CN102383810A - 连续变截面隧道衬砌模板台车 - Google Patents
连续变截面隧道衬砌模板台车 Download PDFInfo
- Publication number
- CN102383810A CN102383810A CN2011103894820A CN201110389482A CN102383810A CN 102383810 A CN102383810 A CN 102383810A CN 2011103894820 A CN2011103894820 A CN 2011103894820A CN 201110389482 A CN201110389482 A CN 201110389482A CN 102383810 A CN102383810 A CN 102383810A
- Authority
- CN
- China
- Prior art keywords
- cross beam
- door frame
- middle cross
- crossbeam
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 8
- 238000003466 welding Methods 0.000 claims description 5
- 210000004258 Portal System Anatomy 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000005098 hot rolling Methods 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Abstract
本发明公开了一种连续变截面隧道衬砌模板台车,门架移动油缸(3)的两端分别连接立柱(7)和竖撑(9),边模定位支架(5)连接于立柱(7)的外侧,侧向移动轮(6)设置在下梁(13)上;在台车的横断面内,两侧的立柱(7)通过门架横梁(2)、门架中横梁(4)连接,在台车的纵断面内,两侧的立柱(7)通过上梁(11)、中梁(12)、下梁(13)连接,在相临的立柱(7)之间设置有交叉支撑(14),行走系统(15)分别与立柱(7)和下梁(13)连接;其中门架横梁(2)包括内门架横梁、外门架横梁,内门架横梁设置在外门架横梁内,门架中横梁(4)包括内门架中横梁、外门架中横梁,内门架中横梁设置在外门架中横梁内。
Description
CN 102383810 A
说明书
1/2页
连续变截面隧道衬砌模板台车
技术领域
[0001] 本发明涉及一种隧道衬砌模板台车。 背景技术
[0002] 隧道衬砌模板台车是隧道施工中二次衬砌时用的一种机械设备,在铁路、公路及水利水电工程施工中被广泛使用。采用该设备,可提高混凝土衬砌质量,加快施工进度,提高效率。在隧道施工设计中,由于地质围岩类型不同,以及隧道转弯半径的差异,每条隧道断面尺寸是不一样的,甚至同一条隧道各段的断面尺寸也经常有变化。如果每一种断面制造一台模板台车,显然会加大施工成本,因此就须将模板台车设计为变截面用台车,以适应不同断面的施工需要。
发明内容
[0003] 本发明要解决的技术问题是,提供一种连续变截面隧道衬砌模板台车,以克服现有技术存在的不能适用不同断面的施工需要、施工成本大等不足。
[0004] 本发明采用以下技术方案:它包括模板系统、门架系统、行走装置、支撑机构和液压系统,门架系统包括门架横梁、门架移动油缸、门架中横梁、边模定位支架、侧向移动轮、 立柱,门架移动油缸的两端分别连接立柱和竖撑,边模定位支架连接于立柱的外侧,侧向移动轮设置在下梁上;在台车的横断面内,两侧的立柱分别通过门架横梁、门架中横梁连接, 在台车的纵断面内,两侧的立柱分别通过上梁、中梁、下梁连接,在相临的立柱之间设置有交叉支撑,行走系统分别与立柱和下梁连接;其中门架横梁包括内门架横梁、外门架横梁, 内门架横梁设置在外门架横梁内,门架中横梁括内门架中横梁、外门架中横梁,内门架中横梁设置在外门架中横梁内。
[0005] 在内门架横梁、外门架横梁和内门架中横梁、外门架中横梁上设置有销子。
[0006] 在门架横梁与门架中横梁之间连接有上斜撑、竖撑,在立柱与门架中横梁之间连接有下斜撑。
[0007] 台车中的门架横梁和门架中横梁采用国标普通热轧20mm钢板组焊而成,是实现台车截面变化的主要结构,门架横梁和门架中横梁内部采用滑槽设计,分为内门架横梁、外门架横梁、内门架中横梁、外门架中横梁,内门架横梁、内门架中横梁在移动油缸的作用下沿着滑槽向一侧滑动以实现断面的加宽,内、外横梁相对滑动到断面工况要求时用定位销进行定位。在台车门架设计时除了考虑门架滑动满足截面变化要求外,还必须考虑其刚度强度和大型施工机械的通过性能;制作加工中根据精度和质量标准制定合理工艺方法;重点为下料工艺,防止焊接变形保证联接的钻孔精度,保证焊缝的焊接质量,防止漏焊假焊。
[0008] 本发明通过门架移动油缸带动内、外门架横梁,内、外门架中横梁的相对滑动及定位,实现了变截面的要求,能够用一台模板台车适用不同断面的施工需要,大大降低了施工成本,具有良好的经济效益。附图说明
[0009] 图1为本发明的结构示意图、横断面图,示意的是原始状态图(原始断面); 图2为本发明的结构示意图、纵断面图;
图3为本发明的结构示意图、横断面图,示意的是变截面状态图。
具体实施方式
[0010] 本发明的实施例:连续变截面隧道衬砌模板台车包括模板系统、门架系统、行走装置、支撑机构和液压系统,门架系统包括门架横梁2、门架移动油缸3、门架中横梁4、边模定位支架5、侧向移动轮6、立柱7,门架移动油缸3的两端分别连接立柱7和竖撑9,边模定位支架5连接于立柱7的外侧,侧向移动轮6设置在下梁13上;在台车的横断面内,两侧的立柱7分别通过门架横梁2、门架中横梁4连接,在台车的纵断面内,两侧的立柱7分别通过上梁11、中梁12、下梁13连接,在相临的立柱7之间设置有交叉支撑14,行走系统15分别与立柱7和下梁13连接;其中门架横梁2包括内门架横梁、外门架横梁,内门架横梁设置在外门架横梁内,门架中横梁4包括内门架中横梁、外门架中横梁,内门架中横梁设置在外门架中横梁内。
[0011] 在内门架横梁、外门架横梁和内门架中横梁、外门架中横梁上设置有销子1。
[0012] 在门架横梁2与门架中横梁4之间连接有上斜撑8、竖撑9,在立柱7与门架中横梁4之间连接有下斜撑10。
[0013] 门架横梁2和门架中横梁4采用国标普通热轧20mm钢板组焊而成。
Claims (4)
1. 一种连续变截面隧道衬砌模板台车,它包括模板系统、门架系统、行走装置、支撑机构和液压系统,其特征在于:门架系统包括门架横梁(2)、门架移动油缸(3)、门架中横梁 (4)、边模定位支架(5)、侧向移动轮(6)、立柱(7),门架移动油缸(3)的两端分别连接立柱 (7 )和竖撑(9 ),边模定位支架(5 )连接于立柱(7 )的外侧,侧向移动轮(6 )设置在下梁(13) 上;在台车的横断面内,两侧的立柱(7)分别通过门架横梁(2)、门架中横梁(4)连接,在台车的纵断面内,两侧的立柱(7)分别通过上梁(11)、中梁(12)、下梁(13)连接,在相临的立柱(7)之间设置有交叉支撑(14),行走系统(15)分别与立柱(7)和下梁(13)连接;其中门架横梁(2)包括内门架横梁、外门架横梁,内门架横梁设置在外门架横梁内,门架中横梁 (4)包括内门架中横梁、外门架中横梁,内门架中横梁设置在外门架中横梁内。
2.根据权利要求1所述的连续变截面隧道衬砌模板台车,其特征在于:在内门架横梁、 外门架横梁和内门架中横梁、外门架中横梁上设置有销子(1)。
3.根据权利要求1所述的连续变截面隧道衬模板台车,其特征在于:在门架横梁(2)与门架中横梁(4)之间连接有上斜撑(8)、竖撑(9),在立柱(7)与门架中横梁(4)之间连接有下斜撑(10)。
4.根据权利要求1所述的连续变截面隧道衬模板台车,其特征在于:门架横梁(2)和门架中横梁(4 )采用国标普通热轧20mm钢板组焊而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103894820A CN102383810A (zh) | 2011-11-30 | 2011-11-30 | 连续变截面隧道衬砌模板台车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103894820A CN102383810A (zh) | 2011-11-30 | 2011-11-30 | 连续变截面隧道衬砌模板台车 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102383810A true CN102383810A (zh) | 2012-03-21 |
Family
ID=45823596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103894820A Pending CN102383810A (zh) | 2011-11-30 | 2011-11-30 | 连续变截面隧道衬砌模板台车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102383810A (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704948A (zh) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN103806926A (zh) * | 2014-03-07 | 2014-05-21 | 陕西理工学院 | 砼衬砌钢模台车的变跨变高装置 |
CN103806923A (zh) * | 2014-03-07 | 2014-05-21 | 陕西理工学院 | 钢模台车的平移机构 |
CN103867214A (zh) * | 2013-11-21 | 2014-06-18 | 上海市基础工程集团有限公司 | 在已完盾构隧道内进行二次衬砌浇筑的施工方法 |
CN104265328A (zh) * | 2014-09-23 | 2015-01-07 | 中铁二十一局集团轨道交通工程有限公司 | 地铁隧道变化断面二衬施工便调式台车 |
CN105065035A (zh) * | 2015-09-09 | 2015-11-18 | 中国铁建大桥工程局集团有限公司 | 一种轻型顶推滑移式隧道衬砌台车 |
CN105332718A (zh) * | 2015-10-23 | 2016-02-17 | 中铁五局集团第一工程有限责任公司 | 一种用于大跨多断面隧道施工的台车 |
CN107060832A (zh) * | 2017-06-20 | 2017-08-18 | 陕西理工大学 | 一种适用于变截面弯道洞库施工的拱顶模板及其支撑结构 |
CN110094214A (zh) * | 2019-04-12 | 2019-08-06 | 中铁七局集团有限公司 | 一种浅埋暗挖隧道二次衬砌移动式支架体系施工方法 |
CN110107315A (zh) * | 2019-05-22 | 2019-08-09 | 贵州大学 | 一种隧道渐变段二衬台车 |
CN111365025A (zh) * | 2020-03-31 | 2020-07-03 | 中铁五局集团有限公司 | 用于衬砌台车的变断面可调式拱模装置 |
CN111365024A (zh) * | 2020-03-31 | 2020-07-03 | 中铁五局集团有限公司 | 变断面可调式衬砌台车的调节方法 |
CN111852507A (zh) * | 2020-06-03 | 2020-10-30 | 保利长大海外工程有限公司 | 一种可用于多种断面尺寸的装配式衬砌台车 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5253955A (en) * | 1990-01-30 | 1993-10-19 | Walbroehl H T | Automatically advancing supporting and sliding form for introducing an in-situ concrete lining |
CN2573678Y (zh) * | 2002-01-14 | 2003-09-17 | 潘明勇 | 组装式可变断面砼被复钢模台车 |
CN2871844Y (zh) * | 2006-02-24 | 2007-02-21 | 李永长 | 混凝土模板的台车结构 |
CN101082280A (zh) * | 2007-07-18 | 2007-12-05 | 湖南中铁五新钢模有限责任公司 | 单线铁路隧道衬砌台车 |
CN201074517Y (zh) * | 2007-09-10 | 2008-06-18 | 中铁八局集团第一工程有限公司 | 一种加宽隧道衬砌台车 |
CN201187304Y (zh) * | 2008-02-22 | 2009-01-28 | 中铁二局股份有限公司 | 组合式衬砌台车 |
CN201671639U (zh) * | 2010-04-28 | 2010-12-15 | 李威德 | 地下洞库支模作业装置 |
CN202325547U (zh) * | 2011-11-30 | 2012-07-11 | 中铁五局(集团)有限公司 | 连续变截面隧道衬砌模板台车 |
-
2011
- 2011-11-30 CN CN2011103894820A patent/CN102383810A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5253955A (en) * | 1990-01-30 | 1993-10-19 | Walbroehl H T | Automatically advancing supporting and sliding form for introducing an in-situ concrete lining |
CN2573678Y (zh) * | 2002-01-14 | 2003-09-17 | 潘明勇 | 组装式可变断面砼被复钢模台车 |
CN2871844Y (zh) * | 2006-02-24 | 2007-02-21 | 李永长 | 混凝土模板的台车结构 |
CN101082280A (zh) * | 2007-07-18 | 2007-12-05 | 湖南中铁五新钢模有限责任公司 | 单线铁路隧道衬砌台车 |
CN201074517Y (zh) * | 2007-09-10 | 2008-06-18 | 中铁八局集团第一工程有限公司 | 一种加宽隧道衬砌台车 |
CN201187304Y (zh) * | 2008-02-22 | 2009-01-28 | 中铁二局股份有限公司 | 组合式衬砌台车 |
CN201671639U (zh) * | 2010-04-28 | 2010-12-15 | 李威德 | 地下洞库支模作业装置 |
CN202325547U (zh) * | 2011-11-30 | 2012-07-11 | 中铁五局(集团)有限公司 | 连续变截面隧道衬砌模板台车 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704948A (zh) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN102704948B (zh) * | 2012-06-07 | 2015-02-04 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN103867214A (zh) * | 2013-11-21 | 2014-06-18 | 上海市基础工程集团有限公司 | 在已完盾构隧道内进行二次衬砌浇筑的施工方法 |
CN103806923B (zh) * | 2014-03-07 | 2016-09-28 | 陕西理工学院 | 钢模台车的平移机构 |
CN103806926A (zh) * | 2014-03-07 | 2014-05-21 | 陕西理工学院 | 砼衬砌钢模台车的变跨变高装置 |
CN103806923A (zh) * | 2014-03-07 | 2014-05-21 | 陕西理工学院 | 钢模台车的平移机构 |
CN104265328A (zh) * | 2014-09-23 | 2015-01-07 | 中铁二十一局集团轨道交通工程有限公司 | 地铁隧道变化断面二衬施工便调式台车 |
CN105065035A (zh) * | 2015-09-09 | 2015-11-18 | 中国铁建大桥工程局集团有限公司 | 一种轻型顶推滑移式隧道衬砌台车 |
CN105332718A (zh) * | 2015-10-23 | 2016-02-17 | 中铁五局集团第一工程有限责任公司 | 一种用于大跨多断面隧道施工的台车 |
CN107060832A (zh) * | 2017-06-20 | 2017-08-18 | 陕西理工大学 | 一种适用于变截面弯道洞库施工的拱顶模板及其支撑结构 |
CN107060832B (zh) * | 2017-06-20 | 2019-03-26 | 陕西理工大学 | 一种适用于变截面弯道洞库施工的拱顶模板及其支撑结构 |
CN110094214A (zh) * | 2019-04-12 | 2019-08-06 | 中铁七局集团有限公司 | 一种浅埋暗挖隧道二次衬砌移动式支架体系施工方法 |
CN110094214B (zh) * | 2019-04-12 | 2021-06-04 | 中铁七局集团有限公司 | 一种浅埋暗挖隧道二次衬砌移动式支架体系施工方法 |
CN110107315A (zh) * | 2019-05-22 | 2019-08-09 | 贵州大学 | 一种隧道渐变段二衬台车 |
CN111365025A (zh) * | 2020-03-31 | 2020-07-03 | 中铁五局集团有限公司 | 用于衬砌台车的变断面可调式拱模装置 |
CN111365024A (zh) * | 2020-03-31 | 2020-07-03 | 中铁五局集团有限公司 | 变断面可调式衬砌台车的调节方法 |
CN111365024B (zh) * | 2020-03-31 | 2021-09-21 | 中铁五局集团有限公司 | 变断面可调式衬砌台车的调节方法 |
CN111852507A (zh) * | 2020-06-03 | 2020-10-30 | 保利长大海外工程有限公司 | 一种可用于多种断面尺寸的装配式衬砌台车 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202325547U (zh) | 连续变截面隧道衬砌模板台车 | |
CN102383810A (zh) | 连续变截面隧道衬砌模板台车 | |
CN202322136U (zh) | 钢结构移动装置 | |
CN103256061B (zh) | 采煤巷道防冲吸能组合金属支架及组装方法 | |
CN102285616B (zh) | 步履式盾构机侧移系统及侧移方法 | |
CN103215894B (zh) | 移动式临时预应力张拉锚块 | |
CN209354165U (zh) | 台车的行走门架系统及隧道二次衬砌混凝土台车 | |
CN201883104U (zh) | 炼钢转炉托圈、炉壳安装用台车装置 | |
CN103615262B (zh) | 一种主体结构可整体通过常规断面的钢模台车及其实现方法 | |
CN202766983U (zh) | 铁路t梁节段式架桥机 | |
CN105065035A (zh) | 一种轻型顶推滑移式隧道衬砌台车 | |
CN203454780U (zh) | 一种工业炉辐射段钢结构的模块化结构 | |
CN109317911A (zh) | 一种十字柱焊接生产线 | |
CN205000974U (zh) | 一种用于隧道开挖施工的轮胎式自动升降组装台架 | |
CN203570323U (zh) | 一种主体结构可整体通过常规断面的钢模台车 | |
CN202707076U (zh) | 双线铁路隧道台车 | |
CN202559264U (zh) | 可用于架设交通信号设备的钢结构装配式框架 | |
CN203531347U (zh) | 一种可拆卸式转炉工装平台 | |
CN202039852U (zh) | 一种隧道掘进机中板步进加固支撑机构 | |
CN105332718A (zh) | 一种用于大跨多断面隧道施工的台车 | |
CN101914990B (zh) | 梁式转换层现浇大梁施工模板支撑系统 | |
CN210178374U (zh) | 一种隧道衬砌的组装式无门架台车装置 | |
CN104944091B (zh) | 一种大型设备模块化安装装置 | |
CN204455789U (zh) | 一种由大型组合钢主梁整孔胎架构成的组合梁钢主梁 | |
CN202195160U (zh) | 大口径顶管施工组装式顶铁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120321 |