CN102312042B - 一种抢修转炉耳轴轴承的方法 - Google Patents

一种抢修转炉耳轴轴承的方法 Download PDF

Info

Publication number
CN102312042B
CN102312042B CN 201110324513 CN201110324513A CN102312042B CN 102312042 B CN102312042 B CN 102312042B CN 201110324513 CN201110324513 CN 201110324513 CN 201110324513 A CN201110324513 A CN 201110324513A CN 102312042 B CN102312042 B CN 102312042B
Authority
CN
China
Prior art keywords
converter
bearing
trunnion
subjected
table frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110324513
Other languages
English (en)
Other versions
CN102312042A (zh
Inventor
王威
刁万国
马维强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China 3 Mcc Group Co Ltd Equipment Testing Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 3 Mcc Group Co Ltd Equipment Testing Engineering Co Ltd filed Critical China 3 Mcc Group Co Ltd Equipment Testing Engineering Co Ltd
Priority to CN 201110324513 priority Critical patent/CN102312042B/zh
Publication of CN102312042A publication Critical patent/CN102312042A/zh
Application granted granted Critical
Publication of CN102312042B publication Critical patent/CN102312042B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及中小型转炉耳轴轴承检修领域,尤其涉及一种抢修转炉耳轴轴承的方法,其特征在于,当非炉役检修期间轴承损坏时,借助钢水包车和受炉台架顶起转炉,使转炉耳轴轴承与轴承座脱离,实现不拆除转炉炉壳及托圈更换轴承。与现有技术相比,本发明的有益效果是:1)由于无须拆除转炉炉壳,施工任务量少,比传统方法缩短工期,施工中仅用60小时,比以往施工缩短5天时间,施工过程安全无事故隐患,安装质量优良,转炉运转良好。2)由于只更换轴承,能大幅降低施工费用,经济效益明显。

Description

一种抢修转炉耳轴轴承的方法
技术领域
本发明涉及中小型转炉耳轴轴承检修领域,尤其涉及一种抢修转炉耳轴轴承的方法。
背景技术
转炉是钢铁企业炼钢的主要设备,在整个钢铁生产中占据重要的位置,由于转炉耳轴轴承不属于易损件,一般转炉生产很久出现损坏后,都在炉役检修期间内进行转炉耳轴轴承更换,该方法主要为,拆除转炉炉壳,拆除耳轴轴承上盖,拆除转炉倾动装置,将托圈吊起,而后更换新的轴承,之后回装,此方法只局限在转炉炉壳更换同时更换耳轴轴承,不足之处是施工周期长,施工任务量大,难度大,对转炉破坏严重,成本较高。而在非炉役检修期间轴承损坏时,只能使转炉下线,提前排入炉役检修,降低了转炉的周转率。
发明内容
本发明的目的是提供一种抢修转炉耳轴轴承的方法,在非炉役检修期间轴承损坏时,不拆除转炉炉壳及托圈实现轴承的更换,缩短施工周期,减少施工任务量。
为解决上述技术问题,本发明的技术方案是:
一种抢修转炉耳轴轴承的方法,当非炉役检修期间轴承损坏时,借助钢水包车和受炉台架顶起转炉,使转炉耳轴轴承与轴承座脱离,实现不拆除转炉炉壳及托圈更换轴承,其具体操作步骤如下:
1)在地面钢包车轨道上转炉中心线下方将两台钢包车固定在一起,在钢包车上投出转炉横坐标、纵坐标中心线,根据托圈支承部位对应确定受炉台架立柱的安装位置,受炉台架包括四组立柱沿托圈一周均匀布置,每组立柱为两根H形钢,其中一根H形钢顶部设置油压千斤顶,另外一根H形钢顶部设置调整垫铁;
2)拆除转炉耳轴轴承座上盖,拆除倾动装置与扭力杆连接螺栓,拆除转炉本体上的水冷管道、底吹管道、空冷管道的连接法兰;
3)均匀操作四组受炉台架立柱上的油压千斤顶使转炉整体顶升200~300mm,耳轴轴承完全脱离轴承座底座,在另外四组受炉台架立柱顶部安装调整垫铁,回落油压千斤顶,使整个转炉由调整垫铁支撑;
4)拆除传动侧转炉耳轴上的二次减速机;
5)分别拆除游动侧和传动侧损坏的耳轴轴承,将新耳轴轴承用60-80℃热油浸泡20分钟后安装在两侧耳轴轴承位上;
6)轴承更换完毕后,回装二次减速机、转炉落回原归,回装轴承座上盖、回装倾动装置、扭力杆及转炉本体相关工艺管道连接法兰,拆除受炉台架,移走钢包车,转炉恢复至待命状态。
与现有技术相比,本发明的有益效果是:1)由于无须拆除转炉炉壳,施工任务量少,比传统方法缩短工期,施工仅需用60小时,比以往施工缩短5天时间,施工过程安全无事故隐患,安装质量优良,转炉运转良好。2)由于只更换轴承,能大幅降低施工费用,经济效益明显。
附图说明
图1是本发明实施例结构示意图;
图2是图1的侧视图;
图3是图1的俯视图。
图中:1-转炉  2-托圈  3-耳轴一  4-轴承座  5-基础  6-钢包车轨道  7-倾动装置8-扭力杆  9-二次减速机  10-钢包车  11-受炉台架  12-耳轴轴承  13-转炉炉壳  14-立柱一  15-立柱二  16-油压千斤顶  17-调整垫铁
具体实施方式
下面结合附图对本发明的具体实施方式作进一步说明:
见图1-图3,是本发明一种抢修转炉耳轴轴承的方法实施例结构示意图,转炉1上设有托圈2,托圈一侧为传动侧设有耳轴一3,托圈2另一侧为游动侧设有耳轴二3′,耳轴一3和耳轴二3′上分别设有轴承座4,轴承座4下方为基础5,转炉1被轴承座4支承吊挂在钢包车轨道6上方,传动侧耳轴一3端部与倾动装置7、扭力杆8、二次减速机9相连,当非炉役检修期间耳轴轴承12损坏时,借助钢包车10和受炉台架11顶起转炉炉体1,使耳轴轴承12与轴承座4脱离,实现不拆除转炉炉壳13及托圈2更换耳轴轴承12的目的,其操作步骤如下:
1)在地面钢包车轨道6上转炉中心线下方将两台钢包车10固定在一起,在钢包车10上投出转炉横坐标、纵坐标中心线,根据托圈2支承部位对应确定受炉台架11立柱的安装位置,受炉台架11包括四组立柱沿托圈一周均匀布置,每组立柱为两根H形钢,其中立柱一14顶部设置油压千斤顶16,立柱二15顶部设置调整垫铁17;
2)拆除转炉耳轴轴承座4上盖,拆除倾动装置7与扭力杆8连接螺栓,拆除转炉1本体上的水冷管道、底吹管道、空冷管道的连接法兰;
3)均匀操作四组立柱一14上的油压千斤顶16使转炉1整体顶升200~300mm,4个油压千斤顶16应同时升起,在升起过程中应注意4个千斤顶受力均匀,在另外四组立柱二15顶部增加调整垫铁17,回落油压千斤顶16,使整个转炉由调整垫铁17支撑,耳轴轴承12完全脱离轴承座4底座;
4)拆除转炉传动侧耳轴一3上的二次减速机9;
5)分别拆除游动侧和传动侧损坏的耳轴轴承12,将新耳轴轴承用60-80℃热油浸泡20分钟后安装在耳轴轴承位上;
轴承安装前要先测出轴承实际内径和轴的实际外径核实配合的过盈量,计算轴承加热温度,加热温度计算公式:t=(δmax+δ0)/σd+tu,
其中:t-加热温度,℃;
tu-施工环境温度,℃;
δmax-实测最大盈值,mm;
σ-轴承内圈线性膨胀系数,取σ=11*10-6/℃,
d-为轴承内圈直径,mm;
δ0-装配所需最小间隙,取0.40mm;
6)轴承更换完毕后,回装二次减速机9、转炉1落回原归,回装轴承座4上盖、回装倾动装置7、扭力杆8及转炉本体相关工艺管道连接法兰,拆除受炉台架11,拆除应注意保护性拆除,以便下次更换轴承时组对,移走钢包车10,转炉恢复至待命状态。

Claims (1)

1.一种抢修转炉耳轴轴承的方法,其特征在于,当非炉役检修期间轴承损坏时,借助钢水包车和受炉台架顶起转炉,使转炉耳轴轴承与轴承座脱离,实现不拆除转炉炉壳及托圈更换轴承,其具体操作步骤如下:
1)在地面钢包车轨道上转炉中心线下方将两台钢包车固定在一起,在钢包车上投出转炉横坐标、纵坐标中心线,根据托圈支承部位对应确定受炉台架立柱的安装位置,受炉台架包括四组立柱沿托圈一周均匀布置,每组立柱为两根H形钢,其中一根H形钢顶部设置油压千斤顶,另外一根H形钢顶部设置调整垫铁;
2)拆除转炉耳轴轴承座上盖,拆除倾动装置与扭力杆及其连接螺栓,拆除转炉本体上的水冷管道、底吹管道、空冷管道的连接法兰;
3)均匀操作四组受炉台架立柱上的油压千斤顶使转炉整体顶升200~300mm,耳轴轴承完全脱离轴承座底座,在四组受炉台架立柱的另外一根H形钢顶部安装调整垫铁,回落油压千斤顶,使整个转炉由调整垫铁支撑;
4)拆除传动侧转炉耳轴上的二次减速机;
5)分别拆除游动侧和传动侧损坏的耳轴轴承,将新耳轴轴承用60-80℃热油浸泡20分钟后安装在两侧耳轴轴承位上;
6)轴承更换完毕后,回装二次减速机、转炉落回原位,回装轴承座上盖、回装倾动装置、扭力杆及转炉本体相关工艺管道连接法兰,拆除受炉台架,移走钢包车,转炉恢复至待命状态。
CN 201110324513 2011-10-24 2011-10-24 一种抢修转炉耳轴轴承的方法 Active CN102312042B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110324513 CN102312042B (zh) 2011-10-24 2011-10-24 一种抢修转炉耳轴轴承的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110324513 CN102312042B (zh) 2011-10-24 2011-10-24 一种抢修转炉耳轴轴承的方法

Publications (2)

Publication Number Publication Date
CN102312042A CN102312042A (zh) 2012-01-11
CN102312042B true CN102312042B (zh) 2013-01-16

Family

ID=45425609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110324513 Active CN102312042B (zh) 2011-10-24 2011-10-24 一种抢修转炉耳轴轴承的方法

Country Status (1)

Country Link
CN (1) CN102312042B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102728992B (zh) * 2012-07-12 2014-08-20 莱芜钢铁集团有限公司 一种用于转炉耳轴的修复方法
CN106086295B (zh) * 2016-08-04 2018-05-25 攀钢集团工程技术有限公司 转炉顶升装置
CN106011369B (zh) * 2016-08-04 2018-02-02 攀钢集团工程技术有限公司 转炉耳轴轴承更换方法
CN111975310B (zh) * 2020-07-02 2022-02-18 甘肃酒钢集团宏兴钢铁股份有限公司 一种炼钢转炉异常情况下传动侧耳轴轴承更换方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215615A (zh) * 2007-12-28 2008-07-09 中国第十七冶金建设有限公司 超大型炼钢转炉的组合法安装技术
CN201883104U (zh) * 2010-09-17 2011-06-29 中国十七冶集团有限公司 炼钢转炉托圈、炉壳安装用台车装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215615A (zh) * 2007-12-28 2008-07-09 中国第十七冶金建设有限公司 超大型炼钢转炉的组合法安装技术
CN201883104U (zh) * 2010-09-17 2011-06-29 中国十七冶集团有限公司 炼钢转炉托圈、炉壳安装用台车装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
300t转炉炉体更新技术;王隆寿;《宝钢技术》;19981231(第6期);全文 *
张井财.炼钢厂180t转炉短耳轴轴承更换方法.《本钢技术》.2011,(第2期),第26-28页.
炼钢厂180t转炉短耳轴轴承更换方法;张井财;《本钢技术》;20110430(第2期);全文 *
王隆寿.300t转炉炉体更新技术.《宝钢技术》.1998,(第6期),第5-8页.

Also Published As

Publication number Publication date
CN102312042A (zh) 2012-01-11

Similar Documents

Publication Publication Date Title
CN102312042B (zh) 一种抢修转炉耳轴轴承的方法
CN100548568C (zh) 大包回转台回转轴承快速更换方法
CN105755205A (zh) 一种超大型转炉组合法的安装方法
CN101798613B (zh) 大型转炉三点球面支承在线快速更换方法
CN106011369B (zh) 转炉耳轴轴承更换方法
CN105438982A (zh) 高炉热风炉炉箅子的快速更换方法
US6403021B1 (en) Method of constructing a blast furnace body and lifting transfer apparatus
CN104878146B (zh) 用于重力除尘器顶部波纹补偿器更换的施工方法
CN210458247U (zh) 一种更换转炉升降烟罩的装置
CN104607282A (zh) 水泥生料粉磨系统中的立磨主减速机更换方法
CN202763025U (zh) 中间罐通道清理装置
CN101774011A (zh) 宽厚板工作辊辊颈修复方法
CN103322826A (zh) 可移动式炉缸
CN204727536U (zh) 一种天车传动轴升降式活动支架
CN109810716B (zh) 用于干熄焦炉牛腿砖和冷却段砌体同时更换的施工方法
CN208748140U (zh) 真空室插入管调节装置及真空室插入管在线更换设备
CN102409120A (zh) 高炉炉底更换方法
CN106828664B (zh) 一种用于转炉汽化冷却烟罩的活动车及使用方法
KR100958304B1 (ko) 고로의 개수 방법
CN204546416U (zh) 一种更换轧机接杆的辅助装置
CN206172869U (zh) 一种板坯辊道电机的更换装置
CN213739552U (zh) 一种炉盖快速更换升降装置
CN114131291B (zh) 一种炼铁高炉炉体中段变形开裂整体更换方法
CN204397287U (zh) 一种轧机轴承的拆卸装置
CN113564299A (zh) 一种在线快速更换转炉轴承的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA THIRD METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: CHINA 3 MCC GROUP CO., LTD. EQUIPMENT TESTING ENGINEERING CO., LTD.

Effective date: 20140812

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114001 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140812

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Patentee after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: 114001, eleven East Street, 1 iron street, Liaoning, Anshan

Patentee before: China 3 MCC Group Co., Ltd. Equipment Testing Engineering Co., Ltd.