CN102360058A - Method for discriminating operation fault of transmission line tower grounding network - Google Patents

Method for discriminating operation fault of transmission line tower grounding network Download PDF

Info

Publication number
CN102360058A
CN102360058A CN2011103200824A CN201110320082A CN102360058A CN 102360058 A CN102360058 A CN 102360058A CN 2011103200824 A CN2011103200824 A CN 2011103200824A CN 201110320082 A CN201110320082 A CN 201110320082A CN 102360058 A CN102360058 A CN 102360058A
Authority
CN
China
Prior art keywords
electric power
power line
pole tower
line pole
resistance value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103200824A
Other languages
Chinese (zh)
Inventor
骆长云
何智强
周卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI TOP INTELLIGENCE ELECTRIC CO Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority to CN2011103200824A priority Critical patent/CN102360058A/en
Publication of CN102360058A publication Critical patent/CN102360058A/en
Pending legal-status Critical Current

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The invention relates to a method for discriminating the operation fault of a transmission line tower grounding network, which comprises the following steps of: (1) performing real-time and on-site data acquisition and arrangement, and establishing a transmission line tower model; (2) applying pilot frequency signal stimulus, and performing simulation calculation to obtain a grounding resistance value or an on-resistance value of the transmission line tower grounding network; and (3) discriminating according to a fault verification term to obtain a fault discrimination conclusion. The method has the advantages that: (1) the operation condition of the transmission line tower grounding network can be accurately grasped; (2) the grounding resistance value or the on-resistance value can be accurately calculated, the authenticity of a data signal is ensured, a large quantity of manpower and material resources are saved, and device, system and industrial production is easy to implement; and (3) the method is suitable for monitoring the operation conditions of the transmission line tower grounding network in various environments, and is not restricted by other factors.

Description

Electric power line pole tower grounded screen operation troubles method of discrimination
Technical field
The invention belongs to the electric power project engineering field, be specifically related to a kind of method of discrimination of electric power line pole tower grounded screen operation troubles.
Background technology
Electric power line pole tower grounded screen is embedded in underground, and its corrosion condition and concrete corrosion position all are to test through the earth resistance of off-line and earth-continuity to differentiate all the time.This kind method of discrimination is the labor manpower and materials not only, and uninhabited that lofty mountains and steep hills is regional powerless with big leaps that is difficult to unwrapping wire test to some.In addition, some lawless persons in the society are oneself minor benefit, steal the tower material, steal and cut power circuit, cause circuit to fall bar, broken string accident and take place frequently.Therefore; Find a kind of method whether electric power line pole tower grounded screen breaks down of differentiating, develop and a kind ofly can differentiate the device whether the tower grounding net breaks down, realize not having a power failure, not to the stake resistance actual numerical value of on-line monitoring tower grounding net under the earth mat excavation situation; And earth mat conducting situation; In time find accident potential, timely fault location point in time provides the scientific and reliable foundation for the maintenance of earth mat and transformation; Prevent the harm that the earth mat fault possibly cause, ensure that power system security, operation reliably are significant and great economic benefit and social benefit.
Summary of the invention
The technical matters that the present invention will solve is; The defective that exists during to the test job of current power transmission overhead line structures grounded screen; A kind of electric power line pole tower grounded screen operation troubles method of discrimination that is applicable to on-line monitoring electric power line pole tower grounded screen operation conditions is provided; This method can not only be guaranteed the authenticity of data-signal, and can save lot of manpower and material resources.
Technical solution of the present invention is that the above-mentioned electric power line pole tower grounded screen operation troubles method of discrimination that is provided is to be following steps:
(1), sets up model.To the electric pressure of being apprised of, structure type, dimensions and the operational factor of entrusting electric power line pole tower, use conventional method to carry out real-time on-site data gathering, data recording and data preparation.According to the data of obtain, use conventional method to set up and entrust the electric power line pole tower model then through arrangement;
(2), simulation calculation.Obtain the model of entrusting electric power line pole tower according to step (1), use conventional method that it is applied the alien frequencies signal excitation.To the electric pressure of being apprised of, structure type, dimensions and the operational factor of the said trust electric power line pole tower of step (1), use conventional method to carry out simulation calculation, obtain entrusting the grounding resistance or the conduction resistance value of electric power line pole tower grounded screen;
(3), data analysis.According to step (2) resulting trust electric power line pole tower Resistance of Grounding Grids value or conduction resistance value; Contrast " overvoltage protection and Insulation Coordination of DL/620-1997 alternating-current electric device " of China Electric Power Publishing House's publication in 1997 and the fault of " the measurement guide rule of DL/T475-2006 earthing device power frequency characterisitic parameter " relevant electric power rules that China Electric Power Publishing House published in 2006 and assert clause; Whether this trust electric power line pole tower Resistance of Grounding Grids value or conduction resistance value are constituted the differentiation of fault, must entrust electric power line pole tower grounded screen operation troubles to differentiate conclusion.Obtaining according to institute then entrusts electric power line pole tower grounded screen operation troubles to differentiate conclusion; Use conventional method to formulate and entrust the fault under the electric power line pole tower grounded screen operating condition to prevent and treat scheme; And send fault pre-alarming to the competent authorities that entrust electric power line pole tower grounded screen simultaneously, to guarantee the safe and stable operation of this trust electric power line pole tower grounded screen place transmission line of electricity.
In the method for the invention, the one, with the resistance calculations of shaft tower itself interior, considered shaft tower itself resistance value to the influence of transmission line lightning stroke trip-out rate; The one, considered when transmission line of electricity is loaded differentiating the influence of conclusion.Through applying the alien frequencies excitation, obtain final grounding resistance or conduction resistance value.
The invention has the beneficial effects as follows:
(1) can guarantee accurate assurance to the actual operating state of entrusting electric power line pole tower grounded screen;
(2) can accurately calculate the grounding resistance or the conduction resistance value of entrusting electric power line pole tower grounded screen, guarantee the authenticity of data-signal, can also save lot of manpower and material resources simultaneously, help implement deviceization, systematization, industrialization production;
(3) this method is applicable to the monitoring of various environment electric power line pole tower grounded screen operation conditionss, not restricted by other factors.
Embodiment
Embodiment 1:
(1), to the electric pressure of being apprised of, structure type, dimensions and the operational factor of entrusting electric power line pole tower, use conventional method to carry out real-time on-site data gathering, data recording and data preparation.According to the data of obtain, use conventional method to set up and entrust the electric power line pole tower model then through arrangement;
(2), obtain the model of entrusting electric power line pole tower, use conventional method that it is applied the alien frequencies signal excitation according to step (1).To the electric pressure of being apprised of, structure type, dimensions and the operational factor of the said trust electric power line pole tower of step (1), use conventional method to carry out simulation calculation, obtain entrusting the grounding resistance or the conduction resistance value of electric power line pole tower grounded screen;
(3), establishing step (2) resulting is to entrust electric power line pole tower Resistance of Grounding Grids value; Entrust electric power line pole tower Resistance of Grounding Grids value to assert clause according to step (2) gained according to the fault of " the measurement guide rule of DL/T475-2006 earthing device power frequency characterisitic parameter " relevant electric power rules of " overvoltage protection and Insulation Coordination of DL/620-1997 alternating-current electric device " and the China Electric Power Publishing House publication in 2006 of China Electric Power Publishing House's publication in 1997; Whether this trust electric power line pole tower Resistance of Grounding Grids value is constituted the differentiation of fault, must entrust electric power line pole tower grounded screen operation troubles to differentiate conclusion.
Embodiment 2:
Step (1)~(2) are with embodiment 1;
(3), establishing step (2) resulting is to entrust electric power line pole tower grounded screen conduction resistance value; Entrust electric power line pole tower grounded screen conduction resistance value to assert clause according to step (2) gained according to the fault of " the measurement guide rule of DL/T475-2006 earthing device power frequency characterisitic parameter " relevant electric power rules of " overvoltage protection and Insulation Coordination of DL/620-1997 alternating-current electric device " and the China Electric Power Publishing House publication in 2006 of China Electric Power Publishing House's publication in 1997; Whether this trust electric power line pole tower grounded screen conduction resistance value is constituted the differentiation of fault, must entrust electric power line pole tower grounded screen operation troubles to differentiate conclusion.

Claims (1)

1. electric power line pole tower grounded screen operation troubles method of discrimination, this method is following step:
(1), to the electric pressure of being apprised of, structure type, dimensions and the operational factor of entrusting electric power line pole tower; Use conventional method to carry out real-time on-site data gathering, data recording and data preparation; According to the data of obtain, use conventional method to set up and entrust the electric power line pole tower model then through arrangement;
(2), obtain the model of entrusting electric power line pole tower according to step (1); Use conventional method that it is applied the alien frequencies signal excitation; The electric pressure of being apprised of, structure type, dimensions and operational factor to the said trust electric power line pole tower of step (1); Use conventional method to carry out simulation calculation, obtain entrusting the grounding resistance or the conduction resistance value of electric power line pole tower grounded screen;
(3), according to step (2) resulting trust electric power line pole tower Resistance of Grounding Grids value or conduction resistance value; Contrast " overvoltage protection and Insulation Coordination of DL/620-1997 alternating-current electric device " of China Electric Power Publishing House's publication in 1997 and the fault of " the measurement guide rule of DL/T475-2006 earthing device power frequency characterisitic parameter " relevant electric power rules that China Electric Power Publishing House published in 2006 and assert clause; Whether this trust electric power line pole tower Resistance of Grounding Grids value or conduction resistance value are constituted the differentiation of fault, must entrust electric power line pole tower grounded screen operation troubles to differentiate conclusion.
CN2011103200824A 2011-10-20 2011-10-20 Method for discriminating operation fault of transmission line tower grounding network Pending CN102360058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103200824A CN102360058A (en) 2011-10-20 2011-10-20 Method for discriminating operation fault of transmission line tower grounding network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103200824A CN102360058A (en) 2011-10-20 2011-10-20 Method for discriminating operation fault of transmission line tower grounding network

Publications (1)

Publication Number Publication Date
CN102360058A true CN102360058A (en) 2012-02-22

Family

ID=45585419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103200824A Pending CN102360058A (en) 2011-10-20 2011-10-20 Method for discriminating operation fault of transmission line tower grounding network

Country Status (1)

Country Link
CN (1) CN102360058A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102707167A (en) * 2012-05-18 2012-10-03 华中科技大学 State monitoring system for grounding grid based on industrial personal computer
CN105652139A (en) * 2015-12-30 2016-06-08 国家电网公司 Method for testing conductivity of grounding grid

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266270A (en) * 2008-05-06 2008-09-17 重庆大学 Pile foundation tower-footing impedance measuring apparatus and its method
CN201307148Y (en) * 2008-10-10 2009-09-09 孟宪龙 Power transmission line pole and tower ground fault monitoring and positioning device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266270A (en) * 2008-05-06 2008-09-17 重庆大学 Pile foundation tower-footing impedance measuring apparatus and its method
CN201307148Y (en) * 2008-10-10 2009-09-09 孟宪龙 Power transmission line pole and tower ground fault monitoring and positioning device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何智强等: "变电站地网接地阻抗感性分量影响因素分析", 《湖南电力》 *
张科等: "变电站地网导通电阻的模拟计算与分析", 《河南电力》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102707167A (en) * 2012-05-18 2012-10-03 华中科技大学 State monitoring system for grounding grid based on industrial personal computer
CN105652139A (en) * 2015-12-30 2016-06-08 国家电网公司 Method for testing conductivity of grounding grid

Similar Documents

Publication Publication Date Title
CN204731317U (en) A kind of intelligentized earth resistance tester
CN101464488B (en) On-line monitoring system for high voltage cable
CN102221644B (en) System and method for online monitoring grounding networks of power stations and substations
CN203422438U (en) Real-time monitoring and fault location system for overhead lines of power distribution network
CN103454517A (en) Method for online monitoring capacitive voltage transformers
CN202994931U (en) Lightning arrester state monitoring device based on wireless sensing technology
CN204758748U (en) Cubical switchboard intelligent integrated monitoring devices
CN101699306A (en) Method for monitoring current acquisition circuit of electric power secondary system
CN203643532U (en) Novel lightning-protection detection system
CN205785327U (en) Urban Underground pipe gallery dynamic monitoring based on Internet of Things and early warning system
CN103310389B (en) Overhead transmission line fault maintenance method based on fault mode and fault tree establishment
CN204214974U (en) High voltage power cable terminal on-Line Monitor Device
CN104266679A (en) Method and device for monitoring and diagnosing power transformer
CN203688734U (en) Insulating property monitoring system of mining high-voltage grid
CN102590639B (en) Lightning accident warning method
CN102360058A (en) Method for discriminating operation fault of transmission line tower grounding network
CN203786250U (en) Power cable intelligent grounding box
CN202520602U (en) Automatic control system for substation fan
CN205910558U (en) Thing networking ammeter case
CN205157649U (en) Monitoring system for seal on insulating tubular busbar
CN207301195U (en) A kind of busbar voltage sampler of arrester on-line monitoring
CN204789871U (en) Fault monitoring device based on distributing type record ripples
CN202563018U (en) Line insulator online monitoring device
CN203350429U (en) On-line real-time error monitoring system for alternating current sampling measurement apparatus
CN202563012U (en) Large-scale power station grounding net impedance parameter measuring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LT

Effective date: 20120316

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120316

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Co-applicant after: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Co-applicant after: Zhuhai Top Intelligence Electric Co., Ltd.

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

ASS Succession or assignment of patent right

Owner name: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LT

Free format text: FORMER OWNER: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LTD. ZHUHAI TOP INTELLIGENCE ELECTRICCO., LTD.

Effective date: 20121029

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121029

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant after: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Applicant after: Zhuhai Top Intelligence Electric Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant before: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Applicant before: Zhuhai Top Intelligence Electric Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120222