CN102491103A - Construction site thin and long single sheet transfer process and equipment - Google Patents

Construction site thin and long single sheet transfer process and equipment Download PDF

Info

Publication number
CN102491103A
CN102491103A CN2011104466755A CN201110446675A CN102491103A CN 102491103 A CN102491103 A CN 102491103A CN 2011104466755 A CN2011104466755 A CN 2011104466755A CN 201110446675 A CN201110446675 A CN 201110446675A CN 102491103 A CN102491103 A CN 102491103A
Authority
CN
China
Prior art keywords
slim
door shaped
lined construction
portal
shaped stent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104466755A
Other languages
Chinese (zh)
Inventor
牛勇
阮庆
窦星慧
杨胜
岳学
王娟
李黎霞
赵子坤
宫晨
唐世振
刘立范
马飞翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN2011104466755A priority Critical patent/CN102491103A/en
Publication of CN102491103A publication Critical patent/CN102491103A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction site thin and long single sheet transfer process and construction site thin and long single sheet transfer process equipment. The process comprises the following steps: 1, prefabricating or transforming a plurality of portal-type supports; 2, arranging the portal-type supports by using a forklift, allowing a flat car to enter the portal-type supports and to eject the portal-type supports, and delivering the portal-type supports to a place beside the thin and long single sheets; 3, hoisting the thin and long single sheets to the top of the portal-type supports, allowing the flat car to eject the portal-type supports and the thin and long single sheets, and transporting the portal-type supports and the thin and long single sheets to a designated point; and 4, after the flat car transports the thin and long single sheets to the designated point, lowering the height of the flat car to place the portal-type supports on the ground, withdrawing the flat car from the front or back of the portal-type supports, and completing the transfer of the whole thin and long single sheets. Each portal-type support comprises a cross beam, upright posts and bases; the two ends of the cross beam area arranged on the top of the upright posts; and the bases are arranged at the bottom ends of the two upright posts respectively. According to the process, the portal-type supports are used for temporary support and transfer, so that the on-site transfer and support are combined; and the operation is simple, the sheet outlet efficiency is high, and the cost is low.

Description

Processes and apparatus is had bad luck in the workyard of slim-lined construction monolithic
Technical field
Processes and apparatus is had bad luck in the workyard that the present invention relates to the slim-lined construction monolithic.
Background technology
Offshore platform and similar large-scale steel structure thereof, its horizontal absolute altitude upper lever is densely distributed, is mainly equipment, pipeline, living quarters etc. and provides support.Because its horizontal absolute altitude place is better in flakes usually; So the rod member that will be positioned at same horizontal absolute altitude place when building is assembled (or be divided into several monolithic according to the construction ability) in advance as the structure monolithic; Treat to adopt after the prefabricated completion of monolithic flat truck to be transported to the workshop and carry out operations such as sandblast and application; Be transported to the general assembly place then, and it is mounted to the final position as a whole.
The slim-lined construction monolithic, characteristics such as it has, and length is big, narrow width and anti-bending strength difference.Conventional practice is when it transports, to be equipped with crossbeam or transportation frame, and in position arranges interim the support, because the monolithic width is little than the flat truck width; So can not arrange interim support at monolithic and flat truck overlapping region; And can only arrange interim the support in the flat truck outside, simultaneously, the monolithic resistance to bending is relatively poor; Support distortion in period is bigger, so the girder that needs the outside to be supported in monolithic welds temporarily.There is following shortcoming in existing traditional handicraft:
1, for guaranteeing the stability of monolithic support, interim support need be welded on the monolithic, and the welding job of this additive incrementation might destroy the characteristic of mother metal.
2, early stage, interim support need be welded on the monolithic, when the later stage general assembly, also will cut away, and increased welding, cutting, polishing and touch-up paint cost like this, made task program loaded down with trivial details, influenced the duration simultaneously.
3, because the two ends of monolithic are welded with interim support; Can only withdraw from from the side direction of monolithic when therefore flat truck withdraws from; And this withdrawing mode need take than large space, and can influence the quantity that painting workshop is placed monolithic, so that influences the spray efficiency of whole project.
4, because monolithic transports and the support operation is separately carried out, thereby increase operation easier, certainly will impact whole project duration and cost.
In view of this, the arts demand of having bad luck of slim-lined construction monolithic improves.
Summary of the invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that existing product exists; And Processes and apparatus is had bad luck in the workyard that a kind of slim-lined construction monolithic is provided; This technology utilization door shaped stent supports temporarily and has bad luck, and the place is had bad luck and support is integrated, easy operating process; Improve slice efficient, the cost that reduces transportation and support.
The objective of the invention is to realize by following technical scheme.
Technology is had bad luck in the workyard of slim-lined construction monolithic of the present invention, it is characterized in that,
The first step: shift to an earlier date prefabricated as required or transform several door shaped stents 1;
Second step: earlier with fork truck with door shaped stent 1 as required distance put, then reduce flat truck 3 height, make flat truck 3 get into door shaped stents 1 and jack-up door shaped stent 1, then door shaped stent 1 is transported to slim-lined construction monolithic 2 next doors of prefabricated completion;
The 3rd step: slim-lined construction monolithic 2 is lifted to door shaped stent 1 top, then by flat truck 3 with door shaped stent 1 and slim-lined construction monolithic 2 jack-up, and be transported to the appointed place;
The 4th step: after flat truck 3 was transported to the appointed place with slim-lined construction monolithic 2, decline flat truck 3 highly was placed into door shaped stent 1 on the D of ground, then flat truck 3 is withdrawed from from the place ahead or the rear of door shaped stent 1, accomplishes having bad luck of whole slim-lined construction monolithic.
Technology is had bad luck in the workyard of aforesaid slim-lined construction monolithic, and wherein the slim-lined construction monolithic is the deck sheet.
The equipment of technology is had bad luck in the workyard of slim-lined construction monolithic of the present invention, it is characterized in that, comprises crossbeam 11, column and base; The two ends of this crossbeam 11 are separately positioned on two columns 12,12 ' top, and this two columns 12,12 ' bottom are respectively equipped with base 13,13 '.
The equipment of technology is had bad luck in the workyard of aforesaid slim-lined construction monolithic, its center member 11, column 12,12 ' and base 13,13 ' be I-beam section; Be provided with a plurality of reinforced ribs 111 between two inboards of this crossbeam I-beam section; Be respectively equipped with reinforced rib 14,14 ' between said column 12 both sides and the base 13; Be respectively equipped with reinforced rib 15,15 ' between said column 12 ' both sides and the base 13 '.
The equipment of technology is had bad luck in the workyard of aforesaid slim-lined construction monolithic, wherein the height of door shaped stent 1 less than flat truck 3 height, length greater than flat truck 3 width.
The equipment of technology is had bad luck in the workyard of aforesaid slim-lined construction monolithic, and wherein door shaped stent 1 base 13,13 ' length are 2 to 3 meters.
The beneficial effect of Processes and apparatus is had bad luck in the workyard of slim-lined construction monolithic of the present invention; This technology utilization door shaped stent supports temporarily and has bad luck; The workyard that is applicable to the slim-lined construction monolithic is had bad luck and is supported temporarily, its can make the place have bad luck and support close as a whole, easy operating process; Improve slice efficient, the cost that reduces transportation and support.Without any need for welding, avoid extra soldered work between door shaped stent and the slim-lined construction monolithic, can reduce or prevent destruction mother metal.During operation, the flat truck exit axis is controlled, can utilize the place space resources to greatest extent.Make things convenient for spraying paint of slim-lined construction monolithic, improve coating efficiency.
Description of drawings:
Fig. 1 is a door shaped stent perspective view of the present invention.
Fig. 2 gets into the door shaped stent scheme drawing for flat truck of the present invention.
Fig. 3 is the scheme drawing of door shaped stent of the present invention on flat truck.
Fig. 4 is flat truck transportation door shaped stent of the present invention and deck sheet scheme drawing.
Fig. 5 withdraws from the door shaped stent scheme drawing for flat truck of the present invention.
Fig. 6 is a door shaped stent support deck sheet scheme drawing of the present invention.
Main label declaration among the figure:
1 door shaped stent, 11 crossbeams, 111 reinforced ribs, 12 columns, 12 ' column, 13 bases, 13 ' base, 14 reinforced ribs, 14 ' reinforced rib, 15 reinforced ribs, 15 ' reinforced rib, 2 slim-lined construction monolithics, 3 flat trucks, A move back car direction, D ground.
The specific embodiment
To shown in Figure 6, technology is had bad luck in the workyard of slim-lined construction monolithic of the present invention, the first step like Fig. 1: shift to an earlier date prefabricated as required or transform several door shaped stents 1; Second step: earlier with fork truck with door shaped stent 1 as required distance put, then reduce flat truck 3 height, make flat truck 3 get into door shaped stents 1 and jack-up door shaped stent 1, then door shaped stent 1 is transported to slim-lined construction monolithic 2 next doors of prefabricated completion; The 3rd step: slim-lined construction monolithic 2 is lifted to door shaped stent 1 top, then by flat truck 3 with door shaped stent 1 and slim-lined construction monolithic 2 jack-up, and be transported to the appointed place; The 4th step: after flat truck 3 was transported to the appointed place with slim-lined construction monolithic 2, decline flat truck 3 height were placed into door shaped stent 1 on the D of ground, then flat truck 3 are withdrawed from from the place ahead or the rear of door shaped stent 1, accomplish having bad luck of whole slim-lined construction monolithic; Wherein the slim-lined construction monolithic is the deck sheet.
As shown in Figure 1, the equipment of technology is had bad luck in the workyard of slim-lined construction monolithic of the present invention, and it comprises crossbeam 11, column and base; The two ends of this crossbeam 11 are separately positioned on two columns 12,12 ' top, and this two columns 12,12 ' bottom are respectively equipped with base 13,13 '; This crossbeam 11, column 12,12 ' and base 13,13 ' be I-beam section; Be provided with a plurality of reinforced ribs 111 between two inboards of this crossbeam I-beam section; Be respectively equipped with reinforced rib 14,14 ' between these column 12 both sides and the base 13; Be respectively equipped with reinforced rib 15,15 ' between these column 12 ' both sides and the base 13 '; The height of this door shaped stent 1 less than flat truck 3 height, length greater than flat truck 3 width; This door shaped stent 1 base 13,13 ' length are 2 to 3 meters.
Embodiment:
The specification of transporting the deck sheet is that the long * 5.4m of 35m is wide.
The first step: (the long * 5.4m of 35m the is wide) specification according to transporting the deck sheet shifts to an earlier date prefabricated 2 door shaped stents 1 (as shown in Figure 1), and it is high that this door shaped stent is of a size of the wide * 2.4m of the long * 2.7m of 8m, and base length is 2.7m;
Second step: with fork truck two door shaped stents 1 are put according to spacing distance 19m earlier, then reduced flat truck 3 height, make flat truck 3 get into door shaped stent 1 and jack-up door shaped stent 1, then door shaped stent 1 is transported to deck sheet 2 next doors of prefabricated completion; (as shown in Figure 2).
The 3rd step: with deck sheet 2 lifting to two door shaped stent 1 tops, then by flat truck 3 with door shaped stent 1 and deck sheet 2 jack-up, and be transported to the appointed place, like painting workshop; Like Fig. 3, Fig. 4, shown in Figure 6.
The 4th step: after flat truck 3 was transported to painting workshop with deck sheet 2, decline flat truck 3 highly is placed into door shaped stent 1 on the D of ground, then the place ahead or rear (A) of flat truck 3 from door shaped stent 1 is withdrawed from, and was as shown in Figure 5.Accomplish having bad luck of whole slim-lined construction monolithic.
The above; It only is preferred embodiment of the present invention; Be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical scheme of the present invention any simple modification, equivalent variations and modification that above embodiment did.

Claims (6)

1. technology is had bad luck in the workyard of a slim-lined construction monolithic, it is characterized in that,
The first step: shift to an earlier date prefabricated as required or transform several door shaped stents (1);
Second step: earlier with fork truck with door shaped stent 1 as required distance put; Then reduce flat truck (3) highly; Make flat truck (3) get into door shaped stent (1) and jack-up door shaped stent (1), then door shaped stent (1) is transported to slim-lined construction monolithic (2) next door of prefabricated completion;
The 3rd step: slim-lined construction monolithic (2) is lifted to door shaped stent (1) top, then by flat truck (3) with door shaped stent (1) and slim-lined construction monolithic (2) jack-up, and be transported to the appointed place;
The 4th step: after flat truck (3) is transported to the appointed place with slim-lined construction monolithic (2); Decline flat truck (3) highly is placed into door shaped stent (1) on the ground (D); Then flat truck (3) is withdrawed from from the place ahead or the rear of door shaped stent (1), accomplish having bad luck of whole slim-lined construction monolithic.
2. technology is had bad luck in the workyard of slim-lined construction monolithic according to claim 1, it is characterized in that, said slim-lined construction monolithic is the deck sheet.
One kind according to claim 1 the workyard of slim-lined construction monolithic have bad luck the equipment of technology, it is characterized in that, comprise crossbeam (11), column and base; The two ends of this crossbeam (11) are separately positioned on the top of two columns (12,12 '), and the bottom of these two columns (12,12 ') is respectively equipped with base (13,13 ').
4. the equipment of technology is had bad luck in the workyard of slim-lined construction monolithic according to claim 3, it is characterized in that, said crossbeam (11), column (12,12 ') and base (13,13 ') are I-beam section; Be provided with a plurality of reinforced ribs (111) between two inboards of this crossbeam I-beam section; Be respectively equipped with reinforced rib (14,14 ') between said column (12) both sides and the base (13); Be respectively equipped with reinforced rib (15,15 ') between said column (12 ') both sides and the base (13 ').
5. the equipment of technology is had bad luck in the workyard of slim-lined construction monolithic according to claim 3, it is characterized in that, the height of said door shaped stent (1) is less than the height of flat truck (3), the length width greater than flat truck (3).
6. the equipment of technology is had bad luck in the workyard of slim-lined construction monolithic according to claim 3, it is characterized in that, the length of said door shaped stent (1) base (13,13 ') is 2 to 3 meters.
CN2011104466755A 2011-12-28 2011-12-28 Construction site thin and long single sheet transfer process and equipment Pending CN102491103A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104466755A CN102491103A (en) 2011-12-28 2011-12-28 Construction site thin and long single sheet transfer process and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104466755A CN102491103A (en) 2011-12-28 2011-12-28 Construction site thin and long single sheet transfer process and equipment

Publications (1)

Publication Number Publication Date
CN102491103A true CN102491103A (en) 2012-06-13

Family

ID=46182974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104466755A Pending CN102491103A (en) 2011-12-28 2011-12-28 Construction site thin and long single sheet transfer process and equipment

Country Status (1)

Country Link
CN (1) CN102491103A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103129984A (en) * 2013-03-05 2013-06-05 中国海洋石油总公司 Overlaying, fixing and transporting process for elongate structure modules

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19610674C2 (en) * 1996-01-12 1999-12-02 Carl Wilhelm Koelker Handling system
CN1874942A (en) * 2003-09-24 2006-12-06 布赖恩·L·哈姆 Material handling system
CN101058372A (en) * 2007-05-25 2007-10-24 中国舰船研究设计中心 Large cargo translating device
CN201446988U (en) * 2009-07-28 2010-05-05 宝鸡石油机械有限责任公司 Derrick moving trailer adopting tractor for dragging
CN201882471U (en) * 2010-08-26 2011-06-29 浙江省火电建设公司 Transportation bracket for heavy equipment
CN202022295U (en) * 2011-03-29 2011-11-02 江西江州联合造船有限责任公司 Segmentation shelving and transferring gantry

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19610674C2 (en) * 1996-01-12 1999-12-02 Carl Wilhelm Koelker Handling system
CN1874942A (en) * 2003-09-24 2006-12-06 布赖恩·L·哈姆 Material handling system
CN101058372A (en) * 2007-05-25 2007-10-24 中国舰船研究设计中心 Large cargo translating device
CN201446988U (en) * 2009-07-28 2010-05-05 宝鸡石油机械有限责任公司 Derrick moving trailer adopting tractor for dragging
CN201882471U (en) * 2010-08-26 2011-06-29 浙江省火电建设公司 Transportation bracket for heavy equipment
CN202022295U (en) * 2011-03-29 2011-11-02 江西江州联合造船有限责任公司 Segmentation shelving and transferring gantry

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103129984A (en) * 2013-03-05 2013-06-05 中国海洋石油总公司 Overlaying, fixing and transporting process for elongate structure modules

Similar Documents

Publication Publication Date Title
CN108580758B (en) Double-deck reinforcing bar net piece processingequipment
CN103366844B (en) Nuclear power station upper-part in-reactor component installation method
CN112144889A (en) Mounting construction method for sliding assembly type building steel structure
CN102140829A (en) Installation device and installation method of roof panel of grid structure factory building and panel conveying trolley
CN202337344U (en) Scaffold structure in cargo cabin of bulk cargo ship
CN102491103A (en) Construction site thin and long single sheet transfer process and equipment
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
US20170044791A1 (en) Material handling tower using column and stub connections
CN211618801U (en) Three-section combined type movable warehouse
US12012311B2 (en) Construction system
CN103216092B (en) Construction material handling method and equipment thereof
CN202431011U (en) Reusable tool type bolting reinforcing steel bar processing shed for construction site
CN202577162U (en) Combined-type steel pipe bracket
CN110524694A (en) Concrete prefabricated element production system with movable supporting
CN101936037B (en) Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method
CN210002826U (en) detachable welding platform for steel column construction
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN206319254U (en) The assembled place that the assembly of steel truss girder segment is used
CN216437920U (en) Multifunctional rail agricultural platform operation vehicle
CN216944368U (en) Lightering tool for horizontal roll-on and ship-loading of jacket
CN220150994U (en) Butt joint device of large-span steel structure box
CN207312205U (en) A kind of longeron apparatus for placing
CN221338915U (en) Prefabricated Liang Bowen pipe coordinate positioning jig
CN210391918U (en) Panel warehousing and transportation tray
CN210149932U (en) Heating furnace integral transportation reinforced structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120613

WD01 Invention patent application deemed withdrawn after publication