CN102409989B - Extraction drilling dust collecting device - Google Patents
Extraction drilling dust collecting device Download PDFInfo
- Publication number
- CN102409989B CN102409989B CN201110296642.7A CN201110296642A CN102409989B CN 102409989 B CN102409989 B CN 102409989B CN 201110296642 A CN201110296642 A CN 201110296642A CN 102409989 B CN102409989 B CN 102409989B
- Authority
- CN
- China
- Prior art keywords
- dust
- dust arrester
- pipe
- gas
- extraction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of extraction drilling dust collecting device, this dust collect plant comprises dust arrester and plenum chamber, and dust arrester comprises dust arrester cavity, dust arrester cavity one sidewall is provided with positioning through hole, relative sidewall is provided with movable door, and active catch covers and is provided with drilling rod through hole; Be provided with atomization mechanism in dust arrester cavity bottom, be provided with in dust arrester bottom and connect dirt passage, be provided with gas bleed off pipe at dust arrester top; Plenum chamber top is provided with admission pipe and extraction interface, and gas bleed off pipe is connected by tube connector with between admission pipe.The features such as it is little, lightweight, simple to operate that extraction drilling dust collecting device of the present invention has volume, conveniently moving, cleaning operation, and dust collecting effect is good.Effectively can collect the airborne dust of 85%, improvement operating environment, collects the gas of holing and gushing out in time, reduces gas density near operating location, improves construction drill safety factor.
Description
Technical field
The invention belongs to mining technical field, be specifically related to a kind of extraction drilling dust collecting device.
Background technology
Gas is the accompanying gas that coal is formed in coalification course, colourless, tasteless, have burning and explosive, forms security threat to coal production; According to ocurrence of coal seam state and the continuous deepening along with pit mining, gas control more and more becomes the key factor of restriction mine safety, High-efficient Production.Administer the main method of gas now, be still and utilize construction extraction boring to carry out gas drainage under suction, carrying out concentrating to extract out discharging or utilizing with the free and analysable gas in coal seam by composing to deposit, to reduce seam gas content, realizing safety, High-efficient Production.
And carry out in the process of gas drainage under suction in utilization construction extraction boring, can return along boring produce coal (rock) dirt and a small amount of gas, return (rock) dirt that produces coal and can have a strong impact on operating environment, a small amount of gas returned out can cause spray orifice.Adopt traditional aperture spray method or blowout prevention aperture apparatus to solve above-mentioned technical problem in prior art, but find at work progress, easily cause to aperture spraying way of escape blocking of drilling, dust-laying effect is poor, the unsuitable centralized collection of coal dust, operating environment are poor; When blowout prevention aperture apparatus uses, previous work amount is comparatively large, reduces the defects such as efficiency of drilling.
Summary of the invention
The object of the invention is to solve the above-mentioned technical problem existed in prior art, a kind of extraction drilling dust collecting device is provided.
For achieving the above object, the technical solution used in the present invention is as follows:
Extraction drilling dust collecting device of the present invention, this dust collect plant comprises dust arrester and plenum chamber, and dust arrester comprises dust arrester cavity, dust arrester cavity one sidewall is provided with positioning through hole, relative sidewall is provided with movable door, and active catch covers and is provided with drilling rod through hole; Be provided with atomization mechanism in dust arrester cavity bottom, be provided with in dust arrester bottom and connect dirt passage, be provided with gas bleed off pipe at dust arrester top; Plenum chamber top is provided with admission pipe and extraction interface, and gas bleed off pipe is connected by tube connector with between admission pipe.
The present invention is preferably provided with baffle plate in the outside of the movable door of dust arrester, to increase the sealing performance of dust arrester cavity.
The present invention is preferably provided with dust-break gauze at dust arrester top.
In plenum chamber, be provided with dust board, described dust board is crisscross arranged.
Described tube connector is wired hose.
The analysis that the present invention is applied by air exercise driller's skill and traditional aperture spray method, blowout prevention aperture apparatus technology, easily cause way of escape blocking of drilling in conjunction with spraying to aperture, hole under construction, dust-laying effect is poor, the unsuitable centralized collection of coal dust, operating environment are poor, and during the use of blowout prevention aperture apparatus, previous work amount is comparatively large, reduces the defects such as efficiency of drilling; According to aerodynamics and dust aerosol principle, from construction drill physical condition, what research and design went out repeatedly to drill the coal dust, chip and the methane gas gushed out that return out in process for centralized collection, reduce job location airborne dust, improvement operating environment, improves a kind of device of construction safety coefficient and efficiency.
The features such as it is little, lightweight, simple to operate that extraction drilling dust collecting device of the present invention has volume, conveniently moving, cleaning operation, and dust collecting effect is good.Effectively can collect the airborne dust of 85%, improvement operating environment, collects the gas of holing and gushing out in time, reduces gas density near operating location, improves construction drill safety factor.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Extraction drilling dust collecting device of the present invention as shown in Figure 1, comprise dust arrester 8 and plenum chamber 16, dust arrester 8 comprises dust arrester cavity, and dust arrester cavity one sidewall is provided with positioning through hole 7, relative sidewall is provided with movable door 3, and movable door 3 is provided with drilling rod through hole; Be provided with baffle plate 5 in the outside of the movable door 3 of dust arrester, baffle plate 5 and door 3 are provided with fixing hole 9, are fixed on door 3 by screw by baffle plate 5, to increase the sealing of dust arrester cavity.
Be provided with atomization mechanism 6 in dust arrester cavity bottom, described atomization mechanism can be high-pressure sprayer or other atomization mechanism be applicable to.Be provided with in dust arrester bottom and connect dirt path 10, connect dirt bag and fixed by retainer plate 11.
Be provided with dust-break gauze 2 at dust arrester 8 top, be provided with gas bleed off pipe 1 at dust arrester top; Plenum chamber 16 top is provided with admission pipe 13 and extraction interface 15, is provided with dust board 14 in plenum chamber, and described dust board 14 is crisscross arranged.Be connected by tube connector 12 between gas bleed off pipe 1 with admission pipe 13.Described tube connector is wired hose.
Installation process of the present invention is as follows:
When coal mine down-hole tunnel construction gas extraction hole, reserve behind orientation and inclination angle until rig, dust arrester is arranged on tunnel sidewall by positioning through hole 7 or meets the tapping point position of wall; Before perforate, dust arrester door 3 is opened, carry out determining hole operation, after drilling tool perforate, door puts down, and after being fixed by baffle plate 5, connects the gas bleed off pipe 1 on dust arrester and the admission pipe 13 on plenum chamber with wired hose 12, and the extraction interface on plenum chamber and drainage system are connected, can construction drill be started.While starting construction drill, atomization mechanism be opened, and according to drilling gas effusion intensity size in operation process, adjustable pipe switch door, controls flow and carries out extraction.
Operating principle of the present invention is as follows:
In construction firedamp taking-out discharging drilling process, the coal dust returned out in boring is separated by dust arrester 8 with coal chip, and by the downward atomizing de-dusting of atomization mechanism 6, coal chip and part coal dust are carried out separated and collected, connect dirt bag, pack process by connecing the inflow of dirt path 10.The dust flown upward rises by air force and suction function, by dust-break gauze 2, the larger dust of part is carried out secondary separation, floating dust after separation and gas enter the admission pipe 13 of plenum chamber 16 through gas bleed off pipe 1 and steel wire tube 12, in gas collection casing, floating dust is through the circulation dust-break effect of dust board 14, third time separation is carried out in the stop of portion's part dust, sedimentation, gas after separation enters drainage system through extraction interface 15, completes the continuous purification of dust and gas, collection process.
Claims (1)
1. an extraction drilling dust collecting device, this dust collect plant comprises dust arrester (8) and plenum chamber (16), dust arrester (8) comprises dust arrester cavity, dust arrester cavity one sidewall is provided with positioning through hole (7), relative sidewall is provided with movable door (3), and movable door (3) is provided with drilling rod through hole; Be provided with atomization mechanism (6) in dust arrester cavity bottom, be provided with in dust arrester bottom and connect dirt passage (10), be provided with gas bleed off pipe (1) at dust arrester top; Plenum chamber (16) top is provided with admission pipe (13) and extraction interface (15), is connected between gas bleed off pipe (1) with admission pipe (13) by tube connector (12); It is characterized in that: be provided with baffle plate (5) in the outside of the movable door (3) of dust arrester; Dust-break gauze (2) is provided with at dust arrester (8) top; Dust board (14) is provided with in plenum chamber; Described tube connector is wired hose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110296642.7A CN102409989B (en) | 2011-09-30 | 2011-09-30 | Extraction drilling dust collecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110296642.7A CN102409989B (en) | 2011-09-30 | 2011-09-30 | Extraction drilling dust collecting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102409989A CN102409989A (en) | 2012-04-11 |
CN102409989B true CN102409989B (en) | 2015-08-26 |
Family
ID=45912291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110296642.7A Expired - Fee Related CN102409989B (en) | 2011-09-30 | 2011-09-30 | Extraction drilling dust collecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102409989B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112855052B (en) * | 2020-10-30 | 2022-06-21 | 浙江华东工程建设管理有限公司 | Drilling clearance dust-proof equipment of mining area environment |
CN113775305A (en) * | 2021-09-30 | 2021-12-10 | 卢强 | Coal mine gas extraction drilling dust falling device and using method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2627218Y (en) * | 2003-06-20 | 2004-07-21 | 崔刚明 | Soft coal seam drilling dust-proof equipment |
CN201310373Y (en) * | 2008-12-12 | 2009-09-16 | 淮南矿业(集团)有限责任公司 | Coal gas purifier for safety protection system for drilling and spraying orifice |
CN201902227U (en) * | 2010-12-22 | 2011-07-20 | 山西晋城无烟煤矿业集团有限责任公司 | Dust removal and gas exhaust device for gas drilling construction |
CN202300480U (en) * | 2011-09-30 | 2012-07-04 | 鹤壁煤电股份有限公司第三煤矿 | A drainage drilling dust collecting device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2002951368A0 (en) * | 2002-09-13 | 2002-09-26 | Leslie Vincent Peddle Johnson | Dust scrubber |
-
2011
- 2011-09-30 CN CN201110296642.7A patent/CN102409989B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2627218Y (en) * | 2003-06-20 | 2004-07-21 | 崔刚明 | Soft coal seam drilling dust-proof equipment |
CN201310373Y (en) * | 2008-12-12 | 2009-09-16 | 淮南矿业(集团)有限责任公司 | Coal gas purifier for safety protection system for drilling and spraying orifice |
CN201902227U (en) * | 2010-12-22 | 2011-07-20 | 山西晋城无烟煤矿业集团有限责任公司 | Dust removal and gas exhaust device for gas drilling construction |
CN202300480U (en) * | 2011-09-30 | 2012-07-04 | 鹤壁煤电股份有限公司第三煤矿 | A drainage drilling dust collecting device |
Also Published As
Publication number | Publication date |
---|---|
CN102409989A (en) | 2012-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102296937A (en) | Wet type hole eddy dust collection and control device and wet type hole eddy dust collection and control method | |
CN108301799A (en) | A kind of hole pumping and mining dust-extraction unit and its application method | |
CN106869834A (en) | A kind of coal bed drilling drilling hole dust collector device | |
CN204703808U (en) | Mine underground is drilled blowout hookup | |
CN201771541U (en) | Negative-pressure dust remover | |
CN103225484B (en) | Gas bearing capacity spot sampling method and apparatus | |
CN102102497B (en) | Blowout prevention and dust prevention device | |
CN204552656U (en) | Mining wind power ganged dedusting blowout hookup | |
CN102409989B (en) | Extraction drilling dust collecting device | |
CN201310373Y (en) | Coal gas purifier for safety protection system for drilling and spraying orifice | |
CN203412533U (en) | Wet dust removal system for coal-mine gas pumping-exhaust drill hole | |
CN103161415A (en) | Negative pressure drilling system | |
CN110374665B (en) | Gas collection device for extraction drilling of extremely soft coal seam and use method | |
CN202762270U (en) | Gas-slag separation device and blowout prevention system | |
CN208203184U (en) | A kind of hole pumping and mining dust-extraction unit | |
CN202300480U (en) | A drainage drilling dust collecting device | |
CN208546149U (en) | A kind of gas injection formula coal bed drilling drilling hole dust collector device | |
CN207408175U (en) | A kind of coal mine gob pernicious gas multipoint acquisition detection device | |
CN202970548U (en) | Gas jet flow dust collector for mine drilling | |
CN202338354U (en) | Blowout preventer for drilling holes on rocks | |
CN102305096A (en) | Medium-wind pressure air drilling dedusting system | |
CN202181916U (en) | Wet type orifice vortex dust collection and control device | |
CN208564472U (en) | A kind of coal mine drilling magnetized foam cyclone system | |
CN210105912U (en) | Dust settling system for underground gas extraction drill hole orifice | |
CN101881177A (en) | Foam dust removing system of wind power slag-discharging coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150826 Termination date: 20160930 |