CN102332689A - 铝镁合金硬母线支柱绝缘子的更换方法 - Google Patents

铝镁合金硬母线支柱绝缘子的更换方法 Download PDF

Info

Publication number
CN102332689A
CN102332689A CN201110282298A CN201110282298A CN102332689A CN 102332689 A CN102332689 A CN 102332689A CN 201110282298 A CN201110282298 A CN 201110282298A CN 201110282298 A CN201110282298 A CN 201110282298A CN 102332689 A CN102332689 A CN 102332689A
Authority
CN
China
Prior art keywords
insulator
hard bus
bracket
crossbeam
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110282298A
Other languages
English (en)
Inventor
郭跃东
郑卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201110282298A priority Critical patent/CN102332689A/zh
Publication of CN102332689A publication Critical patent/CN102332689A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种铝镁合金硬母线支柱绝缘子的更换方法,施工步骤为:首先拆除旧绝缘子底座与横梁的固定螺栓,再拆除旧绝缘子上端法兰与硬母线托架的固定螺栓;在旧绝缘子从横梁与托架之间移出的同时,将事先准备好的方木装到横梁与托架之间;新绝缘子运到横梁上以后,再把方木从横梁与托架之间移出,同时把新绝缘子装到横梁与托架之间。这样在绝缘子更换的过程中,巧妙地利用方木作为中间过度,使铝镁合金硬母线始终有绝缘子或方木的支撑,使得绝缘子更换方便快捷,大大提高了工作效率,缩短了母线检修的停电时间,有效降低了成本和支出,而且缩短了电网的非正常运行时间,提高了电网的安全运行水平。

Description

铝镁合金硬母线支柱绝缘子的更换方法
[0001] 技术领域
[0002] 本发明属于绝缘子更换技术领域,具体涉及一种铝镁合金硬母线支柱绝缘子的更换方法。
背景技术
[0003] 在目前技术和方法下,要更换铝镁合金硬母线的支柱绝缘子,首先需要把与硬母线相连的各分支引下线拆除,随后将硬母线用吊车吊至地面,再更换支柱绝缘子。这样产生的问题就是因为要更换硬母线的支柱绝缘子,需要拆除与硬母线相连的各分支引下线及硬母线。这种作业方法不但增加了工作量,延长了工作时间,而且还浪费了人力、物力和财力。
发明内容
[0004] 本发明的目的在于避免上述现有技术中的不足之处,而提供一种工作效率高、省时省力、绝缘子更换方便快捷、提高供电可靠性的铝镁合金硬母线支柱绝缘子的更换方法。
[0005] 实现本发明的目的所采用的技术方案是:一种铝镁合金硬母线支柱绝缘子的更换方法,所述方法包括如下步骤:
a、首先拆除旧绝缘子底座与横梁的固定螺栓,再拆除旧绝缘子上端法兰与硬母线托架的固定螺栓;
b、在旧绝缘子从横梁与托架之间移出的同时,将事先准备好的方木装到横梁与托架之
间;
C、新绝缘子运到横梁上以后,再把方木从横梁与托架之间移出,同时把新绝缘子装到横梁与托架之间。
[0006] 本发明的有益效果是:利用本发明,这样在绝缘子更换的过程中,巧妙地利用方木作为中间过度,使铝镁合金硬母线始终有绝缘子或方木的支撑,使得绝缘子更换方便快捷, 大大提高了工作效率,缩短了母线检修的停电时间,有效降低了成本和支出,而且缩短了电网的非正常运行时间,提高了电网的安全运行水平。
具体实施方式
[0007] 下面通过具体实施例,进一步说明本发明的优点:
一种铝镁合金硬母线支柱绝缘子的更换方法,施工步骤为:首先拆除旧绝缘子底座与横梁的固定螺栓,再拆除旧绝缘子上端法兰与硬母线托架的固定螺栓;在旧绝缘子从横梁与托架之间移出的同时,将事先准备好的方木装到横梁与托架之间;新绝缘子运到横梁上以后,再把方木从横梁与托架之间移出,同时把新绝缘子装到横梁与托架之间。这样在绝缘子更换的过程中,巧妙地利用方木作为中间过度,使铝镁合金硬母线始终有绝缘子或方木的支撑,使得绝缘子更换方便快捷,大大提高了工作效率,缩短了母线检修的停电时间,有效降低了成本和支出,而且缩短了电网的非正常运行时间,提高了电网的安全运行水平。

Claims (1)

1. 一种铝镁合金硬母线支柱绝缘子的更换方法,其特征在于:所述方法包括如下步骤:a、首先拆除旧绝缘子底座与横梁的固定螺栓,再拆除旧绝缘子上端法兰与硬母线托架的固定螺栓;b、在旧绝缘子从横梁与托架之间移出的同时,将事先准备好的方木装到横梁与托架之间;C、新绝缘子运到横梁上以后,再把方木从横梁与托架之间移出,同时把新绝缘子装到横梁与托架之间。
CN201110282298A 2011-09-22 2011-09-22 铝镁合金硬母线支柱绝缘子的更换方法 Pending CN102332689A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110282298A CN102332689A (zh) 2011-09-22 2011-09-22 铝镁合金硬母线支柱绝缘子的更换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110282298A CN102332689A (zh) 2011-09-22 2011-09-22 铝镁合金硬母线支柱绝缘子的更换方法

Publications (1)

Publication Number Publication Date
CN102332689A true CN102332689A (zh) 2012-01-25

Family

ID=45484351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110282298A Pending CN102332689A (zh) 2011-09-22 2011-09-22 铝镁合金硬母线支柱绝缘子的更换方法

Country Status (1)

Country Link
CN (1) CN102332689A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000059936A (ja) * 1998-08-10 2000-02-25 Chubu Electric Power Co Inc 2連耐張がいし装置用がいし取替装置
CN101593940A (zh) * 2009-04-09 2009-12-02 华中电网有限公司 变电站支持式母线支持设备的更换方法
CN101834421A (zh) * 2010-05-05 2010-09-15 浙江省电力设计院 双臂支撑式直流融冰接入组合金具
CN102185269A (zh) * 2011-05-25 2011-09-14 安徽省电力公司池州供电公司 管母起吊和固定用支架及其应用

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000059936A (ja) * 1998-08-10 2000-02-25 Chubu Electric Power Co Inc 2連耐張がいし装置用がいし取替装置
CN101593940A (zh) * 2009-04-09 2009-12-02 华中电网有限公司 变电站支持式母线支持设备的更换方法
CN101834421A (zh) * 2010-05-05 2010-09-15 浙江省电力设计院 双臂支撑式直流融冰接入组合金具
CN102185269A (zh) * 2011-05-25 2011-09-14 安徽省电力公司池州供电公司 管母起吊和固定用支架及其应用

Similar Documents

Publication Publication Date Title
CN204030347U (zh) 一种环网柜一体化自承载装置
CN201228461Y (zh) 法兰装配装置
CN204299803U (zh) 一种风力发电机组装配运输平台
CN202298645U (zh) 一种兆瓦级风机基础环安装支撑装置
CN206517255U (zh) 一种立式水轮发电机转子安装检修装置
CN201625859U (zh) 一种机车齿轮箱拆装车
CN102332689A (zh) 铝镁合金硬母线支柱绝缘子的更换方法
CN201656340U (zh) 高压管母线支撑绝缘子更换工具
CN201778531U (zh) 辅助抱杆固定底座
CN204947466U (zh) 便携式带电作业提线器
CN103590440A (zh) 电铲回转辊盘与环形轨道更换方法
CN202602136U (zh) 一种高压隔离开关检修防护支架
CN205895852U (zh) 光伏支架固定座
CN204893313U (zh) Gis封闭母线焊接导体传送小车装置
CN204554145U (zh) 一种分体式法兰盘
CN203674913U (zh) 一种加热炉燃烧器电机拆卸辅助装置
CN202741312U (zh) 分片式风电塔架涂装转盘
CN204266684U (zh) 电力设备报警护栏
CN204076181U (zh) 一种起重机回转支承更换装置
CN203383985U (zh) 一种外转子风力发电机组
CN203891929U (zh) 一种综掘支护轨道吊挂装置
CN203461628U (zh) 一种野外作业用钢丝绳索卷绕装置
CN203125428U (zh) 电动机泵轴拆卸专用工具
CN202084849U (zh) 带电作业手摇绞磨
CN202592314U (zh) 一种双馈风力发电机轴承组合拆卸工装

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120125

C02 Deemed withdrawal of patent application after publication (patent law 2001)