CN102277966B - Girder assembling method for manufacturing of steel structure - Google Patents

Girder assembling method for manufacturing of steel structure Download PDF

Info

Publication number
CN102277966B
CN102277966B CN 201110122519 CN201110122519A CN102277966B CN 102277966 B CN102277966 B CN 102277966B CN 201110122519 CN201110122519 CN 201110122519 CN 201110122519 A CN201110122519 A CN 201110122519A CN 102277966 B CN102277966 B CN 102277966B
Authority
CN
China
Prior art keywords
plate
beam section
sample
junction plate
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110122519
Other languages
Chinese (zh)
Other versions
CN102277966A (en
Inventor
李新芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUMADIAN SANCHAO INDUSTRIAL CO LTD
Original Assignee
ZHUMADIAN SANCHAO INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUMADIAN SANCHAO INDUSTRIAL CO LTD filed Critical ZHUMADIAN SANCHAO INDUSTRIAL CO LTD
Priority to CN 201110122519 priority Critical patent/CN102277966B/en
Publication of CN102277966A publication Critical patent/CN102277966A/en
Application granted granted Critical
Publication of CN102277966B publication Critical patent/CN102277966B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a girder assembling method for the manufacturing of a steel structure. The method comprises the following steps of: manufacturing a steel plate platform, and determining a girder section sample placement pattern; proportionally arranging a bulk sample on a girder section; spot-welding a positioning plate and an auxiliary connecting plate at corresponding positions on the steel plate platform respectively; fastening and connecting the auxiliary connecting plate and a connecting plate to be welded by using a connecting bolt; hoisting a sample girder section to make the sample girder section corresponds to the bulk sample and arranged in the positioning plate; after the sample girder section is arranged, simply welding the connecting plate and the corresponding part of the sample girder section; marking a purlin support plate to be post welded and a knee bracing plate to be post welded on the sample girder section according to the girder section sample placement pattern and the bulk sample; loosening the connecting bolt, hoisting the assembled sample girder section away and performing post welding; and repeating the operations on the next standard girder section the same as the sample girder section. The assembling method has the advantages of simple process, small occupied area, low cost, reduction in wasting and favorability for improving working efficiency.

Description

The assemble method of crossbeam in the structure steel fabrication
Technical field
The present invention relates to a kind of structure steel fabrication method, specifically, related to the assemble method of crossbeam in a kind of structure steel fabrication.
Background technology
In the structure steel fabrication, a Pin crossbeam is formed by connecting by some sections beam sections usually, and the beam section that many Pin crossbeam is corresponding all is the same, that is, its package assembly is all the same; Existing crossbeam package technique adopts traditional amplification sample form mostly, amplify not only waste of manpower of sample, material resources, and the amplification sample can not reuse with the material of crossing, and the utmost point accounts for the place, assembling crossbeam is out all numbered, can not be general, need to seek the Components Composition of same numbering during installation, time-consuming.
In order to solve the problem of above existence, people are seeking a kind of desirable technical solution always.
Summary of the invention
The objective of the invention is for the deficiencies in the prior art, thereby provide that a kind of technique is simple, occupied ground is little, cost is low, can cut the waste, be beneficial to the assemble method of crossbeam in the structure steel fabrication of increasing work efficiency.
In order to realize the foregoing invention purpose, the technical solution adopted in the present invention is: the assemble method of crossbeam in a kind of structure steel fabrication, and it may further comprise the steps:
Step 1, preparation: make plate platform, determine beam section setting-out pattern;
Step 2, beam section are amplified sample: according to beam section setting-out pattern, amplify sample in plate platform, making the ratio of the real size of full-page proof size and sample beam section is 1:1, and indicates the position that needs welding purlin supporting plate, angle brace plate in plate platform;
Step 3, spot welding location-plate and auxiliary junction plate: at plate platform difference spot welding location-plate and auxiliary junction plate, the frange plate edge arranged outside on the corresponding full-page proof of described location-plate; Junction plate edge arranged outside on the corresponding full-page proof of described auxiliary junction plate makes the position of described auxiliary junction plate and needs the eyelet of the junction plate of welding to align, and makes described auxiliary junction plate perpendicular to plate platform;
Step 4, connection junction plate: described auxiliary junction plate and the junction plate that needs welding are fastenedly connected with connecting bolt;
Step 5, check and adjustment: check the size of beam section setting-out pattern, sample beam section is carried out dimension control, then, adjust full-page proof;
Step 6, lay the beam section: hang sample beam section, make it corresponding full-page proof and be placed in the location-plate;
Step 7, simple welding: after laying sample beam section, simply weld at the position that described junction plate is corresponding with described sample beam section;
Step 8, annex indicate: contrast beam section setting-out pattern and full-page proof, and the purlin supporting plate, the angle brace plate that needs are gone on foot afterwards welding show at the enterprising rower of sample beam section;
Step 9, rear step welding: unclamp and remove described connecting bolt, the sample beam section after the assembling is hung away and carry out the rear step and weld;
Step 10, the assembling of Standard Beam section: the Standard Beam section identical with described sample beam section to next root, repeating step 4, step 6, step 7, step 8, step 9 get final product.
Based on above-mentioned, it is further comprising the steps of: step 11, engineering ending: for last root Standard Beam section, must be with described auxiliary junction plate and described plate platform sealing-off, and described auxiliary junction plate inwardly moved to junction plate position on the full-page proof, then, simply weld at the position that described auxiliary junction plate is corresponding with described sample beam section, and repeating step 8 and step 9 get final product again.
Based on above-mentioned, it is further comprising the steps of: step 12, engineering finish: the plate platform pad is polished, wipe full-page proof, use in order to next packing engineering.
The relative prior art of the present invention has outstanding substantive distinguishing features and marked improvement, specifically, this assemble method is the comprehensive utilization of ground sample method and loose tool method, it has overcome, and junction plate is difficult for fixing in the ground sample method, need to adopt thin plate to make full-page proof, the drawback of displacement inconvenience, need not make loose tool again, only need to utilize CAD to carry out the computer setting-out, and the contrast full-size drawing carries out line of ink marker setting-out, simple and easy to do, convenient and swift, in operation as long as full-page proof is carefully checked, control the position of auxiliary junction plate well, but just continued operation of angle, avoid human factor to cause the assembling error, it is created in practice, practicable steel work crossbeam assemble method, it is simple that it has technique, occupied ground is little, cost is low, can cut the waste, be beneficial to the advantage of increasing work efficiency.
The specific embodiment
Below by the specific embodiment, technical scheme of the present invention is described in further detail.
The assemble method of crossbeam in a kind of structure steel fabrication, it may further comprise the steps:
Step 1, preparation: produce the plate platform that planeness is better, can bear 1-2 tons of weight, the arrangement mold calculates seam deformation amount and amount of contraction, determines beam section setting-out pattern;
Step 2, beam section are amplified sample: it is theoretical to use descriptive geometry, according to beam section setting-out pattern, amplify sample with the line of ink marker in plate platform, making the ratio of the real size of full-page proof size and sample beam section is 1:1, and indicates the position that needs welding purlin supporting plate, angle brace plate in plate platform;
Step 3, spot welding location-plate and auxiliary junction plate: at plate platform difference spot welding location-plate and auxiliary junction plate, the frange plate edge arranged outside on the corresponding full-page proof of described location-plate; Junction plate edge arranged outside on the corresponding full-page proof of described auxiliary junction plate makes the position of described auxiliary junction plate and needs the eyelet of the junction plate of welding to align, and makes described auxiliary junction plate perpendicular to plate platform, in use will guarantee not occur deflection;
Step 4, connection junction plate: described auxiliary junction plate is connected with connecting bolt with the junction plate that needs welding, the two is tightened, prevent from use being offset;
Step 5, check and adjustment: check the size of beam section setting-out pattern, sample beam section is carried out dimension control, then, adjust full-page proof;
Step 6, lay the beam section: hang sample beam section, make it corresponding full-page proof and be placed in the location-plate, to the end trimming that sample beam section need to be repaired, the bed hedgehopping levelling is carried out at the middle part that aligns junction plate, and parallels is fixed;
Step 7, simple welding: after laying sample beam section, simply weld at the position that described junction plate is corresponding with described sample beam section, and the welding degree is to shift and the phenomenon such as distortion that do not come off when welding of rear step is as the criterion;
Step 8, annex indicate: contrast beam section setting-out pattern and full-page proof, and the purlin supporting plate, the angle brace plate that needs are gone on foot afterwards welding show at the enterprising rower of sample beam section;
Step 9, rear step welding: unclamp and remove described connecting bolt, the sample beam section after the assembling is hung welding bay and carry out the rear step and weld;
Step 10, the assembling of Standard Beam section: the Standard Beam section identical with described sample beam section to next root, repeating step 4, step 6, step 7, step 8, step 9;
Step 11, engineering ending: for last root Standard Beam section, must be with described auxiliary junction plate and described plate platform sealing-off, and described auxiliary junction plate inwardly moved to junction plate position on the full-page proof, then, simply weld at the position that described auxiliary junction plate is corresponding with described sample beam section, again repeating step 8 and step 9;
Step 12, engineering finish: the plate platform pad is polished, wipe full-page proof, use in order to next packing engineering.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit; Although with reference to preferred embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or the part technical characterictic is equal to replacement the specific embodiment of the present invention; And not breaking away from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technical scheme scope that the present invention asks for protection.

Claims (3)

1. the assemble method of crossbeam in the structure steel fabrication is characterized in that it may further comprise the steps:
Step 1, preparation: make plate platform, determine beam section setting-out pattern;
Step 2, beam section are amplified sample: according to beam section setting-out pattern, amplify sample in plate platform, making the ratio of the real size of full-page proof size and sample beam section is 1:1, and indicates the position that needs welding purlin supporting plate, angle brace plate in plate platform;
Step 3, spot welding location-plate and auxiliary junction plate: at plate platform difference spot welding location-plate and auxiliary junction plate, the frange plate edge arranged outside on the corresponding full-page proof of described location-plate; Junction plate edge arranged outside on the corresponding full-page proof of described auxiliary junction plate makes the position of described auxiliary junction plate and needs the eyelet of the junction plate of welding to align, and makes described auxiliary junction plate perpendicular to plate platform;
Step 4, connection junction plate: described auxiliary junction plate and the junction plate that needs welding are fastenedly connected with connecting bolt;
Step 5, check and adjustment: check the size of beam section setting-out pattern, sample beam section is carried out dimension control, then, adjust full-page proof;
Step 6, lay the beam section: hang sample beam section, make it corresponding full-page proof and be placed in the location-plate;
Step 7, simple welding: after laying sample beam section, simply weld at the position that described junction plate is corresponding with described sample beam section;
Step 8, annex indicate: contrast beam section setting-out pattern and full-page proof, and the purlin supporting plate, the angle brace plate that needs are gone on foot afterwards welding show at the enterprising rower of sample beam section;
Step 9, rear step welding: unclamp and remove described connecting bolt, the sample beam section after the assembling is hung away and carry out the rear step and weld;
Step 10, the assembling of Standard Beam section: the Standard Beam section identical with described sample beam section to next root, repeating step 4, step 6, step 7, step 8, step 9 get final product.
2. the assemble method of crossbeam in the structure steel fabrication according to claim 1, it is characterized in that: it is further comprising the steps of:
Step 11, engineering ending: for last root Standard Beam section, must be with described auxiliary junction plate and described plate platform sealing-off, and described auxiliary junction plate inwardly moved to junction plate position on the full-page proof, then, simply weld at the position that described auxiliary junction plate is corresponding with described sample beam section, repeating step 8 and step 9 get final product again.
3. the assemble method of crossbeam in the structure steel fabrication according to claim 2, it is characterized in that: it is further comprising the steps of:
Step 12, engineering finish: the plate platform pad is polished, wipe full-page proof, use in order to next packing engineering.
CN 201110122519 2011-05-12 2011-05-12 Girder assembling method for manufacturing of steel structure Expired - Fee Related CN102277966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110122519 CN102277966B (en) 2011-05-12 2011-05-12 Girder assembling method for manufacturing of steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110122519 CN102277966B (en) 2011-05-12 2011-05-12 Girder assembling method for manufacturing of steel structure

Publications (2)

Publication Number Publication Date
CN102277966A CN102277966A (en) 2011-12-14
CN102277966B true CN102277966B (en) 2013-01-23

Family

ID=45103663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110122519 Expired - Fee Related CN102277966B (en) 2011-05-12 2011-05-12 Girder assembling method for manufacturing of steel structure

Country Status (1)

Country Link
CN (1) CN102277966B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293591A (en) * 2002-04-02 2003-10-15 Shimizu Corp Method for constructing steel beam structure
CN101328746A (en) * 2007-06-18 2008-12-24 浙江展诚建设集团股份有限公司 Steel structure high altitude mounting method
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0384289A (en) * 1989-08-28 1991-04-09 Idemitsu Kosan Co Ltd Resin pipe
JPH09184289A (en) * 1996-01-08 1997-07-15 Kawasaki Steel Corp Method for constructing steel structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293591A (en) * 2002-04-02 2003-10-15 Shimizu Corp Method for constructing steel beam structure
CN101328746A (en) * 2007-06-18 2008-12-24 浙江展诚建设集团股份有限公司 Steel structure high altitude mounting method
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
胎具在钢结构制作中的应用;陈小华;《莱钢科技》;20061031(第5期);参见全文 *
陈小华.胎具在钢结构制作中的应用.《莱钢科技》.2006,(第5期),

Also Published As

Publication number Publication date
CN102277966A (en) 2011-12-14

Similar Documents

Publication Publication Date Title
CN201843351U (en) Multifunctional positioning tool
CN106120561B (en) A kind of cast-in-situ box girder template construct installation method
CN103722297B (en) Steel box-girder open web type transverse wall group is welded standby and manufacture craft
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN103470018B (en) Detachable converter tooling platform
CN208293405U (en) A kind of abutment of linking deck type suspension bridge and the sidewalk that bankets
CN110900081A (en) Large box beam welding platform and welding method
CN102922096A (en) On-site assembly welding method for large aluminum tower
CN201704801U (en) Steel pipe truss and H-shaped steel column connecting member
CN102277966B (en) Girder assembling method for manufacturing of steel structure
CN105540429A (en) Crane main beam and machining method thereof
CN204386608U (en) A kind of tunnel invert construction tool
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN103243910B (en) Hydraulic pressure controlled reinforced concrete structure bed die vertical supporting system and construction method thereof
CN205205680U (en) Cast -in -place arched bridge member formula support steel arc distribution beam construction
CN105715055B (en) A kind of nuclear power station large size penetration piece adjustable tool and adjusting method
CN202220439U (en) Combined steel template of integral stair plate
CN205129244U (en) Truss welding template
CN203531347U (en) Detachable converter tooling platform
CN204921576U (en) Steel structure platform fixes subassembly
CN202693110U (en) Novel combined reinforced concrete weighing platform
CN206982971U (en) A kind of beam making bench
CN202239065U (en) Gantry vertical hydraulic roller type correction device
CN202388183U (en) Lifting equipment for H-shaped steel numerical control cutting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

Termination date: 20140512