CN102332691B - Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method - Google Patents

Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method Download PDF

Info

Publication number
CN102332691B
CN102332691B CN201110277949.2A CN201110277949A CN102332691B CN 102332691 B CN102332691 B CN 102332691B CN 201110277949 A CN201110277949 A CN 201110277949A CN 102332691 B CN102332691 B CN 102332691B
Authority
CN
China
Prior art keywords
cable
cross bar
vertical pole
fixed
paying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110277949.2A
Other languages
Chinese (zh)
Other versions
CN102332691A (en
Inventor
朱祥
彭辉
王阳
韩春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201110277949.2A priority Critical patent/CN102332691B/en
Publication of CN102332691A publication Critical patent/CN102332691A/en
Application granted granted Critical
Publication of CN102332691B publication Critical patent/CN102332691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an auxiliary device capable of paying off a cable from top to bottom in building construction and a cable paying off method. The auxiliary device comprises at least three fixed pulleys, the fixed pulleys are fixedly arranged on a vertical strut and are respectively located at different heights, at least one fixed pulley can be regulated left and right relative to the vertical strut; and a horizontal cross rod is arranged on the vertical strut, and an inclined pull rod is arranged between the other end of the horizontal cross rod and the vertical strut. The cable paying off method disclosed by the invention comprises the following steps of: (1) fixing the auxiliary device on a floor slab, and mounting the vertical strut in a wire hole; and (2) enabling one end of the cable to round all the fixed pulleys from top to bottom, then starting paying off, regulating the fixed pulley which can be regulated at left and right as required in a cable paying off process to change horizontal distance between the fixed pulley and adjacent fixed pulleys, thus paying off speed of the cable can be controlled. According to the invention, labour is saved in the cable paying off process, a falling speed is easy to control, the whole cable paying off process is very safe, and potential safety hazards in construction are reduced.

Description

The servicing unit of payout and line-putting method from the top down in construction
Technical field
The present invention relates to cable Setting-out Technique, specifically refer in construction the servicing unit of payout from the top down.The present invention also relates to this servicing unit method of payout from the top down of utilizing simultaneously.
Background technology
In on the middle and senior level, construction of super highrise building, the trend of cable and to lay be an important engineering.Conventionally cable, first along downward cabling on body of wall, vertical shaft, then according to design, is applied to respective storey, then lays at every floor.For above-below direction cabling, often take the mode of unwrapping wire from top to bottom to carry out, on every floor plate that cable passed through, be provided with a cable-through hole, after cable laying puts in place, then fireproof blocking is done in hole.On wall, be provided with ladder, the cable of above-below direction is just fixed on ladder.What at present unwrapping wire relied on from top to bottom is the gravity of cable self and realize falling voluntarily, but there is a very large problem in the mode of this dependence gravity fall: the weight falling along with cable constantly increases, if do not intervened, cable falling speed can be more and more faster, therefore more to below, control more difficult (because the weight of cable and speed are all increasing) to cable, this needs more workmen jointly to hold cable to overcome cable gravity undoubtedly, cable can slowly be fallen, once speed is out of control, just may there is the cable serious security incident of this class of hurting sb.'s feelings.
Summary of the invention
For prior art above shortcomings, the object of the present invention is to provide the laborsaving and unwrapping wire process of a kind of unwrapping wire to hold in manageable construction the servicing unit of payout from the top down.
According to this device, the present invention has proposed a kind of new line-putting method simultaneously.
To achieve these goals, the technical solution used in the present invention is such: the servicing unit of payout from the top down in construction, this device comprises at least three fixed pulleys, fixed pulley is fixedly mounted on vertical pole above and respectively in different height, all fixed pulleys are positioned on same vertical plane; Has can be the relatively vertical pole left and right adjusting of a fixed pulley at least to change the horizontal range between this fixed pulley and adjacent fixed pulley; On vertical pole, be provided with for the fixing horizontal cross bar of floor, between the horizontal cross bar other end and the vertical pole on horizontal cross bar, be provided with brace.
Further, described horizontal cross bar is two (corresponding brace is also two), and two horizontal cross bars are positioned at same plane and mutually vertical.
Described fixed pulley is three, lays respectively at vertical pole upper end, lower end and middle-end, and horizontal cross bar is between lower end and middle-end two fixed pulleys.
Vertical pole, horizontal cross bar and brace in this servicing unit are angle steel and make.
Utilize this servicing unit from the top down the new method of unwrapping wire be:
(1) erection auxiliary device: the horizontal cross bar on above-mentioned servicing unit is fixed on floor by connector, thereby by servicing unit integral installation on floor, and make the vertical pole on servicing unit be arranged in the cable-through hole on floor;
(2) coiling and unwrapping wire: cable one end that needs are transferred intersects and walks around all fixed pulleys successively from top to bottom, can utilize cable gravity to start unwrapping wire, in unwrapping wire process, regulate as required certain relatively vertically fixed pulley of pole left and right adjusting, to change the horizontal range between this fixed pulley and adjacent fixed pulley, thereby the speed that cable is transferred is controlled.
Compared with prior art, the present invention has following beneficial effect:
1. unwrapping wire is laborsaving.Because the frictional force that cable falls can change by fixed pulley that can left and right adjusting, the horizontal range between this fixed pulley and adjacent fixed pulley is larger, and cable friction power is larger, and cable falling speed is slower, otherwise faster.And along with the carrying out of unwrapping wire process, constantly the size of regulating friction force, to control at any time falling speed, does not therefore need too many people to coordinate, and only needs two people can realize the light control of falling speed.
2. because payingoff speed is controlled, therefore whole unwrapping wire process is fool proof, reduced construction safety hidden danger.
Accompanying drawing explanation
Fig. 1-structural representation of the present invention.
Fig. 2-Fig. 1 lateral plan.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
Referring to Fig. 1 and Fig. 2, from scheming, can find out, the servicing unit of payout from the top down in construction of the present invention, comprises at least three fixed pulleys 1, fixed pulley 1 is fixedly mounted on vertical pole 2 and respectively in different height, and all fixed pulleys 1 are positioned on same vertical plane; (regulative mode of realizing this function can have multiple: such as this fixed pulley is connected with vertical pole by a cross bar to change horizontal range between this fixed pulley and adjacent fixed pulley to have can be relatively vertical pole 2 left and right adjusting of a fixed pulley 1 at least, on cross bar, there is a chute, fixed pulley can move left and right along chute, and now cross bar is fixed with vertical pole position; Or this fixed pulley is fixed on cross bar, cross bar can move left and right along vertical pole; Or cross bar can rotate around vertical pole, at cross bar during in level, fixed pulley and vertical pole distance farthest, thereby realize left and right adjusting).On vertical pole 2, be provided with for the fixing horizontal cross bar 4 of floor 3, between horizontal cross bar 4 other ends and the vertical pole 2 on horizontal cross bar, be provided with brace 5, thereby make vertical pole 2, horizontal cross bar 4 and brace 5 form right angle triangles, to strengthen the intensity of servicing unit self.
As an embodiment, described horizontal cross bar 4 is two (corresponding brace is also two), two horizontal cross bars 4 are positioned at same plane and mutually vertical, thereby form two right-angled triangles, two right-angled triangles share this right-angle side of vertical pole, make like this intensity of this device further strengthen.
As an embodiment, as shown in Figure, this device fixed pulley 1 is three, lays respectively at vertical pole 2 upper ends, lower end and middle-end, horizontal cross bar between lower end and middle-end two fixed pulleys, the fixed pulley that can move left and right for middle that.
Vertical pole, horizontal cross bar and brace in this servicing unit are angle steel and make, and angle steel intensity is good, and material source is wide, even can utilize obsolete material, for unit in charge of construction, easy to make.
Line-putting method of the present invention is as follows, sees Fig. 1 and Fig. 2:
(1) erection auxiliary device: horizontal cross bar all on servicing unit of the present invention 4 is fixed on floor 3 by connector (as expansion bolt), thereby on floor 3, and make the vertical pole on servicing unit be arranged in the cable-through hole on floor servicing unit integral installation;
(2) coiling and unwrapping wire: cable 6 one end that needs are transferred intersect and walk around all fixed pulleys 1 successively from top to bottom, in Fig. 1, arrow represents the trend of line, can utilize cable gravity to start unwrapping wire, in unwrapping wire process, regulate as required certain relatively vertically fixed pulley of pole left and right adjusting, to change the horizontal range between this fixed pulley and adjacent fixed pulley, thereby the speed that cable is transferred is controlled.
On body of wall 7, be provided with ladder 8, after the cable 6 of above-below direction puts in place, be just fixed on ladder 8.
The above embodiment of the present invention is to be only explanation example of the present invention, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make on the basis of the above description other multi-form variation and changes.Here cannot give all execution modes exhaustive.Every still row in protection scope of the present invention of apparent variation that technical scheme of the present invention amplifies out or change that belong to.

Claims (4)

1. the servicing unit of payout from the top down in construction, it is characterized in that: it comprises at least three fixed pulleys (1), fixed pulley (1) is fixedly mounted on vertical pole (2) above and respectively in different height, all fixed pulleys (1) are positioned on same vertical plane; Having a fixed pulley (1) at least is to realize and being fixedly mounted on vertical pole (2) by being fixed on a cross bar that can rotate around vertical pole (2), and described cross bar is around vertical pole (2), to rotate in the same vertical plane at described three fixed pulleys (1) place; On vertical pole (2), be provided with two for the fixing horizontal cross bar (4) of floor, two horizontal cross bars (4) are positioned at same plane and mutually vertical, horizontal cross bar (4) other end and be positioned between the vertical pole (2) on horizontal cross bar and be provided with brace (5).
2. servicing unit according to claim 1, is characterized in that: described fixed pulley (1) is three, lays respectively at vertical pole (2) upper end, lower end and middle-end, and horizontal cross bar is between lower end and middle-end two fixed pulleys.
3. servicing unit according to claim 2, is characterized in that: described vertical pole (2), horizontal cross bar (4) and brace (5) are angle steel and make.
4. the method for payout from the top down in construction, is characterized in that, this method step is:
(1) erection auxiliary device: the horizontal cross bar on servicing unit claimed in claim 1 (4) is fixed on floor (3) by connector, thereby on floor, and make the vertical pole on servicing unit be arranged in the cable-through hole on floor servicing unit integral installation;
(2) coiling and unwrapping wire: the cable that needs are transferred (6) one end intersects and walks around all fixed pulleys (1) successively from top to bottom, can utilize cable gravity to start unwrapping wire, in unwrapping wire process, rotate as required the cross bar that certain can rotate around vertical pole (2), adjusting is fixed on the relatively vertically fixed pulley of pole left and right adjusting on cross bar, to change the horizontal range between this fixed pulley and adjacent fixed pulley, thereby the speed that cable is transferred is controlled.
CN201110277949.2A 2011-09-19 2011-09-19 Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method Active CN102332691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110277949.2A CN102332691B (en) 2011-09-19 2011-09-19 Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110277949.2A CN102332691B (en) 2011-09-19 2011-09-19 Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method

Publications (2)

Publication Number Publication Date
CN102332691A CN102332691A (en) 2012-01-25
CN102332691B true CN102332691B (en) 2014-02-19

Family

ID=45484353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110277949.2A Active CN102332691B (en) 2011-09-19 2011-09-19 Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method

Country Status (1)

Country Link
CN (1) CN102332691B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103515867A (en) * 2013-09-30 2014-01-15 无锡市神力通信工程有限公司 Corner guide device for laying cable
CN104078893B (en) * 2014-07-10 2017-01-25 中建五局工业设备安装有限公司 Vertical well cable construction device used for high-rise building
CN104773609A (en) * 2015-05-10 2015-07-15 冯政 Line pulling frame for inspection well
CN107104394B (en) * 2017-04-30 2019-01-04 芜湖泰庆电子科技有限公司 The method of blow-off line is crossed in a kind of extra-high-tension cable process of deployment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101478124B (en) * 2009-02-18 2011-01-12 中建八局第一建设有限公司 Automatic laying method for electric cable and apparatus thereof
CN101728790B (en) * 2009-12-29 2012-05-02 广东省工业设备安装公司 Method for laying vertical cables for extra-high building
CN202183575U (en) * 2011-09-19 2012-04-04 中建五局工业设备安装有限公司 Auxiliary device for releasing cable from top to bottom in building construction

Also Published As

Publication number Publication date
CN102332691A (en) 2012-01-25

Similar Documents

Publication Publication Date Title
CN102332691B (en) Auxiliary device capable of paying off cable from top to bottom in building construction and cable paying off method
CN205399109U (en) Ring road rescue apparatus
CN201703935U (en) Elastic tensioning device of speed limiter rope
CN103663301B (en) Inclined nacelle device in a kind of
CN104453201A (en) Automatic ascending and descending type material platform
CN105298103A (en) Outwards-inclining hanging basket construction device
CN103867022A (en) Lifting form concrete chimney construction method
CN203143872U (en) Mobile platform for elevator installation construction
CN202183575U (en) Auxiliary device for releasing cable from top to bottom in building construction
CN201116259Y (en) Concealed persons-goods construction elevator
CN102607276B (en) Furnace door lifting lug device and lifting method
CN205616473U (en) Full direction control intelligent security's tower crane machine
CN204418629U (en) A kind of integrated form climbing frame
CN107332164A (en) A kind of automatic control device and control method that cable clip is installed for high-altitude
CN103849709B (en) The installation method of the tilting system of steel-making converter
CN104401830B (en) Electric rescue barring device for elevator with machine room
CN104409997B (en) Transformer substation power transformation and distribution room switch cabinet mounting method
CN108199300A (en) A kind of high-rise building cable lifting construction method
CN208009881U (en) A kind of building lift
CN104390117B (en) A kind of horizontal rail track up system and method
CN204745402U (en) High building fire escape device
CN104863489B (en) Fire resisting shutter levelling gear
CN104563805A (en) Winding displacement lifting type fireproof roller shutter
CN203781568U (en) Height-adjustable elevator buffer cushion abutment
CN204096821U (en) A kind of counterweight guide rail bracket for elevator assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhu Xiang

Inventor after: Peng Hui

Inventor after: Wang Yang

Inventor after: Han Chunxia

Inventor before: Zhu Xiang

Inventor before: Peng Hui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHU XIANG PENG HUI TO: ZHU XIANG PENG HUI WANG YANG HAN CHUNXIA

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 410004 No. 158 Zhongyi Road, Yuhua District, Changsha, Hunan

Patentee after: CHINA CONSTRUCTION FIFTH ENGINEERING INSTALLATION Co.,Ltd.

Address before: 400015, 5 floor, 12 Yong yuan court, Hongyan village, Yuzhong District, Chongqing.

Patentee before: CCFEB INDUSTRIAL EQUIPMENT INSTALLATION Co.,Ltd.

CP03 Change of name, title or address
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000 Floor 9, new Zhoubang science and technology building, No. 9, Changye Road, Liulian community, Pingshan street, Pingshan District, Shenzhen, Guangdong Province

Patentee after: CHINA CONSTRUCTION FIFTH ENGINEERING INSTALLATION Co.,Ltd.

Address before: 410004 No. 158 Zhongyi Road, Yuhua District, Changsha, Hunan

Patentee before: CHINA CONSTRUCTION FIFTH ENGINEERING INSTALLATION Co.,Ltd.