CN102434006A - 大型钢栈桥输送系统地面整体制作吊装施工方法 - Google Patents

大型钢栈桥输送系统地面整体制作吊装施工方法 Download PDF

Info

Publication number
CN102434006A
CN102434006A CN2011104267183A CN201110426718A CN102434006A CN 102434006 A CN102434006 A CN 102434006A CN 2011104267183 A CN2011104267183 A CN 2011104267183A CN 201110426718 A CN201110426718 A CN 201110426718A CN 102434006 A CN102434006 A CN 102434006A
Authority
CN
China
Prior art keywords
steel trestle
construction
trestle
ground
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104267183A
Other languages
English (en)
Inventor
赵雄
李建文
徐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Building & Installation Seventh Engineering Co Ltd
Original Assignee
China Coal Building & Installation Seventh Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Building & Installation Seventh Engineering Co Ltd filed Critical China Coal Building & Installation Seventh Engineering Co Ltd
Priority to CN2011104267183A priority Critical patent/CN102434006A/zh
Publication of CN102434006A publication Critical patent/CN102434006A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明大型钢栈桥输送系统地面整体制作吊装施工方法,属于栈桥施工技术领域;所要解决的技术问题是提供一种高处作业少,施工效率高、经济安全的大型钢栈桥输送系统地面整体制作吊装施工方法;采用的技术方案为按照下述步骤施工:第一步,地面制作,第二步,吊装就位,第三步,连接固定;本发明中施工改高处作业为地面作业,改善了操作环境,不仅保证了施工安全,提高了工作效率,还在降低工程成本的同时保证了工程质量。

Description

大型钢栈桥输送系统地面整体制作吊装施工方法
技术领域
本发明大型钢栈桥输送系统地面整体制作吊装施工方法,属于栈桥施工技术领域。
背景技术
大型钢栈桥输送系统工程目前常用的施工方法有两种:一种是地面制作钢桁架,吊装就位后高空组拼螺栓连接组合成钢栈桥,然后在高空完成栈桥走道底板铺装和侧板屋面板的复合彩钢板围护结构;另一种是在地面制作钢栈桥,整体吊装就位后在高空完成栈桥走道底板铺装和侧板屋面板的复合彩钢板围护结构。这两种施工技术均存在高处作业量大、施工效率低、施工进度慢、安全隐患多、施工成本高等问题。
发明内容
本发明克服现有技术存在的不足,所要解决的技术问题是提供一种高处作业少,施工效率高、经济安全的大型钢栈桥输送系统地面整体制作吊装施工方法。
为了解决上述问题,本发明采用的技术方案为:大型钢栈桥输送系统地面整体制作吊装施工方法,按照下述步骤施工:
第一步,地面制作,将钢栈桥的钢桁架制作、底板铺装、墙板围护、屋面板封盖、带式输送机中间架安装等所有工序均集中在地面完成并装配好;
第二步,吊装就位,建立数学三维坐标系,确定钢栈桥跨越障碍时钢栈桥的端点空间坐标,利用坐标导向法将钢栈桥整体吊装就位;
第三步,连接固定,用螺栓将钢栈桥整体固定在混凝土牛腿支座上。
所述第一步中的底板铺装包括走道踏步和保温板的铺装。
所述第一步中的墙板围护包括窗户的围护。
所述第二步中跨越的障碍包括牛腿和挑檐。
本发明大型钢栈桥输送系统地面整体制作吊装施工方法与现有技术相比具有以下有益效果。
1、本发明中钢桁架制作、墙板安装、底板铺装以及屋面板封盖都是在地面进行,实现了栈桥在地面制作整体合成一体化施工。
2、本发明中施工改高处作业为地面作业,改善了操作环境,不仅保证了施工安全,提高了工作效率,还在降低工程成本的同时保证了工程质量。
3、本发明应用数学三维坐标系,确定钢栈桥跨越障碍时钢栈桥的端点空间坐标,利用坐标导向法整体吊装就位,实现了栈桥整体吊装快速就位,提高了经济效益和社会效益。
附图说明
下面结合附图对本发明作进一步说明。
图1为本发明的栈桥整体制作剖视图。
图2为本发明中的利用坐标导向法整体吊装过程中跨越障碍的示意图。
图中:1为钢桁架,2为底板,3为墙板,4为屋面板,5为带式输送机中间架,6为障碍,7为走道踏步,8为保温板,9为窗户,10为第一体位,11为第二体位,12为第三体位。
具体实施方式
本发明大型钢栈桥输送系统地面整体制作吊装施工方法,按照下述步骤施工:
第一步,地面制作,如图1所示,将钢栈桥的钢桁架1制作、底板2铺装、墙板3围护、屋面板4封盖、带式输送机中间架5安装等所有工序均集中在地面完成并装配好;
第二步,吊装就位,建立数学三维坐标系,确定钢栈桥跨越障碍6时钢栈桥的端点空间坐标,利用坐标导向法将钢栈桥整体吊装就位;
第三步,连接固定,用螺栓将钢栈桥整体固定在混凝土牛腿支座上。
所述第一步中的底板铺装包括走道踏步7和保温板8的铺装。
所述第一步中的墙板3围护包括窗户9的围护。
所述第二步中跨越的障碍6包括牛腿和挑檐。
本发明在施工时,应用数学三维坐标系,确定障碍6的空间坐标和钢栈桥跨越障碍6时钢栈桥的端点空间坐标,在建立的三维坐标系中规划好钢栈桥的吊装路径,然后按此路径实际吊装钢栈桥,如图2所示:
钢栈桥按照规划好的路径在靠近障碍6的第一体位10时改变运行方向移位到第二体位11避开障碍6,再改变运行方向由第二体位11移位至第三体位12,就跨过了障碍6。
按照上述方法施工,在制作上由高处作业改为地面作业,实现了栈桥在地面制作整体合成一体化施工,不仅提高了工作效率和工程质量,还保证了施工安全;在安装上应用数学三维坐标系,实现了栈桥整体吊装快速就位,降低了工程成本,提高了经济效益和社会效益。

Claims (4)

1.大型钢栈桥输送系统地面整体制作吊装施工方法,其特征在于按照下述步骤施工:
第一步,地面制作,将钢栈桥的钢桁架(1)制作、底板(2)铺装、墙板(3)围护、屋面板(4)封盖、带式输送机中间架(5)安装等所有工序均集中在地面完成并装配好;
第二步,吊装就位,建立数学三维坐标系,确定钢栈桥跨越障碍(6)时钢栈桥的端点空间坐标,利用坐标导向法将钢栈桥整体吊装就位;
第三步,连接固定,用螺栓将钢栈桥整体固定在混凝土牛腿支座上。
2.根据权利要求1所述的大型钢栈桥输送系统地面整体制作吊装施工方法,其特征在于:所述第一步中的底板铺装包括走道踏步(7)和保温板(8)的铺装。
3.根据权利要求1所述的大型钢栈桥输送系统地面整体制作吊装施工方法,其特征在于:所述第一步中的墙板(3)围护包括窗户(9)的围护。
4.根据权利要求1所述的大型钢栈桥输送系统地面整体制作吊装施工方法,其特征在于:所述第二步中跨越的障碍(6)包括牛腿和挑檐。
CN2011104267183A 2011-12-19 2011-12-19 大型钢栈桥输送系统地面整体制作吊装施工方法 Pending CN102434006A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104267183A CN102434006A (zh) 2011-12-19 2011-12-19 大型钢栈桥输送系统地面整体制作吊装施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104267183A CN102434006A (zh) 2011-12-19 2011-12-19 大型钢栈桥输送系统地面整体制作吊装施工方法

Publications (1)

Publication Number Publication Date
CN102434006A true CN102434006A (zh) 2012-05-02

Family

ID=45982334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104267183A Pending CN102434006A (zh) 2011-12-19 2011-12-19 大型钢栈桥输送系统地面整体制作吊装施工方法

Country Status (1)

Country Link
CN (1) CN102434006A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358215B (zh) * 2014-11-28 2016-05-11 中煤建筑安装工程集团有限公司 整体预应力全装配箱型模块式钢栈桥制作装配工艺
CN105604334A (zh) * 2016-01-18 2016-05-25 中铁三局集团有限公司 一种用于大跨度钢桁架整体安装的快速施工方法
CN110640406A (zh) * 2019-09-30 2020-01-03 中国二十二冶集团有限公司 厚板小空间箱型牛腿制作方法
CN115030518A (zh) * 2022-05-27 2022-09-09 山东电力工程咨询院有限公司 一种钢结构输煤栈桥的分段整体吊装方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248306A (ja) * 2000-03-03 2001-09-14 Shimizu Corp 躯体施工システムおよびそれを用いた躯体施工方法
CN101866179A (zh) * 2010-07-20 2010-10-20 上海交通大学 三维空间约束下的船舶分段吊装仿真系统
CN102071644A (zh) * 2010-12-31 2011-05-25 中铁港航工程局有限公司 一种桥梁拱肋整体提升安装方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248306A (ja) * 2000-03-03 2001-09-14 Shimizu Corp 躯体施工システムおよびそれを用いた躯体施工方法
CN101866179A (zh) * 2010-07-20 2010-10-20 上海交通大学 三维空间约束下的船舶分段吊装仿真系统
CN102071644A (zh) * 2010-12-31 2011-05-25 中铁港航工程局有限公司 一种桥梁拱肋整体提升安装方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李小军: "大跨度钢结构栈桥整体吊装施工技术", 《山西建筑》 *
武清茹: "大跨度钢栈桥制作吊装技术", 《邯郸职业科技学院学报》 *
王俊杰: "池州电厂输煤栈桥钢结构安装施工", 《第四届安徽科技论坛安徽省电机工程学会分论坛论文集》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358215B (zh) * 2014-11-28 2016-05-11 中煤建筑安装工程集团有限公司 整体预应力全装配箱型模块式钢栈桥制作装配工艺
CN105604334A (zh) * 2016-01-18 2016-05-25 中铁三局集团有限公司 一种用于大跨度钢桁架整体安装的快速施工方法
CN110640406A (zh) * 2019-09-30 2020-01-03 中国二十二冶集团有限公司 厚板小空间箱型牛腿制作方法
CN115030518A (zh) * 2022-05-27 2022-09-09 山东电力工程咨询院有限公司 一种钢结构输煤栈桥的分段整体吊装方法

Similar Documents

Publication Publication Date Title
CN204112833U (zh) 一种可升降的基站通信铁塔
CN102434006A (zh) 大型钢栈桥输送系统地面整体制作吊装施工方法
CN103935901A (zh) 高层墙板自动吊装系统
CN203767643U (zh) 一种封闭式钢结构输送栈桥
CN104675179A (zh) 自升式钢塔安装用吊架装置及钢塔施工方法
CN105217408A (zh) 分段提升式施工电梯机构及其分段提升方法
CN203959689U (zh) 一种大型烧结机降尘管道安装与调整用运行车
CN202542703U (zh) 一种电动单梁起重机
CN202465099U (zh) 一种单主梁龙门偏挂起重机
CN203877779U (zh) 高层墙板自动吊装系统
CN202449757U (zh) 一种电动单梁悬挂起重机
CN104060838B (zh) 一种通廊分组空中组对安装法
CN105625732A (zh) 超高悬挑钢结构桁架无支撑施工方法
CN202337945U (zh) 外侧就地提升梁体的装置
CN205222349U (zh) 分段提升式施工电梯机构
CN202465100U (zh) 一种带双v型支腿的单梁龙门起重机
CN202449760U (zh) 一种轨道式集装箱门式起重机
CN202465098U (zh) 一种带v型支腿的单梁龙门起重机
CN107288354B (zh) 一种龙门吊整体移位的施工方法
CN202465057U (zh) 一种单梁龙门起重机支腿
CN204185121U (zh) 一种可拼装移动搬运设备
CN202465058U (zh) 一种单梁龙门起重机柔性支腿
CN105089194B (zh) 一种吊顶转换层自延式吊挂装置的施工方法
CN204676439U (zh) 一种贝雷梁式可调坡塔顶吊
CN202429884U (zh) 一种大吨位超长龙门吊机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120502