CN102477810A - 一种输电线路钢管塔及其施工方法 - Google Patents

一种输电线路钢管塔及其施工方法 Download PDF

Info

Publication number
CN102477810A
CN102477810A CN2010105641051A CN201010564105A CN102477810A CN 102477810 A CN102477810 A CN 102477810A CN 2010105641051 A CN2010105641051 A CN 2010105641051A CN 201010564105 A CN201010564105 A CN 201010564105A CN 102477810 A CN102477810 A CN 102477810A
Authority
CN
China
Prior art keywords
steel pipe
line
pipe tower
cross arm
main line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105641051A
Other languages
English (en)
Inventor
钮铁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUJIANG POWER SUPPLY Co Ltd JIANGSU ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Original Assignee
Wujiang Power Supply Co Of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang Power Supply Co Of Jiangsu Electric Power Co filed Critical Wujiang Power Supply Co Of Jiangsu Electric Power Co
Priority to CN2010105641051A priority Critical patent/CN102477810A/zh
Publication of CN102477810A publication Critical patent/CN102477810A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种输电线路钢管塔,包括钢管塔主干,所述钢管塔主干上设置有若干支线横担,所述支线横担的尾端通过耐张线夹连接支线,所述钢管塔主干上还设置有主线横担,所述主线横担与所述支线横担交错布置,所述主线横担的担臂上连接有用于悬挂主线的悬垂线夹。通过本发明的输电线路钢管塔,在施工时,对外停电时间短;投入线路金具材料少;施工人员和用工量减少;现场使用工器具减少。

Description

一种输电线路钢管塔及其施工方法
技术领域
本发明涉及一种输电线路钢管塔。
背景技术
目前常规的输电线路钢管塔,其由钢管塔主干以及设置在主干上的若干支线横担组成,施工方法均是将钢管塔组立后,将双回主线开耐张过线,然后实施支线与主线的连接,其一般的具体实施步骤如下:
1、前后二基干先要把导线锚住,需要用12根Φ16的钢丝绳用线夹夹住,导线锚在地锚上;
2、用机动绞磨拉住导线,再开断导线,松至地面;
3、做液压连接耐张线夹;
4、紧线、挂线、前后二基干塔拆除锚线钢丝绳等;
5、做跳线连接;
所需人力、物力大概如下:
工人16个,机动绞磨2台,紧松线钢丝绳2根,液压机1台及其他。
在可以使用吊车组立钢管塔的前提下,该类停电施工一般也需8小时左右,在目前输变电可靠性要求日益提高的大环境下,将对可靠性数据产生极大的影响。
发明内容
为克服现有技术中的不足,本发明的一个目的在于提供一种输电线钢管塔。
本发明的另一个目的在于利用本发明的输电线钢管塔进行施工的方法。
为了解决上述技术问题,实现上述目的,本发明采用了如下技术方案:
一种输电线路钢管塔,包括钢管塔主干,所述钢管塔主干上设置有若干支线横担,所述支线横担的尾端通过耐张线夹连接支线,所述钢管塔主干上还设置有主线横担,所述主线横担与所述支线横担交错布置,所述主线横担的担臂上连接有用于悬挂主线的悬垂线夹。
优选地,所述主线横担的担臂上设置有一对悬垂线夹,所述的一对悬垂线夹成“V”字形设置。
使用本发明的输电线路钢管塔的施工方法,包括以下步骤:
步骤1.所述输电线路钢管塔竖立完毕后,用提线器把主线提升至悬垂线夹的安装点并固定住,然后撤离提线器;
步骤2.所述支线横担通过耐张线夹连接支线;
步骤3.通过一连接线将所述支线与主线连接导通。
与现有技术相比,本发明具有以下优点:
通过本发明的输电线路钢管塔,在施工时,对外停电时间短;投入线路金具材料少;施工人员和用工量减少;现场使用工器具减少。
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。本发明的具体实施方式由以下实施例及其附图详细给出。
附图说明
图1为本发明的输电线路钢管塔的结构示意图。
图中标号说明:1、钢管塔主干,2、主线横担,3、支线横担,4、悬垂线夹,5、主线,6、连接线,7、耐张线夹,8、支线。
具体实施方式
下面结合附图和实施例对本发明的技术实施过程做进一步说明。
参见图1所示,一种输电线路钢管塔,包括钢管塔主干1,所述钢管塔主干1上设置有若干支线横担3,所述支线横担3的尾端通过耐张线夹7连接支线8,所述钢管塔主干1上还设置有主线横担2,所述主线横担2与所述支线横担3交错布置,所述主线横担2的担臂上连接有用于悬挂主线5的悬垂线夹4。
优选地,所述主线横担2的担臂上设置有一对悬垂线夹4,所述的一对悬垂线夹4成“V”字形设置。
使用本发明的输电线路钢管塔的施工方法,包括以下步骤:
步骤1.所述输电线路钢管塔竖立完毕后,用提线器把主线5提升至悬垂线夹4的安装点并固定住,然后撤离提线器;
步骤2.所述支线横担3通过耐张线夹7连接支线8;
步骤3.通过一连接线6将所述支线8与主线5连接导通。
上述实施例只是为了说明本发明的技术构思及特点,其目的是在于让本领域内的普通技术人员能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡是根据本发明内容的实质所作出的等效的变化或修饰,都应涵盖在本发明的保护范围内。

Claims (3)

1.一种输电线路钢管塔,包括钢管塔主干(1),所述钢管塔主干(1)上设置有若干支线横担(3),所述支线横担(3)的尾端通过耐张线夹(7)连接支线(8),其特征在于:所述钢管塔主干(1)上还设置有主线横担(2),所述主线横担(2)与所述支线横担(3)交错布置,所述主线横担(2)的担臂上连接有用于悬挂主线(5)的悬垂线夹(4)。
2.根据权利要求1所述的输电线路钢管塔,其特征在于:所述主线横担(2)的担臂上设置有一对悬垂线夹(4),所述的一对悬垂线夹(4)成“V”字形设置。
3.使用权利要求1或2所述的输电线路钢管塔的施工方法,其特征在,包括以下步骤:
步骤1.所述输电线路钢管塔竖立完毕后,用提线器把主线(5)提升至悬垂线夹(4)的安装点并固定住,然后撤离提线器;
步骤2.所述支线横担(3)通过耐张线夹(7)连接支线(8);
步骤3.通过一连接线(6)将所述支线(8)与主线(5)连接导通。
CN2010105641051A 2010-11-29 2010-11-29 一种输电线路钢管塔及其施工方法 Pending CN102477810A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105641051A CN102477810A (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105641051A CN102477810A (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔及其施工方法

Publications (1)

Publication Number Publication Date
CN102477810A true CN102477810A (zh) 2012-05-30

Family

ID=46090580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105641051A Pending CN102477810A (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔及其施工方法

Country Status (1)

Country Link
CN (1) CN102477810A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669968A (zh) * 2013-11-28 2014-03-26 苏州踵力重型机械有限公司 组合钢管杆
CN105507655A (zh) * 2015-12-03 2016-04-20 重庆瑜煌电力设备制造有限公司 输电线路钢管塔的施工方法
CN110685489A (zh) * 2019-10-24 2020-01-14 湖北恒信电力设计有限公司 基于终端钢管杆的四回路电缆下线结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3196971B2 (ja) * 1992-04-09 2001-08-06 古河電気工業株式会社 架空送電線懸垂支持装置
CN201171152Y (zh) * 2008-03-10 2008-12-24 云南省电力设计院 一种高海拔地区紧凑型架空输电线路
CN101510679A (zh) * 2009-03-20 2009-08-19 江苏科能电力工程咨询有限公司 110kv双回路t接钢管杆
CN201554255U (zh) * 2009-08-26 2010-08-18 国网北京经济技术研究院 一种高强度混压输电钢塔
CN201953130U (zh) * 2010-11-29 2011-08-31 江苏省电力公司吴江市供电公司 一种输电线路钢管塔

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3196971B2 (ja) * 1992-04-09 2001-08-06 古河電気工業株式会社 架空送電線懸垂支持装置
CN201171152Y (zh) * 2008-03-10 2008-12-24 云南省电力设计院 一种高海拔地区紧凑型架空输电线路
CN101510679A (zh) * 2009-03-20 2009-08-19 江苏科能电力工程咨询有限公司 110kv双回路t接钢管杆
CN201554255U (zh) * 2009-08-26 2010-08-18 国网北京经济技术研究院 一种高强度混压输电钢塔
CN201953130U (zh) * 2010-11-29 2011-08-31 江苏省电力公司吴江市供电公司 一种输电线路钢管塔

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669968A (zh) * 2013-11-28 2014-03-26 苏州踵力重型机械有限公司 组合钢管杆
CN105507655A (zh) * 2015-12-03 2016-04-20 重庆瑜煌电力设备制造有限公司 输电线路钢管塔的施工方法
CN110685489A (zh) * 2019-10-24 2020-01-14 湖北恒信电力设计有限公司 基于终端钢管杆的四回路电缆下线结构

Similar Documents

Publication Publication Date Title
CN107834434A (zh) 用于输电线路张力放线施工的跨越方法
CN204551461U (zh) 一种压力分散型葫芦式扩大头锚索
CN105610093B (zh) 一种锚固装置及锚固方法
CN102477810A (zh) 一种输电线路钢管塔及其施工方法
CN106786157B (zh) 通航水面上方的输电线路大跨越拆旧方法
CN205985947U (zh) 一种伦敦塔桥式输电线路不停电跨越系统
CN204407790U (zh) 一种用于支开跳线的绝缘扒杆
CN203352053U (zh) 用于输电线路直线杆塔检修的链式梯
CN201953130U (zh) 一种输电线路钢管塔
CN106532557B (zh) 跨越10kv线路施工平台工具装置
CN103138206A (zh) 利用ppr管垂吊进行高压架空送电线路更换架空地线装置及方法
CN203281765U (zh) 拉线制作专用工具
CN206401811U (zh) 一种跨越带电线路架线施工的跨越网
CN202488034U (zh) 角铁塔输电线路起吊装置
CN203445520U (zh) 带电跨越装置
CN203233106U (zh) 高压输电线接线拉线装置
CN106451200A (zh) 一种伦敦塔桥式不停电输电线路跨越系统及跨越方法
CN201490626U (zh) 一种“一牵三”张力放线用不对称牵引板
CN209562017U (zh) 一种紧线滑轮组装置
CN205583539U (zh) 一种动滑轮式省力卡线器
CN203050216U (zh) 一种双口抱杆帽
CN203445521U (zh) 一种带电跨越架用牵引装置
CN207039143U (zh) 一种张力保持线夹
CN209805246U (zh) 一种基于绝缘子串的起吊系统
CN202586168U (zh) 杆塔挂导线专用连板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE ELECTRIC NET

Effective date: 20130107

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130107

Address after: 215200 Wujiang City, Jiangsu province Pine Township Road

Applicant after: Wujiang Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

Applicant after: Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Applicant after: Suzhou Power Supply Co., Ltd. of Jiangsu Electric Power Company

Address before: 215200 Wujiang City, Jiangsu province Pine Township Road No. 518

Applicant before: Wujiang Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120530