CN102275698B - Bunker wall vibration air hammer - Google Patents

Bunker wall vibration air hammer Download PDF

Info

Publication number
CN102275698B
CN102275698B CN 201110191539 CN201110191539A CN102275698B CN 102275698 B CN102275698 B CN 102275698B CN 201110191539 CN201110191539 CN 201110191539 CN 201110191539 A CN201110191539 A CN 201110191539A CN 102275698 B CN102275698 B CN 102275698B
Authority
CN
China
Prior art keywords
air
vibration
cylinder
hammer
exhaust valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110191539
Other languages
Chinese (zh)
Other versions
CN102275698A (en
Inventor
赵东楼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kangdi Electric Power Science and Technology Co., Ltd.
Original Assignee
Huaibei Kangdi Electric Power Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Kangdi Electric Power Science & Technology Co Ltd filed Critical Huaibei Kangdi Electric Power Science & Technology Co Ltd
Priority to CN 201110191539 priority Critical patent/CN102275698B/en
Publication of CN102275698A publication Critical patent/CN102275698A/en
Application granted granted Critical
Publication of CN102275698B publication Critical patent/CN102275698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The invention discloses a bunker wall vibration air hammer, which solves the problem of lower hopper-plugging dredging efficiency at present and is characterized by comprising an electromagnetic reversing valve, an air cylinder, a hammer head, a quick exhaust valve and the like, wherein the electromagnetic reversing valve is connected with an air outlet pipeline of an air storage tank through an air inlet pipeline, connected to one end of the air cylinder through a front air pipe and connected to the other end of the air cylinder through a rear air pipe and the quick exhaust valve; an adjustment valve is arranged between the rear air pipe and the quick exhaust valve; the air cylinder is fixed on a base; and a piston rod of the air cylinder is connected with the hammer head. The bunker wall vibration air hammer has a simple structure and low manufacturing cost; the whole device is arranged outside the wall of a hopper, so openings are not required to be formed on the hopper, the dredging capability is higher and the bunker wall vibration air hammer is quick and convenient to install and maintain; due to an electric control system, regular and continuous vibration can be realized and the vibration frequency can be set randomly; furthermore, the vibration strength is higher, can be adjusted and much higher than manual strength; the vibration is uniform and an effect is outstanding, so the working efficiency can be improved by multiple times; and the bunker wall vibration air hammer is particularly applicable to dredging of raw coal bunkers of thermal power plants.

Description

Bulkhead rapping pneumatic hammer
Affiliated technical field
The invention belongs to the dredger in a kind of solid particle material course of conveying, belong to a kind of hopper of clearing up or rather and stop up and to make the unobstructed device of mass transport.
Background technology
In the solid material process of conveying powdered, granular, block or its mixture, big, the more high reason of viscosity of high humidity, ash owing to material, material is sticked on the bulkhead, perhaps be blocked in the containers such as bunker or awl bucket, perhaps knot encircles in hopper, cause cutout, influence normally continuing of producing and carry out, particularly carry in the raw coal process at thermal powerplant often to run into.Make the coal breakage bucket glue coal, paulin coal, knot arch, chute blockage because ash, moisture, the pressure of top coal are easy to make raw coal to be squeezed into piece, produce potential safety hazard, influence unit generation.
At present, relatively Chang Yong method is manually to beat headwall with sudden force with sledgehammer, and this relatively produces effect to paulin coal in short-term; to the paulin coal time long then can not satisfy field requirement; there is personal safety hidden danger in scaffolding, or shuts down and to enter coal bunker inside and thoroughly clear up.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, a kind of simple in structure, mediation efficient bulkhead rapping pneumatic hammer higher, easy to install is provided.
Described technical scheme is such: comprise solenoid directional control valve, cylinder, tup, quick exhaust valve etc., solenoid directional control valve connects the outlet pipe of storage tank by admission line, by preceding tracheae be connected to cylinder an end, be connected to the other end of cylinder by back tracheae and quick exhaust valve, be provided with between back tracheae and the quick exhaust valve and regulate the valves; Cylinder is fixed on the base, and the piston rod in the cylinder connects tup.
Also be provided with silencer cover on the described base, comprise inside and outside two-layerly, establish some holes on the internal layer, place quieter material between two-layer.
Described solenoid directional control valve is fixed on the base by adapter plate.
The application of the present invention in the hopper mediation, symmetry is installed 2 or 4 or 6 or 8 pneumatic hammers on hopper, and pneumatic hammer connects storage tank.
Described storage tank is installed in hopper side wall with suspension bracket.
Described built in gas tank is put the steel wire tennis, and the lower end connects automatic bailer.
The present invention utilizes pressure gas to promote the interior piston rod movement of cylinder, drives the tup high-speed motion, and the inertial impaction hopper steel wall that tup produces produces the vibration ripple and makes the material in the hopper be subjected to displacement, fall.
The present invention has following beneficial effect: 1, simple in structure, and low cost of manufacture.Easy for installation: whole device is installed in outside the bucket wall, and any facility is not set in hopper, can guarantee fully that material does not have any resistance to flow, and the mediation ability is stronger.Overhaul quick and easy: do not need to punch at hopper, have fault to overhaul at any time, also do not need blowing out or burn empty coal bunker for coal bunker.
2, the work-hours that can set solenoid directional control valve by electric control system impacts frequency in any setting to realize regularly vibration.Both can work automatically, but manual work again; But both continuous workings, but intermittent use again; Both can control on the spot, remote controlled again.
3, the artificial sledgehammer work of simulation, vibration strength are big and can regulate, and considerably beyond artificial strength, a tup can be equivalent to 8-10 workman's working strength, saves manpower greatly, and vibration strength is bigger, and effect is obvious, and work efficiency obtains the several times raising.Every hopper can arrange 1 to 8 pneumatic hammer, symmetry, staggered installation up and down, and several tups clash into the diverse location of same hopper simultaneously, are equivalent to 8 to 32 workmans and work simultaneously.
4, the present invention is specially adapted to the mediation of the former coal bunker of thermal power plant, can solve operating paulin coal, knot arch, chute blockage phenomenon effectively, also can be used for mediation, the block clearing of equipment such as grey slag bucket, grey pipeline, feed pipeline.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is application scheme drawing of the present invention.
Among the figure, 1. base, 2. permanent seat, 3. before tracheae, 4. back tracheae, 5. regulate the valves, 6. deflation hole, 7. quick exhaust valve, 8. silencer cover, 9. hole, 10. quieter material, 11. tups, 12. piston rods, 13. adapter plates, 14. solenoid directional control valve, 15. admission lines, 16. cylinders, 17. hoppers, 18. pneumatic hammer, 19. supports, 20. impact guar plate, 21. suspension brackets, 22. storage tank, 23. outlet pipes, 24. steel wire tennises, 25. automatic bailers.
The specific embodiment
As shown in Figure 1, the present invention includes solenoid directional control valve 14, cylinder 16, tup 11, quick exhaust valve 7 etc.
Cylinder 16 is fixed on the base 1 by permanent seat 2, in have piston rod 12 to connect tups 11.Solenoid directional control valve 14 connects the outlet pipe 23 of storage tanks 22 by admission line 15, is connected respectively to the two ends of cylinder 16 by preceding tracheae 3, back tracheae 4 and quick exhaust valve 7, is provided with between back tracheae 4 and the quick exhaust valve 7 and regulates the valves 5.Regulate the valves and 5 can regulate suction quantity, and then the vibration momentum when regulating tup 11 and returning.Namely regulate the valves and 5 open and open I control greatly from the tolerance that back tracheae 4 enters cylinder 16, tup 11 is returned with proper speed, avoid returning too fast, impulsive force breaks cylinder 16 too greatly and influences service life of cylinder 16.
Quick exhaust valve 7 is unidirectional non-return valve, can reduce air resistance when tup 11 advances, and improves ram velocity, produces bigger impulsive force.Described solenoid directional control valve 14 is fixed on the base 1 by adapter plate 13.Solenoid directional control valve 14 connects electric control system, by work-hours, the automatic switchover of electric control system control, setting solenoid directional control valve.Described electric control system is the common system that meets industry standard, generally is made up of intelligent time relay, intermediate relay, shift knob, indicating device etc.
For the steel wall of avoiding tup 11 vibration hoppers 17 produces bigger noise, on base 1, also be provided with silencer cover 8, comprise inside and outside two-layerly, establish some holes 9 on the internal layer, place quieter material 10 between two-layer.
Figure 2 shows that the application of the present invention in the hopper mediation.Utilize support 19 symmetries that only (getting even number) pneumatic hammer 18 of 2-8 is installed at hopper 17.The source of the gas of pneumatic hammer is from connecting storage tank 22.
In the described storage tank 22 steel wire tennis 24 is set, plays the profit filtration.If contain moisture, oil in the pressurized air, when it passes through steel wire tennis 24, can be attached on the steel wire tennis, moisture, oil form water droplet, oil droplet, and the automatic bailer 25 that connects from storage tank 2 lower ends is discharged water, oil in the storage tank automatically.
Pressure gas in the storage tank 22 is from the source of the gas of power plant, or the Air compressor air feed is set.For guaranteeing more stable gas and air pressure, the preferred Air compressor of the present invention.Storage tank 22 also can connect air filter, oil sprayer, makes pressure gas obtain cleaning, filter, and is conducive to protect cylinder 16, increases the service life.
Like this, the gas of storage tank 22 through air inlet pipe 15, solenoid directional control valve 14, preceding tracheae 3 or after tracheae 4 arrive cylinders 16.The switching direction of electric control system control solenoid directional control valve 14 makes gas or the past tracheae 3 or enters cylinder 16 from back tracheae 4.When gas when in the past tracheae 3 enters cylinder 16, promote piston rod 12 and travel forward, drive tup 11 vibration bucket walls, and from deflation hole 6 exhausts of quick exhaust valve 7; When pressure gas from back tracheae 4 through regulating the valves 5, when quick exhaust valve 7 enters cylinder 16, piston rod 12 being moved backward, return tup 11, and the exhausr port exhaust that itself has from solenoid directional control valve 14.Finish a vibration thus, and tup 11 is got back to starting point.
When reality is used, consider the reliability of coal bunker wall, also can impact guar plate 20 to gain in strength in the position welding of tup 11 bump hoppers 17.

Claims (4)

1. bulkhead rapping pneumatic hammer, comprise solenoid directional control valve (14), cylinder (16), tup (11), quick exhaust valve (7), solenoid directional control valve (14) connects the outlet pipe (23) of storage tank (22) by admission line (15), be connected to an end of cylinder (16) by preceding tracheae (3), be connected to the other end of cylinder (16) by back tracheae (4) and quick exhaust valve (7), cylinder (16) is fixed on the base (1), piston rod (12) in the cylinder (16) connects tup (11), it is characterized in that being provided with regulate the valves (5) between back tracheae (4) and the quick exhaust valve (7).
2. bulkhead rapping pneumatic hammer as claimed in claim 1 is characterized in that also being provided with silencer cover (8) on the described base (1), comprises inside and outside two-layerly, establishes some holes (9) on the internal layer, places quieter material (10) between two-layer.
3. the application of bulkhead rapping pneumatic hammer as claimed in claim 1 on former coal bunker is characterized in that going up symmetry at hopper (17) installs 2 or 4 or 6 or 8 pneumatic hammers (18), and pneumatic hammer (18) connects storage tank (22).
4. application as claimed in claim 3 is characterized in that arranging in the described storage tank (22) steel wire tennis (24), and the lower end connects automatic bailer (25).
CN 201110191539 2011-07-05 2011-07-05 Bunker wall vibration air hammer Active CN102275698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110191539 CN102275698B (en) 2011-07-05 2011-07-05 Bunker wall vibration air hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110191539 CN102275698B (en) 2011-07-05 2011-07-05 Bunker wall vibration air hammer

Publications (2)

Publication Number Publication Date
CN102275698A CN102275698A (en) 2011-12-14
CN102275698B true CN102275698B (en) 2013-09-11

Family

ID=45101527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110191539 Active CN102275698B (en) 2011-07-05 2011-07-05 Bunker wall vibration air hammer

Country Status (1)

Country Link
CN (1) CN102275698B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102514843A (en) * 2011-12-28 2012-06-27 安徽康迪纳电力科技有限责任公司 Split-type silo wall vibrating air hammer
CN102530439B (en) * 2012-02-18 2013-12-18 中钢集团马鞍山矿山研究院有限公司 Blockage bridging removal machine for ore bin
CN103086096B (en) * 2013-02-18 2014-12-03 赵东楼 Hopper bin wall vibrating air hammer
CN106219122B (en) * 2016-08-31 2018-11-20 天津电力机车有限公司 A kind of railway train wheel storing unit
CN108211763B (en) * 2018-03-12 2021-02-26 光大环保技术装备(常州)有限公司 Control system of semidry method reaction tower
CN115724077A (en) * 2022-11-25 2023-03-03 湖南兴怀新材料科技有限公司 Dredging device for ash bucket and ash conveying pipe

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2748422Y (en) * 2004-12-09 2005-12-28 赵东楼 Jar type hopper dredging machine
CN202175344U (en) * 2011-07-05 2012-03-28 淮北康迪电力科技有限责任公司 Air hammer for shaking and striking wall of bin

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2748422Y (en) * 2004-12-09 2005-12-28 赵东楼 Jar type hopper dredging machine
CN202175344U (en) * 2011-07-05 2012-03-28 淮北康迪电力科技有限责任公司 Air hammer for shaking and striking wall of bin

Also Published As

Publication number Publication date
CN102275698A (en) 2011-12-14

Similar Documents

Publication Publication Date Title
CN102275698B (en) Bunker wall vibration air hammer
CN102785866A (en) Dredging system and dredging method during boiler coal bin shed coal
CN203268734U (en) Conveying device used for material discharging of stock bin
CN103086096B (en) Hopper bin wall vibrating air hammer
CN102491016A (en) Integrated automatic dredging hopper
CN109516006A (en) One plant feed bin blockage-clearing device and its application method
CN202175344U (en) Air hammer for shaking and striking wall of bin
CN100528709C (en) Internally poking and externally vibrating dredging device
CN109797947A (en) Building waste vertical transit system for super high-rise building
CN203127525U (en) Hopper wall vibrating strike pneumatic hammer
CN102580955B (en) Multipoint loosening and dredging device utilizing compressed air
CN206606767U (en) A kind of air-transport system of boiler slag
CN206634535U (en) A kind of BABBbBBvvlockage clearing device for coal bunker for coal mining
CN202460339U (en) Ash clearing device of bag type dust collector
CN203229205U (en) Turbulence delivery double-sleeve combination
CN202379308U (en) Separated-type silo wall vibrating air hammer
CN2748422Y (en) Jar type hopper dredging machine
CN202884341U (en) Combined wear-resistant discharge elbow
CN102398784A (en) In-plant zero-distance tooth rope type pulverized fuel ash conveying system
CN202848424U (en) Online coal bunker dredging device
CN215888546U (en) Railway tunnel sludge cleaning vehicle
CN202343327U (en) Electrostatic precipitator dust fall system
CN202828583U (en) Improved bulkhead vibration air hammer
CN201593306U (en) Mining concrete sprayer with mechanical conveying pump
CN113417358A (en) Railway tunnel sludge cleaning vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ANHUI KANGDINA ELECTRIC POWER TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: CONDI HUAIBEI POWER TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: 235000 Anhui Province, Huaibei City Duji District Canal Road No. 69

Patentee after: Anhui Kangdi Electric Power Science and Technology Co., Ltd.

Address before: 235000 Anhui Province, Huaibei City Duji District Canal Road No. 69 Chinese Mining Equipment Expo City steel market

Patentee before: Huaibei Kangdi Electric Power Science & Technology Co., Ltd.