CN102322263A - 采空区切顶与矿柱崩落法 - Google Patents
采空区切顶与矿柱崩落法 Download PDFInfo
- Publication number
- CN102322263A CN102322263A CN201110160896A CN201110160896A CN102322263A CN 102322263 A CN102322263 A CN 102322263A CN 201110160896 A CN201110160896 A CN 201110160896A CN 201110160896 A CN201110160896 A CN 201110160896A CN 102322263 A CN102322263 A CN 102322263A
- Authority
- CN
- China
- Prior art keywords
- roof
- rock
- goaf
- formula
- cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005520 cutting process Methods 0.000 title claims abstract description 15
- 239000011435 rock Substances 0.000 claims abstract description 55
- 238000005422 blasting Methods 0.000 claims description 14
- 238000004088 simulation Methods 0.000 claims description 8
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000012937 correction Methods 0.000 claims 1
- 238000005065 mining Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 5
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 229910019142 PO4 Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- NBIIXXVUZAFLBC-UHFFFAOYSA-K phosphate Chemical compound [O-]P([O-])([O-])=O NBIIXXVUZAFLBC-UHFFFAOYSA-K 0.000 description 1
- 239000010452 phosphate Substances 0.000 description 1
- 125000002467 phosphate group Chemical group [H]OP(=O)(O[H])O[*] 0.000 description 1
- 239000002367 phosphate rock Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
采空区切顶与矿柱崩落法,直接崩倒顶板极限跨度内的矿柱,使顶板自然冒落,顶板极限跨度lmax根据公式lmax=1.25H[σc/(γH)+0.0012k]0.6求得,还可以利用采空区中天然存在的大型弱面,或者通过爆破切断顶板,然后崩倒顶板极限悬臂跨度内的矿柱,使顶板自然冒落。本发明不仅可以消除薄覆岩下采空区的顶板冲击地压,而且可以成功堵塞非法开采通道,具有成本低、施工快、操作简便的特点。
Description
技术领域
本发明涉及对采空区的处理,特别涉及一种采空区切顶与矿柱崩落法。
背景技术
荆襄磷化集团大峪口磷矿在露天采坑下开采下层磷矿,覆岩平均厚度为50m,矿体倾角30°左右,矿体厚度3m。由于矿体缓倾斜连续分布,且地表出露,容易开采,被当地人盗采形成了38万平方米的采空区。矿方要求实施采空区处理,既消除顶板冲击地压隐患,又从技术上堵塞非法开采通道。因此提出切顶与矿柱崩落法,在未采矿体上部沿走向全长处理采空区,形成沿倾向宽70~110m宽的自然冒落带,冒落而消除顶板冲击地压隐患,非法盗矿也不容易穿越,从而从技术上堵塞了非法开采通道。
发明内容
为了克服上述现有技术的不足,本发明的目的在于提供一种采空区切顶与矿柱崩落法,使顶板自然冒落,不仅可以消除薄覆岩下采空区的顶板冲击地压,而且可以成功堵塞非法开采通道。
为了实现上述目的,本发明采用的技术方案是:
采空区切顶与矿柱崩落法,直接崩倒顶板极限跨度内的矿柱,使顶板自然冒落,所述顶板极限悬臂跨度lmax根据下式求得
lmax=1.25H[σc/(γH)+0.0012k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
如果采空区顶板覆岩中有天然存在的大型弱面,将顶板切断,或者不存在大型弱面的情况下通过爆破切断顶板,则顶板极限悬臂跨度lmax根据下式求得
lmax=0.435H[σc/(γH)+0.0026k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
所述大型弱面指50米以下的薄覆岩顶板中分布的大型断裂或断层。
如果进行爆破切断顶板,则爆破切断顶板的炮孔深度L根据下式求得
L=AN-L扩
式中N为直接顶板岩层的平均厚度,A为切断顶板形成悬臂顶板的爆破及裂纹扩展深度占覆岩厚度的百分比,可以通过数值模拟计算确定;L扩为爆破裂纹的扩展深度,由下式求得
式中,z是岩石声阻抗,可查表取值,re为炮孔半径,St为岩石的抗拉强度。
为了减小实际应用偏差,在所述顶板极限跨度或极限悬臂跨度lmax的值根据公式求得之后,用数值模拟或相似模拟修正。
本发明与现有技术相比,具有的优点是:
1)不是崩落法、充填法、支撑法和封闭隔离法这四种基本采空区处理方法中某几种方法的简单联合,而是通过切顶与矿柱崩落,既达到使顶板应力向有利于安全开采的方向重分布的目的,又实现封闭、隔离采空场的目的,从而促进安全生产,并消除顶板冲击地压隐患,而且还从技术上经济地堵塞非法开采通道。
2)空场处理和矿柱回收及底板清理可同时进行。
3)实施后,可以减缓地表不均匀沉陷,并可有计划地将采、掘废石排入处理过的采空区。
4)经济,简便,工作量小,施工快捷,处理38万平方米采空区,施工经费不超过120万元。
具体实施方式
下面结合实施例对本发明做进一步详细说明。
实施例一
采空区不存在弱面,直接崩倒顶板极限跨度内的矿柱,使顶板自然冒落,所述顶板极限悬臂跨度lmax根据下式求得
lmax=1.25H[σc/(γH)+0.0012k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
利用本方法,矿柱崩倒后,顶板按照预计情况自然冒落,没有任何安全隐患,消除了顶板冲击地压隐患,且能够从技术上堵塞盗矿通道。
实施例二
采空区上有50米以下的薄覆岩,且覆岩中存在天然的大型弱面,基本将顶板切断,顶板极限悬臂跨度lmax根据下式求得
lmax=0.435H[σc/(γH)+0.0026k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
利用本方法,矿柱崩倒后,顶板按照预计情况自然冒落,没有任何安全隐患,消除了顶板冲击地压隐患,且能够从技术上堵塞盗矿通道。
实施例三
不论采空区有没有天然存在的大型弱面,进行爆破切断顶板,同时崩倒顶板极限跨度内的矿柱,顶板极限悬臂跨度lmax根据下式求得
lmax=0.435H[σc/(γH)+0.0026k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度,
其中,爆破切断顶板的炮孔深度L根据下式求得
L=AN-L扩
式中N为直接顶板岩层的平均厚度,A为切断顶板形成悬臂顶板的爆破及裂纹扩展深度占覆岩厚度的百分比,可以通过数值模拟计算确定;L扩为爆破裂纹的扩展深度,由下式求得
式中,z是岩石声阻抗,可查表取值,re为炮孔半径,St为岩石的抗拉强度。
利用本方法,矿柱崩倒后,顶板按照预计情况自然冒落,没有任何安全隐患,消除了顶板冲击地压隐患,且能够从技术上堵塞盗矿通道。
以上实例,因为顶板极限悬臂跨度lmax是在顶板完全断裂的情况下求得的,而三维仿真只假定覆盖较薄的覆岩顶板断裂了50%,后者更接近爆破切顶实际,因此为了减小极限悬臂跨度公式的偏差,最好用数值模拟修正。还可用数值模拟确定切顶深度占覆岩厚度的经济合理百分比。
由于本方法没有任何安全隐患,消除了顶板冲击地压隐患,因此能够将采空区处理和矿柱回收及底板清理同时进行,同时,顶板自然冒落,可以减缓地表不均匀沉陷,可有计划地将采、掘废石排入处理过的采空区。
本发明的方法经济,简便,工作量小,施工快捷,实验证明,处理38万平方米采空区,施工经费不超过120万元。
Claims (6)
1.采空区切顶与矿柱崩落法,其特征在于,直接崩倒顶板极限跨度内的矿柱,使顶板自然冒落,所述顶板极限悬臂跨度lmax根据下式求得
lmax=1.25H[σc/(γH)+0.0012k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
2.根据权利要求1所述的采空区切顶与矿柱崩落法,其特征在于,如果采空区顶板覆岩中有天然存在的大型弱面,将顶板切断,则顶板极限悬臂跨度lmax根据下式求得
lmax=0.435H[σc/(γH)+0.0026k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
3.根据权利要求2所述的采空区切顶与矿柱崩落法,其特征在于,所述大型弱面指50米以下的薄覆岩顶板中分布的大型断裂或断层。
4.根据权利要求1所述的采空区切顶与矿柱崩落法,其特征在于,无弱面时通过爆破切断顶板,同时直接崩倒顶板极限跨度内的矿柱,使顶板自然冒落,所述顶板极限悬臂跨度lmax根据下式求得
lmax=0.435H[σc/(γH)+0.0026k]0.6
式中k=|H-100|,γ为上覆岩层容重,H为上覆岩层厚度,σc为顶板岩体抗拉强度。
6.根据权利要求1至5任一权利要求所述的采空区切顶与矿柱崩落法,其特征在于,所述顶板极限跨度或极限悬臂跨度lmax的值根据公式求得之后,用数值模拟或相似模拟修正。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110160896A CN102322263A (zh) | 2011-06-15 | 2011-06-15 | 采空区切顶与矿柱崩落法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110160896A CN102322263A (zh) | 2011-06-15 | 2011-06-15 | 采空区切顶与矿柱崩落法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102322263A true CN102322263A (zh) | 2012-01-18 |
Family
ID=45450080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110160896A Pending CN102322263A (zh) | 2011-06-15 | 2011-06-15 | 采空区切顶与矿柱崩落法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102322263A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102589372A (zh) * | 2012-03-21 | 2012-07-18 | 西安建筑科技大学 | 采空区的硐室与深孔爆破法 |
CN105626071A (zh) * | 2015-12-30 | 2016-06-01 | 北京矿冶研究总院 | 一种缓倾斜薄矿体采矿方法 |
CN107762511A (zh) * | 2017-09-26 | 2018-03-06 | 山东科技大学 | 一种切顶充填临近采空区的类条带式采煤方法 |
US10231000B2 (en) | 2015-07-01 | 2019-03-12 | Hisense Electric Co., Ltd. | Routing method for combined television and combined television |
CN109667584A (zh) * | 2018-12-26 | 2019-04-23 | 远安县燎原矿业有限责任公司 | 一种磷矿小断层发育地段开采方法 |
CN114382531A (zh) * | 2022-01-11 | 2022-04-22 | 西安建筑科技大学 | 一种硐室与深孔爆破精确处理采空区的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040000810A1 (en) * | 2002-06-26 | 2004-01-01 | Harman Jeffrey K. | Mining system |
RU2314420C1 (ru) * | 2006-07-06 | 2008-01-10 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ реконструкции карьера с двумя близкорасположенными рудными телами |
CN101806226A (zh) * | 2010-03-19 | 2010-08-18 | 中国矿业大学 | 一种采空区堤坝式充填方法 |
CN101881180A (zh) * | 2010-06-04 | 2010-11-10 | 新汶矿业集团有限责任公司孙村煤矿 | 煤矿工作面似膏体充填方法及挡浆装置 |
-
2011
- 2011-06-15 CN CN201110160896A patent/CN102322263A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040000810A1 (en) * | 2002-06-26 | 2004-01-01 | Harman Jeffrey K. | Mining system |
RU2314420C1 (ru) * | 2006-07-06 | 2008-01-10 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ реконструкции карьера с двумя близкорасположенными рудными телами |
CN101806226A (zh) * | 2010-03-19 | 2010-08-18 | 中国矿业大学 | 一种采空区堤坝式充填方法 |
CN101881180A (zh) * | 2010-06-04 | 2010-11-10 | 新汶矿业集团有限责任公司孙村煤矿 | 煤矿工作面似膏体充填方法及挡浆装置 |
Non-Patent Citations (1)
Title |
---|
李俊平等: "木架山采空区处理方案研究", 《岩石力学与工程学报》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102589372A (zh) * | 2012-03-21 | 2012-07-18 | 西安建筑科技大学 | 采空区的硐室与深孔爆破法 |
CN102589372B (zh) * | 2012-03-21 | 2013-12-04 | 西安建筑科技大学 | 采空区的硐室与深孔爆破法 |
US10231000B2 (en) | 2015-07-01 | 2019-03-12 | Hisense Electric Co., Ltd. | Routing method for combined television and combined television |
CN105626071A (zh) * | 2015-12-30 | 2016-06-01 | 北京矿冶研究总院 | 一种缓倾斜薄矿体采矿方法 |
CN107762511A (zh) * | 2017-09-26 | 2018-03-06 | 山东科技大学 | 一种切顶充填临近采空区的类条带式采煤方法 |
CN107762511B (zh) * | 2017-09-26 | 2019-06-11 | 山东科技大学 | 一种切顶充填临近采空区的类条带式采煤方法 |
CN109667584A (zh) * | 2018-12-26 | 2019-04-23 | 远安县燎原矿业有限责任公司 | 一种磷矿小断层发育地段开采方法 |
CN114382531A (zh) * | 2022-01-11 | 2022-04-22 | 西安建筑科技大学 | 一种硐室与深孔爆破精确处理采空区的方法 |
CN114382531B (zh) * | 2022-01-11 | 2024-09-24 | 西安建筑科技大学 | 一种硐室与深孔爆破精确处理采空区的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103939099B (zh) | 一种强冲击危险煤层群冲击地压的防治方法 | |
CN106150503B (zh) | 一种水力压裂治理坚硬顶板的方法 | |
CN103278055B (zh) | 一种坚硬顶板深孔预裂爆破切顶卸压方法 | |
CN104989405B (zh) | 大倾角煤层开采冲击地压定向防治方法 | |
CN106285679B (zh) | 一种预裂和软化火成岩坚硬顶板的方法 | |
CN102322263A (zh) | 采空区切顶与矿柱崩落法 | |
CN102094669B (zh) | 三位立体分源卸压瓦斯治理方法 | |
CN104632221B (zh) | 一种采用液态二氧化碳爆破诱导崩落采矿方法 | |
CN107035370A (zh) | 一种用于沿空留巷静态破碎切顶卸压方法 | |
CN205825826U (zh) | 一种矿山边坡预裂爆破炮孔结构 | |
CN104863591B (zh) | 采空区控制冒落与地表充填治理方法 | |
CN103670412B (zh) | 一种急倾斜矿体开采的采空区处理与卸压开采方法 | |
CN109209472A (zh) | 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法 | |
CN107941097A (zh) | 一种液态二氧化碳致裂岩石的工艺方法 | |
CN104963700B (zh) | 一种软岩巷道围岩高压气体主动预裂注浆装置及方法 | |
CN103233738A (zh) | 一种急倾斜特厚煤层顶煤综合弱化方法 | |
CN105134286B (zh) | L型井采空区瓦斯抽采方法 | |
CN103557000A (zh) | 利用抽帮充填防治沿空巷道冲击地压的方法 | |
CN102589372B (zh) | 采空区的硐室与深孔爆破法 | |
CN110005431A (zh) | 一种不规则孤岛煤柱工作面冲击地压防治方法 | |
Yang et al. | Application cumulative tensile explosions for roof cutting in Chinese underground coal mines | |
CN113700483B (zh) | 一种地面钻井卸压的多煤层冲击矿压防治方法 | |
CN106401588A (zh) | 断层区内工作面开采期间冲击地压防控方法 | |
CN105587319A (zh) | 一种大采高综采工作面快速破顶板岩层过断层方法 | |
CN102797492A (zh) | 切顶巷预裂顶板布置方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120118 |
|
WD01 | Invention patent application deemed withdrawn after publication |