CN102277965B - Method for building underground garage through non-surface excavation on open space - Google Patents
Method for building underground garage through non-surface excavation on open space Download PDFInfo
- Publication number
- CN102277965B CN102277965B CN 201110119223 CN201110119223A CN102277965B CN 102277965 B CN102277965 B CN 102277965B CN 201110119223 CN201110119223 CN 201110119223 CN 201110119223 A CN201110119223 A CN 201110119223A CN 102277965 B CN102277965 B CN 102277965B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- horizontal
- vertical steel
- vertical
- steel tubes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 131
- 239000010959 steel Substances 0.000 claims abstract description 131
- 238000003466 welding Methods 0.000 claims abstract description 16
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 13
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 11
- 239000002689 soil Substances 0.000 claims abstract description 10
- 239000004567 concrete Substances 0.000 claims abstract description 7
- 238000011065 in-situ storage Methods 0.000 claims description 9
- 239000011440 grout Substances 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims description 3
- 239000000428 dust Substances 0.000 abstract description 4
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 238000005266 casting Methods 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 7
- 208000017667 Chronic Disease Diseases 0.000 description 1
- UCKMPCXJQFINFW-UHFFFAOYSA-N Sulphide Chemical compound [S-2] UCKMPCXJQFINFW-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000013521 mastic Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110119223 CN102277965B (en) | 2011-05-06 | 2011-05-06 | Method for building underground garage through non-surface excavation on open space |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110119223 CN102277965B (en) | 2011-05-06 | 2011-05-06 | Method for building underground garage through non-surface excavation on open space |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102277965A CN102277965A (en) | 2011-12-14 |
| CN102277965B true CN102277965B (en) | 2013-05-01 |
Family
ID=45103662
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201110119223 Active CN102277965B (en) | 2011-05-06 | 2011-05-06 | Method for building underground garage through non-surface excavation on open space |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102277965B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105986578A (en) * | 2015-02-13 | 2016-10-05 | 杭州南联地基基础工程有限公司 | Ejecting pipe construction method of roadside tubular underground garage |
| CN109989425A (en) * | 2017-12-31 | 2019-07-09 | 郑州吉田专利运营有限公司 | Method for constructing underground automatic garage structure |
| CN110130951B (en) * | 2019-05-27 | 2020-08-28 | 中铁工程装备集团有限公司 | Mechanized construction method for large underground parking lot structure |
| CN116556424B (en) * | 2023-07-04 | 2023-09-01 | 上海建工集团股份有限公司 | Underground space expansion construction method and system |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3390081B2 (en) * | 1994-03-07 | 2003-03-24 | 株式会社フジタ | How to build an underground parking |
| CN1088785C (en) * | 1998-08-25 | 2002-08-07 | 熊爱民 | Lawn parking lot |
| JP2000291030A (en) * | 1999-04-13 | 2000-10-17 | Kajima Corp | Construction method of underground structure |
| GR1004271B (en) * | 2002-06-25 | 2003-06-23 | Ιωαννης Σπυριδωνος Ντουσκος | Underground parking station constructed under streets and pavements. |
| CN101285385B (en) * | 2008-05-29 | 2010-06-02 | 中交第二公路勘察设计研究院有限公司 | Three-dimensional pipe screen underground excavation method |
-
2011
- 2011-05-06 CN CN 201110119223 patent/CN102277965B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN102277965A (en) | 2011-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106499413B (en) | A kind of Shallow-buried section tunnel stratum consolidation construction method | |
| CN106522242B (en) | For soft stratum close to underground structure foundation pit supporting system construction method | |
| CN100580190C (en) | Building foundation pit support structure | |
| CN101435198A (en) | Deep pit support reinforcing anti-seepage water stop composite structure | |
| CN104131565B (en) | A kind of against making the construction method that the earthwork is just made to excavate | |
| CN211057527U (en) | Roadbed structure of soft foundation pavement | |
| CN206512723U (en) | A kind of multiple-layer horizontal coupling beam double-row pile and underground pipe gallery monolithic construction | |
| CN203729308U (en) | Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall | |
| CN103775110A (en) | Underground excavation construction method for multilayer underground space of soft soil area | |
| CN211340808U (en) | Pile foundation pit supporting construction behind preceding wall | |
| CN115324591B (en) | A comprehensive construction method of partial dewatering and support for saturated soft loess tunnels | |
| CN114622574B (en) | Water-rich throwing filling deep foundation pit water interception excavation supporting method and supporting device | |
| CN111456081A (en) | Pile foundation retaining wall structure and construction method | |
| CN206034454U (en) | Supporting construction | |
| CN102277965B (en) | Method for building underground garage through non-surface excavation on open space | |
| CN115977102A (en) | Combined construction structure and construction method of upper foundation pit and lower tunnel in saturated soft loess strata | |
| CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
| CN207582471U (en) | A kind of Retaining Structure with Double-row Piles equipped with deep layer prestress anchorage cable | |
| CN206941597U (en) | A kind of HSCW engineering methods pile pit supporting construction | |
| CN207003421U (en) | A kind of steel plate pilework for being seated hard rock top surface | |
| CN204753262U (en) | A fender structure on high embankment of existing railway | |
| CN111485560A (en) | Supporting structure of deep foundation pit under ultra-wide pipeline and construction method of deep foundation pit under ultra-wide pipeline | |
| CN207331746U (en) | A kind of underground pipe gallery | |
| CN215406092U (en) | Combination steel constructs foundation ditch retaining structure | |
| CN111622234B (en) | Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: GEOTECHNICAL TECHNOLOGY CO., LTD. Free format text: FORMER NAME: HANGZHOU GEOTECHNICAL ENGINEERING CO., LTD. |
|
| CP03 | Change of name, title or address |
Address after: 310024, Hangzhou, Zhejiang province Xihu District transferred to the streets of Liuzhou Wu Long Industrial Park Patentee after: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Address before: Hangzhou City, Zhejiang province 310014 City East Verde writer Pavilion 2C Patentee before: HANGZHOU GEOTECHNICAL ENGINEERING Co.,Ltd. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method of constructing underground garage by non surface excavation in open space Effective date of registration: 20220704 Granted publication date: 20130501 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20130501 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method for excavating and building an underground garage on a non surface open space Granted publication date: 20130501 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2024980026444 |