CN102457892B - A kind of method of testing and equipment - Google Patents

A kind of method of testing and equipment Download PDF

Info

Publication number
CN102457892B
CN102457892B CN201010527303.0A CN201010527303A CN102457892B CN 102457892 B CN102457892 B CN 102457892B CN 201010527303 A CN201010527303 A CN 201010527303A CN 102457892 B CN102457892 B CN 102457892B
Authority
CN
China
Prior art keywords
test
terminal
plan
reporting policy
testing apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010527303.0A
Other languages
Chinese (zh)
Other versions
CN102457892A (en
Inventor
金凌
王科
杨光华
张伟
陈景岩
尹伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201010527303.0A priority Critical patent/CN102457892B/en
Publication of CN102457892A publication Critical patent/CN102457892A/en
Application granted granted Critical
Publication of CN102457892B publication Critical patent/CN102457892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of method of testing and equipment, the method comprises: test terminal performs test according to current test plan, and according to current reporting policy, test result is reported testing apparatus; Test terminal receives testing apparatus according to the test plan of the test terminal after test result configuration and reporting policy; Test terminal upgrades current test plan according to the test plan after configuration, and upgrades current reporting policy according to the reporting policy after configuration.In the present invention, testing apparatus is by obtaining the test environment of this test terminal, be that suitable test plan and reporting policy are formulated in test terminal according to test environment, thus the test plan of configuration and reporting policy are informed to test terminal, the reporting policy using the test plan of configuration to perform test function and renewal by test terminal reports test result, thus make testing apparatus can obtain test result accurately, and provide top quality service for user, the use sense that improve user is subject to.

Description

A kind of method of testing and equipment
Technical field
The present invention relates to communication technical field, especially relate to a kind of method of testing and equipment.
Background technology
Along with the fast development of communication network, how to assess the network of operator and relevant data traffic quality, for user provides top quality service, become the importance that current operator improves quality of service.Wherein, due to the user that the use object of data service is operator, then operator is in order to improve data traffic quality, need for the business terminal in market various indexs (such as, the index such as product function, properties of product) test, and according to test result for user provides top quality service.
In prior art, operator is in remote auto field tests, the pattern of test terminal+testing apparatus (drive test software) can be adopted, tested for network, signal power by test terminal, and data analysis test terminal collected by testing apparatus.
Realizing in process of the present invention, inventor finds at least there is following problem in prior art:
Test terminal needs to perform test function according to test plan, and testing apparatus is when formulating test plan, the test plan formulated and test result reporting policy are probably and be not suitable for this test terminal, thus make test terminal cannot perform test function with the test plan of optimum, then the test result that testing apparatus cannot obtain test result accurately and report in time is made, can not provide top quality service for user, the use sense that have impact on user is subject to.
Summary of the invention
The embodiment of the present invention provides a kind of method of testing and equipment, uses optimum test plan to perform test function to make test terminal.
In order to achieve the above object, the embodiment of the present invention provides a kind of method of testing, comprising:
Test terminal performs test according to current test plan, and according to current reporting policy, test result is reported testing apparatus;
Described test terminal receives described testing apparatus according to the test plan of the described test terminal after described test result configuration and reporting policy;
Described test terminal upgrades described current test plan according to the test plan after configuration, and upgrades described current reporting policy according to the reporting policy after configuration.
Preferably, described test result is reported testing apparatus, comprising:
Test result according to the Information Selection uploading channel of described test result, and is reported testing apparatus by described uploading channel by described test terminal; Or,
Uploading channel is selected according to described current reporting policy in described test terminal, and by described uploading channel, test result is reported testing apparatus.
Preferably, described test result is reported testing apparatus, comprising:
Described test result is reported testing apparatus according to the cycle of presetting by described test terminal; Or,
Described test terminal monitoring network environment, and when described network environment changes, described test result is reported testing apparatus.
Preferably, described test terminal upgrades described current test plan according to the test plan after configuration, and upgrades described current reporting policy according to the reporting policy after configuration, also comprises afterwards:
Described test terminal performs test according to the test plan after configuration, and according to the reporting policy after configuration, test result is reported described testing apparatus.
Preferably, described test terminal is the test terminal comprising bottom chip and middleware;
Described test terminal performs test according to current test plan, comprising:
Test parameter is supplied to described middleware by described bottom chip, and by described middleware, described test parameter is supplied to described test terminal;
Described test terminal performs test according to described test parameter and current test plan.
The embodiment of the present invention provides a kind of method of testing, comprising:
Testing apparatus receives the test result from test terminal, and configures test plan and the reporting policy of described test terminal according to described test result;
Test plan after configuration and reporting policy are sent to described test terminal by described testing apparatus, upgrade the current test plan of described test terminal for described test terminal according to the test plan after configuration, upgrade the current reporting policy of described test terminal according to the reporting policy after configuration.
Preferably, configure test plan and the reporting policy of described test terminal according to described test result, comprising:
Described testing apparatus determines the test environment of described test terminal according to the situation that reports of described test result and test result, and configures test plan and the reporting policy of described test terminal according to described test environment.
Preferably, the test plan after configuration and reporting policy are sent to described test terminal by described testing apparatus, comprising:
Described testing apparatus is selected to issue passage according to the power of test of described test terminal and performance parameter, and issues passage described in passing through the test plan after described configuration and reporting policy are sent to described test terminal.
The embodiment of the present invention provides a kind of test terminal, comprising:
Test result reporting module, for performing test according to current test plan, and reports testing apparatus according to current reporting policy by test result;
Test plan administration module, for receiving described testing apparatus according to the test plan of the described test terminal after described test result configuration and reporting policy;
And upgrade described current test plan according to the test plan after configuration, upgrade described current reporting policy according to the reporting policy after configuration.
Preferably, also comprise:
Transmission channel selects module, for the Information Selection uploading channel according to described test result, and by described uploading channel, test result is reported testing apparatus by described test result reporting module; Or,
Select uploading channel according to described current reporting policy, and by described uploading channel, test result is reported testing apparatus by described test result reporting module.
Preferably, described test result reporting module, specifically for reporting testing apparatus according to the cycle of presetting by described test result; Or,
Monitoring network environment, and when described network environment changes, described test result is reported testing apparatus.
Preferably, described test result reporting module, also for performing test according to the test plan after configuration, and reports described testing apparatus according to the reporting policy after configuration by test result.
Preferably, described test terminal is the test terminal comprising bottom chip and middleware;
Described bottom chip, for being supplied to described middleware by test parameter;
Described middleware, for being supplied to described test result reporting module by described test parameter;
Described test result reporting module, specifically for performing test according to described test parameter and current test plan.
The embodiment of the present invention provides a kind of testing apparatus, comprising:
Test result receiver module, for receiving the test result from test terminal;
Upload strategy analysis module, for configuring test plan and the reporting policy of described test terminal according to described test result;
Test plan administration module, for managing test plan and reporting policy, and the test plan after configuration and reporting policy are sent to described test terminal, upgrade the current test plan of described test terminal for described test terminal according to the test plan after configuration, upgrade the current reporting policy of described test terminal according to the reporting policy after configuration.
Preferably, described in upload strategy analysis module, specifically for determining the test environment of described test terminal according to the situation that reports of described test result and test result, and configure test plan and the reporting policy of described test terminal according to described test environment.
Preferably, also comprise:
Transmission channel selects module, for selecting to issue passage according to the power of test of described test terminal and performance parameter, and described in described test plan administration module passes through, issue passage the test plan after described configuration and reporting policy are sent to described test terminal.
Compared with prior art, the embodiment of the present invention at least has the following advantages:
When test terminal reports test result, testing apparatus is by obtaining the test environment of this test terminal, be that suitable test plan and reporting policy are formulated in test terminal according to test environment, thus the test plan of configuration and reporting policy are informed to test terminal, the reporting policy using the test plan of configuration to perform test function and renewal by test terminal reports test result, thus make testing apparatus can obtain test result accurately, and providing top quality service for user, the use sense that improve user is subject to.
Accompanying drawing explanation
In order to be illustrated more clearly in technical scheme of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of method of testing flow chart that the embodiment of the present invention provides;
Fig. 2 is test result class statistic schematic diagram under embodiment of the present invention application scenarios;
Fig. 3 is the schematic diagram of test plan, reporting policy and transmission policy different with the formulation of region n for region 1, region 2 under embodiment of the present invention application scenarios;
Fig. 4 is the structural representation of a kind of test terminal that the embodiment of the present invention provides;
Fig. 5 is the structural representation of a kind of testing apparatus that the embodiment of the present invention provides.
Embodiment
In prior art, when adopting the pattern of test terminal+testing apparatus to test, test terminal can perform test function according to test plan automatically, and test result is reported to testing apparatus by data wire, and test plan can be handed down to test terminal by data wire by testing apparatus.Wherein, this test plan is generally according to test request by manually completing in advance, and the test result reporting policy of each test terminal is consistent, namely each test terminal need to select manual report or be completed automatically to report afterwards.
But testing apparatus is when formulating test plan, and the unpredictable environmental parameter affecting test plan and perform, thus affects the test function of test terminal.Such as, partial test terminal is due to the problem of residing network environment, and the testing time is long, reports the test result time long, and speed is slow, and mortality is high; If test plan can not consider above-mentioned factor, after testing according to test plan, the test result of test terminal may be caused cannot to report testing apparatus in time, low and the problems such as test terminal power consumption increase of the success rate reported, even may have influence on carrying out and the accuracy of test.
For the problems referred to above, the embodiment of the present invention provides a kind of method of testing and equipment, with according to the test environment of test terminal (such as, the resident area of test terminal, busy period feature, environment residing for the test such as network busy degree section) be test terminal Automatic Optimal customization (namely configuring) test plan and reporting policy, and further Automatic Optimal customization can be carried out according to the difference of test terminal ability to the test plan of different test terminal and reporting policy further, and the test plan after customization and reporting policy are handed down to test terminal with suitable passage.
Below in conjunction with the accompanying drawing in the present invention, be clearly and completely described the technical scheme in the present invention, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
The embodiment of the present invention provides a kind of method of testing, and the method is applied in the test terminal comprising bottom chip and middleware.This test terminal can not be special terminal, but based on the terminal (terminal of installation testing client software) of Intelligent commercial operating system.In the embodiment of the present invention, by transforming bottom hardware (i.e. bottom chip), making bottom chip upwards open interface (as Trace interface), and by this Trace interface, test parameter being supplied to middleware.Wherein, in order to realize the test to bottom-layer network and various CS territories business, need the chip producer definition at business terminal and upwards open Trace interface, namely chip producer provides chip interface information format specification to third-party testing software, thus makes bottom chip by this Trace interface, test parameter can be supplied to middleware.
In the embodiment of the present invention, also needing on test terminal, arrange middleware (middleware refers in business terminal for providing the intermediate member of test function), namely middleware being set in an operating system.Wherein, for the middleware that different terminals producer provides, can to should the operating system of terminal producer, such as, during terminal producer A use operating system A, need to arrange corresponding middleware A, thus the information making middleware A the test parameter that bottom chip provides can be converted to operating system A can to identify.
Concrete, this middleware is for mating interface between the Trace interface of bottom chip and client and agreement, and for mapping out standard testing port, all kinds of test function (comprising the opening etc. that AT controls serial ports, Trace signaling serial ports, audio frequency and video output serial ports) is provided, makes it possible to carry out network test in general purpose terminal.
Further, by installing client software on test terminal, then client software can direct connecting test port (test port that middleware provides), carries out all kinds of Service control and signal collecting, dialing AT instruction, sending SMS etc. as sent.
In sum, in the embodiment of the present invention, test parameter can be supplied to middleware by bottom chip, and this test parameter can be supplied to operating system by middleware, and by operating system, this middleware is supplied to application program (i.e. client software).Thus the function realizing bottom parameter acquiring, various CS and PS territories business carried out to testing, monitor the various abnormal data of acquisition.Wherein, the associative operation of this operating system and application program by the Implement of Function Module on test terminal, also can be realized by test terminal.
Based on above-mentioned situation, as shown in Figure 1, the method comprises the following steps:
Step 101, test terminal performs test according to test parameter and current test plan, and according to current reporting policy, test result is reported testing apparatus.Wherein, before deserving, test plan and current reporting policy can for the test plans pre-set.
It should be noted that in actual applications, special terminal (namely test terminal is special terminal) also can be adopted to perform technical scheme provided by the invention.When using special terminal to process, not needing the chip producer definition at business terminal and upwards opening Trace interface, namely not needing chip producer to provide chip interface information format specification to third-party testing software; Do not need to arrange middleware yet, can realize as long as the terminal adopting this special carries out test, namely special in this step terminal directly can perform test according to current test plan, and perform the subsequent step of the embodiment of the present invention, repeat no more in the embodiment of the present invention, not being that the situation of special terminal is described.
Concrete, test terminal can perform test according to the test plan of self and test parameter (this test parameter is provided by bottom chip), and recording the detecting information of this test, this detecting information includes but not limited to: the subdistrict position, testing time (test starts the end time) etc. at place, test terminal.When reporting test result to testing apparatus, needing to record this detecting information in test result, test terminal id, reported data amount, test result report the information such as time started; In addition, according to actual needs while reporting test terminal ability and performance parameter (such as, specify in test plan), power of test and the performance parameter of test terminal can also be recorded in test result.
In this step, passage test result being reported testing apparatus includes but not limited to: GPRS (GeneralPacketRadioService, general packet radio service) passage, SMS (ShortMessageService, Mobile Phone Short Message Service) passage, the multiple passage such as WAPPush.
Concrete, test result according to the Information Selection uploading channel of test result, and can be reported testing apparatus by the uploading channel selected by test terminal; Or uploading channel can be selected according to current reporting policy in test terminal, and by the uploading channel selected, test result is reported testing apparatus.Wherein, the information of test result can be the size of test result data bag and the type etc. of test terminal that need upload; Select uploading channel can be the uploading channel of specifying in reporting policy according to testing apparatus according to current reporting policy.
Such as, when the size of test result data bag is less, short message channel can be selected; When the type of test terminal is 3G terminal, 3G bearer path can be selected.
In the embodiment of the present invention, short message channel (i.e. SMS passage) is responsible for that the test result of transmission is split (merging) and is become many notes, and adds special identifier and be transferred to testing apparatus; GPRS passage is used for transmitting packet by GPRS mode; WAPPush passage is for receiving and going the link address acquisition data of specifying.In addition, after passing passage in the choice, also need to be responsible for carrying out encoding and decoding according to the data of different passages to transmission by transmission coding/decoding function.
In the embodiment of the present invention, before deserving, reporting policy can for the reporting policy pre-set, such as, require to give the correct time in test result in the mode of GPRS passage at time A in test terminal, then test terminal needs in the mode of GPRS passage, test result to be reported testing apparatus at time A.
In the embodiment of the present invention, according to the actual needs, test result can be reported testing apparatus according to the cycle of presetting by test terminal; Or test result by monitoring network environment, and is reported testing apparatus when network environment changes by test terminal.
Step 102, testing apparatus determines the test environment of test terminal according to the situation that reports of test result and test result, and according to the test plan of test environment configuration testing terminal and reporting policy.
Concrete, testing apparatus is after receiving the test result that test terminal reports, can be that a detecting information record is set up in this test terminal according to the situation that reports of this test result and test result, in this detecting information record, at least can comprise one or more in following content: community, testing time, the reported data amount at test terminal id, place, test terminal, report speed, this test result reports the information such as the frequency of failure.Wherein, the information such as community, testing time, reported data amount at test terminal id, place, test terminal can be known from test result, reports speed, this test result reports the information such as the frequency of failure can know from reporting situation of test result.
In the embodiment of the present invention, report situation according to test result and test result, directly can determine the test environment (information such as test zone, time period) of test terminal.Such as, from test result and test result report directly can know place, test terminal situation community, testing time, report the test environments such as speed, do not repeat them here.
Afterwards, testing apparatus is to a large amount of detecting information records (record that a large amount of historic test results is corresponding) collected, with different test zone, time period etc. for condition carries out cluster, and statistical separates out the relevant parameter of each network quality such as test zone, time period.Further, when reporting after situation determines the test environment (information such as test zone, time period) of test terminal by the test result of test terminal and test result, the parameter that each network quality such as test zone, time period then separated out according to statistical is correlated with, namely can the test plan of Automatic Optimal (namely configure, be described to be optimized for example in the embodiment of the present invention) test terminal (test environment such as test zone and time period according to place, test terminal) and reporting policy.
Further, when test terminal has reported power of test and performance parameter, according to the power of test of test terminal and performance parameter, testing apparatus can also support that test terminal selects a kind of appropriate channel to transmit from multichannel (SMS, GPRS, WAPPush etc.).Such as, when the power of test of test terminal and performance parameter are for supporting GPRS channel transfer, then testing apparatus can select GPRS passage to transmit.
Therefore, in the embodiment of the present invention, testing apparatus can automatically for different test plans and test result reporting policy be formulated in the test terminal being positioned at zones of different and different time sections, to reduce the blindness that test terminal performs test plan and test result reporting policy, and reduce the impact reporting test result on test, improve the testing efficiency of test terminal.
Step 103, the test plan after configuration and reporting policy are sent to test terminal by testing apparatus.
Concrete, the reporting policy after testing apparatus can send configuration and/or test plan are to the test terminal zones of different (or testing through this region of being everlasting).Wherein, testing apparatus can support that intelligentized selection issues passage, and namely reporting policy and/or test plan can be sent to test terminal by the multiple passage such as GPRS, SMS and WAPPush by testing apparatus.
Concrete, the information such as the type of the data package size that testing apparatus can issue as required and test terminal select to issue passage automatically, such as, when the data package size that needs issue is less, can select short message channel; When the type of test terminal is 3G terminal, 3G bearer path can be selected.Wherein, short message channel is responsible for that the packet of transmission is split (merging) and is become many notes, and adds special identifier and be transferred to test terminal; GPRS passage is used for transmitting packet by GPRS mode; WAPPush passage is for receiving and going the link address acquisition data of specifying.In addition, after selection issues passage, also need to be responsible for carrying out encoding and decoding according to the data of different passages to transmission by transmission coding/decoding function.In actual applications, testing apparatus also according to the type of 3G terminal, can be selected network to adopt 3G to carry transmission means, repeats no longer in detail at this.
Step 104, test terminal upgrades current test plan and current reporting policy according to the test plan after configuration and reporting policy.
Wherein, when after the test plan after receiving configuration and reporting policy, then test terminal can upgrade current test plan according to the test plan after configuration, and upgrades current reporting policy according to the reporting policy after configuration.
Certainly, in practical application, after test terminal receives the test plan after configuration and reporting policy, the test plan after configuration can also be compared whether identical with reporting policy with current test plan with reporting policy, when only having not identical, test terminal just can upgrade current test plan and current reporting policy according to the test plan after configuration and reporting policy; If time identical, then do not need to upgrade current test plan and current reporting policy.
Step 105, test terminal is tested according to the test plan after configuration, and reports according to the reporting policy after configuration.
Further, test with the process reported similar in this process and step 101, just test plan and/or reporting policy there occurs change, in subsequent process, testing apparatus can also proceed the process of optimal inspection plan and reporting policy, make test terminal perform test with the test plan and reporting policy that continue optimization and report process, by that analogy, ensure that test terminal can perform respective handling with the test plan of optimum and reporting policy always.
In order to the technical scheme that the elaboration embodiment of the present invention clearly provides, below in conjunction with concrete application scenarios, the embodiment of the present invention is described in detail.
Under this application scene, after supposing to have passed through the repeatedly test of some test terminals in certain phase and n region, each test terminal these test results uploads to testing apparatus by the GPRS mode of initial setting up.Testing apparatus needs to set up detecting information record to each test result, and record this test community, place, testing time, this test result report the frequency of failure, report speed, upload the parameters such as test result data bag size (reported data amount).
Afterwards, testing apparatus carries out cluster according to n test zone and the historic test results of different time periods, and counts the mean values of test plan implementation status all in each class, test result class statistic schematic diagram as shown in Figure 2.
Under this application scene, testing apparatus is by after cluster, find that mortality is uploaded at 9-14 point in region 1 higher, speed is slower, and laser propagation effect is better during 14-20 point, therefore, the reporting policy of the test terminal that testing apparatus can be formulated in this region 1 is report in the idle time period of non-9-14 point, and uses GPRS passage to upload test result.
Region 2 is peak hours/period in the whole day most of the time (8-22 point), and it is smaller on average to upload result sizes, and therefore, the test of the test terminal that testing apparatus can be formulated in this region 2 is uploaded as during concentrated 22 o'clock to 8 o'clock idles; Or do not distinguish the time period, directly select mode test result compression being split into many notes to upload.
Region n whole day 3G network quality is good, transmission speed block, upload mortality low, therefore, testing apparatus can formulate the test of the test terminal in the n of this region for have tested rear test result of directly uploading at every turn, and use 3G network data feedback channel etc. to upload test result, and 3G network down going channel is used to receive the test plan and reporting policy that issue.
As shown in Figure 3, be the schematic diagram for region 1, region 2 test plan, reporting policy and the transmission policy different with the formulation of region n.Namely testing apparatus can automatically for different test plan reporting policies and transmission policy be formulated in the test terminal being positioned at zones of different and different time sections.
Visible, in the embodiment of the present invention, by using remote automation monitoring means, test plan and test result reporting policy are provided to test terminal, thus reduce the blindness that test terminal performs test plan and test result reporting policy, reduce the impact of reported result on test, improve testing efficiency.
Concrete, this testing apparatus can collect the information such as the often residing environment in each test terminal (region, testing time interval), carries out cluster analysis, customize out test plan suitable under circumstances and reporting policy according to environment difference.And independently test result reporting policy can be customized for the test terminal of zones of different, and be issued to test terminal by the passage that note or WAPPUSH etc. are different, change less to existing test terminal and testing apparatus.
Wherein, test terminal only needs the record each test plan implementation status being done to a time and region, and increases a small amount of field in each test result reports, and does not affect reporting of test result, does not also need to increase extra software and hardware; Testing apparatus only needs to increase the statistics and analysis function according to the record of the test plan implementation status of all test terminals; Upload the common protocol passage that result all can select test terminal all to support with the plan that issues, such as note, GPRS etc., only need to add special identifier and the client test program of test terminal can be identified.
Based on the inventive concept same with said method, in the embodiment of the present invention, additionally provide a kind of test terminal, as shown in Figure 4, comprising:
Test result reporting module 41, for performing test according to current test plan, and reports testing apparatus according to current reporting policy by test result;
Test plan administration module 42, for receiving described testing apparatus according to the test plan of the described test terminal after described test result configuration and reporting policy;
And upgrade described current test plan according to the test plan after configuration, upgrade described current reporting policy according to the reporting policy after configuration.
Transmission channel selects module 43, for the Information Selection uploading channel according to described test result, and by described uploading channel, test result is reported testing apparatus by described test result reporting module 41; Or,
Select uploading channel according to described current reporting policy, and by described uploading channel, test result is reported testing apparatus by described test result reporting module 41.
Described test result reporting module 41, specifically for reporting testing apparatus according to the cycle of presetting by described test result; Or,
Monitoring network environment, and when described network environment changes, described test result is reported testing apparatus.
Described test result reporting module 41, also for performing test according to the test plan after configuration, and reports described testing apparatus according to the reporting policy after configuration by test result.
In the embodiment of the present invention, the size of test result data bag that transmission channel selects module 43 to upload as required and the type of test terminal, select uploading channel automatically; Or the uploading channel that transmission channel selects module 43 that testing apparatus can be selected to be specified by reporting policy.Such as, when the size of test result data bag is less, short message channel can be selected; When the type of test terminal is 3G terminal, 3G bearer path can be selected.
Concrete, short message channel: be responsible for that the test result of transmission is split (merging) and become many notes, and add special identifier and be transferred to testing apparatus;
GPRS passage: for transmitting packet by GPRS mode;
WAPPush passage: for receiving and going the link address acquisition data of specifying;
In addition, after passing passage in the choice, also need to be responsible for carrying out encoding and decoding according to the data of different passages to transmission by transmission coding/decoding function.
In the embodiment of the present invention, described test terminal is the test terminal comprising bottom chip and middleware; Described bottom chip, for being supplied to described middleware by test parameter; Described middleware, for being supplied to described test result reporting module by described test parameter;
Described test result reporting module 41, specifically for performing test according to described test parameter and current test plan.
Wherein, the modules of apparatus of the present invention can be integrated in one, and also can be separated deployment.Above-mentioned module can merge into a module, also can split into multiple submodule further.
In the embodiment of the present invention, when test terminal reports test result, testing apparatus is by obtaining the test environment of this test terminal, be that suitable test plan and reporting policy are formulated in test terminal according to test environment, thus the test plan of configuration and reporting policy are informed to test terminal, the reporting policy using the test plan of configuration to perform test function and renewal by test terminal reports test result, thus make testing apparatus can obtain test result accurately, and providing top quality service for user, the use sense that improve user is subject to.
Based on the inventive concept same with said method, in the embodiment of the present invention, additionally provide a kind of testing apparatus, as shown in Figure 5, comprising:
Test result receiver module 51, for receiving the test result from test terminal;
Upload strategy analysis module 52, for configuring test plan and the reporting policy of described test terminal according to described test result;
Test plan administration module 53, for managing test plan and reporting policy, and the test plan after configuration and reporting policy are sent to described test terminal, upgrade the current test plan of described test terminal for described test terminal according to the test plan after configuration, upgrade the current reporting policy of described test terminal according to the reporting policy after configuration.
In the embodiment of the present invention, describedly upload strategy analysis module 52, specifically for determining the test environment of described test terminal according to the situation that reports of described test result and test result, and configure test plan and the reporting policy of described test terminal according to described test environment.
In the embodiment of the present invention, also comprise:
Transmission channel selects module 54, for selecting to issue passage according to the power of test of described test terminal and performance parameter, and described in described test plan administration module 53 passes through, issue passage the test plan after described configuration and reporting policy are sent to described test terminal.
In the embodiment of the present invention, the type etc. of the data package size that transmission channel selects module 54 to issue as required and test terminal is selected to issue passage automatically, such as, when the data package size that needs issue is less, can select short message channel; When the type of test terminal is 3G terminal, 3G bearer path can be selected.
Concrete, short message channel: be responsible for that the packet of transmission is split (merging) and become many notes, and add special identifier and be transferred to test terminal;
GPRS passage: for transmitting packet by GPRS mode;
WAPPush passage: for receiving and going the link address acquisition data of specifying.
In addition, after selection issues passage, also need to be responsible for carrying out encoding and decoding according to the data of different passages to transmission by transmission coding/decoding function.
Wherein, the modules of apparatus of the present invention can be integrated in one, and also can be separated deployment.Above-mentioned module can merge into a module, also can split into multiple submodule further.
In the embodiment of the present invention, when test terminal reports test result, testing apparatus is by obtaining the test environment of this test terminal, be that suitable test plan and reporting policy are formulated in test terminal according to test environment, thus the test plan of configuration and reporting policy are informed to test terminal, the reporting policy using the test plan of configuration to perform test function and renewal by test terminal reports test result, thus make testing apparatus can obtain test result accurately, and providing top quality service for user, the use sense that improve user is subject to.
Through the above description of the embodiments, those skilled in the art can be well understood to the mode that the present invention can add required general hardware platform by software and realize, and can certainly pass through hardware, but in a lot of situation, the former is better execution mode.Based on such understanding, technical scheme of the present invention can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform method described in each embodiment of the present invention.
It will be appreciated by those skilled in the art that accompanying drawing is the schematic diagram of a preferred embodiment, the module in accompanying drawing or flow process might not be that enforcement the present invention is necessary.
It will be appreciated by those skilled in the art that the module in the device in embodiment can carry out being distributed in the device of embodiment according to embodiment description, also can carry out respective change and be arranged in the one or more devices being different from the present embodiment.The module of above-described embodiment can merge into a module, also can split into multiple submodule further.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
Be only several specific embodiment of the present invention above, but the present invention is not limited thereto, the changes that any person skilled in the art can think of all should fall into protection scope of the present invention.

Claims (14)

1. a method of testing, is characterized in that, comprising:
Test terminal performs test according to current test plan, and according to current reporting policy, test result is reported testing apparatus;
Described test terminal receives described testing apparatus according to the test plan of the described test terminal after described test result configuration and reporting policy; Wherein, the test plan of described test terminal and reporting policy are that described testing apparatus determines the test environment of described test terminal according to the situation that reports of described test result and test result, and configure according to described test environment;
Described test terminal upgrades described current test plan according to the test plan after configuration, and upgrades described current reporting policy according to the reporting policy after configuration.
2. the method for claim 1, is characterized in that, described test result is reported testing apparatus, comprising:
Test result according to the Information Selection uploading channel of described test result, and is reported testing apparatus by described uploading channel by described test terminal; Or,
Uploading channel is selected according to described current reporting policy in described test terminal, and by described uploading channel, test result is reported testing apparatus.
3. the method for claim 1, is characterized in that, described test result is reported testing apparatus, comprising:
Described test result is reported testing apparatus according to the cycle of presetting by described test terminal; Or,
Described test terminal monitoring network environment, and when described network environment changes, described test result is reported testing apparatus.
4. the method for claim 1, is characterized in that, described test terminal upgrades described current test plan according to the test plan after configuration, and upgrades described current reporting policy according to the reporting policy after configuration, also comprises afterwards:
Described test terminal performs test according to the test plan after configuration, and according to the reporting policy after configuration, test result is reported described testing apparatus.
5. the method as described in any one of claim 1-4, is characterized in that, described test terminal is the test terminal comprising bottom chip and middleware;
Described test terminal performs test according to current test plan, comprising:
Test parameter is supplied to described middleware by described bottom chip, and by described middleware, described test parameter is supplied to described test terminal;
Described test terminal performs test according to described test parameter and current test plan.
6. a method of testing, is characterized in that, comprising:
Testing apparatus receives the test result from test terminal, and configures test plan and the reporting policy of described test terminal according to described test result;
Test plan after configuration and reporting policy are sent to described test terminal by described testing apparatus, upgrade the current test plan of described test terminal for described test terminal according to the test plan after configuration, upgrade the current reporting policy of described test terminal according to the reporting policy after configuration;
Wherein, configure test plan and the reporting policy of described test terminal according to described test result, comprising:
Described testing apparatus determines the test environment of described test terminal according to the situation that reports of described test result and test result, and configures test plan and the reporting policy of described test terminal according to described test environment.
7. method as claimed in claim 6, is characterized in that, the test plan after configuration and reporting policy are sent to described test terminal by described testing apparatus, comprising:
Described testing apparatus is selected to issue passage according to the power of test of described test terminal and performance parameter, and issues passage described in passing through the test plan after described configuration and reporting policy are sent to described test terminal.
8. a test terminal, is characterized in that, comprising:
Test result reporting module, for performing test according to current test plan, and reports testing apparatus according to current reporting policy by test result;
Test plan administration module, for receiving described testing apparatus according to the test plan of the described test terminal after described test result configuration and reporting policy;
And upgrade described current test plan according to the test plan after configuration, upgrade described current reporting policy according to the reporting policy after configuration.
9. test terminal as claimed in claim 8, is characterized in that, also comprise:
Transmission channel selects module, for the Information Selection uploading channel according to described test result, and by described uploading channel, test result is reported testing apparatus by described test result reporting module; Or,
Select uploading channel according to described current reporting policy, and by described uploading channel, test result is reported testing apparatus by described test result reporting module.
10. test terminal as claimed in claim 8, is characterized in that,
Described test result reporting module, specifically for reporting testing apparatus according to the cycle of presetting by described test result; Or,
Monitoring network environment, and when described network environment changes, described test result is reported testing apparatus.
11. test terminals as claimed in claim 8, is characterized in that,
Described test result reporting module, also for performing test according to the test plan after configuration, and reports described testing apparatus according to the reporting policy after configuration by test result.
12. test terminals as described in any one of claim 8-11, it is characterized in that, described test terminal is the test terminal comprising bottom chip and middleware;
Described bottom chip, for being supplied to described middleware by test parameter;
Described middleware, for being supplied to described test result reporting module by described test parameter;
Described test result reporting module, specifically for performing test according to described test parameter and current test plan.
13. 1 kinds of testing apparatuss, is characterized in that, comprising:
Test result receiver module, for receiving the test result from test terminal;
Upload strategy analysis module, for configuring test plan and the reporting policy of described test terminal according to described test result; Wherein, the test plan of described test terminal and reporting policy are that described testing apparatus determines the test environment of described test terminal according to the situation that reports of described test result and test result, and configure according to described test environment;
Test plan administration module, for managing test plan and reporting policy, and the test plan after configuration and reporting policy are sent to described test terminal, upgrade the current test plan of described test terminal for described test terminal according to the test plan after configuration, upgrade the current reporting policy of described test terminal according to the reporting policy after configuration;
Wherein, described in upload strategy analysis module, specifically for determining the test environment of described test terminal according to the situation that reports of described test result and test result, and configure test plan and the reporting policy of described test terminal according to described test environment.
14. testing apparatuss as claimed in claim 13, is characterized in that, also comprise:
Transmission channel selects module, for selecting to issue passage according to the power of test of described test terminal and performance parameter, and described in described test plan administration module passes through, issue passage the test plan after described configuration and reporting policy are sent to described test terminal.
CN201010527303.0A 2010-10-26 2010-10-26 A kind of method of testing and equipment Active CN102457892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010527303.0A CN102457892B (en) 2010-10-26 2010-10-26 A kind of method of testing and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010527303.0A CN102457892B (en) 2010-10-26 2010-10-26 A kind of method of testing and equipment

Publications (2)

Publication Number Publication Date
CN102457892A CN102457892A (en) 2012-05-16
CN102457892B true CN102457892B (en) 2015-11-25

Family

ID=46040421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010527303.0A Active CN102457892B (en) 2010-10-26 2010-10-26 A kind of method of testing and equipment

Country Status (1)

Country Link
CN (1) CN102457892B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103455233B (en) * 2012-05-28 2016-08-17 腾讯科技(深圳)有限公司 The user interface of a kind of mobile terminal determines method and apparatus
CN104717670B (en) * 2013-12-13 2019-09-13 中国移动通信集团公司 A kind of measure of the quality of service method, apparatus and system
CN105101242A (en) * 2014-05-20 2015-11-25 北京信威通信技术股份有限公司 Call automated testing implementation method
CN105791833B (en) * 2014-12-17 2018-09-04 深圳Tcl数字技术有限公司 Select the method and device of coding and decoding video hardware platform
CN106921506B (en) * 2015-12-25 2020-11-03 北京京东尚科信息技术有限公司 Data acquisition reporting method and system for mobile equipment
CN113219235B (en) * 2021-05-10 2024-01-19 南京海兴电网技术有限公司 High-instantaneity data updating method applied to electricity acquisition system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101072327A (en) * 2007-06-19 2007-11-14 中兴通讯股份有限公司 Flow media performance testing method
CN101415190A (en) * 2007-10-16 2009-04-22 北京华恒铭圣科技发展有限责任公司 Method and system for detecting wireless communication network
CN101583140A (en) * 2009-05-14 2009-11-18 复旦大学 Automatic communication network monitoring system and realization method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101426224A (en) * 2007-11-02 2009-05-06 华为技术有限公司 Method, system and equipment for measurement result reporting
JP2009277110A (en) * 2008-05-16 2009-11-26 Mitsubishi Electric Corp Software test/development support device, and program for device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101072327A (en) * 2007-06-19 2007-11-14 中兴通讯股份有限公司 Flow media performance testing method
CN101415190A (en) * 2007-10-16 2009-04-22 北京华恒铭圣科技发展有限责任公司 Method and system for detecting wireless communication network
CN101583140A (en) * 2009-05-14 2009-11-18 复旦大学 Automatic communication network monitoring system and realization method thereof

Also Published As

Publication number Publication date
CN102457892A (en) 2012-05-16

Similar Documents

Publication Publication Date Title
CN102457892B (en) A kind of method of testing and equipment
US7248868B2 (en) Method and system for improved monitoring, measurement and analysis of communication networks utilizing dynamically and remotely configurable probes
KR101084012B1 (en) Apparatus and methods for determining voice and/or data processing performance of a wireless device
US7596373B2 (en) Method and system for quality of service (QoS) monitoring for wireless devices
CN102006664B (en) Method, equipment and system for configuring member carriers under carrier aggregation scene
WO2017041406A1 (en) Failure positioning method and device
CN101583140A (en) Automatic communication network monitoring system and realization method thereof
US9462486B2 (en) Method and device for classifying wireless data service
US20090227251A1 (en) System and method for automatically monitoring and managing wireless network performance
CN102025568B (en) Streaming media service quality monitoring device and method
JP6396585B2 (en) Reference signal reception quality reporting method and apparatus
CN110972179B (en) Method, device and storage medium for minimizing drive test
CN102612057A (en) Reporting method and reporting system of position information
JP2016527786A (en) Network test method, data collection method thereof, network test apparatus and system
CN102340802A (en) Service quality monitoring method and system
WO2022268095A1 (en) Information transmission method and apparatus
US20150081758A1 (en) Testing a network using a communication device
CN201398196Y (en) Automatic monitoring system for communication network
CN107333279B (en) Minimization of drive tests method, base station and network management system
US11246071B2 (en) Method for managing a connection in a distributed wireless network
JP2022502945A (en) Data transmission method and equipment
EP2850846B1 (en) Radio access bearer monitoring
KR101115521B1 (en) Full?autonomous remote-dm apparatus
CN117896712A (en) Dual-card switching system and method for 4G camera
CN116915677A (en) Fault analysis method, device, network equipment and readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant