CN102296549A - 桥梁施工中快速拆除临时锚固硫磺砂浆的方法 - Google Patents

桥梁施工中快速拆除临时锚固硫磺砂浆的方法 Download PDF

Info

Publication number
CN102296549A
CN102296549A CN2011101483231A CN201110148323A CN102296549A CN 102296549 A CN102296549 A CN 102296549A CN 2011101483231 A CN2011101483231 A CN 2011101483231A CN 201110148323 A CN201110148323 A CN 201110148323A CN 102296549 A CN102296549 A CN 102296549A
Authority
CN
China
Prior art keywords
sulphur
bonded mortar
mortar
resistance wire
bonded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101483231A
Other languages
English (en)
Other versions
CN102296549B (zh
Inventor
王欣德
张学飞
黄峻峻
郭玉鹏
张云昭
汪晶
张同庆
刘思斌
孙永渭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd, Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN 201110148323 priority Critical patent/CN102296549B/zh
Publication of CN102296549A publication Critical patent/CN102296549A/zh
Application granted granted Critical
Publication of CN102296549B publication Critical patent/CN102296549B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种桥梁施工中快速拆除临时锚固硫磺砂浆的方法,属于桥梁施工技术领域。其采用如下步骤:(1)先在临时锚固用的硫磺砂浆内预埋平行、均匀设置的若干根电阻丝,所述硫磺砂浆的各成分质量配比为:硫磺∶水泥∶砂子∶石蜡=1∶0.5∶1.3∶0.02;(2)通电熔化硫磺砂浆:将所述电阻丝分段串联为几组,利用变压器对每组电阻丝进行通电以熔化硫磺砂浆,通电熔化过程分阶段进行,第一阶段先通电将硫磺砂浆预热至60℃~80℃,第二阶段是调高电压使硫磺砂浆软化,第三阶段是待硫磺砂浆软化后继续调高电压使硫磺砂浆熔化。采用本发明方法能快速、可靠拆除临时锚固硫磺砂浆。

Description

桥梁施工中快速拆除临时锚固硫磺砂浆的方法
技术领域
本发明涉及一种在桥梁施工中拆除临时锚固硫磺砂浆的方法,属于桥梁施工技术领域。
背景技术
硫磺砂浆临时支座是桥梁施工中桥梁采用先间支后连续梁结构形式施工中使用的一种支座。在墩顶连续段施工完成后需要拆除临时支座,使体系转换成结构连续。
由于桥梁施工中施工质量受温度等条件的影响较大,因此要求临时支座的拆除必须既快又稳妥。目前,对硫磺砂浆拆除的方法主要有:人工使用风镐剔除和在硫磺砂浆内部预埋电钨丝通电使其熔化等方法,但人工剔除时,因硫磺砂浆的强度高,一般在30Mp以上,因此人工剔除的效率低、用时长,且在剔除过程中易对主体结构造成破坏,影响结构安全,安全性差,同时,施工时噪音大,易造成噪音污染;采用预埋电阻丝熔化硫磺砂浆的方法由于比较快捷,而且施工中不对主体结构造成破坏,因此应用比较广泛。但采用该种方法拆除时很容易失败,引起失败的主要原因是预埋的电阻丝容易断开。通常引起电阻丝断开的原因有:(1)硫磺砂浆不易熔化,电阻丝容易烧断;(2)电阻丝采用整体串联,一旦其中一根电阻丝熔断,整个埋置线路将会断路而导致无法通电;(3)电阻丝的端头直接裸露在外,容易被腐蚀腐蚀及人为破坏;(4)通电加压方式不当,直接通高压容易使电阻丝受热过快而断开,导致断路。而一旦硫磺砂浆内部预埋的电阻丝断开,将不得不用人工使用风镐对其逐步剔除,严重影响施工进度。
发明内容
针对现有技术中存在的上述缺陷,本发明提供了一种能快速、可靠拆除临时锚固硫磺砂浆的方法。
本发明是通过如下技术方案来实现的:其采用如下步骤:
(1)先在临时锚固用的硫磺砂浆内预埋平行、均匀设置的若干根电阻丝,所述硫磺砂浆的各成分质量配比为:硫磺∶水泥∶砂子∶石蜡=1∶0.5∶1.3∶0.02;
(2)通电熔化硫磺砂浆:将所述电阻丝分段串联为几组,利用变压器对每组电阻丝进行通电以熔化硫磺砂浆,通电熔化过程分阶段进行,第一阶段先通电将硫磺砂浆预热至60℃~80℃,第二阶段是调高电压使硫磺砂浆软化,第三阶段是待硫磺砂浆软化后继续调高电压使硫磺砂浆熔化。
本发明中,通过改善硫磺砂浆的配比,使得硫磺砂浆既能达到设计抗压强度≥30MPa,同时改善了硫磺砂浆的性能,其易于通电熔化。本发明还通过对加热的电阻丝进行合理的分组布置,分组通电,使电阻丝在加热过程中当个别电阻丝意外熔断时,不影响其它部分的熔化。而分阶段进行通电加压,使硫磺砂浆经过预热后再逐渐加压熔化,可有效保证电阻丝在加热过程中不致受热过快而熔断,保证了硫磺砂浆的可靠拆除。
为了保证硫磺砂浆的可靠拆除,所述电阻丝的功率为1000W,在通电熔化硫磺砂浆的第一阶段变压器的电压由0V逐步调节至75V,第二阶段先将电压调至90V,待硫磺砂浆出现软化迹象后再逐步增压调至125V,第三阶段的电压控制在150V-200V。
为了提高硫磺砂浆的熔化效果,本发明在硫磺砂浆高度范围内预埋有两层电阻丝。预埋的两层电阻丝可对硫磺砂浆进行均匀有效的加热。
为了避免裸露在硫磺砂浆外的电阻丝端头受到腐蚀或破坏,所述电阻丝的端头连接有铜片,所述铜片与电阻丝连接的部分埋置在硫磺砂浆体内。
本发明的有益效果是:本发明通过改善硫磺砂浆的配比,在保证达到设计抗压强度的情况下,使其更易通电熔化,提高了施工效率和可靠性;通过对电阻丝进行合理的分组布置和通电,既有效保证了加热效果,又保证在某根电阻丝意外熔断的情况下不致影响其他的电阻丝的正常工作,从而保证可靠的熔化效果;而分阶段进行通电加压的方式,有效保证了电阻丝在加热过程中不致受热过快而熔断,保证了硫磺砂浆的可靠拆除。本发明解除效率高,速度快,可靠性高,且安全、环保,很好地避免了人工剔除方法的缺陷,克服了现有的采用预埋电阻丝熔化的方法中存在的缺陷,可广泛应用于桥梁施工中对临时锚固硫磺砂浆的解除。
附图说明
图1是本发明实施例中的塔梁固结处的临时支撑垫石的结构示意图;
图2是本发明实施例中电阻丝在硫磺砂浆中的布置示意图;
图3是图2中的A-A剖视图;
图中:1、梁体,2、墩顶,3、混凝土,4、硫磺砂浆,5、电阻丝,6、铜片。
具体实施方式
下面通过非限定性的实施例并结合附图对本发明作进一步的说明:
附图1所示是桥梁施工中临时固结塔梁的临时支撑垫石的结构示意图。图中的临时支撑垫石的顶部和底部是硫磺砂浆4,中间是现浇C30现浇混凝土3,硫磺砂浆4的设计要求抗压强度≥30MPa。施工过程中需要解除临时支撑垫石的临时固结的约束,即通过拆除临时支撑垫石顶部和底部的硫磺砂浆4来解除约束。
如图2-图3所示,本发明是在临时支撑垫石的固结施工中,先在临时支撑垫石的顶部和底部的硫磺砂浆4内预埋平行、均匀设置的若干根电阻丝5,在硫磺砂浆的高度范围内设置两层电阻丝,每层的电阻丝均等距排列,每根电阻丝5的端头均连接有保护铜片6,铜片6与电阻丝5的连接端埋置在硫磺砂浆体内,另一端位于砂浆体外。电阻丝5选用最大功率为1000W。所述硫磺砂浆的各成分质量配比为:硫磺∶水泥∶砂子∶石蜡=1∶0.5∶1.3∶0.02。
进行硫磺砂浆的拆除施工时,先将预埋的电阻丝5分段串联为几组,如可将相邻的两根电阻丝串联,将预埋的电阻丝分为若干组。然后利用小型变压器对每组电阻丝进行通电以熔化硫磺砂浆。通电熔化过程分阶段进行,首先接通电源后,利用变压器将电压由0V分两次调节至75V,每级间隔时间约8分钟,对硫磺砂浆及电阻丝进行预热,使硫磺砂浆整体升温至60℃~80℃。预热完成后,将电压调至90V维持约10分钟,硫磺砂浆出现软化迹象,继续逐步增压调至125V时,硫磺砂浆开始软化,维持电压10分钟硫磺砂浆加速软化。待硫磺砂浆软化后加压至150V,硫磺砂浆开始熔化。为加快硫磺砂浆熔化速度,继续稳步增加电压,在该过程中应随时观察硫磺的外观变化防止出现明火燃烧,如发现燃烧应快速减小电压。在该过程中熔化电压控制为150V~200V之间。
本发明中的其他部分采用现有技术,在此不再赘述。
本发明的方法具有操作简单、效率高,安全性高等优点,可广泛应用于对临时锚固硫磺砂浆的拆除。

Claims (4)

1.一种桥梁施工中快速拆除临时锚固硫磺砂浆的方法,其特征是:采用如下步骤:
(1)先在临时锚固用的硫磺砂浆内预埋平行、均匀设置的若干根电阻丝,所述硫磺砂浆的各成分质量配比为:硫磺∶水泥∶砂子∶石蜡=1∶0.5∶1.3∶0.02;
(2)通电熔化硫磺砂浆:将所述电阻丝分段串联为几组,利用变压器对每组电阻丝进行通电以熔化硫磺砂浆,通电熔化过程分阶段进行,第一阶段先通电将硫磺砂浆预热至60℃~80℃,第二阶段是调高电压使硫磺砂浆软化,第三阶段是待硫磺砂浆软化后继续调高电压使硫磺砂浆熔化。
2.根据权利要求1所述的桥梁施工中快速拆除临时锚固硫磺砂浆的方法,其特征是:所述电阻丝的功率为1000W,在通电熔化硫磺砂浆的第一阶段变压器的电压由0V逐步调节至75V,第二阶段先将电压调至90V,待硫磺砂浆出现软化迹象后再逐步增压调至125V,第三阶段的电压控制在150V-200V。
3.根据权利要求1或2所述的桥梁施工中快速拆除临时锚固硫磺砂浆的方法,其特征是:在硫磺砂浆高度范围内预埋有两层电阻丝。
4.根据权利要求1或2所述的桥梁施工中快速拆除临时锚固硫磺砂浆的方法,其特征是:所述电阻丝的端头连接有铜片(6),所述铜片(6)与电阻丝连接的部分埋置在硫磺砂浆体内。
CN 201110148323 2011-06-03 2011-06-03 桥梁施工中快速拆除临时锚固硫磺砂浆的方法 Expired - Fee Related CN102296549B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110148323 CN102296549B (zh) 2011-06-03 2011-06-03 桥梁施工中快速拆除临时锚固硫磺砂浆的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110148323 CN102296549B (zh) 2011-06-03 2011-06-03 桥梁施工中快速拆除临时锚固硫磺砂浆的方法

Publications (2)

Publication Number Publication Date
CN102296549A true CN102296549A (zh) 2011-12-28
CN102296549B CN102296549B (zh) 2013-02-13

Family

ID=45357213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110148323 Expired - Fee Related CN102296549B (zh) 2011-06-03 2011-06-03 桥梁施工中快速拆除临时锚固硫磺砂浆的方法

Country Status (1)

Country Link
CN (1) CN102296549B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106145828A (zh) * 2016-07-13 2016-11-23 宁夏建筑科学研究院有限公司 混凝土芯样补平用硫磺胶泥及其制备方法
CN108166777A (zh) * 2017-12-17 2018-06-15 哈尔滨理工大学 基于电热法破碎技术的绿色拆除方法
CN109081645A (zh) * 2018-09-29 2018-12-25 沈阳建筑大学 一种自碎裂型硫磺锚固砂浆、制备方法及其应用
CN109914254A (zh) * 2019-03-21 2019-06-21 中铁十六局集团第二工程有限公司 一种新型防堵塞、易拆装、可同步卸荷的临时支座砂箱装置
CN110981284A (zh) * 2019-12-12 2020-04-10 广西交建工程检测咨询有限公司 一种环保型砂浆临时支座及其制备方法
CN114164769A (zh) * 2021-12-28 2022-03-11 招商局重庆交通科研设计院有限公司 一种桥梁施工临时支座
CN114263120A (zh) * 2022-01-07 2022-04-01 南京交通职业技术学院 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201087322Y (zh) * 2007-07-26 2008-07-16 中铁二局股份有限公司 一种大吨位箱梁架设临时支座

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201087322Y (zh) * 2007-07-26 2008-07-16 中铁二局股份有限公司 一种大吨位箱梁架设临时支座

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姜云霞;伍必庆;任少英: "先简支后连续装配式板桥施工中硫磺砂浆复合支座的应用研究", 《公路》 *
郑镇兴: "浅谈硫磺砂浆在连续桥梁施工中的应用", 《科技信息》 *
马会良: "硫磺砂浆的配制及在工程施工中的应用", 《交通世界(建养.机械)》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106145828A (zh) * 2016-07-13 2016-11-23 宁夏建筑科学研究院有限公司 混凝土芯样补平用硫磺胶泥及其制备方法
CN108166777A (zh) * 2017-12-17 2018-06-15 哈尔滨理工大学 基于电热法破碎技术的绿色拆除方法
CN109081645A (zh) * 2018-09-29 2018-12-25 沈阳建筑大学 一种自碎裂型硫磺锚固砂浆、制备方法及其应用
CN109914254A (zh) * 2019-03-21 2019-06-21 中铁十六局集团第二工程有限公司 一种新型防堵塞、易拆装、可同步卸荷的临时支座砂箱装置
CN110981284A (zh) * 2019-12-12 2020-04-10 广西交建工程检测咨询有限公司 一种环保型砂浆临时支座及其制备方法
CN110981284B (zh) * 2019-12-12 2021-12-31 广西交建工程检测咨询有限公司 一种环保型砂浆临时支座及其制备方法
CN114164769A (zh) * 2021-12-28 2022-03-11 招商局重庆交通科研设计院有限公司 一种桥梁施工临时支座
CN114164769B (zh) * 2021-12-28 2023-04-14 招商局重庆交通科研设计院有限公司 一种桥梁施工临时支座
CN114263120A (zh) * 2022-01-07 2022-04-01 南京交通职业技术学院 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法
CN114263120B (zh) * 2022-01-07 2024-01-19 南京交通职业技术学院 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法

Also Published As

Publication number Publication date
CN102296549B (zh) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102296549B (zh) 桥梁施工中快速拆除临时锚固硫磺砂浆的方法
CN106702848B (zh) 一种基于微胶囊和感应加热的沥青混凝土修复方法
CN104837231B (zh) 微波加热修复方法及系统
CN205081348U (zh) 一种电力线路中的四芯电缆分线器
CN104514015B (zh) 一种铝电解槽并联预热装置及方法
CN102842771B (zh) 压接分支母排及其分支压接方法
CN103452104A (zh) 一种可方便拆芯的夹片式锚具及其芯材回收方法
CN205666238U (zh) 砷化镓光导开关的引线连接结构
CN202940537U (zh) 一种变压器与配电线路间连接部件的固定装置
CN101552443B (zh) 双极直流输电线路融冰的方法
CN103452108A (zh) 一种可方便拆芯的锥塞式锚具及其芯材回收方法
CN208077929U (zh) 一种具绝缘防护的有机物型热熔断器
CN206820450U (zh) 电缆接头补强装置
CN103452103A (zh) 一种可方便拆芯的握裹式锚具及其芯材回收方法
CN108532404B (zh) 自贴合道路修补用沥青模块的使用方法
CN204156374U (zh) 安装熔断器的工具
CN105781119B (zh) 后张法预应力混凝土施工中拔出预埋钢管的装置及方法
CN110373908A (zh) 一种封闭型喷射式高压熔断器用灭弧材料及其制备方法
CN203174599U (zh) 一种可方便拆芯的握裹式锚具
CN115085130B (zh) 一种配电线路不停电融冰方法
CN205336560U (zh) 一种发热元件结构
CN103061338A (zh) 一种可方便回收芯材的复合钢材及其回收方法
CN211547150U (zh) 一种高刚度的抗裂贴
CN207181953U (zh) 一种复印机加热灯管瓷头固定装置
CN208419585U (zh) 一种加热炉用步进梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20140603