长联连续梁体系
CN113742959A (zh) * 2021-08-05 2021-12-03 中铁大桥勘测设计院集团有限公司 一种大跨长联结构的计算方法、装置及可读存储介质
CN113742959B (zh) * 2021-08-05 2023-09-01 中铁大桥勘测设计院集团有限公司 一种大跨长联结构的计算方法、装置及可读存储介质

Also Published As

Publication number Publication date
CN102505637B (zh) 2013-09-25

Similar Documents

Publication Publication Date Title
CN102505637B (zh) 连续箱梁桥的支座布置方法
CN102121226B (zh) 一种柔性墙抗震桥台
CN204000572U (zh) 摩擦型钢筋混凝土抗震挡块
Congress Standard specifications and code of practice for road bridges
CN202090275U (zh) 自锚上承式钢筋混凝土拱桥
CN103966947A (zh) 一种基于桥梁梁体减震的防落梁装置
CN107988924A (zh) 一种基于旧桥改建的钢-混组合梁桥体系转换系统及转换方法
Dicleli et al. Effect of soil–bridge interaction on the magnitude of internal forces in integral abutment bridge components due to live load effects
CN203846390U (zh) 一种基于桥梁梁体减震的防落梁装置
CN202305346U (zh) 预应力混凝土板桩抗弯试验台座
CN206015535U (zh) 一种具有可调节预应力功能的加固桥梁
Isobe et al. Design approach to a method for reinforcing existing caisson foundations using steel pipe sheet piles
CN209114311U (zh) 一种桥梁钢架支撑结构
CN204676413U (zh) 一种高阻尼橡胶环限位单向活动盆式橡胶支座
CN202000221U (zh) 陡坡路基无砟轨道构造
CN203284727U (zh) 分离式桥墩
CN206941363U (zh) 一种大跨度拱桥桥面梁支承体系
CN104790292A (zh) 高阻尼橡胶环限位单向活动盆式橡胶支座
CN205443900U (zh) 拱肋面内多点约束及分布式系杆拱桥
CN201660851U (zh) 用于顶进大跨度斜交框架的支点转换梁
Barker et al. High-performance steel bridge design and cost comparisons
CN201128193Y (zh) 可拆装式箱梁存梁台架
CN203947404U (zh) 一种预应力连续钢构桥
CN209669681U (zh) 独塔斜拉桥三向减隔震体系
Dai et al. New Songhua river bridge: a continuous girder, tied arch, hybrid bridge with four rail tracks in Harbin, China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20141031

EXPY Termination of patent right or utility model